The invention concerns a probabilistic method and automatic control (3) for preventing and regulating an interruption of a multistage and multilink industrial production glow, to optimise said production flow while controlling industrial impact resulting from random chained stress, and applications to factory noise and value at risk of a clearing house. The invention consists in regulating production by means of a probabilistic automatic control (3) with action loop (5) and feedback loop (6). Industrially speaking, said regulating automatic control (3) can be electronically produced by means of a programmed and cabled computer. The action loop (5) of the automatism (3) consists of an inductive probabilistic simulator (11) evaluating the chaining of random stresses in the production chain leading to a probabilistic measurement of the industrial impact I(r) resulting, on the basis of the adjustable level of an industrial stock parameter (r). The method used in the action loop (5) of the automatic control (3), is of the type called “Value at Risk” or “VaR”. The feedback loop (6) of the automatic control (3) adjusts in course of time (t) the industrial action parameter (r) to an extremal value, maintaining said estimator of VaR effect (p,T(r)) below its authorised nuisance level M. This is aimed at making the industrial production level F(r) extremal but nevertheless at a level compatible with the respect of regulatory or stock out conditions. The method and device of the invention can be advantageously used in numerous industries whether manufacturing, financial, agricultural where risks of pollution and other risks resulting from random chained stress need to be controlled.
|
1. A computer readable medium storing computer program code, for simulating the behavior of a system to thereby control said system, said system having productive subsystems (Si,j), operating along a succession of operative phases (E1, . . . , Em), the subsystems being interlinked and regulated by an industrial action parameter (r), and said subsystems also being affected by respective self-stresses (Wi,j(xz)) and further being constrained to operate according to a set of criteria based on said aggregated stress, said computer program code, when executed by at least one processor, causing the at least one processor to perform the steps of:
a) determining an aggregated stress (Wi,j) at a current productive subsystem (Si,j), said aggregated stress being determined from estimates of the level of self stress (Wi,j(xz)) for productive subsystems at the current operative phase, and from transferred stress from productive subsystems at a preceding operative phase;
b) determining an impact parameter (Ih(xz, T) (r)) for the current operative phase, the determination being based on the aggregated stress (Wi,j) of the productive subsystems of said current operative phase, said impact parameter representing the likelihood that the behaviour of the respective productive subsystem under the aggregated stress will no longer comply with the set of criteria, thus transmitting stress to a subsequent operative phase;
c) repetitively operating the step a) and the step b) for all operative phases, with said transferred stress being each time affected by a pseudo-random component;
d) repetitively operating the step c), each time with new pseudo-random components;
e) building a failure probability distribution (pri,j(xz,T,r,Wz,i,j,ai,j)) for the productive subsystems (Si,j) using the repetitions operated by said the step d); and
f) adjusting the industrial action parameter (r), based on said failure probability distribution (pri,j(xz,T,r,Wz,i,j,ai,j));
wherein the step a) determines the aggregated stress (Wi,j) for each of the productive subsystem (Si,j) using following formula:
Wi,j=Wi,j,self+ΣkW′i,j,k=Wi,j,self+ΣkWi,j,k*di,i−1,j*qi,j,k wherein:
Wi,j,self are estimates of the level of self stress for a given subsystem (Si,j),
ΣkW′i,j,k is the sum of transmitted stress between subsystems (Si,j),
Wi,j,k are the stress of preceding subsystems (Si−1,k) that are transmitted to (Si,j),
di,i−1 are transmission coefficients between the subsystems (Si−1,k) and (Si,j), and
qi,j,k are predetermined linkage coefficients between two successive subsystems (Si−1,k) and (Si,j).
2. A method performed by execution of computer readable program code by at least one processor of at least one computer system, for simulating the behavior of a system to thereby control said system, said system having productive subsystems (Si,j) and operating along a succession of operative phases (E1, . . . , Em), the subsystems being interlinked and regulated by an industrial action parameter (r), and said subsystems also being affected by respective self-stresses (Wi,j(xz)) and further being constrained to operate according to a set of criteria based on said aggregated stress, the method, when executed by the at least one processor, comprising the steps of:
a) determining, using at least one of the processors, an aggregated stress (Wi,j) at a current productive subsystem (Si,j), said aggregated stress being determined from estimates of the level of self stress (Wi,j(xz)) for productive subsystems at the current operative phase, and from transferred stress from productive subsystems at a preceding operative phase, the transferred stress being affected by a pseudo-random component;
b) determining, using at least one of the processors, an impact parameter (Ih(xz, T) (r)) for the current operative phase, the determination being based on the aggregated stress (Wi,j) of the productive subsystems of said current operative phase, said impact parameter representing the likelihood that the behavior of the respective productive subsystem under the aggregated stress will no longer comply with the set of criteria, thus transmitting stress to a subsequent operative phase;
c) repeating, using at least one of the processors, the step a) through the step b) up to a final operative phase;
d) repeating, using at least one of the processors, the step c) for a selected number of times, each time with new pseudo-random components at the step a);
e) building, using at least one of the processors, a probability distribution (pri,j(xz,T,r,Wz,i,j,ai,j)) for the productive subsystems (Si,j) using the repetitions at step d), and
f) adjusting, using at least one of the processors, the industrial action parameter (r), based on said failure probability distribution (pri,j(xz,T,r,Wz,i,j,ai,j)),
wherein the determination of the aggregated stress (Wi,j) for each of the productive subsystem (Si,j) uses following formula:
Wi,j=Wi,j,self+ΣkW′i,j,k=Wi,j,self+ΣkWi,j,k*di,i−1,j*qi,j,k wherein:
Wi,j,self are estimates of the level of self stress for a given subsystem (Si,j),
ΣkW′i,j,k is the sum of transmitted stress between subsystems (Si,j),
Wi,j,k are the stress of preceding subsystems (Si−1,k) that are transmitted to (Si,j),
di,i−1 are transmission coefficients between the subsystems (Si−1,k) and (Si,j), and
qi,j,k are predetermined linkage coefficients between two successive subsystems (Si−1,k) and (Si,j).
8. A computer readable medium storing computer program code, for regulating a production flow of an industrial process performed in an industrial facility by determining an industrial impact resulting from an uncertain chained stress at different production steps in the production flow, the production flow including multi-stage and multi-linked production steps E1, . . . , Em, wherein each of the production steps Ei is composed of productive subsystems Si,j, the computer program code, when executed by at least one processor, causing the at least one processor to perform the steps of:
a) electronically generating elementary impact components I(xz,T)(r) corresponding to each sample of an uncertain quantity xz, wherein T corresponds to a time period during which the production flow operates, and (r) corresponds to an industrial action parameter,
b) making an electronic determination, for each sample of the uncertain quantity xz, and as a function of the industrial action parameter (r), a level of aggregated stress Wz,j,j for each of the productive subsystems Si,j by an inductive method, starting at the first step E1 and ending at the last step Em, wherein step b) comprises:
b1) measuring, starting from the first step E1, a level of self stress W1,j(xz) for each of the productive subsystems S1,j at the first step E1,
b2) determining, only for the first step E1 under consideration, the level of self stress W1,j(xz) for each of the productive subsystems S1,j with the aggregated stress Wz,1,j,
b3) electronically performing a pseudorandom computation of a transmission coefficient dz,1,j for each of the productive subsystems S1,j at the first step E1, using a probability distribution for elementary failures, pr1,j(xz,T,r,Wz,1,j,a1,j) for the productive subsystems S1,j, in which a pseudorandom number uz,1,j in the interval [0,1] is electronically generated, and in which the pseudorandom number uz,1,j is electronically applied to an inverse distribution function Φ1,j(xz,T,r,Wz,1,j,a1,j) (uz,1,j), thereby obtaining a probability of elementary failure pri,j(xz,T,r,Wz,1,j,a1,j) for the productive subsystems S1,j,
b4) determining the level of the self stress W2,k(xz) for each of the productive subsystems S2,k at the second step E2,
b5) electronically evaluating the aggregated stress for each of the productive subsystems S2,k at the second step E2 using the formula:
Wz,2,k=W2,k(sz)+ΣjW′z,2,j,k=W2,k(xz)+ΣjW2,1,j(xz)*d2,1,j*q2,j,k, wherein q2,j,k corresponds to linkage coefficients that are predetermined for the second step of the production flow,
b6) repeating the operations b1) through (b5 for the third step E3 to the last step Em to obtain the aggregated stress for each of the steps E1 through Em,
c) determining a multivariable industrial impact parameter I(xz,T) linked to a sample with index z in such a manner that the sample with index z is a Monte-Carlo sample which constitutes the uncertain quantity xz and the transmission coefficient dz,j,j:
c1) an industrial impact variable I is measured while computing the aggregated stress Wz,i,j at each production step E1 through Em and while computing the transmission coefficients dz,i,j at each production step E1 through Em, and
c2) from the measured industrial impact variable I, a measurement of a probability of violating a predetermined regulation level given by a supplied value V by an impact I(r) on the production flow is obtained,
d) regulating the industrial process through setting an effective violation frequency for authorized limits for the impact I(r) at or near target values based on the measurement of the probability of violating the predetermined regulation level,
e) increasing production flow by reducing industrial safety margins to be applied at a resistance level M in the industrial facility, while still adhering to regulations imposed on the production flow, and
f) improving efficiency of operation in the industrial facility as a result of increasing the production and reducing the industrial safety margins.
