A method for detecting a change in a wellbore fluid includes estimating at least two pressure differences in the wellbore fluid and estimating a change in a density of the fluid using the at least two pressure differences. The density change may be estimated by the equation, Δρ=(ΔPbefore
|
10. A method for detecting a change in a fluid in a wellbore, comprising:
estimating a change in a density of the fluid in the wellbore using a first set of measured pressures in the fluid at a first point and a second point in the wellbore at a first time and using a second set of measured pressures in the fluid at the first point and the second point in the wellbore at a second time.
1. A method for detecting a change in a fluid in a wellbore, comprising:
estimating a first pressure difference in the fluid in the wellbore between a first point and a second point along the wellbore;
estimating a second pressure difference in the fluid in the wellbore between the first point and the second point along the wellbore; and
estimating a change in a density of the fluid using the first and the second pressure differences.
16. A computer-readable medium for detecting a change in a fluid in a wellbore, the medium comprising:
instructions that enable at least one processor to:
estimate a first pressure difference in the fluid in the wellbore between a first point and a second point along the wellbore;
estimate a second pressure difference in the fluid in the wellbore between the first point and the second point along the wellbore; and
estimate a change in a density of the fluid using the first and the second pressure differences.
2. The method according to
wherein ΔP is a fluid pressure difference between the first and second point along the wellbore, ρ is a mean value of density of the fluid between the first and the second point, g is gravity and ΔTVD is a vertical distance between the first and the second point.
3. The method according to
4. The method according to
5. The method according to
6. The method according to
7. The method according to
8. The method according to
9. The method according to
11. The method of
12. The method according to
13. The method according to
14. The method according to
15. The method according to
17. The medium according to
18. The medium according to
19. The medium of
|
This application takes priority from the U.S. Provisional Application Ser. No. 61/029,762, filed on Feb. 19, 2008.
1. Field of the Disclosure
This disclosure relates generally to oilfield downhole tools and more particularly to methods and devices for enhanced directional drilling of wellbores.
2. Description of the Related Art
During construction or servicing of a hydrocarbon producing well, an operator can encounter a number of undesirable conditions that can pose a hazard to equipment and personnel. One undesirable condition is a “kick.” During drilling, a high pressure formation fluid can invade the well bore and displace drilling fluid from the well. The resulting pressure “kick” can lead to a well blow-out at the surface. Conventionally, during drilling, the mud weight of a drilling fluid circulated in the well is selected to provide a hydrostatic pressure that minimizes the risk and impact of a “kick.” Additionally, drilling rigs use surface blowout preventers to protect against the uncontrolled flow of fluids from a well. When activated, blowout prevention systems “shut-in” a well at the surface to seal off and to thereby exert control over the kick. A typical blowout preventer system or “stack” usually includes a number of individual blowout preventers, each being designed to seal the well bore and withstand pressure from the wellbore. Another undesirable condition is a loss of drilling fluid into a formation. That is, in some instances, the drilling fluid pumped into the wellbore is at a pressure that causes some or all of the drilling fluid to penetrate into the formation rather than flow back up to the surface. A loss is usually treated by circulating a lost circulation material (LCM) into the wellbore. The LCM usually includes particles that plug and seal the fractured or weak formation. Yet another undesirable condition is an underground blowout, which is generally understood as an undesirable subsurface cross flow between two reservoirs intersected by a wellbore. Such a cross flow can be caused when a drilling crew activates a surface blowout preventer to suppress and control a kick. The shut-in well can cause an annulus pressure increase that fractures one or more zones in an open hole region. Drilling fluid is then lost to this fractured zone. This condition can require a combination of measures, including the use of LCM and well shut-in, to control.
The corrective measures discussed above, and other corrective measures known in the art, may be most effective when they are instituted as quickly as possible after the occurrence of a wellbore instability. Thus, there is a need for methods, systems and devices that may provide early indications of wellbore instabilities as well as other out-of-norm conditions.
