A method for analyzing historical outages at the customer level for the purposes of determining root-cause and possible corrective actions is described herein. The present invention enables a utility to identify problem areas and prevent future outages from occurring.

Patent
   7801647
Priority
Mar 04 2005
Filed
Jun 11 2009
Issued
Sep 21 2010
Expiry
Mar 06 2026

TERM.DISCL.
Assg.orig
Entity
Large
3
19
all paid
1. A method for tracking events, the method comprising the steps of:
receiving information that at least one event has occurred;
relaying the information regarding the at least one event to a database;
determining a number of customers associated with the at least one event;
creating an individual event record for each associated customer;
analyzing the events for each associated customer;
comparing the number of events for each associated customer with an expected number of events; and,
creating at least two indicators, wherein one of the at least two indicators indicates that the number of events is at or exceeds the number of expected events, wherein one of the at least two indicators indicates that the number of events is below the expected number of events.
2. The method of claim 1, wherein the event record comprises at least a date of the event and a time of the event.
3. The method of claim 2, wherein the event record further comprises at least a reason for the event, a date of resumption of an activity interrupted by the event, a time of resumption of an activity interrupted by the event, and a project number.
4. The method of claim 1, wherein the method further comprises the steps of:
providing a graphic representation of a map showing location of each associated customer; and,
placing a graphic representation of the indicator for each associated customer.

This application claims priority to U.S. Ser. No. 11/368,799, titled METHOD OF TRACKING POWER OUTAGES, filed Mar. 6, 2006, which is incorporated herein by reference, which claims priority to a provisional patent application, U.S. Ser. No. 60/658,901, filed Mar. 4, 2005.

A. Field of Invention

This invention pertains to the art of methods and apparatuses of utilities, and even more particularly to the art of tracking power outages, and even more particularly to tracking historical power outages at the individual customer level.

B. Description of the Related Art

It is known in the art to have outage management systems, wherein customers would call in and report to a call center that their lights were out, or that there was a problem of some kind. These bits of information were stored in the outage management system where they are then worked as a project. The call data that comes in, with the earlier software, is based on, for instance AM/FM, or a GIS model. The software was designed to know where all of the customers are located and how the electricity is delivered to them. The call data is compared against that model and a prediction is made to determine that the outage encompasses a set number of customers. The data is then given to a trouble man, or somebody in the field, to check out, analyze, fix, and restore. The document that earlier software historically creates is essentially one record that says a certain device was out, it went out at this time, it was restored at this time, doing these steps, and it affected this number of customers. All of this information is stored on one record. Each customer's call was one record. Each call then went into the system and was recorded either to an interactive voice response system or live customer service rep contact. If only one call was made, it showed up in the system as a single call. The system would compare numerous calls to see if there was anything in common with them, such as each call having a common up-line fuse for instance, and since the received calls have a common up-line fuse and that common up-line fuse serves 20 people, just because the other 15 did not call in does not mean that their lights are not out.

It is known to use a CRI (Circuit Reliability Index). The single records of outages were associated with a circuit, not the individual customer. The circuits would be grouped together and run through a formula that would then compare it against an average customer's expectations and determine if the entire circuit was performing above, below, or at the customer's expectations. Previously, the utilities would know that an entire circuit had failed the customer's expectations. The circuit performance was bad and the utility would have to go out and patrol the whole circuit or do a deep dive into the data that made up that circuit calculation to see if there was a specific problem that could be isolated.

In a typical electrical distribution system, electrical energy is generated by an electrical supplier or utility company and distributed to consumers via a power distribution network. The power distribution network is the network of electrical distribution wires which link the electrical supplier to its consumers. Typically, electricity from a utility is fed from a primary substation over a distribution cable to several local substations. At the substations, the supply is transformed by distribution transformers from a relatively high voltage on the distributor cable to a lower voltage at which it is supplied to the end consumer. From the substations, the power is provided to industrial users over a distributed power network that supplies power to various loads. Such loads may include, for example, various power machines or computer/electronic equipment.

