A flyback converter is provided that dynamically adjusts a drain threshold voltage for a current cycle of a synchronous rectifier switch transistor based upon operating conditions in a previous cycle of the synchronous rectifier switch transistor. A differential amplifier drives a gate voltage of the synchronous rectifier switch transistor during an on-time of the current cycle so that a drain voltage of the synchronous rectifier switch transistor equals the drain threshold voltage during a regulated portion of the current cycle.
|
15. A method of controlling a gate voltage of a synchronous rectifier switch transistor, comprising: adapting a dynamic drain threshold voltage responsive to a previous cycle of the synchronous rectifier switch transistor; during an on-time in a current cycle of the synchronous rectifier switch transistor, responding to a drain voltage of the synchronous rectifier switch transistor rising to equal the dynamic drain threshold voltage by controlling the gate voltage of the synchronous rectifier switch transistor to maintain the drain voltage of the synchronous rectifier switch transistor equal to the dynamic drain threshold voltage; and discharging the gate voltage responsive to the drain voltage being greater than a turn-off threshold voltage.
9. A synchronous rectifier controller, comprising:
a differential amplifier configured to drive a gate voltage of a synchronous rectifier switch transistor during a regulated portion of a current cycle of the synchronous rectifier switch transistor, the differential amplifier being responsive to a difference between a drain voltage of the synchronous rectifier switch transistor and a dynamic drain threshold voltage;
a timing analysis circuit configured to adjust the dynamic drain threshold voltage based upon a comparison of a duration of a regulated portion of a previous cycle of the synchronous rectifier switch transistor to a threshold delay;
a switch connected between ground and a gate of the synchronous rectifier switch transistor; and
a comparator configured to close the switch to discharge the gate voltage responsive to the drain voltage being greater than a turn-off threshold voltage.
1. A synchronous rectifier controller for a flyback converter, comprising:
a differential amplifier configured to drive a gate voltage of a synchronous rectifier switch transistor during a regulated portion of a current cycle of the synchronous rectifier switch transistor, the differential amplifier being responsive to a difference between a drain voltage of the synchronous rectifier switch transistor and a dynamic drain threshold voltage;
a sample-and-hold circuit configured to sample and hold the drain voltage during the current cycle of the synchronous rectifier switch transistor to provide the dynamic drain threshold voltage, the sample-and-hold circuit being further configured to sample the drain voltage at a sampling time that is a function of a previous cycle of the synchronous rectifier switch transistor;
a switch connected between ground and a gate of the synchronous rectifier switch transistor; and
a comparator configured to close the switch to discharge the gate voltage responsive to the drain voltage being greater than a turn-off threshold voltage.
2. The synchronous rectifier controller of
a timer configured to time an on-time of the synchronous rectifier switch transistor in the previous cycle, wherein the function of the previous cycle is a percentage of the on-time.
3. The synchronous rectifier controller of
a timer configured to time an on-time of the synchronous rectifier switch transistor in the previous cycle, wherein the function of the previous cycle is a difference between the on-time and a constant value.
5. The synchronous rectifier controller of
a dynamic timer configured to adjust the sampling time responsive to whether the gate voltage of the synchronous rectifier switch transistor during the previous cycle was less than a threshold gate voltage, wherein the function of the previous cycle is a comparison of the gate voltage of the synchronous rectifier switch transistor to the threshold gate voltage.
6. The synchronous rectifier controller of
a comparator for comparing the gate voltage of the synchronous rectifier switch transistor to the threshold gate voltage, wherein the dynamic timer is configured to increase the sampling time if an output signal of the comparator indicates that the gate voltage of the synchronous rectifier switch transistor was less than the threshold gate voltage.
7. The synchronous rectifier controller of
8. The synchronous rectifier controller of
10. The synchronous rectifier controller of
a digital-to-analog converter for converting a digital value from the timing analysis circuit into the dynamic drain threshold voltage.