In aspects, the present disclosure provides a method for detecting a change in a fluid in a wellbore. In one embodiment, the method includes estimating a first and a second pressure difference in the fluid in the wellbore; and estimating a change in a density of the fluid using the first and the second pressure differences. In some embodiments, the change in density is in part estimated by the equation, Δρ=(ΔPbefore
For drilling related applications, the method may include positioning the two pressure sensors on a drill string; and drilling the wellbore with the drill string. A method for such applications may include the steps of conveying a processor with a drilling string into a wellbore. The processor may be programmed to estimate the change in the density of the fluid. The method may further include instituting a corrective action for controlling a fluid flow in the wellbore in response to an estimated change in density. Exemplary corrective actions include: (i) sealing off the well to stop fluid flow, (ii) circulating a loss circulation material, (iii) changing a mud weight of a drilling fluid circulated in the wellbore.
In aspects, the present disclosure also provides a method for detecting a change in a fluid in a wellbore that includes estimating a change in a density of the fluid in the wellbore using at least four measured pressures in the fluid. The at least four measured pressures may include a first set of pressures measured at a first time and a second set of pressures measured at a second time different from the first time. The method may further include estimating a first pressure difference using the first set of pressures and estimating a second pressure difference using the second set of pressures. The density may be estimated using the estimated first and second pressure differences.
In aspects, the present disclosure further provides a computer-readable medium for detecting a change in a fluid in a wellbore. The medium may include instructions that enable at least one processor to: estimate a first and a second pressure difference in the fluid in the wellbore; and estimate a change in a density of the fluid using the first and the second pressure differences. The instructions may estimate the change in density in part by using the equation, Δρ=(ΔPbefore
Illustrative examples of some features of the disclosure thus have been summarized rather broadly in order that the detailed description thereof that follows may be better understood, and in order that the contributions to the art may be appreciated. There are, of course, additional features of the disclosure that will be described hereinafter and which will form the subject of the claims appended hereto.
For detailed understanding of the present disclosure, references should be made to the following detailed description of the preferred embodiment, taken in conjunction with the accompanying drawings, in which like elements have been given like numerals and wherein:
The present disclosure relates to devices and methods for obtaining estimations of changes in drilling fluid density at or near a drill bit or elsewhere along a wellbore. The present disclosure is susceptible to embodiments of different forms. There are shown in the drawings, and herein will be described in detail, specific embodiments of the present disclosure with the understanding that the present disclosure is to be considered an exemplification of the principles of the disclosure, and is not intended to limit the disclosure to that illustrated and described herein. Further, while embodiments may be described as having one or more features or a combination of two or more features, such a feature or a combination of features should not be construed as essential unless expressly stated as essential.
Referring now to
In one embodiment, the system 10 shown in
Referring now to
The BHA 60 may include a formation evaluation sub 61 that may includes sensors for estimating parameters of interest relating to the formation, borehole, geophysical characteristics, borehole fluids and boundary conditions. These sensor include formation evaluation sensors (e.g., resistivity, dielectric constant, water saturation, porosity, density and permeability), sensors for measuring borehole parameters (e.g., borehole size, and borehole roughness), sensors for measuring geophysical parameters (e.g., acoustic velocity and acoustic travel time), sensors for measuring borehole fluid parameters (e.g., viscosity, density, clarity, rheology, pH level, and gas, oil and water contents), and boundary condition sensors, sensors for measuring physical and chemical properties of the borehole fluid. The BHA 60 may also include a processor 100, sensors 56 configured to measure various parameters of interest, and one or more survey instruments 58, all of which are described in greater detail below.
In aspects, the BHA 60 may include a processor 100 programmed to determine or estimate a density or a change in a density of a fluid in the wellbore. The processor 100 may be configured to decimate data, digitize data, and include suitable programmable logic circuits (PLC's). For example, the processor may include one or more microprocessors that use a computer program or instructions implemented on a suitable machine-readable medium that enables the processor to perform the control instruments and process data. The machine-readable medium may include ROMs, EPROMs, EAROMs, Flash Memories and Optical disks.