7. A method performed by execution of computer readable program code by at least one processor of at least one computer system, for regulating a operation flow of an industrial process performed in an industrial facility by determining an impact resulting from an uncertain chained stress at different operation steps in the operation flow, the operation flow including multi-stage and multi-linked operation steps E1, . . . , Em, wherein each of the operation steps Ei is composed of operation subsystems Si,j, the method, when executed by the at least processor, comprising:
a) electronically generating using at least one of the processors, elementary impact components I(xz,T)(r) corresponding to each sample of an uncertain quantity xz, wherein T corresponds to a time period during which the operation flow operates, and (r) corresponds to an action parameter,
b) making an electronic determination, using at least one of the processors, for each sample of the uncertain quantity xz, and as a function of the action parameter (r), a level of aggregated stress Wz,j,j for each of the operation subsystems Si,j by an inductive method, starting at the first step E1 and ending at the last step Em, in which:
b1) measuring, using at least one of the processors, starting from the first step E1, a level of self stress W1,j(xz) for each of the operation subsystems Si,j at the first step E1,
b2) determining, using at least one of the processors, only for the first step E1 under consideration, the level of self stress W1,j(xz) for each of the operation subsystems S1,j with the aggregated stress Wz,1,j,
b3) electronically performing, using at least one of the processors, a pseudorandom computation of a transmission coefficient dz,1,j for each of the operation subsystems S1,j at the first step E1, using a probability distribution for elementary failures, pr1,j(xz,T,r,Wz,1,j,a1,j) for the operation subsystems S1,j, in which a pseudorandom number uz,1,j in the interval [0,1] is electronically generated, and in which the pseudorandom number uz,1,j is electronically applied to an inverse distribution function Φ1,j(xz,T,r,Wz,1,j,a1,j) (uz,1,j), thereby obtaining a probability of elementary failure pri,j(xz,T,r,Wz,1,j,a1,j) for the operation subsystems S1,j,
b4) determining, using at least one of the processors, the level of the self stress W2,k(xz) for each of the operation subsystems S2,k at the second step E2,
b5) electronically evaluating, using at least one of the processors, the aggregated stress for each of the operation subsystems S2,k at the second step E2 using the formula:
Wz,2,k=W2,k(sz)+ΣjW′z,2,j,k=W2,k(xz)+ΣjW2,1,j(xz)*d2,1,j*q2,j,k, wherein q2,j,k corresponds to linkage coefficients that are predetermined for the second step of the operation flow,
b6) repeating, using at least one of the processors, the operations b1) through (b5 for the third step E3 to the last step Em to obtain the aggregated stress for each of the steps E1 through Em,
c) determining, using at least one of the processors, a multivariable industrial impact parameter I(xz,T) linked to a sample with index z in such a manner that the sample with index z is a Monte-Carlo sample which constitutes the uncertain quantity xz and the transmission coefficient dz,j,j:
c1) measuring, using at least one of the processors, an impact variable I while computing the aggregated stress Wz,i,j at each operation step E1 through Em and while computing the transmission coefficients dz,i,j at each operation step E1 through Em, and
c2) obtaining, using at least one of the processors, from the measured impact variable I, a measurement of a probability of violating a predetermined regulation level given by a supplied value V by an impact I(r) on the operation flow,
d) regulating the industrial process through setting an effective violation frequency for authorized limits for the impact I(r) at or near target values based on the measurement of the probability of violating the predetermined regulation level,
e) increasing production flow by reducing industrial safety margins to be applied at a resistance level M in the industrial facility, while still adhering to regulations imposed on the operation flow, and
f) improving efficiency of operation in the industrial facility as a result of increasing the production and reducing the industrial safety margins.
3. A method performed by execution of computer readable program code by at least one processor of at least one computer system, for regulating a production flow of an industrial process performed in an industrial facility by determining an industrial impact resulting from an uncertain chained stress at different production steps in the production flow, the production flow including multi-stage and multi-linked production steps E1, . . . , Em, wherein each of the production steps Ei is composed of productive subsystems Si,j, the method, when executed by the at least one processor, comprising:
a) electronically generating, using at least one of the processors, elementary impact components I(xz,T)(r) corresponding to each sample of an uncertain quantity xz, wherein T corresponds to a time period during which the production flow operates, and (r) corresponds to an industrial action parameter,
b) making an electronic determination, using at least one of the processors, for each sample of the uncertain quantity xz, and as a function of the industrial action parameter (r), a level of aggregated stress Wz,j,j for each of the productive subsystems Si,j by an inductive method, starting at the first step E1 and ending at the last step Em, in which:
b1) measuring, using at least one of the processors, starting from the first step E1, a level of self stress W1,j(xz) for each of the productive subsystems S1,j at the first step E1,
b2) determining, using at least one of the processors, only for the first step E1 under consideration, the level of self stress W1,j(xz) for each of the productive subsystems S1,j with the aggregated stress Wz,1,j,
b3) electronically performing, using at least one of the processors, a pseudorandom computation of a transmission coefficient dz,1,j for each of the productive subsystems S1,j at the first step E1, using a probability distribution for elementary failures, pr1,j(xz,T,r,Wz,1,j,a1,j) for the productive subsystems S1,j, in which a pseudorandom number uz,1,j in the interval [0,1] is electronically generated, and in which the pseudorandom number uz,1,j is electronically applied to an inverse distribution function Φ1,j(xz,T,r,Wz,1,j,a1,j) (uz,1,j), thereby obtaining a probability of elementary failure pri,j(xz,T,r,Wz,1,j,a1,j) for the productive subsystems S1,j,
b4) determining, using at least one of the processors, the level of the self stress W2,k(xz) for each of the productive subsystems S2,k at the second step E2,
b5) electronically evaluating, using at least one of the processors, the aggregated stress for each of the productive subsystems S2,k at the second step E2 using the formula:
Wz,2,k=W2,k(sz)+ΣjW′z,2,j,k=W2,k(xz)+ΣjW2,1,j(xz)*d2,1,j*q2,j,k, wherein q2,j,k corresponds to linkage coefficients that are predetermined for the second step of the production flow,
b6) repeating, using at least one of the processors, the operations b1) through (b5 for the third step E3 to the last step Em to obtain the aggregated stress for each of the steps E1 through Em,
c) determining, using at least one of the processors, a multivariable industrial impact parameter I(xz,T) linked to a sample with index z in such a manner that the sample with index z is a Monte-Carlo sample which constitutes the uncertain quantity xz and the transmission coefficient dz,j,j:
c1) measuring, using at least one of the processors, an industrial impact variable I while computing the aggregated stress Wz,i,j at each production step E1 through Em and while computing the transmission coefficients dz,i,j at each production step E1 through Em, and
c2) obtaining, using at least one of the processors, from the measured industrial impact variable I, a measurement of a probability of violating a predetermined regulation level given by a supplied value V by an impact I(r) on the production flow,
d) regulating the industrial process through setting an effective violation frequency for authorized limits for the impact I(r) at or near target values based on the measurement of the probability of violating the predetermined regulation level,
e) increasing production flow by reducing industrial safety margins to be applied at a resistance level M in the industrial facility while still adhering to regulations imposed on the production flow, and
f) improving efficiency of operation in the industrial facility as a result of increasing the production and reducing the industrial safety margins.
