A system is provided for preventing erosion of a bluff or hillside having a face extending between a toe at a bottom thereof and a crest at a top surface thereof, and a failure shear plane. The bluff or hillside is subject to excess water accumulation contributing to land mass degradation. The invention is improved by at least one horizontal wick drain positioned behind the failure shear plane in a water saturated zone substantially parallel to the crest of the bluff or hillside for the purpose of controlling drainage of the excess water accumulation. The horizontal wick drain is installed from the top surface of the bluff or hillside so as not to impair the structural integrity and cause land mass degradation of the face thereof.
|
1. In a system for preventing erosion of a bluff or hillside having a face extending between a toe at a bottom thereof and a crest at a top surface thereof, and a failure shear plane, the bluff or hillside being subject to excess water accumulation contributing to land mass degradation thereof, the improvement comprising:
at least one horizontal wicking drain positioned behind the failure shear plane in a water saturated zone substantially parallel to the crest of the bluff or hillside for the purpose of controlling drainage of the excess water accumulation, the horizontal wicking drain having a proximal end located at the crest of the bluff or hillside, and a distal end located in the water saturated zone at the face of the bluff or hillside so as not to impair the structural integrity and cause land mass degradation of the face thereof.
4. In a bluff lying adjacent a body of water and having a shear failure plane and a face extending from a toe at the bottom of the bluff to a crest at a top surface of the bluff, a drainage system for preventing erosion of the bluff caused by excess water forces acting outwardly towards the face of the bluff, the system comprising:
an elongated bore extending substantially parallel to the crest of the bluff behind the shear failure plane and having a first end at the top surface of the bluff and a second end at a lower elevation exiting through the face of the bluff, the bore being started from the top surface of the bluff; an elongated horizontal wicking drain having a plastic corrugated core surrounded by a filtering fabric, the wicking drain being positioned within the bore and further having a proximal end at the first end of the bore and a distal end at the second end of the bore; and a collector drain pipe connected to the distal end of the wicking drain for returning excess water accumulated in the wicking drain to the adjacent body of water.
7. A method for preventing erosion in a face of a bluff having accumulated water therein, the face running from a toe of the bluff to a crest of the bluff at a top surface thereof, the method comprising the steps of:
drilling a series of substantially vertical holes into the top surface of the bluff to locate a shear failure plane behind a line extending from the toe of the bluff to the top surface of the bluff; and to locate water in the bluff; advancing a drill string from an out hole at a top surface of the bluff downwardly on a radius, horizontally in a water saturated zone and then outwardly to the face of the bluff; connecting an end of the drill string at the face of the bluff to a proximal end of a horizontal wicking drain for channeling water accumulated in the bluff; withdrawing the drill string from the out hole at the top of the bluff so as to drag the wicking drain through the out hole bringing the proximal end of the wicking drain to the top surface of the bluff and a distal end of the wicking drain to the face of the bluff; disconnecting the wicking drain from the drill string when the proximal end reaches the top surface of the bluff; and attaching an input end of a collection drain pipe to the distal end of the wicking drain for directing water accumulated in the wicking drain via an outlet end away form the face of the bluff.
2. The improvement of
3. The improvement of
5. The system of
6. The system of
8. The method of
9. The method of
10. The method of
|
This invention relates generally to erosion control of bluffs, hillsides and the like and, more particularly, pertains to a system and method for stabilizing the bluff or hillside by controlling the internal water drainage so as to prevent landslides or similar land mass slumping along the face or slope of the bluff or hillside.
The erosion of bluffs lying adjacent a lake or ocean has constituted a long and serious environmental problem. These bluffs are subject to the action of the waves occasionally pounding against them which erode away the base of the bluff leaving the bluff with an extremely steep face. This steep front face is very unstable, and, in some instances, is not able to support the weight of the dirt, sand and the like lying above it. Consequently, landslides or slumping may occur which can endanger man-made structures as well as trees and bushes on top of the bluff.
These bluffs as well as hillsides, such as those which slope down to a highway, are also subject, on a larger scale, to the action of forces acting within as caused by groundwater and water from spray, rain or snow melt which matriculates to various layers running through and exiting out the face of the bluffs or hillsides. If water saturation becomes excessively high, the outwardly exerting forces cause collapse of the steep face of the bluff or hillside, sometimes along an appreciable length thereof.
