A tension leg platform is secured to the sea floor with a plurality of tendons, each of the tendons being in tension due to buoyancy of the platform. The tendons are made up of joints of pipe secured together to define a hollow interior sealed from entry of sea water. A lower section of the joints of pipe of each of the tendons has smaller inner and outer diameters and greater wall thicknesses than an upper section of the joints of pipe. bulkheads are sealed within the interior of the upper and lower sections of the joints of pipe of each of the tendons. The bulkheads are spaced apart from each other along the lengths of the upper and lower sections of the joints of pipe to define separate compartments sealed from each other.
|
1. An apparatus for securing an offshore platform to a piling, comprising:
an elongated tubular member;
an upper section of the tubular member having a larger diameter than a lower section of the tubular member;
the tubular member having a hollow interior that is sealed for preventing entry of sea water; and
a plurality of sealed bulkheads in the interior of the tubular member at selected intervals, defining a plurality of separate compartments that are sealed from each other.
8. An apparatus for securing an offshore platform to a piling, comprising:
a tendon having an upper termination for securing to an offshore platform and a lower termination for securing to a piling on a sea floor;
the tendon comprising a plurality of joints of pipe secured together to define a hollow interior sealed from entry of sea water;
a lower section of the joints of pipe having smaller inner and outer diameters and greater wall thicknesses than an upper section of the joints of pipe; and
a plurality of sealed bulkheads spaced apart from each other along the lengths of the upper and lower sections, defining a plurality of separate compartments in the interior that are sealed from each other.
14. An apparatus for performing offshore hydrocarbon extraction operations, comprising:
a floating tension leg platform;
a plurality of tendons, each of the tendons having an upper termination secured to the offshore platform and a lower termination secured to a piling on a sea floor, the platform being ballasted to create tension in the tendons;
each of the tendons comprising a plurality of joints of pipe secured together to define a hollow interior sealed from entry of sea water;
a lower section of the joints of pipe of each of the tendons having smaller inner and outer diameters and greater wall thicknesses than an upper section of the joints of pipe; and
a plurality of bulkheads sealed within the interior of the upper and lower sections of the joints of pipe of each of the tendons, each of the bulkheads being spaced apart from each other along the lengths of the upper and lower sections of the joints of pipe to define separate compartments sealed from each other.
2. The apparatus according to
3. The apparatus according to
the tubular member comprises a plurality of joints of pipe secured together; and
each of the joints of pipe has at least one of the bulkheads.
4. The apparatus according to
the tubular member comprises a plurality of joints of pipe secured together; and
each of the joints of pipe has one of the bulkheads at an upper end and one of the bulkheads at a lower end.
5. The apparatus according to
6. The apparatus according to
7. The apparatus according to
9. The apparatus according to
10. The apparatus according to
each of the joints of pipe has one of the bulkheads at an upper end and one of the bulkheads at a lower end.
11. The apparatus according to
12. The apparatus according to
13. The apparatus according to
15. The apparatus according to
16. The apparatus according to
17. The tendon according to
|
This application claims the benefit of provisional application Ser. No. 60/561,831, filed Apr. 13, 2004.
This invention relates in general to offshore floating platforms, and in particular to a tension leg platform utilizing tendons with stepped outer diameters and internal sealed compartments.
One technique for offshore drilling and production, particularly in deeper water, utilizes a tension leg platform (“TLP”). A TLP is secured by a number of tendons that attach to pilings in the sea floor. The TLP is de-ballasted to create a desired tension in each of the tendons. The tendons limit lateral movement of the TLP due to waves and currents.
Each of the tendons is preferably close to being neutrally buoyant so that it is substantially self supporting prior to connection to the TLP. Being approximately neutrally buoyant reduces the amount of buoyancy required by the TLP and thus the hull size. To provide buoyancy, the tendons have hollow interiors sealed from sea water. Typically, each tendon is made up of a plurality of joints of pipe, each being approximately 60 to 90 feet in length.
It is important to maintain the buoyancy, because if an interior of one of the tendons filled with sea water, the loss in buoyancy would result in excessive weight being applied to the TLP at the point of connection. It is known to mount sealed bulkheads in the joints of pipe to form separate sealed compartments in the interior of the tendon. Leakage of one compartment would not be as catastrophic as the entire interior of the tendon filling with sea water.
Each tendon must withstand the hydrostatic pressure of the surrounding sea water, which increases with depth. A greater wall thickness will increase the ability of a pipe to withstand hydrostatic pressure. However, a greater wall thickness throughout the length of the tendon would also increase the weight of the tendon, thus requiring a larger and more buoyant hull for the TLP. U.S. Pat. No. 6,851,894 discloses a stepped diameter tendon having upper, intermediate, and lower sections. The upper section has a greater diameter and thinner wall than the intermediate section. Similarly, the intermediate section has a greater diameter and thinner wall than the lower section. This patent does not disclose sealed bulkheads in the interiors of any of the sections.
In this invention, stepped diameter tendons are provided with bulkheads to define a plurality of sealed compartments in the interior. Each tendon has an elongated tubular portion. An upper section of the tubular portion has a larger diameter than a lower section of the tubular member. Both the inner and outer diameters are larger in the upper section. The lower section also has greater wall thickness. Preferably, the cross-sectional areas of the walls of the upper and lower sections are substantially the same.
The tubular portion has a hollow interior that is sealed for preventing entry of sea water. Sealed bulkheads are mounted in the interior of the tubular portion at selected intervals. Preferably, the bulkheads are located both in the upper section and in the lower section of the tubular portion of each tendon. In the preferred embodiment, the tubular portion comprises a plurality of joints of pipe secured together. Each of the joints of pipe has at least one of the bulkheads and preferably two, one located at each end.
