A load bank for testing power sources includes a load resistor assembly having a plurality of resistors which can be switched between wye and delta configurations for testing a variety of voltages and power sources requiring various load applications. First and second power connections are connected with primary and redundant power sources and a relay alternately connects the first and second power connections with the load resistor assembly for alternately testing the primary and redundant power sources while maintaining the sources electrically isolated. A damper is arranged adjacent the load resistor assembly and is operable between an open position which permits cold air to be delivered to the load resistor assembly to cool the assembly when the load bank is operating and a closed position which prevents hot air from being recirculated when the load bank is not operating.
|
1. A load bank and cooling assembly, comprising
(a) a housing including a cold air inlet on one side and a hot air outlet on a side opposite said cold air inlet;
(b) a load resistor assembly arranged in said housing;
(c) a blower arranged within said housing adjacent said cold air inlet for circulating cold air through said load resistor assembly to cool said load resistor assembly via heat exchange resulting in hot air which exits said housing via said hot air outlet; and
(d) a damper arranged in said housing between said blower and said load resistor assembly and operable between an open position when the load bank is in an operating condition wherein cold air from said blower is delivered to said load resistor assembly and a closed position when the load bank is in a non-operating condition wherein hot air is prevented from being recirculated.
6. A load bank for testing power sources, comprising
(a) a load resistor assembly comprising a plurality of resistors which may be switched between delta and wye configurations for testing a variety of voltages and power sources requiring various load applications;
(b) first and second power connections connected with primary and redundant power sources;
(c) a relay for alternately connecting said first and second power connections with said load resistor assembly for alternately testing said primary and redundant power sources while maintaining said primary and redundant power sources electrically isolated; and
(d) a damper arranged adjacent said load resistor assembly and operable between an open position which permits cold air to be delivered to said load resistor assembly to cool said assembly when said load bank is operating and a closed position which prevents hot air from being recirculated when said load bank is not operating.
2. The load bank and cooling assembly as defined in
3. The load bank and cooling assembly as defined in
4. The load bank and cooling assembly as defined in
5. The load bank and cooling assembly as defined in
|
This application is a division of U.S. application Ser. No. 16/113,147 filed Aug. 27, 2018 which was a division of U.S. application Ser. No. 15/142,562 filed Apr. 29, 2016.
Load banks are used to test new data center installations or upgrades and have two primary objectives. One objective is to test the power infrastructure in a building to insure that it is able to reliably provide power to the server racks of the data center in both normal and emergency power conditions. The second objective is to test and optimize the heating, cooling and ventilation (HVAC) system within the data center to insure that it is capable of cooling all of the heat generating equipment in the server racks and that the HVAC system has been sufficiently optimized to reduce operating costs. The present invention relates to a load bank assembly that can be configured to provide versatility for testing various power sources and includes an innovative cooling system for the assembly.
Traditionally a load bank puts a specific power draw on the power source to simulate a computer operating in a server rack. Just as a computer generates heat, a load bank generates heat as well. The heat is evacuated from the load bank using one or more fans that draw cool air in from a cold aisle and discharges hot air into a hot aisle. During the testing of a data center, many load banks are installed and utilized to conduct the testing. Each load bank is subject to its own operating condition and some load banks may not be operating at all. In load bank assemblies available on the market today, any load banks not being used are turned off while the other units continue to operate and generate heat. The desired result is that all heat exhausted into the hot aisle is routed to the HVAC system. However, some of the air recirculates through any load banks not presently turned on and returns to the cold aisle. This invalidates the test and is thus undesirable. In an effort to solve the problem, makeshift baffles such as a piece of cardboard or a thin sheet of metal are used to physically block the intake of any load banks not in use. This process introduces manual error and is time consuming. It could also pose a safety threat if a load bank is returned to service and the baffle is not removed.
