A perfectly ductile hard steel wire having superposed coatings resisting corrosion. The wire is coated with a first inner layer A1 (al-Fe-Zn) and a second outer layer A2 (Zn-al-Fe) and the first inner coating layer has the following composition:

______________________________________
al between 15% and 45%
Fe between 5% and 25%
al Zn forming the balance with elements of addition
in a small amount, such as Mg, Sn, Ni, Cu, Cr,
Mischmetal, etc. . . the total amount of which
does not exceed 0.5%.
______________________________________

This wire has a resistance to corrosion very much higher than that of conventional galvanized wires and that of similar Zn-al coatings which had been deposited in a single stage.

Patent
   4605598
Priority
Jun 28 1983
Filed
Jun 26 1984
Issued
Aug 12 1986
Expiry
Jun 26 2004
Assg.orig
Entity
Large
7
17
all paid
1. A highly ductile hard steel wire having corrosion resistant superposed coatings, said wire being coated with a first inner al-Fe-Zn alloy layer consisting essentially of between 15% and 45% al, between 5% and 25% Fe and the balance being essentially Zn with minor amounts of one or more elements selected from the group consisting of Mg, Sn, Ni, Cu, Cr and mischmetal in an amount which does not exceed a total amount of 0.5% and a second outer alloy layer consisting essentially of between 3% and 20% al, between 0.5% and 5% Fe and the remainder being essentially Zn with minor amounts, not to exceed a total amount of 0.5%, of one or more elements selected from the groups consisting of Mg, Sn, Ni, Cu, Cr, and Mischmetal.

The present invention relates to a hard steel wire having a high carbon content and perfectly ductile employed in the manufacture of cables and springs, and having a protective coating formed by a plurality of layers of different alloys containing zinc, aluminium and iron.

According to the invention, the wire is coated with a first inner layer of alloy A1 (Al-Fe-Zn) containing at least 15% of aluminium and a second outer layer A2 (Zn-Al-Fe) containing at least 3% of aluminium and 90% of zinc.

According to one embodiment of the invention, the composition of these coating layers is the following:

the first layer (inner) of alloy A1 contains iron, aluminium and zinc, the overall content of this layer being the following:

______________________________________
Al between 15% and 45%
Fe between 5% and 25%
Al Zn forming the balance with addition elements
in a small amount such as Mg, Sn, Ni,
Cu, Cr, Mischmetal, etc . . . ;
______________________________________

the second layer (outer) of alloy A2, disposed on the first layer contains zinc, aluminium and iron, and its overall content is the following:

______________________________________
Al between 3% and 20%
Fe between 0.5% and 5%
A2 Zn forming the balance with elements of addi-
tion in a small amount such as Mg, Zn,
Ni, Cu, Cr, Mischmetal, etc . . .
______________________________________

These layers are obtained by a manufacturing process in two stages.

The preparation of protective coatings in two stages has been known for a long time, but the prior processes do not describe voluntary heat treatments before and after the two immersions.

The first stage of the process according to the invention comprises a galvanization of the pure zinc by hot dipping in a bath of pure zinc followed by a controlled cooling and/or controlled heating (R1).

The second stage of this process is a dipping of the first galvanization coating in a bath of molten zinc-aluminium alloy having the following composition:

Al between 3% and 10%;

Zn forming the balance with elements of addition in a small amount: Mg, Sn, Cr, Ni, Cu, Mischmetal, etc . . . the total of which does not exceed 0.5%.

The dipping in this second bath followed by a controlled cooling and/or a controlled heating (R2), produces a considerable thermochemical modification of the coatings of alloy obtained by the first galvanization so as to result in the alloy A1 (Al-Zn-Fe).

Further, the layer of pure zinc of the first galvanization completely disappears and gives the layer of alloy A2 (Al-Zn-Fe).

These successive coolings and/or heatings thus produce a controlled diffusion thermochemical treatment.

These two layers have for respective overall compositions: A1 and A2.

There is therefore found a very high enrichment with aluminium of the inner layer, while the first bath contains only pure zinc.

The process of the invention therefore comprises two consecutive dippings with controlled cooling and/or controlled heating, so as to produce a controlled diffusion of Al and Fe.

The obtained wire as defined, has a resistance to corrosion which is very distinctly improved relative to that of conventional galvanized wires while it retains excellent characteristics of ductility and deformability (folding, winding, wiredrawing, etc . . . ).

It has been found that the resistance to accelerated corrosion in a saline mist according to the French standard ASTM B-117 of the wire of the present invention is at least double that of a conventional galvanized wire.

Moreover, the resistance to accelerated corrosion in a saline mist according to the French standard NFX41-002 (August 1975) of the wire of the invention is at least twice as high as that of a conventional galvanized wire, as shown by tests carried out. By way of illustrative numerical examples, for anticorrosion coatings of a thickness of 20 microns exposed to the saline mist, rust appeared at the end of about 150 hours on a conventional galvanized wire, and after 400 hours on a wire provided with a coating according to the invention. In respect of coatings of 40 microns in thickness, these times are respectively 300 hours and 800 hours.

It has also been ascertained that the cathodic protection in a chlorinated medium of the coating according to the invention is at least equal to that of a conventional galvanized wire.

Tests have also been carried out concerning corrosion in an SO2 atmosphere, at 10 ppm SO2, the following table of which shows the results expressed in loss of weight due to the corrosion for various specimens exposed to a 10 ppm SO2 atmosphere and examined after three days, 1, 2, 3 and 4 weeks.