One prior art attempt to mitigate degradation of a hillside is disclosed in U.S. Pat. No. 4,714,376 issued Dec. 22, 1987 to Jenab. In this patent, a perforated drain pipe is placed within a hillside substantially parallel to the face of the hillside at a location on or above an impermeable layer. Jenab is thus primarily concerned with control of water drainage at the bottom of the hillside and is limited to boring holes, construction of a concrete apron and placement of a drain pipe at locations close to the face of the hillside near its bottom edge where a bulldozer is used to facilitate installation. While the '376 patent discloses the use of another drain pipe at a higher level of the hillside, it is only possible that the location of such pipe is within the reaching limits of the bulldozer leading one to believe it must be near the bottom of the hillside. Installation of Jenab's drain pipes through the front face of the hillside would thus appear to contribute to the collapse of the front face of the hillside, the very problem which the present invention seeks to prevent.
Another attempt to rectify bluff erosion by controlling internal water drainage has resulted in installing horizontal wick drains through the face of the bluff at angles generally perpendicular thereto. These installations are effected by forming a series of bores in upper elevations of the bluff using drilling equipment mounted on a support device suspended outside the face of the bluff. While such installations have been generally satisfactory for their intended purpose, they have not proven to be as efficient as desired in regulating bluff drainage. They also can exacerbate the problem because they conduct water and turn many drilled holes perpendicular to the bluff which adds water to the mass between the bluff shear plane and the bluff face.
Accordingly, it is desirable to provide a differently styled system and method for preventing bluff or hillside erosion which is more efficient in stabilizing the face of the bluff or hillside by controlling the water seepage therein.
It is a general object of the present invention to provide a novel and improved system which alters the natural drainage of water from the bluff so as to substantially preserve the formation thereof.
It is also an object of the present invention to strategically position a horizontal wick drain parallel to the crest or toe of the bluff in a water saturated layer or layers running therethrough.
It is a further object of the present invention to provide a unique method of installing a horizontal wick drain in a bluff using conventional drilling equipment.
It is an additional object of the present invention to provide for channeling water down the face of the bluff to a beach level using collection pipes attached to wick drain end points.
It is another object of the present invention to provide a bluff erosion protection system which eliminates the need for insertion of drainage structure by drilling or excavating the face of the bluff or hillside.
A still further object of the present invention is to provide a dewatering system for a bluff which does not require supplemental physical structure at the base or along the slope of the bluff.
In one aspect of the invention, a system is provided for preventing erosion of a bluff or hillside having a face extending between a toe at a bottom thereof and a crest at a top surface thereof, and a failure shear plane. The bluff or hillside is subject to excess water accumulation contributing to land mass degradation thereof. The system is improved by at least one horizontal wick drain positioned behind the failure shear plane in a water saturated zone substantially parallel to the crest of the bluff or hillside for the purpose of controlling drainage of the excess water accumulation. The horizontal wick drain is installed from the top surface of the bluff or hillside so as not to impair the structural integrity or cause land mass degradation of the face thereof. The wick drain has a proximal end located at the top surface of the bluff or hillside, and a distal end located in the water saturated zone at the face of the bluff or hillside. The distal end of the wick drain curves to exit at the bluff face and is connected to a solid drain pipe which extends downwardly along the face of the bluff or hillside and terminates in advance of the toe of the bluff or hillside. The wick drain is installed in a hole formed by a horizontal directional boring machine positioned on the top surface of the bluff or hillside.
In another aspect of the invention, in a bluff lying adjacent a body of water and having a shear failure plane and a face extending from a toe at the bottom of the bluff to a crest at the top surface of the bluff, there is provided a drainage system for preventing erosion of the bluff caused by excess water forces acting outwardly towards the face of the bluff. The system includes an elongated bore extending substantially parallel to the crest of the bluff behind the shear failure plane and having a first end at the top surface of the bluff, and a second end exiting through the face of the bluff, the bore being formed from the top surface of the bluff. An elongated horizontal wick drain has a plastic corrugated core surrounded by a filtering fabric and is positioned within the bore, the wick drain further having a proximal end at the first end of the bore and a distal end at the second end of the bore. A collector drain pipe is connected to the distal end of the wick drain for returning excess water accumulated to the wick drain in the adjacent body of water. The bluff includes a water attracting sand layer interposed between a pair of clay layers. The bore and the wick drain are located substantially in the sand layer.
