A method for extracting accumulated material from a well bore includes pressurizing gas recovered from the well bore and disposing an extraction string in communication with a sump. The sump is disposed to receive liquid from the well bore. The method further includes sealing the sump and injecting at least a portion of the pressurized gas into the sump such that at least some of the liquid in the sump is driven upward into the extraction string.

Patent
   7311150
Priority
Dec 21 2004
Filed
Dec 21 2004
Issued
Dec 25 2007
Expiry
Jul 15 2025
Extension
206 days
Assg.orig
Entity
Large
19
88
EXPIRED
21. A method for extracting accumulated material from a wellbore, comprising:
pressurizing gas recovered from the well bore;
disposing an extraction string in communication with a sump, wherein the sump is disposed to receive liquid from the well bore;
sealing the sump;
injecting at least a portion of the pressurized gas into the sump such that at least some of the liquid in the sump is driven upward into the extraction string;
measuring a gas pressure within the sump; and
unsealing the sump when the gas pressure reaches a predetermined amount.
23. A method for extracting accumulated material from a well bore, comprising:
pressurizing gas recovered from the well bore;
disposing an extraction string in communication with a sump, wherein the sump is disposed to receive liquid from the well bore;
sealing the sump;
injecting at least a portion of the pressurized gas into the sump such that at least some of the liquid in the sump is driven upward into the extraction string;
unsealing the sump;
timing a predetermined time interval; and
repeating the steps, injecting, and unsealing each time the predetermined time interval elapses.
11. A method for extracting accumulated material from a well bore, comprising:
pressurizing gas recovered from the well bore;
disposing an extraction string in communication with a sump, wherein the sump is disposed to receive liquid from the well bore;
sealing the sump; and
injecting at least a portion of the pressurized gas into the sump such that at least some of the liquid in the sump is driven upward into the extraction string, wherein:
the sump is sealed using an inflatable packer; and
the step of sealing the sump comprises inflating the packer using at least a portion of the pressurized gas.
22. A method for extracting accumulated material from a well bore, comprising:
pressurized gas recovered from the well bore;
disposing an extraction string in communication with a sump, wherein the sump is disposed to receive liquid from the well bore;
sealing the sump;
injecting at least a portion of the pressurized gas into the sump such that at least some of the liquid in the sump is driven upward into the extraction string;
measuring a liquid pressure within the sump; and
preforming the steps of sealing the sump and injecting at least a portion of the pressurized gas in response to detecting that the liquid pressure has reached a predetermined amount.
1. A system, comprising:
a compressor operable to pressurize gas recovered from a well bore;
a sump disposed to receive liquid from the well bore;
a seal operable to seal the sump, wherein the sump is substantially airtight when sealed;
a gas injection string coupled to the compressor and operable to inject at least a portion of the pressurized gas into the sump; and
an extraction string disposed within the sump such that at least some of the liquid in the sump is driven upward into the extraction string when the pressurized gas is injected into the sump, wherein:
the seal comprises an inflatable packer; and
the packer is inflated using at least a portion of the pressurized gas.
20. A system, comprising:
a compressor operable to pressurize gas recovered from a well bore;
a sump disposed to collect liquid from the well bore, wherein the sump comprises at least one cavity portion drilled transversely to the drilling direction of the sump;
a packer coupled to the compressor, the packer operable to be inflated using at least a portion of the pressurized gas, wherein the packer, when inflated, seals the sump such that the sump is substantially airtight;
a gas injection string in communication with the sump and coupled to the compressor, the gas injection string operable to inject pressurized gas into the sump; and
an extraction string surrounding the gas injection string so as to define an annular space between the extraction string and the gas injection string, wherein liquid from the sump is driven upward into the annular space when the pressurized gas is injected into the sump, the extraction string comprising a flared end flared inwardly in order to prevent debris from entering the annular space.
2. The system of claim 1, further comprising a valve coupled to the packer and to the gas injection string, wherein the valve is operable to allow the pressurized gas used to inflate the packer to flow into the gas injection string.
3. The system of claim 1, further comprising a valve coupled to the packer operable to vent the pressurized gas used to inflate the packer to the atmosphere.
4. The system of claim 1, wherein the sump further comprises at least one cavity portion extending transversely to the longitudinal axis of the sump.
5. The system of claim 1, wherein:
the extraction string surrounds the gas injection string so as to define an annular space between the extraction string and the gas injection string; and
the liquid from the sump is driven upward into the annular space when the pressurized gas is injected into the sump.
6. The system of claim 5, wherein the extraction string comprises a flared end, the flared end flared inwardly to prevent debris from entering the annular space.
7. The system of claim 1, further comprising a pressure sensor operable to measure at least one of a gas pressure or a liquid pressure in the sump.
8. The system of claim 1, further comprising a control timer operable to cause the packer to seal the sump and further operable to cause the gas injection string to inject the pressurized gas into the sump.
9. The system of claim 1, further comprising a vessel on a surface above the well bore operable to collect liquid driven upward into the extraction string.
10. The system of claim 1, wherein the extracted liquid comprises suspended solids.
12. The method of claim 11, further comprising:
deflating the packer; and
allowing the pressurized gas used to inflate the packer to flow into the extraction string.
13. The method of claim 11, further comprising venting the pressurized gas used to inflate the packer into the atmosphere.
14. The method of claim 11, further comprising:
measuring a gas pressure within the sump; and
unsealing the sump when the gas pressure reaches a predetermined amount.
15. The method of claim 11, further comprising:
measuring a liquid pressure within the sump; and
performing the steps of sealing the sump and injecting at least a portion of the pressurized gas in response to detecting that the liquid pressure has reached a predetermined amount.
16. The method of claim 11, further comprising:
unsealing the sump;
timing a predetermined time interval; and
repeating the steps of sealing, injecting, and unsealing each time the predetermined time interval elapses.
17. The method of claim 11, further comprising collecting liquid driven upward into the extraction string at a storage vessel on a surface above the well bore.
18. The method of claim 11, wherein the sump comprises an enlarged cavity portion extending transversely from a longitudinal axis of the sump.
19. The method of claim 11, wherein the liquid comprises suspended solids.