______________________________________
THICK-
NESS
OF THE 3 1 2 3 4
SO2
COATING days week weeks weeks weeks
______________________________________
Wire of the
64 g/m2
21 28 40 57 51
invention
Galvanized
71 g/m2
65* 58* 11* 63* 464*
wire 10μ
Galvanized
150 g/m2
76 122* 112* 105* 134*
wire 21μ
Wire of the
142 g/m2
20 28 58 66 73
invention
20μ
Galvanized
228 g/m2
67 105 190* 184* 157*
wire 32μ
Wire of the
228 g/m2
20 27 62 75 104
invention
32μ
______________________________________
SO2 Resistance to corrosion of the wire of the invention and of the
wire in a 10 ppm atmosphere.
The corrosion is expressed in loss of weight (g/m2).
*signifies that the steel is attacked.

The specimens were wound onto a mandrel having a diameter of 10 mm before the test.

The wires having a light coating of zinc (10 μm) exhibit red rust after three days of an exposure.

The galvanized wires having a coating thickness of 21 μm are corroded (with attack of the steel) after a week and those having a thickness of 35 μm reveal rust after two weeks of exposure.

No trace of red rust was observed on the specimens of wire according to the invention, even those having a thin coating (10 μm) after four weeks of exposure.

The resistance to corrosion of the wire obtained according to the invention is higher than that of similar coatings of Zn-Al but deposited in a single operation, without a controlled diffusion.

By way of example, the controlled cooling R1 of the wire as it leaves the first bath (pure zinc) was 20°C per second, the heating before the second bath was 100°C per second, the cooling R2 after the second bath (alloy containing zinc+Al+additions) was 100°C per second.

Thomas, Bruno, Viart, Guy

Patent Priority Assignee Title
4830184, Apr 21 1988 TRI-STEEL USA INC Metal wire spacer for use in the bundling of nested stacks of metal pieces
5545482, Jul 01 1992 Shinko Kosen Kogyo Kabushiki Kaisha Two-phase stainless steel wire rope having high fatigue resistance and corrosion resistance
5849408, Dec 27 1993 Nippon Mining & Metals Co., Ltd. Hot-dip zinc plating product
6338590, Aug 07 1998 Pfeifer Holding GmbH & Co., KG Swage fitting made of steel and method for its production
6610423, Feb 29 2000 Nippon Steel Corporation Plated steel product having high corrosion resistance and excellent formability and method for production thereof
7022146, Jan 17 2003 GREATBATCH, LTD NEW YORK CORPORATION Method for providing a hermetically sealed coin cell
7901769, Nov 21 2008 The Curators of the University of Missouri; PRO-PERMA ENGINEERED COATINGS, LLC Corrosion-resistant glasses for steel enamels
Patent Priority Assignee Title
1307853,
1468905,
2068904,
2069658,
3190768,
3320040,
3343930,
3393089,
3952120, May 31 1974 BIEC INTERNATIONAL, INC , A CORP OF DE Aluminum-zinc coated low-alloy ferrous product and method
4056366, Dec 24 1975 Inland Steel Company Zinc-aluminum alloy coating and method of hot-dip coating
4128676, Jan 05 1976 Inland Steel Company Method of hot-dip coating a ferrous substrate with a zinc-aluminum alloy resistant to intergranular corrosion
4152472, Mar 19 1973 Nippon Steel Corporation Galvanized ferrous article for later application of paint coating
4202921, Feb 24 1976 Aktiebolaget Garphytte Bruk Process for the preparation of rope and spring wire of carbon steel with an improved corrosion resistance
4350539, Nov 08 1979 BIEC INTERNATIONAL, INC , A CORP OF DE Method of improving the ductility of the coating of an aluminum-zinc alloy coated ferrous product
4448748, Mar 25 1980 International Lead Zinc Research Organization, Inc. Zinc-aluminum alloys and coatings
DE2146376,
EP37143,
///
Executed onAssignorAssigneeConveyanceFrameReelDoc
Jun 12 1984THOMAS, BRUNOFILS ET CABLES D ACIER DE LENS FICAL ASSIGNMENT OF ASSIGNORS INTEREST 0042790373 pdf
Jun 12 1984VIART, GUYFILS ET CABLES D ACIER DE LENS FICAL ASSIGNMENT OF ASSIGNORS INTEREST 0042790373 pdf
Jun 26 1984Fils et Cables d'Acier de Lens (FICAL)(assignment on the face of the patent)
Date Maintenance Fee Events
Feb 12 1990M173: Payment of Maintenance Fee, 4th Year, PL 97-247.
Feb 20 1990ASPN: Payor Number Assigned.
Jan 24 1994M184: Payment of Maintenance Fee, 8th Year, Large Entity.
Feb 14 1994ASPN: Payor Number Assigned.
Feb 14 1994RMPN: Payer Number De-assigned.
Aug 20 1997ASPN: Payor Number Assigned.
Aug 20 1997RMPN: Payer Number De-assigned.
Jan 20 1998M185: Payment of Maintenance Fee, 12th Year, Large Entity.


Date Maintenance Schedule
Aug 12 19894 years fee payment window open
Feb 12 19906 months grace period start (w surcharge)
Aug 12 1990patent expiry (for year 4)
Aug 12 19922 years to revive unintentionally abandoned end. (for year 4)
Aug 12 19938 years fee payment window open
Feb 12 19946 months grace period start (w surcharge)
Aug 12 1994patent expiry (for year 8)
Aug 12 19962 years to revive unintentionally abandoned end. (for year 8)
Aug 12 199712 years fee payment window open
Feb 12 19986 months grace period start (w surcharge)
Aug 12 1998patent expiry (for year 12)
Aug 12 20002 years to revive unintentionally abandoned end. (for year 12)