11. The synchronous rectifier controller of
12. The synchronous rectifier controller of
14. The synchronous rectifier controller of
16. The method of
measuring an on-time of the synchronous rectifier switch transistor during the previous cycle of the synchronous rectifier switch transistor to provide a measured on-time; and
during the on-time in the current cycle of the synchronous rectifier switch transistor, sampling the drain voltage of the synchronous rectifier switch transistor at a percentage of the measured on-time to provide the dynamic drain threshold voltage.
17. The method of
measuring an on-time of the synchronous rectifier switch transistor during the previous cycle of the synchronous rectifier switch transistor to provide a measured on-time; and
during the on-time in the current cycle of the synchronous rectifier switch transistor, sampling the drain voltage of the synchronous rectifier switch transistor at a sampling time equaling a difference of the measured on-time and a constant value to provide the dynamic drain threshold voltage.
18. The method of
timing a regulated portion of an on-time of the synchronous rectifier switch transistor during the previous cycle of the synchronous rectifier switch transistor to provide a measured regulated portion;
adjusting a sampling time based upon a difference between the measured regulated portion and a threshold delay to provide an adjusted sampling time; and
during the on-time in the current cycle of the synchronous rectifier switch transistor, sampling the drain voltage of the synchronous rectifier switch transistor at the adjusted sampling time to provide the dynamic drain threshold voltage.
19. The method of
adjusting a sampling time based upon a comparison of the gate voltage of the synchronous rectifier switch transistor during an on-time of the synchronous rectifier switch transistor during the previous cycle of the synchronous rectifier switch transistor to a threshold gate voltage to provide an adjusted sampling time; and
during the on-time in the current cycle of the synchronous rectifier switch transistor, sampling the drain voltage of the synchronous rectifier switch transistor at the adjusted sampling time to provide the dynamic drain threshold voltage.
|
The present application is a continuation-in-part of U.S. patent application Ser. No. 16/888,466, filed May 29, 2020, which is hereby incorporated by reference in its entirety.
This application relates to switching power converters, and more particularly to the adaptive gate regulation of a synchronous rectifier switch transistor in a flyback converter.
As known in the flyback arts, a secondary-winding current in a flyback converter's transformer is rectified so as to not conduct while the primary-winding current conducts. This rectification may be performed by an output diode or by a synchronous rectifier switch transistor. Although an output diode is passive and thus requires no synchronous rectifier control, the use of an output diode lowers efficiency as compared to a flyback converter with synchronous rectification. Synchronous rectification is thus broadly used to improve efficiency.
The synchronous rectifier switch transistor is typically a metal-oxide-semiconductor field-effect transistor (MOSFET). To control the switching of a synchronous rectifier (SR) switch MOSFET, an SR controller monitors the drain-to-source voltage across the SR MOSFET. Based upon the drain-to-source voltage, the SR controller detects whether the power switch transistor has cycled off so that the SR switch transistor may be switched on. For example, if the SR switch transistor is an n-type metal-oxide semiconductor (NMOS) transistor, the SR controller switches on the SR switch transistor by increasing a gate-to-source voltage for the SR switch transistor above its threshold voltage.
Operation of the flyback converter in a continuous conduction mode (CCM) of operation complicates the synchronous rectifier control. In CCM, the power switch transistor is switched on before the secondary winding current has ramped down to zero. In contrast, the secondary winding current has ramped down to zero before the power switch transistor is cycled on during a discontinuous conduction mode (DCM) of operation. During DCM operation, the SR controller may switch on the SR switch transistor when the SR MOSFET's drain-to-source voltage is less than a turn-on threshold voltage (e.g., −120 mV). The SR controller may then switch off the SR switch transistor when the drain-to-source voltage approaches a turn-off threshold voltage such as −3 mV. Since the SR switch transistor is then off, the power switch transistor may be cycled on without any danger of “shoot-through,” which is the undesirable common-conduction condition of both the primary-winding current and the secondary-winding currents conducting at the same time.