In one arrangement, the processor 100 determines changes in density using measurements received from two axially spaced-apart pressure sensors 102a, 102b. The pressure sensor 102a is positioned at point 104a and the pressure sensor 102b is positioned at point 104b. The distance separating the points 104a and 104b may be fixed or adjustable, but is known. These sensors may include pressure sensors that have accuracies on the order of 0.02% to 0.04% of full scale and resolution on the order of 0.008-0.010 PSI. At high downhole pressures (on the order of 10 000 PSI), these gauge accuracy limits correspond to offset errors in the pressure readings that are likely to be on the order of several PSI, which is more than 100 times worse than the gauge resolution. Pure water corresponds to a pressure gradient of 0.434 PSI per vertical foot. A heavy drilling fluid, with many suspended solids, could be 0.9 PSI/ft. If the pressure gauges are located 10 vertical feet apart, then the difference in pressure readings would be only 9 PSI, even for a heavy mud. Therefore, a several PSI offset error in each gauge would lead to a very inaccurate density as calculated from pressure gradient. However, when we are only interested in the change in drilling fluid density associated with the influx of gas rather than the drilling fluid density itself, it is gauge resolution rather than gauge accuracy that limits one's measurement capability. That is, although there may be substantial error in the density that is computed from the difference in pressure readings of two gauges located a known vertical distance apart, the error in the change in density before and after gas influx can be 100 times more accurate than the density measurement, which is one key concept underlying this disclosure. Using pre-programmed instructions or mathematical model, the processor 100 may estimate or calculate a density or density change of a fluid flowing in the annulus 24 (
ΔP=(ρ×g×ΔTVD) (1)
Furthermore, by subtracting the pressure difference between the two gauges after gas influx from the pressure difference before gas influx, we can compute the change in drilling fluid density, Δρ.
Δρ=(ΔPbefore
In equation (1), ΔP is the mud pressure gradient or pressure difference between points 104a and 104b, ρ is a mean value of density of the fluid between points 104a, b, g is gravity and ΔTVD is the change in true vertical depth between points 104a and 104b. Of course, if the tool is not vertical, but at an angle of θ with respect to vertical (as measured by the tool's internal inclinometer), then ΔTVD can be calculated as the product of the distance (along the tool) between the two pressure gauges and the cosine of θ. The sensors 102a,b provide the pressures at points 104a,b respectively and thus provide an estimated value of ΔP. The processor 100 may receive directional survey measurements from survey instruments such as inclinometers or three (3) axis accelerometers to determine inclination, or the angular deviation for a horizontal or vertical datum. The determined inclination may then be used to determine the vertical leg or vertical distance separating points 104a,b. Thus, ρ may be calculated based on measurements made by the pressure sensors and the directional survey tools. In embodiments, discrete values for ρ are continually calculated and monitored for variations that may exceed a preprogrammed threshold.
It should be appreciated that estimating changes in density by determining the differences in downhole pressure measurements may reduce the impact of system errors associated with the sensors or the inherent operational limitations of such sensors. By way of explanation, a measurement offset error associated with pressure readings P1 and P1′ taken at two separate times by first sensor 102a may be ξ1 and a measurement offset error associated with pressure readings P2 and P2′ taken at two separate times by a second sensor 102b may be ξ2. The two sensors may be vertically separated by a height h. These pressure offset errors, ξ1 and ξ2 are not expected to change over the fairly short times (seconds to minutes) between successive pressure readings. Then, the change in density or Δρ between these two points may be expressed as:
{[P1′+ξ1−(P2′+ξ2)]−[P1+ξ1−(P2+ξ2)]×g×h=Δρ (3)
As should be evident in equation (3), the pressure offset errors ξ1 and ξ2 cancel out and are eliminated from the calculation of the change in density.