At the consumer's facility, there will typically be an intelligent electronic device (“IED”), such as an electrical energy/watt-hour meter, connected between the consumer and the power distribution network so as to measure quantities such as the consumer's electrical consumption or electrical demand. Such a meter may be owned by the consumer and used to monitor and control consumption and report costs or may be owned by the utility and used to monitor consumption and report revenue.

IED's include devices such as Programmable Logic Controllers (“PLC's”), Remote Terminal Unit (“RTU”), meters, protective relays, and fault recorders. Such devices are widely available that make use of memory and microprocessors and have limited remote reporting capabilities. A PLC is a solid-state control system that has a user-programmable memory for storage of instructions to implement specific functions such as Input/output (I/O) control, logic, timing, counting, report generation, communication, arithmetic, and data file manipulation. A PLC consists of a central processor, input\output interface, and memory. A PLC is typically designed as an industrial control system. An exemplary PLC is the SLC 500 Series, manufactured by Allen-Bradley in Milwaukee, Wis.

A meter is a device that records and measures electrical power consumption. Energy meters include, but are not limited to, electric watt-hour meters. In addition, meters are also capable of measuring and recording power events, power quality, current, voltage waveforms, harmonics, transients, or other power disturbances. Revenue accurate meters (“revenue meter”) are revenue accuracy electrical power metering devices which may include the ability to detect, monitor, or report, quantify, and communicate power quality information about the power which they are metering. An exemplary revenue meter is model 8500, manufactured by Power Measurement Ltd, in Saanichton, B.C. Canada.

A protective relay is an electrical device that is designed to interpret input conditions in a prescribed manner, and after specified conditions are met, to cause contact operation or similar abrupt change in associated electric circuits. A relay may consist of several relay units, each responsive to a specified input, with the combination of units providing the desired overall performance characteristics of the relay. Inputs are usually electric but may be mechanical, thermal or other quantity, or a combination thereof. An exemplary relay is type N and KC, manufactured by ABB in Raleigh, N.C.

A fault recorder is a device that records the waveform resulting from a fault in a line, such as a fault caused by a break in the line. An exemplary fault recorder is IDM, manufactured by Hathaway Corp in Littleton, Colo.

IED's can also be created from existing electromechanical meters or solid-state devices by the addition of a monitoring and control device which converts the mechanical rotation of the rotary counter into electrical pulses. An exemplary electromechanical meter is the AB1 Meter manufactured by ABB in Raleigh, N.C. Such conversion devices are known in the art.

In the early 1980's, the Computer Business Manufacturers Association (CBEMA), which is now the Information Technology Industry Council (ITIC), established a susceptibility profile curve to aid manufacturers in the design of power supply protection circuits. This power quality curve has since become a standard reference within the industry, measuring all types of equipment and power systems and defines allowable disturbances that can exist on the power lines. Additionally, the semiconductor industry has established its own standard SEMI F47 curve for power quality, which is similar to the CBEMA curve but instead is focused on semiconductor power quality and associated supporting equipment.

In more recent years the electric utility marketplace has moved towards deregulation, where utility consumers will be able to choose electrical service providers. Until now, substantially all end users purchased electric power they needed from the local utility serving their geographic area. Further, there was no way for utilities to guarantee the same reliability to all consumers from the utility because of different connection points to the transmission and distribution lines. With deregulation it is essential for consumers to be able to measure and quantify power reliability from their suppliers in order to ensure they are receiving the service they have opted for. Such service may involve various pricing plans, for example on volume, term commitments, peak and off-peak usage or reliability.