But in CCM operation, the power switch transistor is cycled on while the SR switch transistor is still conducting. The drain-to-source voltage for the SR switch transistor quickly rises due to the power switch transistor being cycled on so that the drain-to-source voltage rises to the turn-off threshold voltage, whereupon the SR controller switches off the SR switch transistor. But a common-conduction condition exists from when the power switch transistor switches on to when the SR switch transistor switches off. Since the common-conduction issue during CCM operation is stressful to the power converter, it is conventional to apply a pre-drop technique to the gate voltage of the SR switch transistor to reduce the common-conduction time. In the pre-drop technique, the gate voltage of the SR switch transistor is pulled down to approximately the threshold voltage for the SR switch transistor. Since the gate-to-source voltage for the SR switch transistor is barely satisfying the threshold voltage, the SR controller can more quickly turn off the SR switch transistor in response to the drain-to-source voltage rising to the turn-off threshold voltage.
But how and when to pre-drop the gate voltage of the SR switch transistor remains a problem. If the gate voltage drops too fast and has an undershoot below the threshold voltage, the on-resistance for the SR switch transistor will suddenly become large. As a result, the drain voltage for the SR switch transistor drops, resulting in power loss increases. To reduce power losses, it is known to control the gate voltage of the SR switch transistor to regulate its drain voltage to a fixed, pre-set value. This regulation functions adequately during DCM operation and critical DCM operation. But during CCM voltage, the drain voltage may not reach the desired pre-set value. To achieve regulation during CCM operation, the desired pre-set value may be lowered, but the resulting threshold for controlling the gate voltage sacrifices efficiency during CCM and DCM operation.
Accordingly, there is a need in the art for flyback converters with improved gate voltage control to increase power efficiency across both DCM and CCM operation.
In accordance with a first aspect of the disclosure, a synchronous rectifier controller for a flyback converter is provided that includes: a differential amplifier configured to drive a gate voltage of a synchronous rectifier switch transistor during a regulated portion of a current cycle of the synchronous rectifier switch transistor, the differential amplifier being responsive to a difference between a drain voltage of the synchronous rectifier switch transistor and a dynamic drain threshold voltage; a sample-and-hold circuit configured to sample and hold the drain voltage during the current cycle of the synchronous rectifier switch transistor to provide the dynamic drain threshold voltage, the sample-and-hold circuit being further configured to sample the drain voltage at a sampling time that is a function of a previous cycle of the synchronous rectifier switch transistor; a switch connected between ground and a gate of the synchronous rectifier switch transistor; and a comparator configured to close the switch to discharge the gate voltage responsive to the drain voltage being greater than a turn-off threshold voltage.
In accordance with a second aspect of the disclosure, a synchronous rectifier controller is provided that includes: a differential amplifier configured to drive a gate voltage of a synchronous rectifier switch transistor during a regulated portion of a current cycle of the synchronous rectifier switch transistor, the differential amplifier being responsive to a difference between a drain voltage of the synchronous rectifier switch transistor and a dynamic drain threshold voltage; a timing analysis circuit configured to adjust the dynamic drain threshold voltage based upon a comparison of a duration of a regulated portion of a previous cycle of the synchronous rectifier switch transistor to a threshold delay; a switch connected between ground and a gate of the synchronous rectifier switch transistor; and a comparator configured to close the switch to discharge the gate voltage responsive to the drain voltage being greater than a turn-off threshold voltage.
In accordance with a third aspect of the disclosure, a method of controlling a gate voltage of a synchronous rectifier switch transistor is provided that includes: adapting a dynamic drain threshold voltage responsive to a previous cycle of the synchronous rectifier switch transistor; during an on-time in a current cycle of the synchronous rectifier switch transistor, responding to a drain voltage of the synchronous rectifier switch transistor rising to equal the dynamic drain voltage by controlling the gate voltage of the synchronous rectifier switch transistor to maintain the drain voltage of the synchronous rectifier switch transistor equal to the dynamic drain threshold voltage; and discharging the gate voltage responsive to the drain voltage being greater than a turn-off threshold voltage.
