suction pile installation method comprising the steps of
|
9. A suction pile (10) comprising:
a top surface (11),
a substantially cylindrical side surface (15),
a bottom surface (18) which is at least partially open, and
an air connection (12) situated in an upper half of the suction pile,
the suction pile comprises in a lower half (L) of the side surface at least one opening (16, 17) that allows fluid to escape from the pile to reduce pressure inside the suction pile upon contact of the suction pile with the sea bed.
1. A suction pile installation method comprising the steps of:
lowering a suction pile (10) to the sea bed, the suction pile having a top surface (11), a substantially cylindrical side surface (15) and a bottom surface (18) which is at least partially open,
keeping the interior of the suction pile in open fluid communication with the exterior at least via the bottom surface, dropping the pile onto the sea bed (19), characterized in that the method comprises:
allowing fluid to escape from the pile via at least one opening (16, 17) in a lower half of the side surface (15) for reducing the pressure inside the suction pile upon contact of the suction pile with the sea bed, and
allowing the suction pile to penetrate into the sea bed over such a distance that the at least one opening (16, 17) in the side surface becomes closed off from the exterior by the soil, and
pumping air from the suction pile from an air connection (12) situated in an upper half of the suction pile for driving the pile further into the sea bed.
2. The method according to
3. The method according to
4. The method according to
5. The method according to
6. The method according to
7. The method according to
8. The method according to
10. A suction pile (10) according to
|
The invention relates to a suction pile installation method and to a suction pile for use in said method.
A suction pile is a thin walled steel cylinder, closed at least one longitudinal end, which is placed on the sea bed with a lower end and which penetrates the sub sea soil with the aid of suction (under-pressure) created within the cylinder. The creation of the suction can be with the aid of a suction source, such as a pump, that is mounted on, close to or at a distance (e.g. above the water surface, e.g. at a vessel) from the suction pile. The applied level of the suction can be e.g. at least substantially constant, smoothly increase or decrease or comprise a number of pulses. After use, the suction pile can be removed by creating an overpressure within the cylinder, e.g. by pumping in (sea) water.
Suction piles and their way of installing are known from e.g. U.S. Pat. No. 4,318,641 in the name of Shell. The above patent describes a method and apparatus for securing a tubular element to the bottom of the sea. It describes the steps of lowering the tubular element from the water surface to the water bottom, removably securing the pumping unit to the tubular element either before or after the lowering of the tubular element, closing the tubular element at the upper end, reducing the pressure within the tubular element by operating the pumping unit, so as to cause the tubular element to penetrate into the water bottom to a desired depth. Subsequently, the operation of the pumping unit is stopped and the pumping unit is disconnected from the tubular element and raised to the water surface to recover it.
U.S. Pat. No. 6,719,496 in the name of Shell describes a method for deploying a suction pile anchor in which the flood valves are opened on the top of the suction pile and the suction pile anchor is off loaded from the anchor boat and lowered it to the sea floor. A remote operated vehicle (ROV) with pump capacity is used to close the flood valves and to control the suction into the soil.
The known suction piles and installation methods employ valves on the top of the suction pile in order to accommodate the lowering of the suction pile during landing. The water pressure inside the pile rapidly increases while the pile is landing on the seabed when it is dropped (launched) from several meters above the seabed to penetrate into the soil. The open valves or vents on the top of the pile allow the trapped water to escape and therefore avoid building up a water pressure inside the pile so that large pressure differentials between the inside and outside of the pile are avoided. When the water cannot escape fast enough there will be a pressure build up that will cause a bearing capacity failure in the soil when the pile lands.
After the pile is landed, the vents need to be completely sealed in order to control the internal pressure. If the vents don't completely seal, it is not possible to depressurize the pile to let it penetrate the soil, or to over pressurise it to come back out of the soil. It is needed that each vent ensures a 100% sealing over the lifetime of an installed pile. Therefore the pile cover at the top end should be fitted with specific installation aids. This makes the operation expensive as known pile covers normally have 2 or more valves or costly closing devices which requiring ROV assistance operations, particularly in deep waters.
Normally a submerged pumping skid is attached to the vents and activated by a ROV. The pumping skid is removed after the pile is depressurized. This operation also needs expensive anchor handling tug boats which are provided with a heave compensation system to safely and smoothly land the piles on the seabed.
It therefore is an object of the present invention to provide for a suction pile installation method and for a suction pile which is of a relatively simple construction and which avoids the use of complex venting valves at the top end.
It is furthermore an object of the present invention to provide a suction pile installation method which can be carried out using a simple installation vessel.
It is again an object of the present invention to provide a suction pile wherein venting can be effectively controlled in a relatively simple and economic manner.
Hereto the installation method according to the invention is characterized by:
The suction pile has in its lower half, for instance in the first 2-4 meters from the tip of the pile, an opening, such as two or more rows of holes. These holes or other shaped openings will allow the water inside the pile to escape during the first stage of the landing when the suction piles touch down on the seabed.
During this stage no additional internal pressure will be build up inside the pile. In this way it is possible to reach (if required) a controlled pile landing rate, for instance as high as 1 m/s.