The invention further contemplates a method for preventing erosion in a face of a bluff having accumulated water therein, the face running from a toe of the bluff to a crest of the bluff at a top surface thereof. The method includes the steps of drilling a series of substantially vertical holes into the top surface of the bluff to locate a shear failure plane and water bearing layers in the bluff; advancing a drill string from an out hole at a top surface of the bluff downwardly on a radius, horizontally in a water saturated zone behind the shear failure plane and then outwardly to the face of the bluff; connecting an end of the drill string at the face of the bluff to a proximal end of a horizontal wick drain for channeling water accumulated in the bluff; withdrawing the drill string from the out hole at the top surface of the bluff so as to drag the wick drain through the out hole bringing the proximal end of the wick drain to the top surface of the bluff and a distal end of the wick drain to the face of the bluff; disconnecting the wick drain from the drill string when the proximal end reaches the top surface of the bluff; and attaching an input end of a collection drain pipe to the distal end of the wick drain for directing water accumulated in the wick drain via an outlet end away from the face of the bluff.
The step of advancing the drill string in the horizontal hole is performed using a horizontal directional boring machine located at the top surface of the bluff. The steps of connecting an end of the drill string to the proximal end of a horizontal wick drain, and the step of attaching the collector drain pipe to the distal end of the wick drain are performed by a worker suspended in a cherry picker positioned on the top surface of the bluff. All of the steps avoid excavation and drilling of the face of the bluff.
Various other objects, features and advantages of the invention will be made apparent from the following description taken together with the drawings.
The drawings illustrate the best mode presently contemplated of carrying out the invention.
In the drawings:
Referring to the drawings,
Referring now to
In accordance with the invention, each horizontal wick drain 22 is located in the water bearing layer 30 substantially parallel to the toe 26 or crest 14 of the bluff 12 without drilling or excavating the face 24 thereof. The wick drain 22, as shown in
A further important aspect of the present invention resides in the method in which the wick drain system is installed. In contrast with prior art drainage systems, installation of the wick drains 22 is accomplished from the top rather than from the face of the bluff 12.
With reference to
Once the shear failure plane 34 is identified, a conventional mobile horizontal directional boring (HDB) machine 50 (
At this point, a "cherry picker" 56 or similar apparatus is placed on the top surface 28 of the bluff 12 near the crest 14. The cherry picker 56 has a moveable basket 58 in which a worker positioned therein may attach a proximal end 60 of the 600 to 1,000 foot long wick drain 22 to the end of the drill string 52. Once connection has been made, the drill string 52 is retracted in the formed hole, pulling the wick drain 22 along with it until the proximal end 60 reaches the out hole 53 in the top surface 28 of the bluff 12 at which point the drill string 52 is disconnected from the wick drain 22. As mentioned above, retraction of the drill string 52 is facilitated by the low friction polymer slurry inside the hole. The opposite end of the wick drain 22 may be cut or otherwise manipulated or monitored by the worker in the cherry picker 54 to establish the distal end 42 of the drain as shown in FIG. 7.
With the wick drain 22 in place within the bored hole, a worker in the cherry picker 56 can attach the solid collector drain pipe 44 to the distal end 42 of the wick drain 22. The collector drain pipe 44 extends downwardly along the face 24 of the bluff 12 and then outwardly over the beach 18 to deposit water accumulated in the wick drain 22 into the lake 20.
It should be understood that once in use, the polymer slurry lining the hole holding the wick drain 22 will simply be filtered by the fabric sleeve 38 and then be flushed away by accumulating water seeping into the bore formed by the drill string 52.
While the system and method described above are particularly beneficial for control of water drainage in a lakeside or oceanside bluff 12, it should be appreciated that the present invention has a wider range of application for other sloped land masses. For example, a hillside sloping down to a highway also requires soil stabilization to prevent landslides which can impair traffic flow and cause danger to those traveling in vehicles on the highway. Using the equipment and procedures previously discussed, with collector drain pipes 44 leading to various types of drain structure provided alongside the highway, soil erosion can be effectively managed.
The present invention thus provides for a bluff or hillside erosion prevention system which is able to accumulate much larger soil quantities of drainage water than the prior art by placing horizontal wick drains 22 substantially parallel to the crest 14 of the hillside or bluff 12 in water saturated zones 30 located behind the shear failure plane 34. It is extremely noteworthy that the positioning and location of such horizontal wick drains 22 are accomplished from the top 28 of the bluff or hillside 12; that is, there is no drilling or excavating of the bluff or hillside 12 from the face 24 thereof. Not only is this important so as to avoid causing early landslides, but also physical installation is made less dangerous and more universally possible. For example, in a bluff application, it may be physically impossible to locate excavating and/or drilling equipment on a beach 18 having a low elevation and reduced width or unstable composition. For wick drains installed from the face of the hillside, it is unsafe to have working equipment penetrating the slope 16 of the hillside 12 with ongoing traffic flow in close vicinity.
