A chilled water distribution system includes a chilled water loop in fluid communication with a plurality of buildings and also in fluid communication with a plurality of chiller stations. A monitoring and control system communicates with one of the chiller stations, hereinafter referred to as a “controlled” chiller station because it is configured with one or more variable frequency drives that are controlled by the monitoring and control system to modulate the speed of at least one chiller station component such as, but not limited to, a pump or a fan. By way of this modulation process, a differential pressure of the chilled water loop may be maintained in a “sweet spot” so as to optimize chiller station output while minimizing chiller station energy consumption.
|
1. A method for controlling a chilled water distribution system, the method comprising:
determining a real-time chiller plant load at a selected location within a chilled water loop of the distribution system;
monitoring a real-time pump speed of a base chiller station that includes a variable frequency drive coupled to a chilled water pump;
determining an energy load for a plurality of buildings served by the chilled water loop;
modulating a pump speed of the base chiller station to stay within a desired range of a pre-determined set point chiller plant load of the chilled water loop; and
determining whether to change a capacity of the distribution system by bringing a chiller of another chiller station either online or offline.
6. At least one computer-readable medium on which are stored instructions that, when executed by at least one processing device, enable the at least one processing device to perform a method for controlling a chilled water distribution system, the method comprising:
determining a real-time chiller plant load at a selected location within a chilled water loop of the distribution system;
monitoring a real-time pump speed of a base chiller station that includes a variable frequency drive coupled to a chilled water pump;
determining an energy load for a plurality of buildings served by the chilled water loop;
modulating a pump speed of the base chiller station to stay within a desired range of a pre-determined set point chiller plant load of the chilled water loop; and
determining whether to change a capacity of the distribution system by bringing a chiller of another chiller station either online or offline.
11. A system comprising:
at least one nontransitory processor-readable storage medium that stores at least one of instructions or data; and
at least one processor communicatively coupled to the at least one nontransitory processor-readable storage medium, wherein the instructions or data cause the at least one processor to:
determine a real-time chiller plant load at a selected location within a chilled water loop of a distribution system;
monitor a real-time pump speed of a base chiller station that includes a variable frequency drive coupled to a chilled water pump;
determine an energy load for a plurality of buildings served by the chilled water loop;
modulate a pump speed of the base chiller station to stay within a desired range of a pre-determined set point chiller plant load of the chilled water loop; and
determine whether to change a capacity of the distribution system by bringing a chiller of another chiller station either online or offline.
2. The method of
3. The method of
4. The method of
5. The method of
7. The at least one medium of
8. The at least one medium of
9. The at least one medium of
10. The at least one medium of
|
This application is a continuation-in-part of U.S. patent application Ser. No. 16/573,933 filed on Sep. 17, 2019, which is a continuation of U.S. patent application Ser. No. 15/682,320 filed on Aug. 21, 2017, issuing as U.S. Pat. No. 10,415,869 on Sep. 17, 2019; which application is a continuation-in-part of U.S. patent application Ser. No. 13/299,182 filed Nov. 17, 2011. All of the above-referenced applications are hereby incorporated by reference in their entireties as if fully set forth herein.
The present invention generally relates to systems and methods for reducing energy consumption of a chilled water distribution system by monitoring and controlling a variable speed drive within a base or controlled chiller station.
A conventional chilled water system typically includes a cooling loop having a return and a supply line both in fluid communication with at least two chilling stations and with at least two buildings. In such conventional systems, the water supply pressures produced at the chilling stations are relatively high, which in turn may cause any number of undesired consequences. By way of example, the high pressures may reduce an operational life of the system even though a standard maintenance schedule is followed. Alternatively or in addition to, the high pressures may require more frequent maintenance, which in turn leads to higher costs. Further, the high pressures may necessitate the installation of pressure reducing valves, but while such valves may drop the incoming chilled water pressures their installation increases capital costs and system control complexity. Moreover, the pressure reducing valves may not adequately close off against the high pressures and over-cooling can become a problem.
A chilled water distribution system includes a chilled water loop in fluid communication with a plurality of buildings and also in fluid communication with a plurality of chiller stations. A monitoring and control system communicates with one of the chiller stations, hereinafter referred to as a “controlled” chiller station because it is configured with one or more variable frequency drives that are controlled by the monitoring and control system to modulate the speed of at least one chiller station component such as, but not limited to, a pump or a fan. By way of this modulation process, a differential pressure of the chilled water loop may be maintained in a “sweet spot” so as to optimize chiller station output while minimizing chiller station energy consumption.