4. The method according to
5. The method according to
6. The method according to
|
The present invention concerns a process and a mechanism (automation) to regulate and/or prevent the stoppage of a flow F of a multi-stage and multi-linked industrial process of the following type:
By the term “Industrial Production” (or “production”) is understood, according to this invention, all human activity which has as its goal the production of an added-value product (production flow) that an be directly or indirectly expressed in terms of added value which might be itself associated with an industry that could be manufacturing, energy, agro-food or financial . . .
By “Production Flow” F(r) is understood according to the invention, all transfer of materials or measurable content arriving at the final stage En and providing the chain of production activities of the sub-processes Sij at the different steps Ei of the production cycle.
The invention applies to the domains of industry, manufacture and finance, where it is appropriate to estimate, in order to circumscribe it, an uncertain impact I(r), which can be—for manufacturing—pollution, or—for a financial process—risk of loss or failure, and which is connected with a production of a value-added good (manufactured or financial product). The searched-for global goal for which we aim is to optimise the production flow of the value-added good while limiting the uncertain negative impact of this production. This uncertain impact I(r) is normally found to grow with the production of the value-added good.
The invention is put to work specifically in the case of a multi-stage multi-linked configuration. The structure of this production of this production can be either tree-like, or, in the more general case, matrix-like.
The invention consists of the control of production according to a probabilistic automatic procedure with an action loop and a reaction loop. Industrially, this automatic control can be electronically implemented with the help of a computer that is programmed and networked to control the stages of the process according to the invention, such as will be described below. The outputs from the computer are transmitted through a system of activators or servomotors which control the industrial parameter (r) to set it to its optimal value.
According to the invention, the action loop of the automatic process consists of an inductive probabilistic evaluation simulator of the chain of uncertain stresses in the production chain resulting in a probabilistic measure of the resulting industrial impact I(r), which is a function of the “controlled” level of the industrial parameter (r). The method put to work by the invention, at the heart of the automatic action loop, is generally called “Value at Risk” or “VaR”. The VaR method is actually used principally in financial applications, with a view to grasp the quantifiable risks of the market (value volatility of a portfolio of stock), and of the credit and liquidity risks of financial institutions.
The invention's action loop for the probabilistic automatic control of production measures the function of the possible values of the industrial action parameter (r), and the Value at Risk, VaR of the production flow F(r), this for a duration T and a probability level (p). That is, for, the action loop measures the estimate of the of the effect that is described as the value of VaR (p,T) (r), such that the impact I(r) imposed by the production during the time horizon T=[0,t] only exceeds VaR by the probability (p); this, while taking into account the uncertain variations of the sub-uncertainties Xi which influence the production.
Within the invention's automatic probabilistic reaction loop for production control, the level of the industrial control parameter (r) is set during the time (t) to the external multivariable (rmax) or (rmin), while maintaining the aforementioned effect estimator VaR (p,T) (r) on the right side of of its authorized impact level M. That is, in the general case, where the action parameter r=(ri, . . . , rh, . . . , rn) , the authorized impact level M=(M1, . . . , Mh, . . . , Mn) and the reliability probabilities (p)=(p1, . . . , ph, . . . , pn) are multivariables, the (r) is picked at the extremes such that nevertheless for each index h:
This is with the goal of pushing the industrial production level F(r) to the limit while still being compatible with the aforementioned regulatory condition of controlling the impact Prob[Ih(X,T) (r)<Mh]≧ph (type 1) or Prob[Ih(X,T) (r)>Mh]≧ph (type 2). That is, for each index h, the induced effect Ih stays less than (type 1) or larger than (type 2) the authorized level Mh with a probable reliability of ph.
According to prior art, there are three classical techniques to estimate the distribution of the uncertain industrial impact I(r) by a VaR method. For the sake of simplification, we place it here in the realm of financial applications (the most frequent use of prior art), the measure of risk in a portfolio of financial investments, and specifically in a portfolio of stock (the global volatility of their value), tied to the uncertainties of the market. In effect, the applications of the VaR methods on industrial manufacture, while perfectly viable, are actually essentially confined to an academic level. In the realm of this financial application, the Value at Risk of a portfolio during a duration T and a probability level p is understood to be the amount, called VaR, such that the loss incurred in this portfolio during the time horizon T=[0,t] does surpass VaR only with a probability equal to (1−p). That is, formally,: Prob[portfolio loss>VaR]=1−p, this probability being calculated according to an assumed distribution of the external sub-uncertainties Xi (volatility in the market) which influence the portfolio.
The first method for estimating the VaR is called the estimated variance/covariance matrix, initially developed by the JP Morgan company (See JP Morgan, RiskMetrics™—Technical documents, 4th ed., Morgan Guaranty Trust Company New York, 1996). This method is practically not applicable, an/or very imprecise when applied to complex investment assets (the implicit volatility of options).
The second method for estimating the VaR, called historical analysis, was originally advocated by the Chase Manhattan Company, with the Charisma™ and Risk$™ (see CHASE MANHATTAN BANK, N.A., Value at Risk, 1996). This method rests on the hypothesis that the risk factors are stable. In addition to the fact that that it presupposes that the future has a statistical behaviour identical to the past—and more precisely, the recent past—it has a strong tendency to badly evaluate the frequency of catastrophic events. Further, the historical VaR method can not technically simulate the total failure of a stage in the risk process.
The third method for estimating the VaR, called “The Monto Carlo Simulation” was initially advocated by the Bankers Trust Company with its RAROC 2020™ system.
A general description of these three systems can be found at
The invention, in its automatic probabilistic action loop, measures the uncertain industrial impact I(r) resulting from the chained stresses in the production subsystems Sij in the different production steps, according to the third method, i.e. by Monte Carlo Simulation.
The systems to determine the final probabilistic impact (VaR) in a production system (especially financial) advocated by prior art:
If one refers to the domain of the risk matrix of financial portfolios and of the optimisation of activities in a clearing house (application of a potentially multi-stage or multi-linked type in the financial industry) where the uncertain values Xi are composed of the variations of the stock values; where the impact I(r) is composed of the potential global loss of the clearing house; where the stresses Wij are composed successively: of the loss-of-customers suffered by members or local offices (step Ei−1), and then the loss of members (step Ei); and/or the the multivariable action parameter (r) is composed of the members' deposited guarantees ri to the clearing house:
The prior art systems, are either single-stage and only consider the members' accounts, or are multi-stage but only address a simple combination of members' and customers' accounts in their probability calculation. In other words, the prior art systems which do consider a tree-like structure of counterparties (composed of productive sub-assemblies distributed over stages) consider it sufficient to consider the simultaneous failure of each branch of the “tree”. The invention, on the other hand, measures the inductive probabilistic chain of failures in the branches of the “tree” with a probabilistic calculation at each of the levels. More generally, the prior art systems, unlike the invention, do not take into account the measure of a probabilistic “catastrophic” chain of stresses at several levels of production.
The closest prior art systems are found in the domains of analyses of VaR using electronic methods in financial trading environments (banks, brokerage houses, . . . ). Here is a list of systems and various associations and promoters that have developed them:
Algorithmics™ by Ron Dembo
This system uses first a small-scale Monte Carlo portfolio simulation, and then a simplified portfolio calculation having a similar behaviour. Thereafter, it performs a more complete Monte Carlo simulation for a simplified portfolio. This system can regard the global portfolio of outstanding amounts with a counterparty and study the VaR of this portfolio (which is called the “credit VaR”) as a function of market movements, which take into account the catastrophic movements (deterministic and depending on probability). The failure probabilities retained at each “stage” come from the rating agencies S&P™ or Moody's™, and are thus fixed, are not determined in a probabilistic manner, and do not depend on market movements. The “Credit VaR”s of several counterparties are added on, not included through an inductive method of probabilistic chain of failures.