It is known in the art to provide a load bank with resistor assemblies connected in different configurations. The Nestel U.S. Pat. No. 6,833,636 discloses a load bank for testing power systems in which heater elements are connected in a delta configuration, but indicates that the elements may also be connected in a wye configuration. However, there is no teaching of reconfiguring the elements between the delta and wye configurations.
It is also known in the art to provide load systems which are capable of testing emergency or backup power supply systems. The Hancock U.S. Pat. No. 8,483,982, for example, discloses an automated emergency power supply system and testing solution for an alternate power source of a building. However, such known systems are not capable of switching back and forth between main and redundant or backup power systems for testing the systems using the same load resistor assembly.
The present invention was developed in order to overcome these and other drawbacks of prior load banks by providing a versatile load bank assembly which can be configured as necessary to test various power sources while also improving the cooling capabilities of the load bank.
Accordingly, it is a primary object of the invention to provide a load bank for testing a variety of power sources and voltages with various load applications. The load bank includes a plurality of inputs having different phases, a resistor connected with each of the phase inputs, respectively, and a relay connected with each of the resistors. Each relay is operable to connect each resistor with one of a neutral input and another phase input, respectively, so that the resistors can be connected in wye and delta configurations by selective operation of the relays. More particularly, when the load bank is connected in the wye configuration, the resistors connected with the first, second, and third phase inputs are connected with the neutral input. When the load bank is connected in the delta configuration, the resistor connected with the first phase input is connected with the second phase input, the resistor connected with the second phase input is connected with the third phase input, and the resistor connected with the third phase input is connected with the first phase input.
According to a further object of the invention, the load bank is capable of testing both primary and redundant power sources. It includes a first set of power connections connected with the primary power source, a second set of power connections connected with the redundant power source, a load resistor assembly for testing the power sources, a multi-pole relay for alternately connecting the first and second power connections with the load resistor assembly, respectively, so that the primary and secondary power sources may be tested with the same load resistor assembly while remaining electrically isolated. A protective contactor circuit is arranged between the load resistor assembly and the multi-pole relay.
It is yet another object of the invention to provide a load bank and cooling assembly including a housing having a cold air inlet on one side and a hot air outlet on a side opposite the cold air inlet and a load resistor assembly arranged in the housing. A blower is also arranged in the housing adjacent the cold air inlet for circulating cold air through the load resistor assembly to cool the load resistor assembly via heat exchange which results in hot air which exits the housing via the hot air outlet. A damper is arranged in the housing between the blower and the load resistor assembly and is operable between an open position when the load bank is in operation so that cold air from the blower is delivered to the load resistor assembly and a closed position when the load bank is not in operation so that cold air is prevented from passing to the load resistor assembly.
According to a more specific embodiment of the invention, a controller is connected with the relays to control the operation of the relays to switch the load bank between the wye and delta configurations. The controller is also connected with the multi-pole relay to control its operation for alternately testing the primary and redundant power sources. A solenoid is connected with the damper to operate the damper between the open and closed position. The controller is also connected with the damper to control its operation.
Other objects and advantages of the invention will become apparent from a study of the following specification when viewed in the light of the accompanying drawing, in which:
Referring to
A first relay 12 is connected with the first resistor 4, a second relay 14 is connected with the second resistor 6, and a third relay 16 is connected with the third resistor 8. Each relay is operable to connect its associated resistor with either the neutral input 10 as shown in
A controller 18 is connected with the relays 12, 14, and 16 to control the operation of the relays and thus configure the load bank in the wye and delta configurations. One example of a suitable controller is a microprocessor which sends digital signals to the power relays to form the desired configuration. Alternatively, the relays can be manually operated by a user.
As used herein, the term microprocessor is not limited to integrated circuits referred to in the art as a processor or microprocessor. The term broadly refers to a computer, an application specific integrated circuit, and any other programmable circuit. It should be understood that the microprocessor execute instructions, or computer programs, stored in memories (not shown) in the microprocessor. The above examples are exemplary only and not intended to limit in any way the definition and/or meaning of the term microprocessor.