In one aspect of the present invention, a distributed process chilled water system includes a supply line having a supply line temperature sensor; a return line having a return line temperature sensor, a flow meter sensor in either the supply or return line, the supply line temperature sensor and the return line temperature sensor and the flow meter sensor cooperating to provide a differential temperature between the supply line and the return line that when multiplied by the flow provides the current cooling load of the chiller station in tonnage; a plurality of buildings, each building having a building automation system controller, each building in fluid communication with the return and supply lines, the controllers communicatively networked together; a plurality of chiller stations comprising at least one base chiller station, each chiller station in fluid communication with the return and supply lines, the chiller stations communicatively networked together, at least one of the chiller stations in communication with at least one of the buildings; and an operating system operable to process machine-readable instructions, the operating system in communication with at least the base chiller station, the operating system configured to receive a signal indicative of the differential pressure, the operating system further configured, based on the differential pressure, to determine whether to modulate a pump speed of the base chiller station, bring another chiller online or take another chiller offline to maintain the differential pressure within a desired range.
In another aspect of the invention, a method for controlling a chilled water distribution system includes the steps of (1) determining a real-time chiller plant load at a selected location within a chilled water loop of the distribution system; (2) monitoring a real-time pump speed of a base chiller station that includes a variable frequency drive coupled to a chilled water pump; (3) determining an energy load for a plurality of buildings served by the chilled water loop; (4) modulating the pump speed of the base chiller station to approximately stay within a desired range of pre-determined set point chiller plant load of the chilled water loop; and (5) determining whether to change the capacity of distribution system by bringing a chiller of another chiller station either online or offline.
Preferred and alternative embodiments of the present invention are described in detail below with reference to the following drawings:
In the following description, certain specific details are set forth in order to provide a thorough understanding of various embodiments of the invention. However, one skilled in the art will understand that the invention may be practiced without these details. In other instances, well-known structures associated with chilled water distribution systems, the operating components used therein, chiller stations, pumps, sensors, a chilled water loop, various computing and/or processing systems, various system operational parameters, and methods of operating a chilled water distribution system that supplies one or more buildings have not necessarily been shown or described in detail to avoid unnecessarily obscuring descriptions of the embodiments of the invention.
In conventional chilled water distribution systems, the chilled water supply pressures produced at various chilling stations are relatively high, which in turn results in several consequences for the buildings served by the chilled water loop. For example, the high chilled water supply pressure for buildings close to the chilling station may necessitate the installation of pressure reducing valves to drop the incoming chilled water supply pressure, which increases capital costs and system complexity in terms of control, installation, and maintenance. The high chilled water supply pressure may mean that certain types of control valves cannot close off against the high pressure and combined with low cooling water temperatures this may create an over-cooling situation that requires heating compensation. Further, the high chilled water supply pressure may result in increased maintenance costs and maintenance frequency for all of the components in the system affected by the high pressure.
To address at least some of the aforementioned drawbacks with conventional systems, at least one aspect of the present invention involves a chilled water distribution system that supplies one or more buildings. For the present description, a building may generally include any structure that utilizes a chilled water supply line of the system and demands a non-zero load. Likewise, the term “load” may generally mean a flow requirement needed by the building's cooling unit, which may take the form of a roof-top cooling unit. Flow requirements are often referred to in terms of tonnage of cooling water, for example a particular building may require 5,000 tons of cooling water from the system to meet its present cooling and/or heating needs. And, the load required by a particular building often fluctuates throughout even a single day due to temperature changes, weather changes, time of day (e.g., primary work hours), etc.
The chilled water distribution system may be controlled by monitoring current cooling load of the chiller plant in tonnage; to maintain a minimum cooling load that still allows the chiller stations and the building's cooling units to function adequately. Reducing the chilled water cooling load may realize a number of advantages. By way of example, the chilled water distribution system of the present invention and methods of operating the same may advantageously reduce overall energy use (i.e., consumption) of the entire system and reduce energy use for at least two networked chilling stations, which in turn would reduce chilled water production costs and chilled water rates. The reduction in chilling station energy use may more than make up for any increased power consumption in one or more of the loads. Further, the maintenance costs associated with high pressure related problems may be reduced for the chilled water loop, the chiller stations and the loads.
The chilled water loop 102 includes a supply loop 102a and a return loop 102b. Pressure sensors 108 are in communication with the supply and return loops 102a, 102b, respectively, and a pressure difference between the sensor readings provides a chilled water differential pressure. Although two pressure sensors 108 are shown, the system 100 may include a plurality of sensors for taking pressure readings at various locations around the chilled water loop 102.