CreditRisk+™ by Mark Holmes
This multi-stage system advocates taking into account, for the subsystems of a stage, a failure probability which is not fixed. But the process used is an uncertain process. That is to say, the that the subsystems' failure probabilities Si,j do not depend on the aggregated stresses Wz,i,j to which they are subjected (neither indirectly through the uncertain values X nor in this particular case, through the market movements). They are notably no higher when the heightened stresses Wz,i,j are more important.
This system proposes to combine the possible failures of the different counterparties by calculating the portfolio diversification's efficaciousness. But it does not propose the probabilistic measure of failure at the various stages of the chain of failures and the chain reaction of failures between stages using an inductive method.
CATS/Carma™ by Robert Geske
This system advocates a multi-period random draw of Monte Carlo to simulate the market movements, and afterwards, a rating of the counterparties by others, and finally the possible failure. The calculation of the Credit VaR is done for each counterparty with a distribution over due dates. This system uses neither the aggregation of the counterparties' failure risk by an inductive probabilistic method, nor do the failure probabilities depend on the stress state (market movements).
The proposed systems in the domain of finance by Algorithmics™, Credit Risk+™ amd CATS™, in contradistinction to other more current systems among prior art, apply to a “tree” stress chain structure for the various counterparties. It is in this sense that they can be considered as the closest to this invention. But, in contradistinction to the invention, this particular structure is not intended to succeed in producing a more exact measure of the probabilistic impact.
Thus, according to prior art, no account is taken of the fact that the non-mastering of the stress at a prior stage has an effect, i.e. that in this financial application of measure of portfolio risk, that the failure of one customer makes the position of his compensators more fragile, that is, it increases the stress on the next stage. In other words, according to prior art, the failure of the subsystems is not simulated from one stage to the other using a probabilistic inductive method. That is to say that the prior art does not simulate the failure of the system at the 1st lowest level, and does not report this failure to the next 2nd level before simulating in a probabilistic fashion the failure of subsystems at level 2, and so on.
Also, for the prior art systems, and in particular for the Algorithmics™ and CATS™ systems, the subsystem's (counterparty's) probability of failure is fixed. As the studied portfolio can contain options, the amount to pay by the counterparty at a given date can change from one random draw of the Monte Carlo method to another (that is, by the way, the reason why options are considered in academia as “contingent assets”). For Credit Risk+™, the portfolio contains only bonds. Thus, the amount to pay by the counterparty at a given date is known. Bonds are not “contingent assets” (except if they have floating interest rates or have clauses about convertibility or callback). The failure probability according to Credit Risk+™ results in an uncertain random draw. But the draw and the probability value which result from it are independent of the state of the market during the travel along the Monte Carlo “trajectory”. On the other hand, according to the first variant recommended and described below and implemented by the invention, the distribution of the probability of the coefficient of failure for a subsystem Si,j is neither constant nor unknown, it depends on the state of the stresses on the subsystem Si,j, thus on the state of the market. Instead, once this distribution is known, the coefficient value is unknown, please note, according to this distribution.
Additionally, according to prior art, and in contradistinction to the recommendations of the second variant recommended and described below for the implementation of the invented system, the prior art systems are based on that the reliability of the issuer is given by their Moody's™ or S&P™ rating. The prior art systems cannot separate the quality of an issuer and his size. According to the logic implemented by the most evolved systems, the only way to consider the size of an issuer consists of regarding an issuer who is small but reliable as having a very small probability of failure for a small amount, but which probability rises sharply starting from a certain amount, whereas regarding an issuer who is large but unstable as having a probability of failure of the same order of magnitude for a small amount as for a large amount. For the majority of prior art systems, the probability of failure is considered to be independent of the amount due, thus this distinction becomes irrelevant.
Finally, and contrary to the recommendations of the third variant recommended and described below in the implementation of the invention, prior art does not, in the probabilistic simulation, propose to implement uncertain catastrophic scenarios with given probabilities. Prior art in general proposes to perform stress tests whose goal is to study the consequences of a catastrophic movement such as a stock market crash. To do this, it is recommended to simulate a catastrophic scenario where all the parameters are introduced by the user, without uncertainty in these parameters. Certain compensation phenomena such as hedging, can then pass unnoticed, which is not the case if the stress test is itself uncertain (such as according to this invention).
The following prior art systems are far removed from the specifications of this invention, by the method of measuring impact which it implements.:
Credit Metrics™ and Risk Metrics™ by J.P. Morgan
These systems function counterparty by counterparty, according to the covariance matrix method, with the failure probabilities independent of market movements and supplied via the Internet. These systems do not advocate the means that are characteristic of this invention.
Credit Risk™ Boundary Rider™ by Steve Davis
This system, called “close-out netting module” calculates the involvement of each counterparty, while taking into account a tree structure of counterparties. The involvement at one level of the tree generates the “netting” of all branches that it carries. This system recommends neither aggregation of risk-of-failure of the counterparties by an inductive probabilistic method, nor probabilities of failure depending on market movements. This system thus does not advocate the means that are characteristic of this invention.
Hedge™ by Richard Sandor
This system uses a Monte Carlo draw for market movements, and then a calculation of the effect on the portfolios, and finally a draw for failure of the counterparties using an inductive probabilistic independent of the market movements, and a calculation of the global VaR. Thus, this system does not advocate the means that are characteristic of this invention.
KMV “EDF”™ by Oltech Vasicek
This system is based on a Markov chain. It evaluates, using a multi-period Monte Carlo method, the expected return from a stock. This system only takes into account loans and bonds and calculates the risk coming from the issuer. This system evaluates the risk from each counterparty. The probabilities of failure for each subsystem Is fixed. Thus, this system advocates neither the aggregation of risk of counterparty failures with a inductive probabilistic method, nor probabilities of failure depending on the amount of stress in the system (market movements). This system thus does not advocate the means that are characteristic of this invention.
Midas Kapiti™ by Misys (UK)
This system advocates neither the aggregation of risk of counterparty failure using an inductive probabilistic method, nor probabilities of failure that depend on the amount of system stress (market movements). This system thus does not advocate the means that are characteristic of this invention.
NetRisk™ by Eugene Shanks
This system advocates neither the aggregation of risk of counterparty failure using an inductive probabilistic method, nor probabilities of failure that depend on the amount of system stress (market movements). This system thus does not advocate the means that are characteristic of this invention.
The following prior art systems are further removed from the specifications in the current invention because of the fact that they are not concerned with “netting” of the counterparties (aggregation of stress):
The purpose of the invention (automatic probabilistic process for control of a chain of uncertain stress flows) such as desribed below can be used in numerous industries, equally manufacturing, financial or agricultural. Below, there is a description of the invention, firstly its definition and its global characterisation, i.e. applicable notably to the set of types of industrial and financial production that involves stress chains. Secondly, the invention is more specifically described for a manufacturing industry application (optimisation of the production in a factory with noise limitations). Finally, the invention is described for a particularly advantageous application in the financial industry, aiming at optimising the activity level of a clearing house—an exchange for chattels or raw materials—exposed to risks of failure of the counterparties (linked to the volatility of the market for the traded items) while conforming with the criteria for limits on the global risk—“Capital Adequacy”—in order to minimise the failure risk.
Outside of the industrial applications described below, the knowledgeable person will be able to apply the invention's principles to numerous other multi-stage industrial domains that have chained uncertainties, and notably for the control of production flow for energy as a function of the uncertainties of demand, of the availability of sources of energy, and the immediate limits on production capacity (local or global), and of the capacity of the energy transmission net; this while respecting “minimal” constraints, notably the availability for each user and/or regulatory constraints on pollution, (air, cooling water temperature, . . . ) and avoiding the disconnection of certain circuits.
The process and the device of this invention can equally be applied to chained industrial operational risks, notably in industries whose operation produces certain environmental problems such as noise or pollution; it can also be used in complex industrial systems which have catastrophic risk chains, such as nuclear power plants, oil and gas drilling platforms, and chemical factories.
The devices derived from this invention can also be applied to great advantage in the agricultural domain, particularly for the control of the procurement cycles for a country or a region as a function of the chained uncertainties of production (regional or world-wide) and the variations in the consumption of food, all while assuring a minimum supply to each inhabitant.