This invention relates generally to the recovery of subterranean deposits, and more particularly to a method and system for cleaning a well bore.

Subterranean zones that contain valuable deposits frequently include other materials, such as entrained water or solids, that are considered extraneous. Since such materials can interfere with the production of the valuable deposits, it may be desirable or necessary to have some way to remove extraneous materials from the production well bore. One method for handling extraneous, co-produced materials is to form a “sump” or “rat hole.” The sump is a well bore drilled below the production well bore such that extraneous materials are allowed to fall into the sump and to collect therein. Sumps may be drilled vertically or obliquely from an existing well bore.

As materials are collected within the sump, the sump may become nearly or completely filled. In such instances, it is desirable to remove some of the collected material in order to provide sufficient capacity for new material to be collected in the sump. For example, a pump may be lowered into the sump, and water may be pumped to the surface. Such techniques permit the sump to be used to facilitate production after the capacity of the sump would ordinarily have been exhausted. Therefore, it is advantageous to have efficient and versatile methods for removing collected material from a sump. Furthermore, collected materials with a high solid content may present additional challenges for the removal process. For example, the solid phase material may obstruct the flow of collected material through pumps and potentially damage pump mechanisms. In another example, the relatively low liquid content of such collected materials may prove insufficient liquid flow to adequately lubricate and/or cool various types of pumping mechanisms. Consequently, it would be useful to have a technique for extracting collected material that can effectively remove materials with a high solid content as well.