While the invention has been described with reference to a preferred embodiment, those skilled in the art will appreciate that certain substitutions, alterations and omissions may be made without departing from the spirit thereof. Accordingly, the foregoing description is meant to be exemplary only, and it should not be deemed limitative on the scope of the invention as set forth in the following claims.
Patent | Priority | Assignee | Title |
6948886, | Aug 12 2004 | BLUFF DRAINS, LLC | System and method for preventing bluff erosion |
7153060, | Oct 17 2005 | Systems and methods for environmental stabilization of a body of water | |
7575394, | Jan 29 2008 | Oceansafe LLC | Aquifer replenishment system |
7993076, | Oct 08 2008 | Bluff penetrating outfall drainage system |
Patent | Priority | Assignee | Title |
1151608, | |||
1344656, | |||
1866826, | |||
2136151, | |||
2514509, | |||
3625010, | |||
3902322, | |||
4610568, | Mar 28 1984 | Slope stabilization system and method | |
4655637, | Jun 19 1985 | Revetment system for preventing bluff erosion | |
4666334, | Jun 03 1985 | Erosion control system for bluffs located adjacent a body of water | |
4714376, | Dec 31 1984 | Hillslope landslide stability drain | |
4768897, | Dec 08 1984 | ED ZUBLIN AKTIENGESELLSCHAFT, STUTTGART-MOHRINGEN, GERMANY | Covering for waste depositories |
4820080, | Mar 21 1986 | LICENCE TRADE INNOVACIOS KFT | Process for the construction of a drain system |
4863312, | Jul 26 1983 | Finic, B. V. | Underground leachate and pollutant drainage barrier system |
5015122, | Jul 10 1989 | System permitting channeling of drainage fluid | |
5067854, | Feb 04 1991 | Aardvark Corporation | Apparatus and technique for installing an elongated rod in an earth formation |
5272910, | May 13 1992 | Regents of the University of California, The | Vadose zone monitoring system having wick layer enhancement |
5439326, | Apr 14 1993 | Geotechnics America, Inc. | Apparatus for inserting prefabricated vertical drains into the earth |
5597045, | Apr 22 1993 | Universitat Karlsruhe | Process and tool for laying underground collector mains for liquids and gases |
5780144, | Nov 04 1994 | BRADLEY INDUSTRIAL TEXTILES, INC. | Planar drainage and impact protection material |
5820296, | May 10 1996 | Prefabricated vertical earth drain and method of making the same | |
599719, | |||
6089788, | Apr 10 1997 | RasWILL Representative Pte. Ltd. | Vertical drain |
6161776, | Aug 12 1997 | FGP ENTERPRISES, LLC | Multi-layered, porous mat turf irrigation apparatus and method |
6280117, | Feb 08 1999 | American Wick Drain Corporation | Universal drain fitting |
6312190, | Apr 20 1999 | Nilex Construction, LLC | Method and apparatus for enhancement of prefabricated composite vertical drains |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Apr 10 2002 | JACKSON, GARY A | EDWARD E GILLEN CO | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 013046 | /0626 | |
May 01 2002 | Edward E. Gillen Co. | (assignment on the face of the patent) | / | |||
Jul 21 2014 | EDWARD E GILLEN CO | BLUFF DRAINS, LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 033419 | /0786 |
Date | Maintenance Fee Events |
Feb 17 2007 | M2551: Payment of Maintenance Fee, 4th Yr, Small Entity. |
Feb 18 2011 | M2552: Payment of Maintenance Fee, 8th Yr, Small Entity. |
Feb 25 2015 | M2553: Payment of Maintenance Fee, 12th Yr, Small Entity. |
Date | Maintenance Schedule |
Sep 02 2006 | 4 years fee payment window open |
Mar 02 2007 | 6 months grace period start (w surcharge) |
Sep 02 2007 | patent expiry (for year 4) |
Sep 02 2009 | 2 years to revive unintentionally abandoned end. (for year 4) |
Sep 02 2010 | 8 years fee payment window open |
Mar 02 2011 | 6 months grace period start (w surcharge) |
Sep 02 2011 | patent expiry (for year 8) |
Sep 02 2013 | 2 years to revive unintentionally abandoned end. (for year 8) |
Sep 02 2014 | 12 years fee payment window open |
Mar 02 2015 | 6 months grace period start (w surcharge) |
Sep 02 2015 | patent expiry (for year 12) |
Sep 02 2017 | 2 years to revive unintentionally abandoned end. (for year 12) |