Each building 104 includes a building automation system (BAS) 110 (individually 110a-110d). The BASs 110 receive and exchange operating information with the respective building's heating, ventilation and cooling (HVAC) system. In one embodiment, the BASs may take the form of the BASs described in U.S. patent application Ser. Nos. 12/609,452 and/or Ser. No. 12/874,607, both of which are incorporated herein by reference in their entireties. In the illustrated embodiment, the BASs may be networked together so they may receive and exchange information with each other, the chiller stations and the monitoring and control system 107. In another embodiment, the BASs 110 may operate independently from another while each communicates with the monitoring and control system 107.
In the illustrated embodiment, each chiller station 106 communicates with at least one other chiller station to provide a networked communication link. Chiller station 106a communicates directly with the monitoring and control system 107. As will be described in more detail below, the chiller station 106a operates as the primary chiller station in the group in response to the load requirements of the buildings and in conjunction with each chiller station's output and processing capacity.
In one embodiment, the monitoring and control system 107 takes the form of an operating system having relational control algorithms that automatically calculate the most efficient operation of the chilled water distribution system 100, to include the various components or subsystems within such as, but not limited to, chillers, pumps and cooling tower fans based on real-time, building cooling loads. The monitoring and control system 107 in operation as described herein may advantageously provide a holistic approach to maximizing energy efficiency while providing a stable operating performance not possible with conventional proportional-integral-derivative control.
In operation, the differential pressure of the chilled water loop 202 may be monitored at several locations and the speed (i.e., power) of at least one of the supply pumps 214 of the primary chiller station may be continuously monitored. Each of the differential pressure locations will have a minimum required differential pressure for the buildings to function properly (e.g., temperature, humidity, etc.). The speed of the chilled water supply pumps 214 at the primary chilling station will be modulated to maintain the minimum differential pressure at all of these differential pressure locations. In addition, information from the building's chilled water pumps, for instance pump speed taken from the BAS, will allow the monitoring and control system to perform an analysis in real time or at least contemporaneously in time that ensures that any reduction in pressure at one or more of the chilling stations 206 does not adversely affect the operation of the building. By way of example, if the differential pressure at one or more locations became too low then this may cause an overall increase in energy consumption among the buildings 204 in aggregate.
In a first mode of operation (Mode 1), the chiller stations are each online, but none are at capacity. At 310, the monitoring and control system simply continues to monitor the incoming information as indicated by block 310.
In a second mode of operation (Mode 2), one or more of the chiller stations are operating at capacity or may soon be at capacity based on information from the building BASs. At 312, the monitoring and control system determines if one of the chillers at one of the chiller stations should be brought online or if online already then whether its capacity should be increased by signaling the variable speed drive for the respective pump.
In the third mode of operation (Mode 3), one or more of the chiller stations are operating substantially below capacity or may soon be operating at substantially below capacity based on information from the building BASs. At 314, the monitoring and control system determines if one or more chillers at one of the chiller stations should be brought offline and/or which chiller should have its capacity decreased.
The control of one or more variable frequency drives coupled to the chilled water pumps may significantly reduce overall energy consumption for the buildings in aggregate. By way of example, the chilled water distribution system shown in
Referring back to
The monitoring and control system 107 may be pre-programmed to store all of the operational set points for flow, output capacity (e.g., tons of chilled water), pump speed, number of pumps in operation for one chiller station, and the desired differential pressure a various locations in the chilled water loop 102. Further, each of these set points may adjustable as building loads change for a variety of reasons.
In one operational embodiment, the chilled water loop pressure may be controlled and a minimum energy level (e.g., Kilowatt per Ton) for the entire system may be achieved by controlling the speed of the pumps at chiller station 106a and bringing other chiller stations either online or offline to maintain the Min Control Chiller Plant Load in the chilled water loop.
Preferably, an operational sequence of the entire system may be determined by the monitoring and control system 107 even when various chillers are different sizes and different evaporator pressure drops are flow controlled using the variable frequency drives on the chilled water pumps instead of the evaporator flow control valves has been routinely done in the past. Thus in
In another embodiment, variable frequency drives may be installed on other chilled water pumps in other chilled water stations. In such an embodiment, the monitoring and control system will control the sequence of operation to operate the controlled chiller station in its “sweet spot” (see
Now referring back to
As the building load requirements increase, such as for one or more buildings, then the differential pressure throughout the chilled water loop 202 may decrease and one or more of the measured pressure locations may drop below its required set point. As such, the monitoring and control system 207 will then begin to increase the chilled water pump speeds at the controlled chiller station 206, which will also increase pump flow and this will cause the Control Chiller Plant load to increase until the requisite set point min Control Chiller Plant load is again achieved. In one embodiment, the chilled water pump speeds are incrementally increased until the requisite set point Control Chiller Plant load is achieved.