In a particular implementation, a method for extracting accumulated material from a well bore includes pressurizing gas recovered from the well bore and disposing an extraction string in communication with a sump. The sump is disposed to receive liquid from the well bore. The method further includes sealing the sump and injecting at least a portion of the pressurized gas into the sump such that at least some of the liquid in the sump is driven upward into the extraction string. In another implementation, 1. A system includes a compressor, a sump, a seal, a gas injection string, and an extraction string. The compressor pressurizes gas recovered from a well bore. The sump disposed receives liquid from the well bore. The seal seals the sump so that the sump is substantially airtight when sealed. The gas injection string is coupled to the compressor, and it injects at least a portion of the pressurized gas into the sump. The extraction string disposed within the sump such that at least some of the liquid in the sump is driven upward into the extraction string when the pressurized gas is injected into the sump.

The details of one or more embodiments of the invention are set forth in the accompanying drawings and the description below. Other features, objects, and advantages of the invention will be apparent from the description and drawings, and from the claims.

FIG. 1 illustrates a system for extracting liquid from a well bore in accordance with an implementation of the present invention;

FIG. 2 illustrates a cross-sectional view of a working string in the system of FIG. 1;

FIG. 3 illustrates a downhole portion of a system for extracting liquid from a well bore; and

FIG. 4 illustrates a method for extracting liquid from a well bore in accordance with another implementation of the present invention.

Like reference symbols in the various drawings indicate like elements.

FIG. 1 depicts a system 100 for cleaning a well bore 102. In the depicted implementation, system 100 includes a working string 104 and a compressor 106 with a low pressure line 108 and a high pressure line 110. System 100 also includes valves 112A and 112B coupled to high pressure line 110 that permit pressurized gas to be supplied to other parts of system 100. Overall, system 100 uses pressurized gas to remove undesired materials from well bore 102.

In the depicted embodiment, well bore 102 is an articulated well bore extending into a subterranean zone 114, such as a coal seam, in which there are subterranean deposits of natural gas, such as, for example, methane. An articulated well bore, such as the one depicted in FIG. 1, includes a first portion that is vertical, a second portion that is oriented within a plane of a subterranean zone, and a curved portion that connects the first and second portions. It should be understood that the described techniques are applicable to other types of well bores, and the articulated well bore is only one example. Well bore 102 may be reinforced using a tubular casing 103, which is any rigid material affixed (such as, for example, by cementing) within well bore 102. Although the described implementation describes a gas well, it should be understood that the described methods are also applicable to recover of a variety of materials from a subterranean zone, including natural gas, crude oil, associated solution gas, formation water, injected water, natural gas liquids, and numerous other subterranean minerals and solids. Within subterranean zone 114, there may be liquids and/or solids that could collect within the horizontal portion of well bore 102. The accumulation of such liquids and/or solids may interfere with the production of natural gas from well bore 102. Accordingly, there is a sump 116 drilled below the horizontal portion of well bore 102, allowing such liquids and solids to drain by gravity or reservoir pressure into sump 116. Sump 116 may be drilled using any suitable drilling technique, including any of the numerous well-known techniques for directional drilling. Although sump 116 is depicted as being drawn at an angle from well bore 102, it should be understood that the described techniques are equally applicable to a sump that is drilled vertically.

During gas production, gas produced from well bore 102 travels into a phase separation vessel 130, where the gas is allowed to flow upward while any entrained liquids and/or solids drop from suspension within phase separation vessel 130, so that phase separation vessel 130 also acts as a storage vessel 130 for entrained liquids and/or solids. Such entrained liquids and/or solids may include, for example, subterranean water from a coal seam. A floater 132 or other similar level indicator may be used to indicate when the liquid level in storage vessel 130 reaches a predetermined level. When the predetermined level is reached, drain 134 may be opened to drain accumulated liquids and solids from storage vessel 130. The gas, minus any removed liquids and solids, is then provided to low pressure line 108 of compressor 106. Compressor 106 pressurizes the gas and sends the pressurized gas out of high pressure line 110, which carries the pressurized gas to a sales or storage facility.