The appended figures represent schematically the characteristics of the probabilistic automatic operation of this invention, and also the three recommended variations for its application, and two specific applications.
About the figures:
The
The process and the automatic regulation 3 according to this invention are applied specifically to a multi-stage and multi-linked production. That is, they concern an industrial or financial production centre composed of several production stages called E1, . . . Em, and each production stage Ei is itself composed of productive subsystems Si,j. These receive one or more production sub-flows Fi,j,k from one or several subsystems Si−1,k of the previous stage (except the first, i=1), and transmit one or more production sub-flows Fi+1,j,k to one or several subsystems Si+1,k′ of the following stage Ei+1 (except the last stage i=m).
The invention concerns the case where the production sub-flows Fi,j,k can be controlled with the aid of a—possibly multivariable—industrial control parameter (r) or (r)=(r1, . . . , rn), and where the (global) industrial production flow results from a combination of production sub flows Fi,j,k.
The invention is specifically applied to an uncertain stress chain Wi,j associated with an industrial impact I(X,T) (r) (in general harmful) possibly multivariable (I)=(I1, . . . , Ih, . . . , IH). This impact I(X,T) (r) should be mastered (notably to avoid damage, or for regulatory reasons) within a time horizon T. It is the result of a cascading chain of aggregated stresses Wi,j (measurable phenomena) suffered by each of the productive subsystems Si,j.
The invention specifically concerns the types of production whose industrial impact I(X,T) (r) depends in a globally monotone manner (increasing or decreasing) on the aggregated stresses Wi,j of the subsystems Si,j at the different production stages Ei, and where at least one of the elements of Ih depends on:
Each uncertain aggregated stress Wi,j (with “catastrophic” local effect) suffered by a subsystem Si,j is in nominal the nominal mode contained at the level of subsystem Si,j. But it can, in failure mode, be partially or totally transmitted to the following stage, Ei+1. That is, formally, each aggregated stress Wi,j is the result (sum) of the following items:
According to the invention each of the transmitted stresses w′I,j,k is expressed a combination (which is formally written in the form of a sum (Σ) for each of the subsystems in the previous stage of the products):
Referring to the
These confidence coefficients ai,j, as well as the linkage coefficients qi,j,k are fixed and are characteristic of the production centre, (1), (
As can be seen in
According to the invention, the abovementioned transmission coefficients di,j can be:
The inductive usage—inside the inductive probabilistic processor 12 (
The control process according to this invention is specifically implemented in the case where the variations—at the time horizon T, where the uncertain sub-quantities Xi constitute the abovementioned multivariable X, the uncertain environment—are quantifiable by a rule of joint probability Prob(x1, . . . , xN). The xi−s constitute the generic state which can be taken by the uncertain subquantity Xi. In general, the subquantitity's characteristics, especially the average, the variance and the correlations as well as its behaviour at the extreme ends, result from a statistical analysis of the recorded history of the uncertain subquantities Xi.
With reference to
Finally, as can be seen from
The process implemented by this invention's control device (automation) is described in reference to
The action loop function 5 of the control function automation 3 is to electronically calculate, for the time horizon T, as a function of the possible values of the industrial control function (r), the multivariable estimator for the maximal impact VaR(p,T) (r) with a threshold probability possibly multivariable (p)=(p1, . . . , ph, . . . , pH) imposed by the conditions stored in memory 9 of the operator specifications.
This is defined as a vector Var(p,T) (r) of limits VaR(ph,T) (r) such that the abovementioned elementary impact components Ih(X,T) (r) only exceed their limits (upwards or downwards depending on system type) with a probability of (1−ph), that is Prob[Ih(X,T) (r)>VaRh(ph,T) (r)=(1−ph) (type 1) or Prob[Ih(X,T) (r)<VaRh(ph,T) (r)=(1−ph) (type 2).
According to this known frame of implementation of the invention, the industrial action parameter (r) is automatically—as part of the production control 3—regulated over time within the action loop 6. The industrial action parameter is regulated to its maximum or minimum multivariable value (rmax) or (rmin) while maintaining the abovementioned estimator of the effect VaR(p,T) (r) on the right side of its authorized nuisance level M. That is, for each component h, the reaction loop 6 of the automatic process 3 electronically “extremises” the VaRh(ph,T) (rmax or min)<Mh (type 1) or VaRh(ph,T) (rmax or min)>Mh (type 2).
The process of the invention consists in, additionally, taking care of the sampling of the state of the production according to a pseudo-random method of the “Monte Carlo” type, where the global sampling number is Z. This is implemented by the Monte Carlo generator 8.
To this end, the invented process in general contains the implementation of the following stages, electronically in the interior of the modelling unit 2 and the action loop 5 of the automatic process 3:
A principal new characteristic of this control process and device (automation) 3 as advocated by the invention consists of that, to electronically generate the elementary components of the impact Ih(xz,T) (r) which corresponds to each sample of the uncertain quantity xz, the aggregated stress levels Wz,i,j are electronically determined for each pseudo-random sample of the abovementioned uncertain multivariable (xz), and as a function of the industrial action parameter (r). These stress levels Wz,i,j are determined for each of the productive subsystems Si,j by a inductive probabilistic method 11, starting at the first stage E1 and going to last step Em. That is, according to this principal method to implement the invention, and inside the abovementioned inductive probabilistic processor 12, starting at the first stage E1 of the production unit, and for each pass—done by the Monte Carlo generator 8—through the random draw loop 7, that is for each pseudo-random sample yz=(yz,1, yz,2, . . . , yz,G) of the index vector (when ACP is used) or for each random draw of the pseudo-random samples of the state vector xz−(xz,1,xz,2, . . . , xz,G) (when ACP is not used):
At the core of the probabilistic inductive processor 12, the operations (gg through gggg) are iterated in an inductive manner 11 of probabilistic determination of aggregated stresses Wi,j from stage to stage until the aggregated stress Wz,m,j of the productive subsystem Sm,j at stage Em. The industrial multivariable impact value I(xz,T) (r) linked to the Monte Carlo sample with index z.
This process is repeated through (Z) loops of the inductive probabilistic processor 12.
One of the advantages of the process and device built according to this principal implementation of the invention is that for each interlocked Monte Carlo sample constituted of the uncertain environmental factor Xz and the “probabilistic cascade” of the failure coefficients dz,I,j emitted at the core of the inductive probabilistic processor 12:
Such that:
Thus, thanks to this control process, a more efficient industrial production control automation can be constructed.
A first auxiliary characteristic variant of implementation and control device according to this invention consists additionally of that it is imposed electronically that the failure coefficients dz,1,j of the productive subsystems Si,j are higher when the aggregated stresses Wz,I,j are more important. That is, that in the method implemented by the inductive probabilistic processor (12) for the evaluation of the stress transmissions from one stage to the next higher stage, the fact is taken into account that in the majority of cases, the higher failure coefficients appear precisely when the stress is important, pulling with it a sensitive increase of the mean level of the stress transmitted to the next higher step, and, as a consequence, of the amount of induced global effect.
To implement this advantageous variant of the invention, functional rules are imposed at the modeller 2. These rules are such that, for some threshold value d<1, it electronically fixes the elementary failure probabilities Pri,j in such a fashion that Pri,j(xz,T,r,Wz,i,j,ai,j) [dz,i,j>d] grows with the aggregated stress value Wz,i,j. To do this, at the heart of the modeller 2, the description parameters for the inverse distribution function Φi,j(x?,T,r,Wz,i,j,ai,j) (uz,i,j) are fixed in such a manner that the function becomes an increasing function of the parameter Wz,I,j, all other parameters and variables, including uz,i,j remaining fixed.
Two practical variants of the implementation of this particularity are given below, in reference to
One of the advantages of the process and device according to this first auxiliary variant of the invention is that:
A second auxiliary variant characteristic of the procedure and device according to this invention should preferably be implemented for production of a type that has diversified stress links. That is, a production where the productive subsystems have the characteristics of size and reliability that are independent.