At a different operational period where the building chilled water loads have decreased, the differential pressure throughout the chilled water loop 202 would correspondingly increase, which may cause one or more of the measured pressure locations to rise above their required set points. In turn, the monitoring and control system 207 will begin to decrease the chilled water pump speeds at the controlled chiller station 206, which also decreases pump flow and this will cause the Control Chiller Plant load to decrease until the actual Chiller Plant load in the chilled water loop 202 meets the required set point Chiller Plant load in the same. In one embodiment, the chilled water pump speeds are incrementally decreased until the requisite set point Chiller Plant load is achieved.
The process of the pump speeds at the controlled chiller station 206 being modulated to maintain the Control Chiller Plant load would continue as long as the output of the controlled chiller station 206 is anticipated to remain within the constraints of its minimum and maximum output and flow. Once the controlled chiller station 206 has reached either a maximum or minimum flow rate then additional action will likely be required, for example bring other pumps and chillers in one of more of the other chiller stations either online or offline.
By way of example, when the controlled chiller station 206 reaches its maximum output, depending on the anticipated building cooling loads for the remainder of the day, one or both of the other chiller stations may need to be brought on line. Conversely, when the controlled chiller station 206 reaches its minimum output the monitoring and control system 107 (
For the example where only a single chiller station is online, then as building loads change (e.g., increase or decrease, respectively) the monitoring and control system will modulate pump speed (flow) to generate a corresponding change for maintaining the control chiller plant load set point. Since there are multiple differential pressures throughout the loop and multiple minimum set points, the monitoring and control system may also determine which of the differential pressures is the “controlling differential pressure” at any point in time. For the example where only a single chiller station is online, then as building loads change (e.g., increase or decrease, respectively) the monitoring and control system will modulate pump speed (flow) to generate a corresponding change for maintaining the chilled water loop set point and chiller plant load. Since there are multiple differential pressures throughout the loop and multiple minimum set points, the monitoring and control system may also determine which of the differential pressures is the “controlling differential pressure” at any point in time. In addition to modulating pump speed, the monitoring and control system may also determine the optimum number of chilled water supply pumps that should be in operation at any given time. When a pump is to be added or subtracted the monitoring and control system alerts the operator to either start or stop a pump, and once accepted by the operator, the BOP system will then start or stop the pump just as it currently does. Consequently, the monitoring and control system attempts to maintain the chilled water distribution system in the “sweet spot” where the desired capacity of the building loads is sufficiently met by the controlled chiller station as other chillers within other chiller stations are brought online or offline. Hence, the pump speed, and thus output, of the controlled chiller station is modulated to maintain the desired chilled water loop chiller plant load as selected by the monitoring and control system.
In the embodiment where the controlled chiller station is continuously performing pressure control, the monitoring and control system modulates the pump speed of another chiller station brought online to keep the output of the controlled chiller station in the desired “sweet-spot”. In this embodiment, the chilled water pumps at the non-controlled chiller station do not react to loop pressure and will maintain a constant flow unless the output of controlled chiller station goes outside of the desired “sweet-spot”.
While the preferred embodiment of the invention has been illustrated and described, as noted above, many changes can be made without departing from the spirit and scope of the invention. Accordingly, the scope of the invention is not limited by the disclosure of the preferred embodiment. Instead, the invention should be determined entirely by reference to the claims that follow.