Power reliability is typically measured by several various indices. These indices include System Average Interruption Frequency Index (“SAIFI”), Customer Average Interruption Duration Index (“CAIDI”), System Average Interruption Duration Index (“SAIDI”), Average System Availability Index (“ASAI”) and Momentary Average Interruption Duration Index (“MAIFI”). Each index provides a measure, in terms of ratios or percentages, of interruptions in delivery of electrical power, wherein an interruption may be classified as a complete loss of electrical power or where the quality of the delivered electrical power falls below or exceeds a pre-determined threshold. SAIFI measures the ratio of the total number of customer interruptions to the total number of customers served, hence the average. Lower averages signify better reliability. CAIDI measures the total customer hours interrupted to the total customer interruptions, in minutes. The lower the measure, the better the reliability. SAIDI measures the ratio of customer hours interrupted to total customers served, in minutes. Again, the smaller the number the better the system. ASAI is a ratio of total number of customer hours the electric service has been turned on to the number of customer hours the service has been demanded. It is measured as a percentage and the higher the percentage, the better the reliability. The MAIFI measurement considers interruptions that last less than 5 minutes. System Average RMS Variation Frequency Index (“SARFI”) is another power quality index that provides counts or rates of voltage sags, swells and/or interruptions for the system. There are two types of SARFI indices—SARFI_x and SARFI_curve. SARFI_x corresponds to a count or rate of voltage sags, swells and/or interruptions below a threshold where SARFI_curve corresponds to a rate of voltage sags below an equipment compatibility curve, such as a CBEMA or SEMI curve. Mean Time Between Failure (“MTBF”) is another measurement to indicate reliability. MTBF is usually expressed in hours and is calculated by dividing the total number of failures into the total number of operating hours observed. For example a device may specify MTBF as 300,000 hours. If this device operates 24 hours a day, 365 days a year it would take an average of 34 years before the device will fail.

The present invention provides methods for tracking individual utility outages at the customer level. The difficulties inherit in the art are therefore overcome in a way that is simple and efficient, while providing better and more advantageous results.

According to one aspect of the present invention, a method of determining and recording power outages at the individual customer level includes receiving a signal that a power outage has occurred, relaying the information to a database, determining the circuit affected by the power outage, determining the number of customers associated with the circuit, and creating an individual outage record for each associated customer.

In accordance with another aspect of the present invention, individual records are maintained for each customer.

In accordance with another aspect of the present invention, historical power outages are analyzed to determine the cause and possible corrective actions.

In accordance with another aspect of the present invention, an after-the-fact analysis is conducted of where outages have occurred historically and the need for increased reliability.

In accordance with another aspect of the present invention graphic representations are created to show relative levels of compliance with customer expectations for power outages.

Still other benefits and advantages of the invention will become apparent to those skilled in the art to which it pertains upon a reading and understanding of the following detailed specification.

The invention may take physical form in certain parts and arrangement of parts, a preferred embodiment of which will be described in detail in this specification and illustrated in the accompanying drawings which form a part hereof and wherein:

FIG. 1 is a web page of the online, hand-held device report;

FIG. 2 is a web page of the claims and activity reports;

FIG. 3 is a data error report;

FIG. 4 is a reports page, showing follow-up reports, error reports, potential lockout reports, and closed lockout reports;

FIG. 5 is a twenty-four hour follow-up report;

FIG. 6 is a twenty-four hour activity report;

FIG. 7 is a twenty-four hour outage report;

FIG. 8 is a twenty-four hour street light report;

FIG. 9 is a twenty-four hour troubleman activity report;

FIG. 10 is a web page showing the applications of the present invention;

FIG. 11 is a regional storm chart page;

FIG. 12 is a map showing outages in the Pennsylvania region;

FIG. 13 is a map showing outages in the northeastern Ohio region; and,

FIG. 14 is a list of current storm warnings in Ohio.

Referring now to the drawings wherein the showings are for purposes of illustrating at least one embodiment of the invention only and not for purposes of limiting the same, FIGS. 1-14 show various reports created by the present invention. The various reports provide details on the various power outages, what caused the power outage, how long the power was out, what equipment was repaired, the customer's name and address, as well as follow-up reports to determine if the problem has been remedied. It is to be understood that these reports are merely embodiments of the present invention, and are not intended to limit the invention in any manner. It is to be understood that the reports can be modified as necessary for any of the variety of details. The FIGURES also show maps that provide pictorial representations of the power outages in a particular area. These maps display the general areas in which power outages occurred, as well as the number of customers in that area who experienced the power outages. The invention also provides maps that show different color dots on individual customers to show power outages in a particular area. In one embodiment, the dots are green, yellow, and red. The green dots represent that the individual customer exceeds the expectation with respect to power outages, the yellow dots represent that the individual customer has experienced an acceptable level of power outages but may be close to failing the expectations, and the red dots represent that the individual customer has failed the expectation with respect to power outages. It is to be understood that any manner of representing the relative level of meeting or not meeting expectations can be used, as long as chosen using sound business judgment.

