A method for building a road bed by providing a plurality of vaulted structures located at a road bed site. A first layer of concrete is applied on the structures for reinforcing the structures. The structures can be comprised of a profiled steel plate or a sheet metal mesh. They may have reinforcement braces comprised of troughs or corrugations provided on an outer surface of the structures which receive the first layer of concrete. The first layer of concrete is allowed to set before a second layer of concrete is applied to the structures and to the first layer to form a concrete casing.
|
1. A method of building a road bed comprising the steps of:
(a) placing at least one hollow vaulted structure at a site wherein the vaulted structure includes a plurality of individual concrete-holding reinforcement braces which extend over the vaulted structure; (b) shotcreting concrete on each one of the plurality of reinforcement braces of the vaulted structure and allowing the concrete to set to define a plurality of separate concrete-filled reinforcement braces to reinforce the vaulted structure; (c) with the vaulted structure at a road bed site, applying a layer of concrete over the vaulted structure to form a road bed.
17. A method of building a road bed, comprising the steps of
(a) placing a support in a vaulted structure form at a road bed site, wherein the vaulted structure includes a plurality of individual concrete-holding reinforcement braces which extend over the vaulted structure; (b) shotcreting concrete onto each one of the plurality of reinforcement braces to define a plurality of separate concrete-filled reinforcement braces over the vaulted structure form and integral therewith; (c) allowing the shotcreted concrete to set in the braces; (d) continuing the shotcreting so as to form a concrete casing in the vaulted structure form.
3. The method of
4. The method of
5. The method of
6. The method of
8. The method of
9. The method of
10. The method of
11. The method of
12. The method of
13. The method of
14. The method of
15. The method of
16. The method of
|
This is a continuation of application Ser. No. 08/039,102, filed on Apr. 8, 1994.
1. Field of the Invention
The present invention relates to a method for building a road bed.
2. Description of the Related Art
Our earlier Patent application FI 894535 discloses a method for producing a joint structure formed of a combination of a shaped plate, generally a profiled steel plate, and concrete shotcreted on the shaped plate. An expanded sheet metal mesh manufactured thin steel sheet by elongation, is known from U.S. Pat. No. 1,864,598 and 3,034,197. A widermeshed diagonal screen grid manufactured from thicker sheet metal by cutting and elongation is known from U.S. Pat. No. 3,570,086.
A drawback in the current road-building methods is that a road bed requires the soil masses, which often leads to undesired the depressions in the soft ground underneath. The elimination of the depressions requires expensive ground reinforcements. Indeed, the construction of road beds on soft basic ground generally incurs major expense and extra costs.
Building passages in road-bed structures by the application of the prior known methods is expensive and inconvenient. Particularly, the casting of concrete into an arched vaulted shape is difficult and tedious. Carrying great masses of soil to a road-construction site requires a lot of time and causes environmental problems. The soil materials suitable for road-building are nearly exhausted in many places and must often be excavated in areas valuable in terms of environmental protection. Construction on soft grounds may take several years, as the reinforcement of subsoil is a tedious procedure. The road surfaces do not often remain flat, but develop traffic-disturbing depressions.
At present, road beds used as soil storages are useless especially in urban areas, for example where, the street sections are highly valuable areas. These road beds should be in service for more useful priorities other than the storage of sand.
An object of the present invention is to alleviate the above drawbacks by means of a method of applying shotcreting to provide a road bed having one or a plurality of vaulted cavities inside a concrete casing.
The invention can be used for a great number of applications.
In the specification, the term "roadway" refers to highways, walking paths, railroads, and streets, as well as like passages.
The term "vaulted" refers in specification to arched vaults, vaulted shapes consisting of arched and straight sections, circles, egg shapes and its sections, as well as parabolic and hyperbolic segments. A vaulted structure is often dominated by compression stresses, but also flexural stresses may exist. Compression stresses are preferred since in that case the concrete does not require many steel reinforcements to take up tensile stresses. Thus, the structure will be inexpensive as expensive steel can be saved.
FIG. 1 shows in cross-section a presently used general road bed.
FIG. 2 shows an arched bent mesh and plate section prior to concreting. FIG. 3 shows a section of an elongated mesh structure following the addition of a first concrete layer.
FIG. 4 illustrates shotcreting by means of two nozzles behind steel members.