At the same time, subterranean liquids and/or solids within well bore 102 flow to sump 116, where they are collected. As liquids and/or solids accumulate within sump 116, sump 116 may eventually become filled to a level at which it becomes desirable to extract the accumulated material from the sump and produce them at the surface. In previous systems, a pump, such as an electric submersible pump, is placed within sump 116 to pump liquids to the surface through a tube or other conduit. The use of a pump to extract liquids incurs costs to purchase and operate pumps and also introduces technical challenges such as the need for a power and control system for the pump. Additionally, most conventional pumps do not adequately handle high volumes of entrained solids, and they may be damaged if they continue to run in a “pumped off” condition, such as after most of the accumulated material has been extracted Accordingly, it is advantageous to have an alternative technique for extracting liquids and/or solids from sump 116. Various implementations of the present invention provide such an alternative by using pressurized gas to extract liquid from sump 116.

In the depicted implementation, system 100 uses packer 118 to act as a seal for an annular space 126 (illustrated in the cross-sectional view of FIG. 2) between working string 104 and an interior of sump 116. Packer 118 may be any suitable device adapted to seal sump 116 in a substantially airtight manner. In the depicted implementation, packer 118 is an inflatable device comprising an expandable material, such as an elastomer or numerous other similar materials, that inflates to seal the annular space between working string 104 and sump 116. Packer 118 is controlled by a control string 120. Control string 120 is any suitable apparatus for causing packer 118 to seal and unseal sump 116. In the depicted implementation, control string 120 comprises tubing that couples high pressure line 110 of compressor 106 to packer 118 through valve 112A, which valve 112A also includes a vent 113 to the atmosphere. Valve 112A may be controlled by any suitable method, such as manual operation, electrically-controlled solenoid actuation, or numerous other methods for opening and closing valves. Valve 112A may thus be opened, closed, and/or vented to cause packer 118 to be inflated or deflated.

To seal sump 116, valve 112A is opened, allowing pressurized gas to flow through control string 120 into packer 118, thus expanding packer 118 to fill annular space 126. Once packer 118 is inflated, valve 112A may be closed to prevent gas from being driven back into high pressure line 110, such as, for example, by external pressure on packer 118. To unseal sump 116, vent 113 of valve 112A is opened, allowing the pressurized gas in packer 118 to escape into the atmosphere, which in turn deflates packer 118.

When sump 116 is sealed, working string 104 is used to inject pressurized gas into sump 116 and to recover gas from sump 116. In the depicted implementation, working string 104 includes a gas injection string 122 and an extraction string 124, which surrounds gas injection string 122 to define an annular space 126, as illustrated in the cross-sectional view of working string 104 shown in FIG. 2. Gas injection string 122 comprises tubing or other suitable conduit that couples sump 116 to high pressure line 110 of compressor 106 through valve 112B, which may be of a similar type to valve 112A. By opening valve 112B while sump 116 is sealed, a flow of pressurized gas through gas injection string 122 raises the pressure in sump 116, which in turn drives liquid into annular space 126. As the pressure in sump increases 116, accumulated material from sump 116 is carried to the surface by extraction string 124, which may be any suitable form of tubing or conduit for producing liquid and/or solid material to the surface. The produced liquids and/or solids are allowed to flow into storage vessel 130, where they accumulate along with the products dropped from suspension in the produced gas. As noted above, when the accumulated material exceeds a predetermined level, it may be drained from storage vessel 130 in order to prevent storage vessel 130 from overfilling.

Once the extraction of accumulated material from sump 116 is completed, valve 112B may be closed to stop the flow of pressurized gas, and packer 118 may be deflated to unseal sump 116 and to permit the pressurized gas in sump 116 to escape. The escaping gas is recovered at the surface along with the rest of the gas produced using well bore 102. To deflate packer 118, the gas in packer 118 is vented to the atmosphere through vent 113 of valve 112A. In an alternative implementation, another valve 112C may be used to couple control string 120 to a low pressure side of the well system. Such an implementation enables the gas used to inflate packer 118 to be recovered along with the other gas injected into sump 116. Further, the gas may be introduced into the extraction string 124, and the sudden entry of gas into extraction string 124 may create a pressure increase that can dislodge debris, such as loose coal or rocks from subterranean zone 114, that may become caught around the end of working string 104 as liquid enters extraction string 124.