In one embodiment of the present invention, a record is created for each and every individual customer (in this embodiment, a customer is any entity that pays an electric bill, which could be an individual in a house, a business, or an apartment complex, etc.) connected down line from a device that experiences difficulty. So instead of one record, if 50 customers were affected, 50 records are created, one for each customer. In this embodiment, in a situation where a customer's power was out, each record would contain the following information: the lights went off on this date, at this time, and they went back on this date and at this time, the lights went out for this reason, for this duration, and the related project number. Then the data, on a historical basis (for example, a year-to-date or rolling twelve months), is extracted from the database and each customer's outage history can be analyzed independently. The data can be used to review the performance at a particular service address to determine if it is meeting, failing, or exceeding expectations of a “typical customer.” As an example, a mathematical routine is applied, wherein an outage that occurred yesterday is combined with the outage that occurred a month ago, as well as the one that occurred around Christmas of last year. The data is compared with the expectations to determine if this is too many outages, is not enough, or is it less than a typical average.

The above analysis creates an indicator that is based on an expectation scale, and, in one embodiment, if the indicator is exceeding, or at, the expectation, a green dot is applied to a map for that particular service address. If it is approaching the limit of failing expectations, a yellow dot is placed on the map for that particular service address. And if the indicator failed the expectations, a red dot is placed on the map for that particular service address. This allows analysis down to the customer and the utility can see individual customers within that circuit, because it is not always an entire circuit that is bad, but a portion of the circuit might go off, for example if a fuse blows.

The present invention can be used to determine emerging trends in power outages. For instance, there could be pockets of bad performance within a particular town or within a particular circuit. The invention would allow tracking of potential problems, in that the utility can review the different color dots on a particular area map and see where problem areas are developing. For example, a particular area may have a large number of yellow dots, where the expectations have not failed yet, but it may indicate a problem that needs to be addressed. The invention would allow the utility to have relevant information in order to analyze, and potentially fix, a problem before the failure of expectations occurs. The invention allows the utility to determine which portion of the circuit is performing poorly.

The present invention creates a record for each individual customer's meter. This record is associated with their account, provides the information that they were affected, beginning at this time, ending at this time, and for this reason. Each record on each account can be retrieved and a user can see all of the outage records and see the customer history. The data can also be used to show field personnel, design engineers, and the people maintaining the lines, where there are growing problems.

In another embodiment of this invention, the reports and applications can be made available via a handheld electronic device, such as a Palm Pilot® or a Blackberry®. The data can then be available to individuals who are not at the specific location where the database is located or those who are hooked up to the network. This enables the invention to be utilized in the field or at any other remote location. The details of how the reports and applications are uploaded to the handheld device are well known within the art, and will not be described further herein.

The present invention allows a utility to target where they want to spend their money. For instance, at the end of the year, the utility reviews that data and determines they have served X number of thousand customers, and their reportable indices to the Public Utilities Commission, which is called SAFEE (the number of outages per number of customers served) was 0.9. This can be done at the circuit level. Therefore, that circuit had a safety of 0.9, which previously might mean nine tenths of the customers on the circuit experienced an outage, which means, theoretically, one tenth of them did not. With the present invention's ability to allow utilities to view results at the customer level, the 0.9 could mean, not nine tenths of the customers experienced an outage, but that one tenth of the customers experienced an outage nine times. So now the utilities can better determine where the problem areas are, and where funds need to be distributed.

The present invention is not just simply mapping outages, but it is mapping the performance base against the typical customer's expectations. In one embodiment, the expectations are determined through customer surveys, but any method of calculating expectations can be used, as long as chosen using sound business judgment.

It is to be understood that the present invention is not limited to electric companies, but can be used by any company providing a continual service to multiple consumers.