These and other aspects of the invention will become more fully understood upon a review of the detailed description, which follows. Other aspects, features, and embodiments will become apparent to those of ordinary skill in the art, upon reviewing the following description of specific, exemplary embodiments in conjunction with the accompanying figures. While features may be discussed relative to certain embodiments and figures below, all embodiments can include one or more of the advantageous features discussed herein. In other words, while one or more embodiments may be discussed as having certain advantageous features, one or more of such features may also be used in accordance with the various embodiments discussed herein. In similar fashion, while exemplary embodiments may be discussed below as device, system, or method embodiments it should be understood that such exemplary embodiments can be implemented in various devices, systems, and methods.
Embodiments of the present disclosure and their advantages are best understood by referring to the detailed description that follows. It should be appreciated that like reference numerals are used to identify like elements illustrated in one or more of the figures.
Flyback converters are provided in which a secondary-side SR controller uses feedback to control the gate voltage of the SR switch transistor so that its drain voltage is regulated during a regulated portion of the SR switch transistor on-time. The regulated portion of the on-time is thus adaptive from cycle-to-cycle. In contrast, it was conventional for the regulated portion of the on-time to be a fixed time period. This fixed duration needed to be sufficiently short for CCM operation, but this leads to lowered efficiency during DCM operation. In contrast, the adaptive regulation disclosed herein provides for efficient operation during both CCM and DCM modes of operation. Turning now to the drawings, an example flyback converter 100 with a gate-voltage regulating secondary-side SR controller (U2) 105 is shown in
SR controller 105 detects whether the power switch transistor SW is on or off by monitoring a drain-to-source voltage Vds across an SR switch transistor. To perform this monitoring, SR controller 105 has a drain monitoring terminal SR D and a source monitoring terminal SR S. In addition, SR controller 105 includes a gate terminal SR G that connects to a gate of the SR switch transistor to control whether the SR switch transistor is on or off. In response to detecting that the power switch transistor S1 is on, SR controller 105 switches off (in CCM operation) the SR switch transistor or maintains the SR switch transistor off (in DCM operation) to prevent a secondary-winding current from flowing in a secondary winding T2 of the transformer T. In response to detecting that the power switch transistor S1 is off, SR controller 105 switches on the SR switch transistor during CCM operation to let the secondary-winding current flow and charge an output capacitor Cout with the output voltage. Rather than monitor the drain-to-source voltage of the SR switch transistor to determine the switching state of the power switch transistor, SR controller 105 may instead receive a switch on or off status for the power switch transistor S1 through an isolating channel such as an optocoupler in alternative embodiments.
The problems of voltage pre-drop for both CCM and DCM operation are solved by adaptively regulating the drain voltage. Regarding this regulation, note that there are two conflicting issues that should be solved. For example, it would be optimal with respect to reducing the conduction losses (the Rds on-resistance) in the SR switch transistor to not regulate the drain voltage but instead drive the gate voltage of the SR switch transistor so that it was in saturation across the entire SR switch transistor on-time (the transformer reset time Trst). But with the gate voltage being relatively high, common-conduction losses (switch loss) will occur during CCM operation because it will then take longer to switch off the SR switch transistor in response to a switching-on of the power switch transistor. In contrast, if the drain voltage of the SR switch transistor were regulated by a feedback-controlled lowering of the gate voltage of the SR switch transistor, the common-conduction losses are reduced. It is thus advantageous to have the drain voltage unregulated during an initial portion of the SR switch transistor on-time and then regulated during a final portion of the SR switch transistor on-time. The regulated portion should not be too short, or the gate voltage is not reduced sufficiently at the end of the SR switch on-time, resulting in unacceptable common-conduction losses. Conversely, if the regulated portion is too long, the conduction losses may be unacceptable. There is thus an optimal duration for the regulation portion that achieves the desired goal of reducing common-conduction losses without causing unacceptable conduction losses.