A variety of techniques may be used to determine when to extract liquid from sump 116 and when sufficient liquid has been drained from sump 116. In some implementations, the inflation and deflation of packer 118 and the injection of gas is controlled by control timer 136. Control timer 136 is set to open and close valve 112A, 112B, and/or 112C so that sump 116 is periodically drained. In other implementations, the determination that sufficient liquid has been drained is based on reading a pressure sensor 128 coupled to packer 118 that measures gas and/or liquid pressure. In such an implementation, control string 120 may include an insulated wire or any of numerous other media for carrying signals from pressure sensor 128 to the surface. In an example of operation, pressure sensor 128 may measure the liquid pressure resulting from accumulated liquid in sump 116. When the pressure exceeds a certain amount, accumulated material is extracted from sump 116. In another example, pressure sensor 128 may monitor the gas pressure in sealed sump 116, and once the gas pressure reaches a predetermined level deemed sufficient to indicate that most of the accumulated material in sump 116 has been driven to the surface, sump 116 may be unsealed. Alternatively, a pressure sensor, which may be located on the surface, may be coupled to the gas injection string 122 to monitor the pressure of a constant, low-volume flow of gas. Rising pressure would then indicate an increase in the level of accumulated material. When the pressure reaches a predetermined threshold level, accumulated material is extracted from sump 116. The implementations described here are merely examples, and it should be understood that numerous other methods for determining when to extract accumulated material from sump 116 and when to unseal sump 116 may be employed.

FIG. 3 illustrates an implementation of a downhole portion of working string 104. In the depicted implementation, sump 116 has been provided with cavity portions 138 extending transversely to the longitudinal axis of sump 116. Cavity portions 138 increase the capacity of sump 116 to contain liquid. Pressure sensor 128 is a liquid pressure sensor that is placed to measure the liquid level 140 within sump 116 in order to facilitate the determination of when to extract liquid from sump 116. In the depicted implementation, extraction string 124 includes a flared, end 142. End 142 may be flared inward in order to prevent larger debris in sump 116 from being pulled into annular space 126 by the flow of liquid and gas into extraction string 124. This tends to prevent extraction string 124 from becoming obstructed or clogged by such debris.

FIG. 4 illustrates an example of a method for extracting accumulated material from sump 116 using injection of pressurized gas. At step 402, valve 112A coupling packer 118 to high pressure line 110 is opened, inflating packer 118 and sealing sump 116. Once packer 118 is inflated, valve 112A to packer 118 may be closed at step 404. In alternative implementations, valve 112A may be left open. Valve 112B coupling gas injection string 122 to high pressure line 110 is opened at step 406. This causes the pressure in sump to rise, thus driving accumulated liquid and solid material into annular space 126 within extraction string 124 and eventually to the surface. Liquids and/or solids are collected in storage vessel 130 at step 408. Accumulated material may be drained out of storage vessel 130 to prevent storage vessel 130 from overfilling.

The removal process continues until the drainage of sump 116 has been completed, as shown at decision step 410. The determination of when the drainage is completed may be made based on elapsed time, measured changes in pressure, or any other suitable method, including any of those described herein. Once the drainage is completed, valve 112B is closed at step 412. The gas within packer 118 is then vented at step 414, thus unsealing sump 116. The gas from packer 118 may be vented in any suitable manner, including venting the gas to the atmosphere using valve 112A or venting the gas back into extraction string 124.

A number of embodiments of the invention have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of the invention. For example, the described techniques may be used to extract any manner of liquids and solids from any type of subterranean well drilled using any suitable technique. In another example, the extraction string may be separated from the gas injection string, so that the extraction string does not enclose the gas injection string. Accordingly, other embodiments are within the scope of the following claims.