In this case, certain productive subsystems Si,j can be of small size, as well in terms of the production subflow as in terms of own stress, reliable at their scale, that is their failure coefficients for an aggregated stress of the same order of magnitude as their own stress is on average small, but such that a large aggregated stress can bring about almost certain failure. While there are other productive subsystems Si,j have the opposite property. That is, their productive subflow is elevated just as their own stress. Their failure coefficient has a high but relatively stable average value, even while the aggregated stress is important.
According to this variant of the invention, at the heart of the production parameter memory 14 the confidence coefficients ai,j are locked electronically to a size which contains at least two independent components:
Two practical variants of the implementation of this particular method are given below in
In this way is obtained a more reliable and precise estimate of the reality of the linkedness of the production failures, which allows a reduction of the safety margins, and, as a consequence, this brings about an increase of production flow F(r). This variant turns out to be particularly effective when the action variable (r) is a multivariable, and each of its components primarily involves a precise level of a productive subsystem. In this case, it will be possible to individually control each of the productive subsystem flows, and to optimise them as a function of their size.
A third auxiliary characteristic variant of this process and device according to this invention is applied specifically to a production whose environmental multivariable uncertain production factor X is subject, with a small probability, to movements that are very important and impossible to predict. According to this variant, (to electronically construct the abovementioned sampling of the state of production according to a pseudo-random Monte Carlo method, where the number of random draws is Z), a historical and “catastrophic” probabilistic combination is applied electronically.
A choice is made (validated by adequate classical statistical tests) of a behavioural simultaneous model of the different uncertain production subsystems (X1), (it can be for example distributions that are normal, log-normal, or more generally, a subsystem level distribution that is justified by historical observations of these uncertain quantities). A standard sub-probability Ps of occurrence is attributed to this historical model. For the historical model, with the help of a Monte-Carlo generator 8, Zs standard pseudo-random samples of the state vector xz=(xz,1, xz,2, . . . , xz,N) are generated, [for z=1, . . . , Zs possible values of the abovementioned common uncertain subfactors indexed to production (X1))], and one applies to each of these Zs—called standard samples—a weight called standard, ms=Ps/Zs.
A choice is made of one or several so called “catastrophic scenarios” with different uncertain production factors (X1); indeed the subfamilies of catastrophic situations from which the characteristic averages and deviations are defined:
For this catastrophic model, with the help of a Monte-Carlo generator 8, Zc pseudo-random samples are electronically generated for the index vector xz=(xz,1, xx,2, . . . , xx,c), [for z=1, . . . ,Zc] the possible multi-values for the abovementioned uncertain production subfactors (X1). To each of the Zc, called “standard samples”, a weight is applied, called catastrophic, mc=Pc/Zc. There may be several catastrophic models, applied with probabilities Pc1, . . . , Pcn, for which as many sub-families of pseudo-random samples.
For each of the Z=Zs+Zc (or Z=Zs+Zc1+ . . . Zcn) pseudo-random samples of the abovementioned specific state vector xz, and as a function of the abovementioned action parameter (r), the level corresponding to the multivariable industrial impact vector I(xz,T) (r) is determined electronically.
The Z results are reorganised and brought together electronically. For each elementary impact component Ih, and for each value V which can reach the component Ih, the weight ZPh(V) of the abovementioned samples is calculated [sum of the number of electronic samples for which the abovementioned impact component Ih(xz,T) (r) violates (too low or too high, depending on whether production of type 1 or 2 is controlled) the value V multiplied by the associated weights Ms or Mc)].
In this case, we calculate the pseudo-random probability p′h(V)/Z of violation of the value V by this impact component Ih. Then, in a classical fashion:
According to this third variation of the invention, we correct the bias observed between the actual probability distribution of the uncertain values (X1, . . . , XN) and those of the values taken during the historical recording of the characteristics of the process. If certain events (with grave consequences and whose probabilities cannot be considered negligible) do not in fact happen during the period when the historical record was made, we nevertheless impose on the control automation 3 to take them into account. If, by a compensatory phenomenon, the simulation of a definite event did not any important industrial impact, thanks to the simulation of the sub-family of events, we will nevertheless avoid this fortuitous compensation, and keep the real risk linked to this catastrophe.
One of the types of major applications is to control all harmful effects (such as pollution, . . . ) of a staged productive apparatus, each stage of which is both susceptible to production of this harmful product and to transmit it to the following step, but also has the ability to master it at its level.
The multi-stage structure to which this invention is applicable can appear: either at the production apparatus itself, or at the control process for the harmful effect.
As an example of this last configuration,
For regulatory reasons, tied to machine operator health, the noise must not pass beyond certain limits, except with a very small probability. To reduce this noise, a known system has been installed called “counternoise”, functioning with the help of a string of microphones and loudspeakers placed in the machine hall. The microphones register the noise at different strategic places in the hall and transmit to a programmed calculator, which, in a quasi-instantaneous fashion, transmits a signal to the loudspeakers distributed through the hall. This signal, called “counternoise” is such that, if the microphones and the loudspeakers function correctly, it compensates the noise from the machines, using the effect of waves of opposite phase. It is possible, in this fashion, cancel a very large proportion of this noise (up to over 90%).
Generally speaking, the counternoise is, as a first approximation, a linear combination of the signals picked up by the microphones. It is the coefficients of this combination which the calculator recalculates all the time using a feed-back system. This part is known by prior art.
Unfortunately, the microphones and loudspeakers are subject to saturation, and, in a more serious fashion, might overload and not function at all. These imperfections translate directly to an increase in resulting noise throughout the hall, and require a reduction in the machines' production rate. The present invention applies advantageously to minimising this reduction, or, if preferred, to maximize the functional intensity, while respecting the noise control rules, specifically in the case where the command to reduce (or increase) production does not have an immediate effect, but has a time delay T. It is imperative to predict the probability distribution of the resulting noise amplitude in the hall during this delay, in order to assure that it will only surpass the regulation level with a probability imposed by regulation.
The multi-stage and multi-linked system is formed by the machines, the microphones and the loudspeakers. The staged structure of the global system, formed by the productive subsystems Sij, appear in the following form:
We have here a matrix structure. In effect, the subsystems at each stage are capable of transmitting their noise or their signal to all the subsystems in the following stage.
The uncertain multivariable factor (X) is the noise produced by the various machines, as a sound wave. This noise is obviously uncertain, even with a fixed and known production intensity for the machines, because, even if its amplitude is, in certain cases, purely a function of the production intensity of the machine, the wave itself, in particular, its phase, is uncertain.
The time horizon T is the delay which separates the command for machine intensity and the actual variation of this intensity. It is during this delay that an unknown variation of the noise might surpass the norm.
In this application, only in the first stage, composed of the machines, is there a production sub-flow F1,j. The production flow F is the result of this sub-flow.
The industrial action parameter (r), here a multivariable, is the machines' function intensity (production rate). Each of the components corresponds to one of the machines.
The industrial impact (I), (see §a-aaaa) multivariable also in this application, is the resulting noise in the hall, after correction by the counternoise, such as it is perceived by the operators. It has as many components as there are ears of operators functioning in the hall.
The “self” stress W1,j (see §b) of the machines, which is also their aggregated stress W1,j as this is the first stage, is the noise that they produce. At this stage, the transmission coefficients d1,j (see §ccc) is not uncertain, and stays equal to 1, as the machines do not control any noise by themselves. We can conceive an antinoise protection at the machines, but we come back to the case without protection, considering that the correct “self” stress is the noise coming from the set of machine-and-its-protection.
The transmitted stress w′2,j,k (see §bb) from the machine S1,j to the microphone S2,k is the noise created by the machine, i.e. the “self” stress of the machine, multiplied by sensitivity coefficient q2,j,k for the microphone to this noise (see §cc). The self stress w2,k for the microphone is the result of sources of noise other than from the machines, picked up by the microphone. The aggregated stress W2,k (see §c) us the actual total noise picked up by the microphone.
When the microphone saturates, or even worse, overloads, the actual noise can differ from the signal registered. The relation between the registered signal and the actual noise W2,k is the transmission coefficient d2,k for the microphone (see §ccc). In the case where the microphone has been overloaded, no signal is registered, and d2,k=0. Perfect microphone function on the other hand means that d2,k=1. In general, this transmission coefficient has a value between 0 and 1, with a probability distribution that depends on a confidence coefficient a2,j, possibly multivariable (see §ddddd).