Referring to
Upper tendon supports 19 are mounted to platform 11 at each corner. In this embodiment, each upper tendon support 19 is located on an end of one of the horizontal sections 15. Normally, two tendons 21 are supported at each tendon support 19, thus a platform 11 with four corners would have eight separate tendons 21. The lower end of each tendon 21 is secured to a piling 23. A riser 25 is shown extending from wellhead assembly 27 to platform deck 17. Riser 25 may be a drilling riser through which a drill string extends for drilling a well. Riser 25 could also be a production riser. In that instance, a Christmas tree (not shown) may be located at the upper end of riser 25 for controlling well fluid flowing upward from riser 25. If surface Christmas trees are employed, a number of production risers 25 will extend parallel to each other from the sea floor to platform 11, each riser 25 being connected to a separate wellhead. Alternately, subsea trees could be employed.
Referring to
As shown in
By having the smallest outer diameter section and thickest wall, tendon lower section 41 is better able to withstand the higher hydrostatic pressure of the sea water in which it is located. The larger diameter and thinner wall of the upper section 35 increases the buoyancy of tendon 21 by providing more volume for trapped air. The increased buoyancy in upper section 35 helps to support the weight of tendon 21, allowing for a reduced size of platform 11. Preferably, the diameters and wall thicknesses of upper, intermediate, and lower sections are selected to provide a slightly positive or neutral overall buoyancy for tendon 21, such as from 0.95 to 0.97. The slightly positive buoyancy avoids any part of tendon 21 going into compression prior to connection and tensioning with platform 11. Also, when tensioning, platform 11 does not have to initially lift the weight of tendons 21 if they are slightly positive in buoyancy.
A plurality of bulkheads 47 are mounted in each tendon 21 to reduce the consequences of accidental flooding of tendon 21. Bulkheads 47 separate the buoyancy volume into several sealed air compartments so that any leak along the length of tendon 21 will damage only one compartment. The compartment's lengths are selected so that if one or two flood, for example, the remaining compartments would provide sufficient buoyancy to support the weight of tendon 21. Preferably bulkheads 47 are located in each of the sections 35, 37 and 41.
The number of bulkheads 47 may vary. For example, bulkheads 47 could be located at the upper or lower ends of each pipe within upper section 35, intermediate section 37 and lower section 41. Each pipe is typically 60 to 90 feet in length. Alternately, bulkheads 47 could be spaced at greater intervals. Each bulkhead 47 may be secured within the inner diameter of one of the sections of tendon 21 by welding or in a variety of other manners.
Tendons 21 are installed and platform 11 deployed in a conventional manner. Tendons 21 are lowered into the sea and the lower ends latched into bottom connectors 45. Tendons 21 are self supporting, enabling platform 11 to be moved over tendons 21. Columns 13 and horizontal sections 15 are then ballasted until upper terminations 29 are attached to top connectors 33. Then columns 13 and horizontal sections 15 are de-ballasted, causing platform 11 to rise and apply the desired tension to tendons 21.
The invention has significant advantages. The sealed compartments within the stepped diameter tendons avoid catastrophic failure due to leakage. The larger volume of trapped air within the upper section provides additional buoyancy. The smaller diameter lower section better withstands hydrostatic pressure.
While the invention has been shown in only one of its forms, it should be apparent to those skilled in the art that it is not so limited, but is susceptible to various changes without departing from the scope of the invention.
Patent | Priority | Assignee | Title |
7422394, | May 15 2006 | Modec International, Inc.; Sea Engineering, Inc. | Tendon for tension leg platform |
Patent | Priority | Assignee | Title |
5443330, | Mar 28 1991 | Deep water platform with buoyant flexible piles | |
5447392, | May 03 1993 | Shell Oil Company | Backspan stress joint |
6851894, | Jun 23 1999 | Aker Kvaerner Engineering & Technology AS | Deep water TLP tether system |
H1246, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Apr 13 2005 | Deepwater Marine Technology L.L.C. | (assignment on the face of the patent) | / | |||
Jun 28 2005 | HUANG, EDWARD W | DEEPWATER MARINE TECHNOLOGY L L C | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 016746 | /0714 | |
Jun 28 2005 | LIAO, SHIHWEI | DEEPWATER MARINE TECHNOLOGY L L C | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 016746 | /0714 |
Date | Maintenance Fee Events |
Jul 16 2010 | M1551: Payment of Maintenance Fee, 4th Year, Large Entity. |
Jul 16 2014 | M1552: Payment of Maintenance Fee, 8th Year, Large Entity. |
Jul 16 2018 | M1553: Payment of Maintenance Fee, 12th Year, Large Entity. |
Date | Maintenance Schedule |
Jan 16 2010 | 4 years fee payment window open |
Jul 16 2010 | 6 months grace period start (w surcharge) |
Jan 16 2011 | patent expiry (for year 4) |
Jan 16 2013 | 2 years to revive unintentionally abandoned end. (for year 4) |
Jan 16 2014 | 8 years fee payment window open |
Jul 16 2014 | 6 months grace period start (w surcharge) |
Jan 16 2015 | patent expiry (for year 8) |
Jan 16 2017 | 2 years to revive unintentionally abandoned end. (for year 8) |
Jan 16 2018 | 12 years fee payment window open |
Jul 16 2018 | 6 months grace period start (w surcharge) |
Jan 16 2019 | patent expiry (for year 12) |
Jan 16 2021 | 2 years to revive unintentionally abandoned end. (for year 12) |