The prior art, however, did not achieve a “just right” duration to the final regulated portion. For example, it is conventional to utilize a fixed drain threshold voltage that determined when the drain voltage regulation would begin. But the drain voltage behavior during the unregulated portion depends upon the load. In times of relatively high load such as to support rapid charge modes, the flyback converter operates in CCM such that the drain voltage of the SR switch transistor is more negative during the unregulated portion. Conversely, the flyback converter operates in DCM during periods of lower load such that the drain voltage of the SR switch transistor is less negative during the unregulated portion. Since the drain voltage is less negative during DCM operation, the drain threshold voltage should be less negative as well or the regulated portion becomes too long. But such a relatively-larger value for the drain threshold voltage is then unsuitable for CCM operation since the drain voltage may then never rise to the drain threshold voltage to trigger the regulation of the drain voltage. In that case, the gate voltage would then be too high at the end of the SR switch transistor on-time so that common-conduction losses occur. The solution would then be to decrease the drain threshold voltage but then the regulation time becomes too long during DCM operation so that conduction losses occur.
To solve these issues, a dynamic drain threshold voltage is utilized that is adjusted responsive to the drain voltage regulation in a previous SR switch transistor cycle. As time goes on, each current SR switch transistor cycle becomes a previous SR switch transistor cycle to a current SR switch transistor cycle. The following discussion will assume that the dynamic drain threshold voltage is adjusted for a current SR switch transistor cycle based upon the regulation in the immediately-preceding SR switch transistor cycle, but it will be appreciated that the historic SR switch transistor behavior may be averaged over several SR switch transistor cycles.
With regard to the drain voltage regulation in a preceding SR switch transistor cycle, several factors can be utilized to adjust the dynamic drain threshold voltage in the current SR switch transistor on-time. For example, as shown in more detail in
Adaptation circuit 215 is shown in more detail in
Some operating waveforms for SR controller 200 in an embodiment that adjusts the dynamic drain threshold voltage based upon the SR switch transistor on-time Trst(n−1) in a previous cycle of the SR switch transistor are shown in
The adaptation of the dynamic drain threshold voltage V1 results in an adaptation of a duration for the regulated portion of the SR gate voltage/SR switch on-time. For example, the regulated portion extending from a time t0 to a time t1 for the high load switching cycle is greater than a regulated portion extending from a time t2 to a time t3 for the medium load switching cycle. In turn, the regulated portion of the medium load switching cycle is greater than a regulated portion extending from a time t4 to a time t5 for the light load switching cycle. This variation in the regulated portion length of the SR switch on-time is quite advantageous in that the SR switch transistor may be switched off more quickly during the high load switch cycle whereas the shorter duration of the regulated portion for the medium and light load switching cycles increases efficiency due to the lowered on-resistance of the SR switch transistor. To measure the transformer reset time Trst(n−1) in the previous switching cycle, timing circuit 225 measures the SR switch on-time. The delay of 67.5% of Trst(n−1) then expires at time t2 in the second switching cycle such that the drain voltage VDS is sampled through a S/H pulse in the sample-and-hold circuit. The initial unregulated portion of the current SR switch transistor in the second switching cycle on-time thus ends at time t2.