The microphone signal is then transmitted to the central programmed calculator which redistributes it to the various loudspeakers while applying the counternoise coefficients q2,j,k (see §cc). This denotes that each loudspeaker S3,k should reproduce a signal which results from the signals transmitted from the microphones S2,j to the central programmed calculator, with the coefficients q2,j,k applied.
The transmitted stress w′3,j,k (see §bb) from the microphone S2,j to the loudspeaker S2,k is thus equal to the product of the aggregated stress from the microphone W2,j and its transmission coefficient d2,j and the counternoise coefficient q2,j,k.
The loudspeakers do not have a “self” stress. Their aggregated stress W3,k is equal to the signal which they are requested to produce, i.e. the resultant of the transmitted stresses.
If a loudspeaker S3,k saturates, or worse, overloads, the sound it emits will differ from the received signal. Its failure coefficient d2,k is the ratio between the emitted sound and the received signal. As for the microphones, the probability distribution of the failure coefficient d3,k depends on a confidence coefficient a3,k, possibly multivariable (see §ddddd).
In the ideal case where the microphones and the loudspeakers function perfectly, the counternoise reproduced by the loudspeakers exactly compensates the noise from the machines, in a quasi-uniform fashion throughout the hall. The operators that are present only suffer from the residual noise that is much reduced. On the other hand, increased noise results partly from imperfections in the microphones, partly from imperfections in the loudspeakers. The total noise suffered by an operator Ok resulting partly from residual noise, partly from the saturation or overload of microphones and loudspeakers, is given by the formula:
Ik=Bk+Σj q4,j,k(d3,j W3,j+Σ1(1−d2,1)q2,1,jW2,i)
where:
The implementation of the process and the invention in this particular application consists of creating an automatic process 3 whose control conforms to
with a view to generate a sampling that is as true a representation as possible of the resulting noise in the machine hall. This process is characterised by that, in order to electronically generate the industrial impact (I), the noise perceived by the operators, we place an inductive probabilistic processor 12 according to the inductive method 11 for impact determination, i.e. the following stages:
The reaction loop 6 of this control automation 3, aims to determine the maximum value (rmax) of the machine intensity function (production rate) such that the parameter VaR does not violate the prescribed value (M) also specified in the memory zone 9 called the operator specifications. This loop is completed by a servo motor acting on the machines' intensity control, and keeping this calculated value (rmax) constant.
This multi-staged calculation procedure for the final impact, which takes into account at each stage and in a separated fashion the signal exactly received by the subsystem and which it emits, allows a better estimation of the probability of violation of the authorised threshold, and, as a consequence, a reduction of the safety margins and an increase in the production flow within the given safety specifications.
The implementation of this first variant of the invented process finds its justification in the fact that the risk of saturation or overload, for the microphones as well as for the loudspeakers, is as large as the stress at the subsystems. According to this variant, the probability distribution Pri,j of the transmission coefficient for the microphones and the loudspeakers is such that a larger noise perceived (microphones) or a larger signal to transmit (loudspeakers) pulls with it a level of saturation that is statistically higher, just like a more likely overload. Typically, according to this variant, we can give the the probability density Pri,j on the interval [0,1] a bell shape, whose centre moves to the right when the stress grows. Such a density may for example be realised with the help of “Bernstein's polynomials”, φ(x)=λxα(1−x)m−α where the exponent α is an increasing function of stress.
Additionally, saturation, just like overload, can partly depend on the global quality of the microphone and the loudspeaker, but also on a “saturation threshold” belonging to each piece of apparatus (microphone or loudspeaker) beyond which the saturation phenomenon becomes systemic, justifying the application of the second variant of the invention. According to this variant, the confidence coefficient ai,j for the microphones and the loudspeakers possess two components. One recommended form consist of setting one of these components equal to the saturation threshold, and the other being a value assigned to the reliability of the apparatus, which can be statistically measured.
The third variant of the process of the invention is applicable when the machines have a tendency to sporadically emit important noise. In this case, the user specifies in the memory zone 9, called the operator specifications, the frequency of these “explosive pulses”, and a probability distribution of their intensity according to the “disaster scenario” model. The probabilistic automatic process 3 then generates a sub-sample for the emitted noise values constituted only from the explosive pulses.
The technical organisation of the electronic probabilistic automation 3 according to the invention, to be implemented at the heart of a clearing house, is described in reference to
Let us recall that that the critical activity of a stock exchange consists of accepting stockbrokers. A trader who wishes to make a transaction must do so through a stockbroker. When he can, the stockbroker will match the operators who use his services, and will only pass on to the stock exchange the remainder (including those passes for his own account). The “clearing” which recapitulates all the day's transactions, is done each evening. In the case where on of the traders turn out to falter, that is incapable of completing his part of a transaction, the stock broker is held to completing the transaction in his place. For this performance guarantee, the stockbroker is remunerated by a brokerage commission. Additionally, the stockbroker in general requires of his clients, that is of the traders that do trades through an intermediary, a “deposited guarantee” the amount of which is a function of the transactions made.
This situation repeats almost identically between the stock exchange the different stock brokers which are affiliated with it. This last matches its members, that is the stockbrokers. In contradistinction to the stockbrokers, it is forbidden for it to place orders for itself. On the contrary, it is also held responsible for the performance of the transactions between members. The cost of this guarantee to the exchange is equal to the difference between the price at which the transaction took place and the current price at which it is possible to do the transaction. Just like the stockbrokers, the exchange bills the commissions for each transaction and requires a deposited guarantee from its members.
Because of competition between exchanges, the volume of transactions, thus the amount of transaction commissions collected by the exchange, and for the same reason, its economic efficiency is directly linked to a decrease for the deposited guarantees that it imposes on its members (stockbrokers). On the other hand, at the end of the day, the global cost of the performance guarantee (i.e. taking into account the totality of members) should only exceed certain limits M1, . . . , MH, at frequencies F1, . . . , fH which are imposed by regulation. In particular, exceeding its own funds, which might pull with it the possibility of failure, should only happen with a infinitesimal probability. In order to avoid too frequent member failures, the exchange should not only require of them sufficient funds, but additionally, should impose on the brokers a minimum for them to require of their own clients.
According to the invention and in the exchange system, the multi-stage and multi-linked system is formed by the traders (clients, members) and by the exchange itself. The multi-staged structure of the global system according to the invention appears in the following form:
It is possible to imagine a structure that has more stages, if, for example, the clients themselves are in the position of “clearing” transactions for their own clients.
The productive subsystems Si,j of the multistage and multilinked system are the traders (clients, brokers) as well as the exchange itself.
We have here a tree structure, if we consider as distinct the multiple accounts of the same client held by different members (we no longer suppose a 100% correlation between the failure of different accounts belonging to the same client). In effect, each client is only linked to a single member and the top of the tree is composed of only a single subsystem: the exchange.
The uncertain multivariable factor (X) is the set of price variations of the different assets quoted on the exchange during the day. The impact of each of these assets on the participants (clients, members, or exchange) is equal to the product of the variation of their price and the quantity of the investments contained in the participants' portfolios.
The natural time horizon T is the day. But a control of the market movements could turn out to be necessary if, for reasons of liquidity, the portfolio of one of the participants in default cannot be liquidated in a single day.
Each transaction made for a client by a member takes place upon payment of a brokerage commission. The set of commissions paid by a client S1,j to a member S2,k represents the production subflow F2,j,k. In the same way, each transaction made by a member of the exchange takes place upon payment of a transaction fee. The set of transaction fees paid by a member S2,j to the exchange S3,j represents the production subflow F3 (there is no third index because there is only a single subsystem at stage E3). The production flow F is the sum of all the subflows F3,j, that is of all the commissions obtained by the exchange during the day.