The present invention allows the utility to create a record for each individual customer affected, tie each individual customer record to a project number, create an outage history for each customer, compare outage history for each customer to form an indicator (which can be a scale or a number), compare the indicator for each customer to a level of expectation, and place a graphic representation of a map showing the location of each customer, wherein the graphic representation will indicate by color (in one embodiment) how the indicator compares to the level of expectation. The indicator is intended to be used as a comparison to the level of expectation, and it is to be understood that the indicator and level of expectation can be calculated by any means, as long as chosen using sound business judgment.

At least one embodiment has been described, hereinabove. It will be apparent to those skilled in the art that the above methods may incorporate changes and modifications without departing from the general scope of this invention. It is intended to include all such modifications and alterations in so far as they come within the scope of the appended claims or the equivalents thereof.

Having thus described the invention, it is now claimed:

Fickey, Karl J., Homsher, David V.

Patent Priority Assignee Title
8065098, Dec 12 2008 SCHNEIDER ELECTRIC USA, INC Progressive humidity filter for load data forecasting
8769426, Sep 20 2011 Haier US Appliance Solutions, Inc User interface for monitoring resource consumption
9003063, Nov 16 2011 Aclara Meters LLC Systems, methods, and apparatus for estimating power time of use
Patent Priority Assignee Title
3602703,
3789201,
4916328, Dec 08 1988 Honeywell Inc. Add/shed load control using anticipatory processes
5153837, Oct 09 1990 SHAFFER DEVL LLP Utility consumption monitoring and control system
5301122, Feb 12 1992 MEASURING & MONITORING SERVICES, INC Measuring and monitoring system
5568399, Jan 31 1995 ENGHOUSE SYSTEMS USA, INC Method and apparatus for power outage determination using distribution system information
5805458, Aug 11 1993 TECHNOLOGIES FUTURES, INC , D B A ORION GROUP, INC System for utility demand monitoring and control
5974403, Jul 21 1997 International Business Machines Corporation; IBM Corporation Power trading and forecasting tool
6021402, Jun 05 1997 International Business Machines Corporaiton; IBM Corporation Risk management system for electric utilities
6259972, Jan 16 1998 ENGHOUSE SYSTEMS USA, INC Method for processing and disseminating utility outage information
6628207, Dec 24 1997 Elster Electricity, LLC Method and apparatus for detecting and reporting a power outage
6671654, Nov 28 2000 POWER MEASUREMENT LTD Apparatus and method for measuring and reporting the reliability of a power distribution system
6687574, Nov 01 2001 Intellectual Ventures II LLC System and method for surveying utility outages
6778882, May 10 2001 SIEMENS INDUSTRY, INC Business management system and method for a deregulated electric power market with sharing of supply chain data
6865450, May 10 2001 SIEMENS INDUSTRY, INC Schedule-based load estimator and method for electric power and other utilities and resources
20030040845,
20030040847,
20040010478,
20040225625,
///
Executed onAssignorAssigneeConveyanceFrameReelDoc
Mar 29 2006HOMSHER, DAVID V FIRSTENERGY CORP ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0230500039 pdf
Apr 03 2006FICKEY, KARL J FIRSTENERGY CORP ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0230500039 pdf
Jun 11 2009FirstEnergy, Corp.(assignment on the face of the patent)
Date Maintenance Fee Events
Mar 14 2014M1551: Payment of Maintenance Fee, 4th Year, Large Entity.
Aug 02 2017ASPN: Payor Number Assigned.
Mar 19 2018M1552: Payment of Maintenance Fee, 8th Year, Large Entity.
Mar 10 2022M1553: Payment of Maintenance Fee, 12th Year, Large Entity.


Date Maintenance Schedule
Sep 21 20134 years fee payment window open
Mar 21 20146 months grace period start (w surcharge)
Sep 21 2014patent expiry (for year 4)
Sep 21 20162 years to revive unintentionally abandoned end. (for year 4)
Sep 21 20178 years fee payment window open
Mar 21 20186 months grace period start (w surcharge)
Sep 21 2018patent expiry (for year 8)
Sep 21 20202 years to revive unintentionally abandoned end. (for year 8)
Sep 21 202112 years fee payment window open
Mar 21 20226 months grace period start (w surcharge)
Sep 21 2022patent expiry (for year 12)
Sep 21 20242 years to revive unintentionally abandoned end. (for year 12)