Zupanick, Joseph A.

Patent Priority Assignee Title
11021933, Sep 13 2017 Well hole cleaning tool
7549477, Jul 20 2005 University of Southern California System and method for unloading water from gas wells
7753115, Aug 03 2007 Pine Tree Gas, LLC Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations
7770656, Oct 03 2007 Pine Tree Gas, LLC System and method for delivering a cable downhole in a well
7789157, Aug 03 2007 Pine Tree Gas, LLC System and method for controlling liquid removal operations in a gas-producing well
7789158, Aug 03 2007 Pine Tree Gas, LLC Flow control system having a downhole check valve selectively operable from a surface of a well
7819197, Jul 20 2005 University of Southern California Wellbore collection system
7832468, Oct 03 2007 Pine Tree Gas, LLC System and method for controlling solids in a down-hole fluid pumping system
7971648, Aug 03 2007 Pine Tree Gas, LLC Flow control system utilizing an isolation device positioned uphole of a liquid removal device
7971649, Aug 03 2007 Pine Tree Gas, LLC Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations
8006767, Aug 03 2007 Pine Tree Gas, LLC Flow control system having a downhole rotatable valve
8100184, Jul 20 2005 University of Southern California Collection and lift modules for use in a wellbore
8162065, Aug 03 2007 Pine Tree Gas, LLC System and method for controlling liquid removal operations in a gas-producing well
8167052, Oct 03 2007 Pine Tree Gas, LLC System and method for delivering a cable downhole in a well
8272456, Jan 02 2008 Pine Tree Gas, LLC Slim-hole parasite string
8276673, Mar 13 2008 Pine Tree Gas, LLC Gas lift system
8302694, Aug 03 2007 Pine Tree Gas, LLC Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations
8528648, Aug 03 2007 Pine Tree Gas, LLC Flow control system for removing liquid from a well
9279315, Dec 21 2012 Halliburton Energy Services, Inc. Injection well and method for drilling and completion
Patent Priority Assignee Title
3971437, Sep 16 1974 Apparatus for dewatering boreholes
4599172, Dec 24 1984 Flow line filter apparatus
4744420, Jul 22 1987 Phillips Petroleum Company Wellbore cleanout apparatus and method
4844156, Aug 15 1988 Method of secondary extraction of oil from a well
4865130, Jun 17 1988 WorldEnergy Systems, Inc. Hot gas generator with integral recovery tube
5033550, Apr 16 1990 Halliburton Company Well production method
5211242, Oct 21 1991 Amoco Corporation Apparatus and method for unloading production-inhibiting liquid from a well
5316081, Mar 08 1993 Baski Water Instruments Flow and pressure control packer valve
5394950, May 21 1993 Method of drilling multiple radial wells using multiple string downhole orientation
5402851, May 03 1993 Horizontal drilling method for hydrocarbon recovery
5450902, May 14 1993 Method and apparatus for producing and drilling a well
5680901, Dec 14 1995 Radial tie back assembly for directional drilling
5685374, Feb 14 1996 ConocoPhillips Company Well completions in weakly consolidated formations
5720356, Feb 01 1996 INNOVATIVE DRILLING TECHNOLOGIES, L L C Method and system for drilling underbalanced radial wells utilizing a dual string technique in a live well
5863283, Feb 10 1997 System and process for disposing of nuclear and other hazardous wastes in boreholes
6016702, Sep 08 1997 CiDRA Corporate Services, Inc High sensitivity fiber optic pressure sensor for use in harsh environments