By providing the load bank in different load configurations, it can be used in a variety of ways to test a large variety of different power sources, voltages and with various load applications that include balanced and unbalanced phase loading.
The load bank can be used to compensate for the variety of voltages and tests necessary for commissioning a power system, with three phase voltages up to 250 VAC (L-N) with a neutral present, or 250 VAC (L-L) without a neutral present. The table below outlines the different power dissipation levels achievable with the delta/wye configuration according to the invention and compares it with two conventional products to demonstrate how the inventive load bank results in an increase in utility.
Power Table
3 Phase
Single Phase
Configuration
Voltage
Phase
Step
Power
Voltage
Step
Power
Wye
240VACL-N
A
1
400
240VAC L-N
1
400
2
800
2
400
3
1600
3
400
4
3200
4
800
B
1
400
5
800
2
800
6
800
3
1600
7
1600
4
3200
8
1600
C
1
400
9
1600
2
800
10
3200
3
1600
11
3200
4
3200
12
3200
Total
—
18000
Total
18000
120VAC L-N
A
1
100
120VAC L-N
1
100
2
200
2
100
3
400
3
100
4
800
4
200
B
1
100
5
200
2
200
6
200
3
400
7
400
4
800
8
400
C
1
100
9
400
2
200
10
800
3
400
11
800
4
800
12
800
Total
—
4500
Total
4500
Delta
208VAC L-L
A
1
300
2
600
3
1200
4
2400
B
1
300
2
600
3
1200
4
2400
C
1
300
2
600
3
1200
4
2400
Total
—
13500
Voltage
Step
Power
Standard 3 Phase Load Bank
240VAC L-N
1
1000
2
2000
3
3000
4
4000
5
8000
—
18000
120VAC L-N
1
250
2
500
3
750
4
1000
5
2000
—
4500
Standard Singe Phase Load Bank
240VAC L-N
1
1000
2
2000
3
3000
4
4000
5
8000
—
18000
120VAC L-N
1
250
2
500
3
750
4
1000
5
2000
—
4500
Referring now to
When the multi-pole relay 34 is operated to configure the load bank to test the primary power source, electricity flows through a series of fuses 36 and on to the normally closed contacts and reaches a circuit designed to monitor and protect against voltages which may be detrimental to the machine. If the primary power source is adequate, a series of relays allow electricity to reach the resistive elements thus putting a load on the primary source. By making a selection within a custom software program within a microprocessor 38, a command can be sent to the load bank via a metrology chip 40 which results in the multi-pole double throw relay 34 being energized. This cuts the primary power source and enables the redundant power source. Similarly, electricity flows through fuses 42 to the resistive elements for testing.
Preferably, a protective circuit including a plurality of contactors 44 is arranged between the resistive elements of the load resistor assembly and the multi-pole double throw relay 34. Because of the way the circuit is designed, a single set of protection devices may be used to monitor both power supplies, which yields a savings in weight, cost, and complexity. Furthermore, from the time the user chooses to simulate the loss of the primary power source and pick up of the redundant power source, a few things must happen. The microprocessor must react to the command and the multi-pole double throw relay must switch states. Then the protection circuit must feed data to the microprocessor for evaluation. After testing of the primary power source is completed, another signal is sent to close the relays of the multi-pole double throw relay which allow the resistive elements of the load resistor assembly 28 to engage. This entire sequence of events takes less than 500 milliseconds. Because switching and testing utilizing the invention can be done two orders of magnitude faster than testing using conventional load banks, it increases the integrity of the test by more realistically simulating a failure event. Furthermore, the improved method drastically reduces labor required to thoroughly complete the testing. In an installation with 200 load banks, a savings of 10 minutes per load bank yields over 30 hours of labor savings. It also accelerates the schedule of the testing which benefits the customer.