As the opening, such as the row of holes in the side surface is in the lower segment of the pile, the first 2 to 3 m of seabed soil, which is anyway muddy, will be washed away by the water escaping from the holes while landing the pile. This disruption of the first mud line will have no significant influence on the pile holding capacity of the soil. As the falling pile penetrates the mud line by its own weight, the pile will penetrate also the soil under the mud line which soil will then cover the holes. After this free fall penetration of the pile into the soil, the pile can be moved further into the soil with the known process of adding an under-pressure within the pile by disconnectable vacuum pumps at the top of the pile activated by a ROV or via a suction hose which is attached to the top of the pile.
The openings in the suction pile can replace the vents on the pile cover except for a small valve, which is used for the suction process (while creating an under pressure for pile penetration or an overpressure for the breakout, if needed). Therefore there no longer is a need for providing complicated and costly closing devices that are operated with a ROV manipulation system.
The pile according to the present invention with one or more openings in the lower side surface section can be easily installed with a known anchor handling tug boat which does not need to be equipped with a heave compensation system or a constant tension devise which normally is required when a control line connects the venting valves on the pile with the vessel. This latter is especially relevant for deep water projects were the suction piles and hence the heave compensation devices need to be relatively large and expensive to be able to reach to the seabed.
The at least one opening in the side surface of the suction pile according to the present invention has furthermore been found to ensure a controlled vertical landing without a large inclination of the pile which ensures an optimal bearing capacity in the soil.
An embodiment of a suction pile in accordance with the present invention will be explained in detail with reference to the accompanying drawings. In the drawings:
In
Patent | Priority | Assignee | Title |
11713833, | Oct 01 2012 | Oceaneering International, Inc. | Gravity driven pile tower based device for pipeline lifting and support |
8162061, | Apr 13 2008 | BAKER HUGHES HOLDINGS LLC | Subsea inflatable bridge plug inflation system |
9446821, | May 21 2015 | Port and plug system for subsea equipment | |
9458595, | Sep 26 2014 | Heavy duty vent cap system for a suction pile | |
9574316, | Apr 02 2015 | KOREA INSTITUTE OF OCEAN SCIENCE & TECHNOLOGY | Suction foundation having enhanced self-weight penetration and construction method thereof |
9815526, | Sep 30 2013 | FMC KONGSBERG SUBSEA AS | Suction pile |
Patent | Priority | Assignee | Title |
2466692, | |||
3344612, | |||
3817040, | |||
4036161, | Jul 04 1973 | The Secretary of State for Industry in Her Britannic Majesty's | Underwater anchoring apparatus |
4086866, | Mar 28 1974 | United Kingdom of Great Britain and Northern Ireland, The Secretary of | Anchoring devices |
4095550, | Apr 21 1976 | The Secretary of State for Industry in Her Britannic Majesty's | Self-burying anchoring devices |
4270480, | Nov 14 1977 | The Secretary of State for Industry in Her Britannic Majesty's | Pinned suction anchors |
4432671, | Apr 02 1981 | Shell Oil Company | Suction anchor and method of installing a suction anchor |
4576521, | Dec 30 1983 | Permanent mooring method and arrangement | |
4830541, | May 30 1986 | Shell Offshore Inc. | Suction-type ocean-floor wellhead |
5915326, | Feb 21 1997 | ANCHOR CONTRACTING AS | Subsea mooring |
6488446, | Apr 02 1998 | Suction Pile Technology BV | Marine structure |
6685396, | Nov 16 2000 | Method and apparatus for suction anchor and mooring deployment and connection | |
6719496, | Nov 01 1997 | Shell Oil Company | ROV installed suction piles |
DE1940392, | |||
WO9951821, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Dec 01 2006 | Single Buoy Moorings Inc. | (assignment on the face of the patent) | / | |||
Jan 04 2007 | ALHAYARI, SAMY | SINGLE BUOY MOORINGS, INC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 018935 | /0381 |
Date | Maintenance Fee Events |
Feb 19 2010 | ASPN: Payor Number Assigned. |
Sep 27 2013 | REM: Maintenance Fee Reminder Mailed. |
Feb 16 2014 | EXP: Patent Expired for Failure to Pay Maintenance Fees. |
Date | Maintenance Schedule |
Feb 16 2013 | 4 years fee payment window open |
Aug 16 2013 | 6 months grace period start (w surcharge) |
Feb 16 2014 | patent expiry (for year 4) |
Feb 16 2016 | 2 years to revive unintentionally abandoned end. (for year 4) |
Feb 16 2017 | 8 years fee payment window open |
Aug 16 2017 | 6 months grace period start (w surcharge) |
Feb 16 2018 | patent expiry (for year 8) |
Feb 16 2020 | 2 years to revive unintentionally abandoned end. (for year 8) |
Feb 16 2021 | 12 years fee payment window open |
Aug 16 2021 | 6 months grace period start (w surcharge) |
Feb 16 2022 | patent expiry (for year 12) |
Feb 16 2024 | 2 years to revive unintentionally abandoned end. (for year 12) |