Referring now to
It should be understood that the method 110 may be applicable in a variety of situations. For example, rather than fluid invasion, a change in pressure may be caused by loss of fluid into a formation having a relatively low pore pressure, or “thief zone.” The density estimations of the method 110 may be utilized to identify those types of wellbore instabilities as well. Additionally, while
Referring now to
The sensor system 150 may also include a survey instrument 162 such as an inclinometer that may be used to determine a vertical distance separating the pressure sensors 152 and 154. Other sensors, such as a temperature sensor 164, may also be used with the sensor system 150. The sensor system 150 may be positioned on a conveying device 168 that may be coupled to a drill string made of jointed tubulars or coiled tubing. Non-rigid carriers such as a wireline or a slick line may also be utilized as a conveyance device.
During operation, a first set of pressure readings are taken by the first pressure sensor 152 and the second pressure sensor 154. Next, the switching device is actuated to reverse the positions of the first and second pressure sensors 152, 154. In this reversed position, a second set of pressure readings are taken by the first pressure sensor 152 and the second pressure sensor 154. An inter-calibration may then be performed using the first and second set of pressure readings. For example, the first pressure sensor 152 in a lower position may read a pressure Pal while the second pressure sensor 154 in an upper position may read a pressure Pbu. After the switch, the first pressure sensor 152 in the upper position may read a pressure Pau while the second pressure sensor 154 in a lower position may read a pressure Pbl. Thus, the pre-switch and post-switch measured pressure differences may be expressed as (Pau−Pbu) and (Pal−Pbl). To reduce or eliminate a relative offset between the two gauges and so allow one to calculate a correct fluid density from the difference of their readings, one can either add the difference of the two gauge's readings taken when they are at the same location to the first gauge and leave the second gauge's reading unchanged (make the first gauge read like the second gauge) or, alternatively, subtract this difference in readings from the second gauge and leave the first gauge's readings unchanged (make the second gauge read like the first gauge). In the event of a change in temperature or other wellbore condition that impacts offset, the switching and inter-calibration may be repeated.
From the above, it should be appreciated that what has been disclosed includes, in part, a method for detecting a change in a fluid in a wellbore. An illustrative method may include estimating a first and a second pressure difference in the fluid in the wellbore; and estimating a change in a density of the fluid using the first and the second pressure differences. In arrangements, the change in density may be estimated by the equation, Δρ=(ΔPbefore
For drilling related applications, the method may include positioning the two pressure sensors on a drill string; and drilling the wellbore with the drill string. A method for such applications may include the steps of conveying a processor with a drilling string into a wellbore. The processor may be programmed to estimate the change in the density of the fluid. The method may further include instituting a corrective action for controlling a fluid flow in the wellbore in response to an estimated change in density. Exemplary corrective actions include: (i) sealing off the well to stop fluid flow, (ii) circulating a loss circulation material, (iii) changing a mud weight of a drilling fluid circulated in the wellbore.
From the above, it should be appreciated that what has been disclosed includes, in part, a method for detecting a change in a fluid in a wellbore that includes estimating a change in a density of the fluid in the wellbore using four or more measured pressures in the fluid. The measured pressures may include a first set of pressures measured at a first time and a second set of pressures measured at a second time different from the first time. The method may further include estimating a first pressure difference using the first set of pressures and estimating a second pressure difference using the second set of pressures. The density may be estimated using the estimated first and second pressure differences.
From the above, it should be appreciated that what has been disclosed includes, in part, a computer-readable medium for detecting a change in a fluid in a wellbore. The medium may include instructions that enable at least one processor to: estimate a first and a second pressure difference in the fluid in the wellbore; and estimate a change in a density of the fluid using the first and the second pressure differences. The instructions may estimate the change in density in part by using the equation, Δρ=(ΔPbefore
The foregoing description is directed to particular embodiments of the present disclosure for the purpose of illustration and explanation. It will be apparent, however, to one skilled in the art that many modifications and changes to the embodiment set forth above are possible without departing from the scope of the disclosure. It is intended that the following claims be interpreted to embrace all such modifications and changes.