FIG. 5 shows a concrete casing sprayed on top of an expanded sheet metal mesh braced with reinforcement corrugations.
FIG. 6 shows an expanded sheet metal mesh shotcreted on both sides.
FIG. 7 illustrates the lifting of a prevaulted shotcreted surface element on top of a foundation.
FIG. 8 illustrates two parallel-set vaulted concreting surfaces.
FIG. 9 illustrates shotcreting mesh elements by means of a remote-controlled heavyduty machine.
FIG. 10 illustrates vaulted and profiled thin sheets on top of a foundation prior to concreting.
FIG. 11 shows a finished road structure obtained according to the invention.
FIG. 12 shows a finished road structure built on top of piles. FIG. 13 shows a visualization of an alternative road structure with passages extending crosswise relative to the direction of a road.
FIG. 14 shows a divided roadway located on top of piles.
FIG. 15 shows a street obtained according to the invention.
FIG. 16 shows a pedestrian street obtained according to the invention.
FIG. 17 shows a roadway obtained according to the invention with a parking lot provided in its bed structure.
FIG. 18 shows a roadway with another traffic route provided in its bed structure.
FIG. 19 shows in cross-section shotcreting the ground having an egg shape.
FIG. 20 shows the spraying of the top portion of an egg-shaped cross-section on top of the structure shown in FIG. 19.
FIG. 21 shows a cross-section of a road structure set on top of an egg-shaped void.
FIG, 1 Illustrates a known available road structure having a great amount of soil material underneath a cover structure 55. The resulting road bed is heavy and requires large amounts of soil material;
In FIG. 2, an arched mesh 86 has been mounted on top of an arched and profiled thin sheet 1. Mesh 86 is shaped into an apexed form for increased rigidity. The diagonal strands of mesh 86 provide dimensional stability prior to concreting.
In FIG. 3, a first shotcrete layer 6 is applied to cover the lower section of mesh 86 and sheet 1. In order to prevent the passage of shotcrete, it is possible to employ some sort of a backing member 27, temporarily or permanently. Through mesh apertures the concrete mass 6 works its way inside the ribbed mesh portion.
A double nozzle 5 as shown in FIG. 4 can be used for spraying shotcrete 4 on the same spot from different directions, for filling possible shadow regions caused by steel members 86. It is also possible to employ a plurality of nozzles to spray concrete from different directions to a common spot. Nozzles 5 can be secured to support arms 82 that can be linked with a pivot 89 for adjusting the angle of incidence between various nozzles 5. If desired, the concrete mass 4 can be ricocheted from backing member 27 into Spaces behind steel members 86.
In FIG. 5, the shotcreting is effected on top of an expanded sheet metal mesh 10 reinforced with corrugations 49.
In an embodiment shown in FIG. 6, an expanded sheet metal mesh 10 is shotcreted on both sides, to increase the vault strength with increased thickness. At the same time, a mesh made of, e.g. steel, can the protected against corrosion.
In FIG. 7, a crane 52 is used for lifting a vaulted mesh element 10 on top of pre-made foundations 45, the element 10 being provided with reinforcement corrugations 49. The mutually tied foundations 45 are preset on ground 23.
In FIG. 8, the mesh elements are provided with reinforcement braces 100 which can be e.g. mesh troughs. Those can be first shotcreted full of concrete at the beginning of a concreting operation, when the structure is still light. The structurally reinforcing braces are developed upon setting of the concrete. The diagonal reinforcement braces 100 are used to readily transfer the loads on a vault to piles 60 on soft ground.
In FIG. 9, shotcreting is carried out effectively from a remote-control equipped machine and having crane 52 nozzles onto parallel mesh elements 10 forming vaulted cavities 92. Concreting can be effected in layers in a manner that structural strength increases gradually as the preceding concrete layers are setting. The weight and strength of the structure are increased at the same rate.
In an embodiment shown in FIG. 10, shotcreting can be applied onto a profiled metal sheet 1.
In an embodiment shown in FIG. 11, a road construction 96 is provided by shotcreting two vaulted cavities 92 extending side by side. The horizontal stresses of concrete casings 6 on the level of foundations can be directed oppositely to each other at the center.
In an embodiment shown in FIG. 12, shotcreting is used to provide a vaulted casing structure 6 with a noise barrier and upper-structure supporting ribs for supporting roadway 55 and pipeline 26b.