A portion of a flyback converter including an example SR controller 400 is shown in
Some operating waveforms for SR controller 400 in an embodiment that adjusts the dynamic drain threshold voltage based upon the SR switch transistor on-time Trst(n−1) in a previous cycle of the SR switch transistor are shown in
In the event of a sudden load change or input voltage change, the SR switch transistor on-time may vary significantly from one cycle to the next. It is thus possible that if the current switching cycle is significantly shorter than the previous one, basing the drain voltage regulation upon the previous cycle's on-time may result in the final regulated portion being unacceptably short or perhaps not even occur. For example, if the current cycle's SR switch transistor on-time is less than the function of Trst(n−1) that is used to form the sampling time, then no drain voltage regulation would be triggered in the current switching cycle. Undesirable common-conduction losses and/or damage to the flyback converter may then occur. To avoid these problems, SR controller 200 may respond to the transient occurrence by using a minimum sampling time (Min ton). The sampling time t2 thus cannot occur any earlier than the expiration of the minimum on-time.
Rather than use a function of the SR switch transistor on-time, the final regulated portion of the previous SR switching cycle may be measured and used to adjust the dynamic drain threshold voltage in the current switching cycle. An example SR controller 500 is shown in
In another embodiment, as shown for a SR controller 600 in
Those of some skill in this art will by now appreciate that many modifications, substitutions and variations can be made in and to the materials, apparatus, configurations and methods of use of the devices of the present disclosure without departing from the scope thereof. In light of this, the scope of the present disclosure should not be limited to that of the particular embodiments illustrated and described herein, as they are merely by way of some examples thereof, but rather, should be fully commensurate with that of the claims appended hereafter and their functional equivalents.
Chen, Yimin, Liu, Mengfei, Kong, Pengju, Zong, Qingqing
Patent | Priority | Assignee | Title |
Patent | Priority | Assignee | Title |
10033285, | Jun 19 2017 | DIALOG SEMICONDUCTOR INC; DIALOG SEMICONDUCTOR UK LIMITED | Secondary controller for a flyback converter including a sense resistor fault detection |
10560012, | Jul 27 2018 | Richtek Technology Corporation | ZVS control circuit for use in a flyback power converter |
10615700, | Jan 21 2019 | Semiconductor Components Industries, LLC | Synchronous rectifier control for switched mode power supplies and method therefor |
10658917, | Apr 20 2018 | STMicroelectronics S.r.l. | Synchronous rectification circuit, corresponding device and method |
7688602, | Apr 29 2008 | Infineon Technologies Austria AG; INFINEON TECHNOLOGIES AUST | Synchronous rectifier control circuit and method |
9118255, | Nov 14 2012 | Lite-On Technology Corporation | Flyback power converter and electronic apparatus |
20150124495, | |||
20180062530, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Jan 15 2021 | Dialog Semiconductor Inc. | (assignment on the face of the patent) | / | |||
Jan 15 2021 | ZONG, QINGQING | DIALOG SEMICONDUCTOR INC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 055503 | /0655 | |
Jan 15 2021 | CHEN, YIMIN | DIALOG SEMICONDUCTOR INC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 055503 | /0655 | |
Jan 15 2021 | LIU, MENGFEI | DIALOG SEMICONDUCTOR INC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 055503 | /0655 | |
Jan 15 2021 | KONG, PENGJU | DIALOG SEMICONDUCTOR INC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 055503 | /0655 |
Date | Maintenance Fee Events |
Jan 15 2021 | BIG: Entity status set to Undiscounted (note the period is included in the code). |
Date | Maintenance Schedule |
Apr 04 2026 | 4 years fee payment window open |
Oct 04 2026 | 6 months grace period start (w surcharge) |
Apr 04 2027 | patent expiry (for year 4) |
Apr 04 2029 | 2 years to revive unintentionally abandoned end. (for year 4) |
Apr 04 2030 | 8 years fee payment window open |
Oct 04 2030 | 6 months grace period start (w surcharge) |
Apr 04 2031 | patent expiry (for year 8) |
Apr 04 2033 | 2 years to revive unintentionally abandoned end. (for year 8) |
Apr 04 2034 | 12 years fee payment window open |
Oct 04 2034 | 6 months grace period start (w surcharge) |
Apr 04 2035 | patent expiry (for year 12) |
Apr 04 2037 | 2 years to revive unintentionally abandoned end. (for year 12) |