6065550, Feb 01 1996 INNOVATIVE DRILLING TECHNOLOGIES, L L C Method and system for drilling and completing underbalanced multilateral wells utilizing a dual string technique in a live well
6280000, Nov 20 1998 EFFECTIVE EXPLORATION LLC Method for production of gas from a coal seam using intersecting well bores
6298918, Feb 18 1999 Petroleo Brasileiro S.A.-Petrobras System for lifting petroleum by pneumatic pumping
6325152, Nov 26 1997 Kelley & Sons Group International, Inc. Method and apparatus for increasing fluid recovery from a subterranean formation
6357523, Nov 20 1998 EFFECTIVE EXPLORATION LLC Drainage pattern with intersecting wells drilled from surface
6412556, Aug 03 2000 EFFECTIVE EXPLORATION LLC Cavity positioning tool and method
6425448, Jan 30 2001 EFFECTIVE EXPLORATION LLC Method and system for accessing subterranean zones from a limited surface area
6439320, Nov 20 1998 EFFECTIVE EXPLORATION LLC Wellbore pattern for uniform access to subterranean deposits
6454000, Nov 19 1999 EFFECTIVE EXPLORATION LLC Cavity well positioning system and method
6457540, Feb 01 1996 Method and system for hydraulic friction controlled drilling and completing geopressured wells utilizing concentric drill strings
6478085, Nov 20 1998 EFFECTIVE EXPLORATION LLC System for accessing subterranean deposits from the surface
6497556, Apr 24 2001 EFFECTIVE EXPLORATION LLC Fluid level control for a downhole well pumping system
6561288, Nov 20 1998 EFFECTIVE EXPLORATION LLC Method and system for accessing subterranean deposits from the surface
6575235, Jan 30 2001 EFFECTIVE EXPLORATION LLC Subterranean drainage pattern
6595301, Aug 17 2001 EFFECTIVE EXPLORATION LLC Single-blade underreamer
6598686, Nov 20 1998 EFFECTIVE EXPLORATION LLC Method and system for enhanced access to a subterranean zone
6604580, Nov 20 1998 EFFECTIVE EXPLORATION LLC Method and system for accessing subterranean zones from a limited surface area
6604910, Apr 24 2001 EFFECTIVE EXPLORATION LLC Fluid controlled pumping system and method
6629566, Jun 14 2001 NORTHEN PRESSURE SYSTEMS INC Method and apparatus for removing water from well-bore of gas wells to permit efficient production of gas
6662870, Jan 30 2001 EFFECTIVE EXPLORATION LLC Method and system for accessing subterranean deposits from a limited surface area
6668918, Nov 20 1998 EFFECTIVE EXPLORATION LLC Method and system for accessing subterranean deposit from the surface
6668931, Jul 08 2002 Apparatus and method for cleaning a gas well
6672392, Mar 12 2002 FORESTAR PETROLEUM CORPORATION Gas recovery apparatus, method and cycle having a three chamber evacuation phase for improved natural gas production and down-hole liquid management
6679322, Nov 20 1998 EFFECTIVE EXPLORATION LLC Method and system for accessing subterranean deposits from the surface
6681855, Oct 19 2001 EFFECTIVE EXPLORATION LLC Method and system for management of by-products from subterranean zones
6688388, Nov 20 1998 EFFECTIVE EXPLORATION LLC Method for accessing subterranean deposits from the surface
6708764, Jul 12 2002 EFFECTIVE EXPLORATION LLC Undulating well bore
6722452, Feb 19 2002 EFFECTIVE EXPLORATION LLC Pantograph underreamer
6725922, Jul 12 2002 EFFECTIVE EXPLORATION LLC Ramping well bores
6732792, Nov 20 1998 EFFECTIVE EXPLORATION LLC Multi-well structure for accessing subterranean deposits