Patent | Priority | Assignee | Title |
Patent | Priority | Assignee | Title |
2126230, | |||
2189008, | |||
2217944, | |||
2674934, | |||
3400374, | |||
3729051, | |||
3875995, | |||
4262491, | Mar 24 1978 | Controlled Energy Systems Company | Electronic modulating system for air conditioning apparatus |
4406397, | May 25 1981 | Topre Corporation | Central air conditioning equipment |
4515069, | Jan 20 1984 | Acutherm, Ltd.; ACUTHERM, LTD , A CA GENERAL PARTNERSHIP | Change-over diffuser |
4545524, | Nov 25 1983 | Zone control apparatus for central heating and/or cooling systems | |
4646964, | Mar 26 1982 | Carrier Corporation | Temperature control system |
4718021, | Sep 20 1985 | Technique for fan cycling to maintain temperature within prescribed limits | |
4843832, | Mar 12 1987 | Takenaka Komuten Co., Ltd.; Sinko Kogyo Co., Ltd. | Air conditioning system for buildings |
5070704, | Jan 19 1988 | MULTISTACK LLC | Heating and cooling systems |
5179524, | Apr 01 1988 | Carrier Corporation | Fan-powered mixing box assembly |
5251814, | Oct 18 1991 | Kabushiki Kaisha Toshiba | Air conditioning apparatus having louver for changing the direction of air into room |
5251815, | Dec 18 1992 | AMERICAN STANDARD INTERNATIONAL INC | Self powered and balancing air damper |
5271558, | Jan 21 1993 | TURBO GUARANTY GROUP, INC | Remotely controlled electrically actuated air flow control register |
5327742, | May 07 1993 | Carrier Corporation | Hierarchial control for discrete chiller units |
5341988, | Oct 01 1991 | Trane International Inc | Wireless air balancing system |
5344069, | Nov 30 1991 | Kabushiki Kaisha Toshiba | Air conditioning apparatus for distributing primarily-conditioned air to rooms |
5361985, | Oct 01 1991 | Trane International Inc | Setup tool for a wireless communications system |
5533668, | Jun 30 1994 | TURBO GUARANTY GROUP, INC | Remotely activated opposing/aiding air flow control register |
5540555, | Oct 04 1994 | FIFECO, INC | Real time remote sensing pressure control system using periodically sampled remote sensors |
5547018, | Dec 10 1993 | FIJITSU GENERAL LIMITED | Air conditioner |
5600960, | Nov 28 1995 | Trane International Inc | Near optimization of cooling tower condenser water |
5651264, | Jun 29 1993 | Siemens Electric Limited | Flexible process controller |
5946926, | Apr 07 1998 | Optimum Energy, LLC | Variable flow chilled fluid cooling system |
6185946, | May 07 1999 | Optimum Energy, LLC | System for sequencing chillers in a loop cooling plant and other systems that employ all variable-speed units |
6718779, | Dec 11 2001 | HENRY, WILLIAM R | Method to optimize chiller plant operation |
6792765, | Aug 23 2002 | Chilling system and method | |
7849701, | Jun 03 2008 | DOVER SYSTEMS, INC | Refrigeration system with a charging loop |
8219250, | Oct 31 2008 | OPTIMUM ENERGY CO, LLC | Systems and methods to control energy consumption efficiency |
8897921, | Sep 02 2009 | OPTIMUM ENERGY CO, LLC | Environmental control for HVAC system |
8939196, | Feb 13 2009 | TOSHIBA CARRIER CORPORATION | Secondary pump type heat source and secondary pump type heat source control method |
9252018, | Nov 18 2009 | ELPIS TECHNOLOGIES INC | High-k/metal gate transistor with L-shaped gate encapsulation layer |
20020139129, | |||
20020184898, | |||
20040000155, | |||
20040068996, | |||
20050039904, | |||
20050103032, | |||
20060010839, | |||
20060010893, | |||
20070028632, | |||
20080016890, | |||
20090151388, | |||
20090217686, | |||
20100023171, | |||
20100121495, | |||
20110112701, | |||
20120111034, | |||
20120111035, | |||
20130048114, | |||
20130125565, | |||
JP1169256, | |||
JP1169279, | |||
JP4009540, | |||
JP49540, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Feb 22 2012 | DEMPSTER, IAN | Optimum Energy, LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 061855 | /0986 | |
Mar 01 2012 | ERPELDING, BEN | Optimum Energy, LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 061855 | /0986 | |
Dec 16 2019 | Optimum Energy, LLC | (assignment on the face of the patent) | / | |||
Jun 22 2023 | Optimum Energy LLC | OPTIMUM ENERGY CO, LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 068910 | /0976 |
Date | Maintenance Fee Events |
Dec 16 2019 | BIG: Entity status set to Undiscounted (note the period is included in the code). |
Jan 08 2020 | SMAL: Entity status set to Small. |
Date | Maintenance Schedule |
Dec 27 2025 | 4 years fee payment window open |
Jun 27 2026 | 6 months grace period start (w surcharge) |
Dec 27 2026 | patent expiry (for year 4) |
Dec 27 2028 | 2 years to revive unintentionally abandoned end. (for year 4) |
Dec 27 2029 | 8 years fee payment window open |
Jun 27 2030 | 6 months grace period start (w surcharge) |
Dec 27 2030 | patent expiry (for year 8) |
Dec 27 2032 | 2 years to revive unintentionally abandoned end. (for year 8) |
Dec 27 2033 | 12 years fee payment window open |
Jun 27 2034 | 6 months grace period start (w surcharge) |
Dec 27 2034 | patent expiry (for year 12) |
Dec 27 2036 | 2 years to revive unintentionally abandoned end. (for year 12) |