In an embodiment shown in FIGS. 13 and 14, cavities or passages 92 are placed side by side and thus, on the level of foundations, the horizontal forces substantially neutralize each other. The passages extend crosswise to a roadway and can serve as underpasses, bridges, or storage cavities for example.
In FIGS. 15 and 16, vault cavity 92 is provided underneath a street area 55 e.g. for traffic, pipelines 26, 26a or other equipment.
In FIGS. 17 and 18, the road bed is also adapted to the requirements of traffic in crowded urban areas with no available space for large parking lots or multi-lane roadways.
In FIGS. 19, 20 and 21, an egg-shaped void space 92 is formed in the bed of a road 55. The egg-shaped form is preferable in terms of stresses. At the beginning, concreting can be effected against the ground 23. The necessary mesh or plate elements are used as a shotcreting foundation for the top section. Necessary extensions can also be readily made by shotcreting. If desired, it is also possible to employ a circular form or some other shape instead of an egg shape in cavity 92.
An essential object of this invention is to make a hollow road bed as light as possible with minimum labor. A method of the invention can be applied to produce structures having a great load-carrying capacity and flexural strength.
Patent | Priority | Assignee | Title |
10011962, | May 02 2014 | SOLETANCHE FREYSSINET S A S | Method of enlarging the space beneath a masonry arch bridge, and a masonry arch bridge |
10655335, | Nov 14 2016 | Innovatech Systems, LLC | System and method of assembling and installing commercial roofing |
11092010, | Feb 20 2019 | FCI HOLDINGS DELAWARE, INC | Underground support system and method |
11274450, | Nov 14 2016 | Innovatech Systems, LLC | System and method of assembling and installing commercial roofing |
6682259, | Feb 04 2000 | Earthsource Technologies | Structure having an insulated support assembly |
9322137, | Sep 13 2011 | Method for building structures, particularly passages under operating railways or the like | |
9926671, | Jan 10 2014 | KANGWON NATIONAL UNIVERSITY University-Industry Cooperation Foundation | Method for repairing paved road |
Patent | Priority | Assignee | Title |
1864598, | |||
2315895, | |||
2425079, | |||
2686421, | |||
2964821, | |||
3622656, | |||
3751929, | |||
3776990, | |||
4155967, | Mar 07 1977 | Building structure and method of making same | |
4211504, | Jun 24 1976 | High strength corrugated metal plate and method of fabricating same | |
4587684, | Oct 14 1983 | Roman Arch and Culvert Corporation of America | Precast concrete bridge |
4597925, | Jul 05 1985 | PROMINEX U K , A CORP UNITED KINGDOM, DOMICILED AT ENGLAND | Method of constructing a modular reinforced building structure |
4618283, | Sep 06 1984 | Hilfiker Pipe Co. | Archway construction utilizing alternating reinforcing mats and fill layers |
4695187, | Aug 02 1984 | Bridginfill Design Ltd. | Concrete arch buried bridge |
4890993, | Jan 11 1988 | Apparatus for forming concrete structures | |
597590, | |||
CH620272, | |||
DD246581, | |||
DE1931431, | |||
FI29705, | |||
FR1286805, | |||
JP100208, | |||
NO100074, | |||
NO155822, | |||
SE303307, | |||
SE447280, | |||
SE456685, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Apr 29 1994 | Gesertek Oy | (assignment on the face of the patent) | / |
Date | Maintenance Fee Events |
Jan 10 1999 | EXP: Patent Expired for Failure to Pay Maintenance Fees. |
Date | Maintenance Schedule |
Jan 10 1998 | 4 years fee payment window open |
Jul 10 1998 | 6 months grace period start (w surcharge) |
Jan 10 1999 | patent expiry (for year 4) |
Jan 10 2001 | 2 years to revive unintentionally abandoned end. (for year 4) |
Jan 10 2002 | 8 years fee payment window open |
Jul 10 2002 | 6 months grace period start (w surcharge) |
Jan 10 2003 | patent expiry (for year 8) |
Jan 10 2005 | 2 years to revive unintentionally abandoned end. (for year 8) |
Jan 10 2006 | 12 years fee payment window open |
Jul 10 2006 | 6 months grace period start (w surcharge) |
Jan 10 2007 | patent expiry (for year 12) |
Jan 10 2009 | 2 years to revive unintentionally abandoned end. (for year 12) |