6745855, Feb 01 1996 Innovative Drilling Technologies, LLC Method and system for hydraulic friction controlled drilling and completing geopressured wells utilizing concentric drill strings
6848508, Oct 30 2001 EFFECTIVE EXPLORATION LLC Slant entry well system and method
6851479, Jul 17 2002 EFFECTIVE EXPLORATION LLC Cavity positioning tool and method
6854518, Mar 12 2002 Method and apparatus for enhancing production from an oil and/or gas well
6923275, Jan 29 2001 Multi seam coal bed/methane dewatering and depressurizing production system
6942030, Sep 12 2002 EFFECTIVE EXPLORATION LLC Three-dimensional well system for accessing subterranean zones
6945755, Apr 24 2001 EFFECTIVE EXPLORATION LLC Fluid controlled pumping system and method
6968893, Apr 03 2002 TARGET DRILLING, LLC Method and system for production of gas and water from a gas bearing strata during drilling and after drilling completion
20020096336,
20020189801,
20030217842,
20040007389,
20040007390,
20040011560,
20040031609,
20040035582,
20040050552,
20040050554,
20040055787,
20040084183,
20040108110,
20040118558,
20040140129,
20040149432,
20040206493,
20040244974,
20050087340,
20050109505,
20050115709,
20050133219,
20050139358,
20050161216,
20050161221,
20050161258,
20050167119,
20050167156,
20050189114,
20050211471,
20050211473,
20050252689,
GB2312727,
WO2005026540,
////////
Executed onAssignorAssigneeConveyanceFrameReelDoc
Dec 21 2004CDX Gas, LLC(assignment on the face of the patent)
Dec 21 2004ZUPANICK, JOSEPH A CDX Gas, LLCASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0166610255 pdf
Mar 31 2006CDX Gas, LLCBANK OF MONTREAL, AS FIRST LIEN COLLATERAL AGENTSECURITY AGREEMENT0175960001 pdf
Mar 31 2006CDX Gas, LLCCREDIT SUISSE, AS SECOND LIEN COLLATERAL AGENTSECURITY AGREEMENT0175960099 pdf
Sep 23 2009BANK OF MONTREAL VIA TRUSTEE FOR US BANKRUPTCY COURT FOR THE SOUTHERN DISTRICT OF TEXAS CDX GAS, LLC REORGANIZED DEBTOR RELEASE BY SECURED PARTY SEE DOCUMENT FOR DETAILS 0323790337 pdf
Sep 23 2009CREDIT SUISSE VIA TRUSTEE FOR US BANKRUPTCY COURT FOR THE SOUTHERN DISTRICT OF TEXAS CDX GAS, LLC REORGANIZED DEBTOR RELEASE BY SECURED PARTY SEE DOCUMENT FOR DETAILS 0323790810 pdf
Sep 30 2009CDX Gas, LLCVitruvian Exploration, LLCCHANGE OF NAME SEE DOCUMENT FOR DETAILS 0318660777 pdf
Nov 29 2013Vitruvian Exploration, LLCEFFECTIVE EXPLORATION LLCASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0322630664 pdf
Date Maintenance Fee Events
Aug 01 2011REM: Maintenance Fee Reminder Mailed.
Sep 14 2011M1551: Payment of Maintenance Fee, 4th Year, Large Entity.
Sep 14 2011M1554: Surcharge for Late Payment, Large Entity.
Aug 07 2015REM: Maintenance Fee Reminder Mailed.
Dec 25 2015EXP: Patent Expired for Failure to Pay Maintenance Fees.
Oct 31 2016ASPN: Payor Number Assigned.
Oct 31 2016RMPN: Payer Number De-assigned.


Date Maintenance Schedule
Dec 25 20104 years fee payment window open
Jun 25 20116 months grace period start (w surcharge)
Dec 25 2011patent expiry (for year 4)
Dec 25 20132 years to revive unintentionally abandoned end. (for year 4)
Dec 25 20148 years fee payment window open
Jun 25 20156 months grace period start (w surcharge)
Dec 25 2015patent expiry (for year 8)
Dec 25 20172 years to revive unintentionally abandoned end. (for year 8)
Dec 25 201812 years fee payment window open
Jun 25 20196 months grace period start (w surcharge)
Dec 25 2019patent expiry (for year 12)
Dec 25 20212 years to revive unintentionally abandoned end. (for year 12)