Referring now to
Preferably, the damper 58 is formed of a plurality of damper blades 58a which are linked together so that they move in sync between the open and closed position. A solenoid 60, which is preferably an electric solenoid, is used to displace the damper blades and a position sensor 62, preferably formed of one or more Hall effect sensors, is connected between the solenoid and the damper blades to positively identify the position of the damper to prevent operation of the load bank if the damper blades are jammed or the solenoid fails. A controller 64 controls the operation of the solenoid.
In practice, a number of separate load banks 46 may be used in a testing procedure. These banks have a common cold air aisle and a common hot air aisle as shown in
While the preferred forms and embodiments of the invention have been illustrated and described, it will be apparent to those of ordinary skill in the art that various changes and modifications may be made without deviating from the inventive concepts set forth above.
Thompson, Graham, Seal, Lowell, Kelleher, Brian, Morin, Joseph, Gidge, Brett, Locker, Todd
Patent | Priority | Assignee | Title |
Patent | Priority | Assignee | Title |
10488468, | Jan 11 2016 | TwinTech Industry, Inc. | Quality-control-testing system for portable charging devices and methods of use |
4445047, | Mar 22 1983 | Load bank | |
6833636, | Jun 04 2001 | Antares Capital LP; ANTARES CAPITAL LP, AS SUCCESSOR AGENT | Compact load bank for testing power systems |
8483982, | Nov 02 2010 | SCHNEIDER ELECTRIC USA, INC. | Automated emergency power supply test using variable load bank stages |
9488694, | Feb 24 2014 | Tatsumi Ryoki Co., Ltd | Load testing apparatus and coupling switch unit for load testing apparatus |
20080303138, | |||
20120105097, | |||
20180142630, | |||
20190204391, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Apr 14 2016 | LOCKER, TODD | Mosebach Manufacturing Company | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 054718 | /0574 | |
Apr 14 2016 | THOMPSON, GRAHAM | Mosebach Manufacturing Company | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 054718 | /0574 | |
Apr 18 2016 | MORIN, JOSEPH | COMRENT INTERNATIONAL, LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 054825 | /0185 | |
Apr 18 2016 | KELLEHER, BRIAN | COMRENT INTERNATIONAL, LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 054825 | /0185 | |
Apr 28 2016 | SEAL, LOWELL | COMRENT INTERNATIONAL, LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 054825 | /0185 | |
Apr 28 2016 | GIDGE, BRETT | COMRENT INTERNATIONAL, LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 054825 | /0185 | |
May 03 2016 | Mosebach Manufacturing Company | COMRENT INTERNATIONAL, LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 054766 | /0223 | |
Dec 22 2020 | COMRENT INTERNATIONAL, LLC | (assignment on the face of the patent) | / | |||
Feb 16 2022 | COMRENT INTERNATIONAL, LLC | SUNBELT RENTALS, INC | MERGER SEE DOCUMENT FOR DETAILS | 066575 | /0936 |
Date | Maintenance Fee Events |
Dec 22 2020 | BIG: Entity status set to Undiscounted (note the period is included in the code). |
Date | Maintenance Schedule |
Jan 11 2025 | 4 years fee payment window open |
Jul 11 2025 | 6 months grace period start (w surcharge) |
Jan 11 2026 | patent expiry (for year 4) |
Jan 11 2028 | 2 years to revive unintentionally abandoned end. (for year 4) |
Jan 11 2029 | 8 years fee payment window open |
Jul 11 2029 | 6 months grace period start (w surcharge) |
Jan 11 2030 | patent expiry (for year 8) |
Jan 11 2032 | 2 years to revive unintentionally abandoned end. (for year 8) |
Jan 11 2033 | 12 years fee payment window open |
Jul 11 2033 | 6 months grace period start (w surcharge) |
Jan 11 2034 | patent expiry (for year 12) |
Jan 11 2036 | 2 years to revive unintentionally abandoned end. (for year 12) |