DiFoggio, Rocco, Zhao, Jinsong
Patent | Priority | Assignee | Title |
10036219, | Feb 01 2017 | CHEVRON U S A INC | Systems and methods for well control using pressure prediction |
10061050, | Aug 08 2016 | Gowell International, LLC | Fractal magnetic sensor array using mega matrix decomposition method for downhole application |
10415378, | Nov 19 2013 | MINEX CRC LTD | Borehole logging methods and apparatus |
10612325, | Dec 17 2014 | Halliburton Energy Services, Inc | Monitoring of the oil to water ratio for drilling fluids |
8271246, | Mar 30 2009 | CHEVRON U S A INC | System and method for minimizing lost circulation |
9187966, | Jan 21 2013 | Halliburton Energy Services, Inc | Drilling a well with predicting sagged fluid composition and mud weight |
9688902, | Jun 01 2015 | Halliburton Energy Services, Inc. | Drilling fluids with high dispersed phase concentration |
9863240, | Mar 11 2004 | M-I L L C | Method and apparatus for drilling a probabilistic approach |
9970290, | Nov 19 2013 | MINEX CRC LTD | Borehole logging methods and apparatus |
Patent | Priority | Assignee | Title |
4201082, | May 25 1977 | Process and equipment for determining the density of a loaded drilling fluid from a deep well, in particular an oil well | |
4267726, | Aug 30 1978 | Schlumberger Technology Corporation | Well pressure testing method |
4867254, | Aug 07 1987 | Schlumberger Technology Corporation | Method of controlling fluid influxes in hydrocarbon wells |
5070949, | Aug 07 1987 | Schlumberger Technology Corporation | Method of analyzing fluid influxes in hydrocarbon wells |
5080182, | Dec 20 1989 | Schlumberger Technology Corporation | Method of analyzing and controlling a fluid influx during the drilling of a borehole |
6176323, | Jun 26 1998 | Baker Hughes Incorporated | Drilling systems with sensors for determining properties of drilling fluid downhole |
6814142, | Oct 04 2002 | Halliburton Energy Services, Inc | Well control using pressure while drilling measurements |
7021405, | May 02 2003 | Halliburton Energy Services, Inc | Determining gradients using a multi-probed formation tester |
20050194184, | |||
20080060846, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Feb 17 2009 | Baker Hughes Incorporated | (assignment on the face of the patent) | / | |||
Feb 23 2009 | DIFOGGIO, ROCCO | Baker Hughes Incorporated | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 022294 | /0830 | |
Feb 23 2009 | ZHAO, JINSONG | Baker Hughes Incorporated | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 022294 | /0830 |
Date | Maintenance Fee Events |
Oct 29 2014 | M1551: Payment of Maintenance Fee, 4th Year, Large Entity. |
Nov 15 2018 | M1552: Payment of Maintenance Fee, 8th Year, Large Entity. |
Oct 20 2022 | M1553: Payment of Maintenance Fee, 12th Year, Large Entity. |
Date | Maintenance Schedule |
May 31 2014 | 4 years fee payment window open |
Dec 01 2014 | 6 months grace period start (w surcharge) |
May 31 2015 | patent expiry (for year 4) |
May 31 2017 | 2 years to revive unintentionally abandoned end. (for year 4) |
May 31 2018 | 8 years fee payment window open |
Dec 01 2018 | 6 months grace period start (w surcharge) |
May 31 2019 | patent expiry (for year 8) |
May 31 2021 | 2 years to revive unintentionally abandoned end. (for year 8) |
May 31 2022 | 12 years fee payment window open |
Dec 01 2022 | 6 months grace period start (w surcharge) |
May 31 2023 | patent expiry (for year 12) |
May 31 2025 | 2 years to revive unintentionally abandoned end. (for year 12) |