Each asset kept in a portfolio gives rise to a deposited guarantee, which, as a general rule, is proportional to the amount of assets. The industrial action parameter (r) is the proportional relation between the amount of assets and the associated deposited guarantee. It is multivariable, because the relationship depends on the asset. The more it is raised, the more the required deposit is important, which as a consequence reduces the risk of failure, but on the other hand, also reduces the amount of transactions, that is the production flow F and the subflows Fi,j,k.
The industrial impact (I) (see §a-aaaa) is, in this application, the total amount that the exchange must forward to its members' counterparties in a failure situation under the heading “performance guarantee”. It is possible to conceive of a second component of this industrial impact, which would be the same amount, reduced by the sums recovered after the liquidation of the members in default.
The aggregated stress Wi,j (see §b-bb) of the subsystems Si,j is equal to the negative part of their financial results at the end of the day.
The amount of transmitted stress (see §c-ccc) can be either the totality or only a proportion of the loss suffered by the client or member. This proportion (equal to 1 if it is a total default and to 0 if there is no default) is the failure coefficient di,j for the client or member.
This failure coefficient is obviously unknown. But its probability distribution Pri,j moves towards higher values when the operator's loss is larger, thus justifying putting into operation the first process variant of this invention. The confidence coefficient ai,j of the subsystem Si,j carries the name “rating” of the operator. In the systems that exist as prior art, this rating is a simple property attributed to the operator. In the second variant, this invention recommends a rating that has at least two components. The first reflects the size, or, at the occurrence, the level of the funds owned by the operator FP1,j. The second reflects his reliability, or, if you prefer, his failure probability by the ratio given between his aggregated stress W1,j (i.e. the loss suffered) and his own funds FP1,j.
The third variant of the process of the invention finds its justification in the “stock market crashes” which historically only happen on the scale of several years. If the historical record of prices and failures are only go back a year, or indeed even a number of years, it is possible, even probable, that no crash has taken place during the period covered by the historical record. However, the risk calculation for the exchange should not ignore the possibility of such a catastrophic event. The normal known technique, called “stress test” consists of simulating a global downward movement, for example 20% for all the papers listed on the exchange. Certain operators have as a strategy to bet on the movement—up or down—of one stock compared to the exchange average, or compared to an exchange index. In a stress test, this stock will vary by 20%, the same as the average or the index. Such an operator would appear to have zero risk, whereas in a real crash, his real risk is actually increased because the stock, if for exampled bet to go up, might lose 30% where on average other stocks might lose only 20%. The third variant if the invention recommends a simulation of a sub-family of catastrophic situations where certain samples will make the operator's real risk clearly appear.
The implementation of the process and the invention in this particular application connected to the exchange system is described in
with a view to generating a sampling that is as true as possible to the financial amounts which the performance guarantees will cost the exchange at the end of the day.
This procedure is characterised by that, to electronically generate the industrial impact (I), in this case the financial amount, we put in place an inductive probabilistic processor 12 according to the inductive method 11 of impact determination, i.e. containing the following stages:
The reaction loop 6 for this probabilistic automation 3 control consists of determining the minimal values (r1min, . . . , rNmin) for the coefficients to be applied to the calculation of the required “deposited guarantees”, such that the parameter VaR does not surpass the prescribed value (M) specified also in the memory zone 9 called the operator specifications. This loop is handled by an automatic procedure to adjust the required deposited guarantees.
This stepwise procedure to calculate the final impact, which takes into account, at each calculation step, the failure probability of each subsystem, allows a better estimation of the probability of violating the authorized threshold, and, as a consequence, allows a reduction in the safety margins and an increase in the production flow (the exchange's financial activity) within the given safety norms. These safety norms may include, specifically:
The implementation, in the exchange system, of the first variant of the process finds its justification in the fact that the failure risk, for the clients as well as for the members, is as high as the stress levels of the sub-systems. According to this variant, the probability distribution Pri,j for the clients' and members' failure coefficients is such that a financial loss (clients) or, a higher global amount to cover—failures+loss (members), pulls with it a higher statistical failure probability. Typically, according to this variant, the probability density Pri,j can be assembled from a probability 1−pi,j for zero value and a uniform distribution over the interval [0,1] of the total weight pij, where the failure probability pi,j is an increasing function of the aggregated stress Wi,j.
Additionally, the failure of clients and members can partly depend on the global reliability of the operator, but also on a “failure threshold” specific to each operator (client or member) beyond which the failure becomes almost inevitable, thus justifying the implementation of the second variant of the process invention. According to this variant, the clients' and members' confidence coefficients ai,j have two components. One recommended form consists of setting one of the components equal to the amount of own funds, and the other a value describing the reliability of the operator, which can be obtained from specialised rating agencies.
The implementation of the third variant of the process is justified by abrupt movements of the prices—rising or falling—which appear from time to time. When the user specifies in the memory zone 9 called operator specification, the frequency of these “catastrophic movements” and a probability distribution of their intensity on the pattern of “catastrophic scenarios”. The automat then generates a sub-sample of values of their prices uniquely constituted of catastrophic scenarios.
As the invention has been described, and its interest and applicability justified by the detailed examples, the claimants reserve to themselves exclusivity during the length of the patent, without limitations other than those in the patent claims below.
Billiotte, Jean-Marie, Durand, Philippe, Adlerberg, Ingmar, Douady, Raphaël, Kovalenko, Ivan, Casanova, Jean-François, Frignet, Jean-Philippe, Basset, Frédéríc
Patent | Priority | Assignee | Title |
10581974, | Aug 10 2001 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
10637240, | Jan 24 2014 | Fujitsu Limited | Energy curtailment event implementation based on uncertainty of demand flexibility |
11507898, | Aug 10 2001 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
11836659, | Mar 17 2020 | Freeport McMoRan Inc. | Methods and systems for deploying equipment required to meet defined production targets |
11847595, | Mar 17 2020 | Freeport-McMoRan, Inc. | Methods and systems for deploying equipment required to meet defined production targets |
8788247, | Aug 20 2008 | International Business Machines Corporation | System and method for analyzing effectiveness of distributing emergency supplies in the event of disasters |
8972067, | May 11 2011 | GE INFRASTRUCTURE TECHNOLOGY LLC | System and method for optimizing plant operations |
9031892, | Apr 19 2012 | SCHNEIDER ELECTRIC SYSTEMS USA, INC | Real time safety management system and method |
9311603, | Apr 19 2012 | SCHNEIDER ELECTRIC SYSTEMS USA, INC | Real time safety management system and method |
9729639, | Aug 10 2001 | ROCKWELL AUTOMATION TECHNOLOGIES, INC | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
Patent | Priority | Assignee | Title |
7043444, | Apr 13 2001 | BLUE YONDER GROUP, INC | Synchronization of planning information in a high availability planning and scheduling architecture |
7155399, | Apr 03 2001 | CREDIT SUISSE AS ADMINISTRATIVE AGENT | System and method for complex schedule generation |
7188075, | Jun 29 2000 | Oracle International Corporation | Extended product configuration techniques |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Date | Maintenance Fee Events |
Aug 16 2013 | REM: Maintenance Fee Reminder Mailed. |
Dec 17 2013 | M2551: Payment of Maintenance Fee, 4th Yr, Small Entity. |
Dec 17 2013 | M2554: Surcharge for late Payment, Small Entity. |
Aug 18 2017 | REM: Maintenance Fee Reminder Mailed. |
Feb 05 2018 | EXP: Patent Expired for Failure to Pay Maintenance Fees. |
Date | Maintenance Schedule |
Jan 05 2013 | 4 years fee payment window open |
Jul 05 2013 | 6 months grace period start (w surcharge) |
Jan 05 2014 | patent expiry (for year 4) |
Jan 05 2016 | 2 years to revive unintentionally abandoned end. (for year 4) |
Jan 05 2017 | 8 years fee payment window open |
Jul 05 2017 | 6 months grace period start (w surcharge) |
Jan 05 2018 | patent expiry (for year 8) |
Jan 05 2020 | 2 years to revive unintentionally abandoned end. (for year 8) |
Jan 05 2021 | 12 years fee payment window open |
Jul 05 2021 | 6 months grace period start (w surcharge) |
Jan 05 2022 | patent expiry (for year 12) |
Jan 05 2024 | 2 years to revive unintentionally abandoned end. (for year 12) |