Described herein is a method for processing an invalidation of a downlink data tunnel between networks. The method includes the following steps: (1) a core network user plane anchor receives an error indication of data tunnel sent from an access network device, (2) after deciding that the user plane corresponding to the error indication uses a One tunnel technology, the core network user plane anchor notifies a relevant core network control plane to request recovering the downlink data tunnel, (3) the core network control plane recovers the downlink data tunnel and notifies the core network user plane anchor to update information of the user plane. In addition, a communication system and a communication device are also provided. The method, system, and device can improve the speed of recovering data transmission after the downlink data tunnel becomes invalid.

Patent
   8125889
Priority
Aug 15 2006
Filed
Feb 11 2009
Issued
Feb 28 2012
Expiry
Jan 01 2028
Extension
140 days
Assg.orig
Entity
Large
11
12
all paid
1. A method for processing an invalidation of a downlink data tunnel between networks, comprising:
receiving, by a core network user plane anchor, an error indication of a data tunnel from an access network device; and
instructing, by the core network user plane anchor, a core network control plane to recover a downlink data tunnel if a user plane corresponding to the error indication uses a One tunnel technology;
wherein the method further comprises:
updating, by the core network user plane anchor, information of the user plane according to a notification sent by the core network control plane, wherein the notification sent by the core network control plane is sent to the core network user plane anchor by the core network control plane after recovering the downlink data tunnel.
17. A communication device, comprising: a receiving unit and a sending unit, wherein
the receiving unit is configured to receive an error indication of a data tunnel from an access network device, and
the sending unit is configured to instruct the core network control plane to recover a downlink data tunnel if a user plane corresponding to the error indication uses a One tunnel technology;
and wherein the receiving unit is further configured to receive a message sent by the core network control plane, the message is sent to a core network control plane anchor by the core network control plane after the core network control plane recovers the downlink data tunnel,
the communication device further comprising a storage unit configured to update a packet data protocol (PDP) context according to the message received by the receiving unit and sent by the core network control plane, and recover the downlink data tunnel with the access network device.
13. A communication system, comprising: a core network user plane anchor and a core network control plane, wherein
the core network user plane anchor is configured to receive an error indication of a data tunnel from an access network device, and instruct the core network control plane to recover a downlink data tunnel if a user plane corresponding to the error indication uses a One tunnel technology, and
the core network control plane is configured to recover the downlink data tunnel after receiving a notification sent by the core network user plane anchor; and wherein
the core network control plane is further configured to send a message for updating information of the user plane to the core network user plane anchor after the core network control plane recovers the downlink data tunnel, and
the core network user plane anchor is further configured to update information of the user plane according to the message sent by the core network control plane.
2. The method according to claim 1, wherein the step of updating, by the core network user plane anchor, information of the user plane according to a notification sent by the core network control plane comprises:
updating, by the core network user plane anchor, a corresponding PDP context according to the notification sent by the core network control plane; and
recovering, by the core network user plane anchor, the downlink data tunnel between the core network user plane anchor and the access network device;
wherein the notification sent by the core network control plane comprises tunnel resource information allocated by the access network device,
the tunnel resource information is used to receive downlink data, and is allocated and sent to the core network control plane by the access network device after the access network device receives a radio access bearer (RAB) reestablishment request and accomplishes an RAB reestablishment, and
the RAB reestablishment request carries the tunnel resource information allocated by the core network user plane anchor for receiving uplink data.
3. The method according to claim 2, wherein the tunnel resource information comprises: an Internet protocol (IP) address of the user plane and a GPRS tunnel protocol (GTP) tunnel end identity (TEID).
4. The method according to claim 2, wherein the step of updating, by the core network user plane anchor, information of the user plane according to a notification sent by the core network control plane comprises:
updating, by the core network user plane anchor, the downlink data tunnel to a tunnel between the core network user plane anchor and the core network control plane according to the notification sent by the core network control plane,
wherein the notification sent by the core network control plane comprises tunnel resource information allocated by the core network control plane and used to receive downlink data.
5. The method according to claim 4, after updating, by the core network user plane anchor, the downlink data tunnel to a tunnel between the core network user plane anchor and the core network control plane, the method further comprising:
receiving, by the core network user plane anchor, a downlink user data and sending the downlink user data to the core network control plane via the tunnel between the core network user plane anchor and the core network control plane, and buffering, by the core network control plane, the downlink user data.
6. The method according to claim 5, wherein updating, by the core network user plane anchor, information of the user plane according to a notification sent by the core network control plane, further comprises:
updating, by the core network user plane anchor, a corresponding PDP context according to tunnel resource information allocated by the access network device and recovering the downlink data tunnel between the core network user plane anchor and the access network device,
wherein the tunnel resource information is used to receive downlink data, and is allocated and sent to the core network control plane by the access network device after the access network device receives a RAB reestablishment request and accomplishes an RAB reestablishment, and the RAB reestablishment request carries the tunnel resource information allocated by the core network user plane anchor for receiving uplink data.
7. The method according to claim 6, after the core network control plane receives the tunnel resource information allocated by the access network device, the method further comprising:
sending, by the core network control plane, the downlink data buffered by the core network control plane to the access network device according to the tunnel resource information if the core network control plane buffers the downlink data.
8. The method according to claim 4, wherein the notification sent by the core network control plane further carries information for notifying the core network user plane anchor of the user plane not established by adopting the One tunnel.
9. The method according to claim 4, wherein the tunnel resource information comprises: an Internet protocol (IP) address of the user plane and a GPRS tunnel protocol (GTP) tunnel end identity (TEID).
10. The method according to claim 2, before receiving, by a core network user plane anchor, an error indication of a data tunnel from an access network device, the method further comprising:
establishing the user plane between the core network user plane anchor and the access network device by adopting the One tunnel if the core network control plane determines to establish the user plane by adopting the One tunnel during activating a PDP context.
11. The method according to claim 10, further comprising:
determining, by the core network control plane, whether to establish the user plane by adopting the One tunnel based on at least whether the core network user plane anchor supports the One tunnel, and whether the core network control plane supports the One tunnel, subscription data of a user, and a roaming status of the user.
12. The method according to claim 10, further comprising:
determining, by the core network control plane, whether to establish the user plane by adopting the One tunnel based on at least whether the core network user plane anchor supports the One tunnel, subscription data of a user, and a roaming status of the user.
14. The communication system according to claim 13, further comprising:
an access network device configured to send the error indication of the data tunnel to the core network user plane anchor according to invalidation information of the data tunnel, perform a radio access bearer (RAB) reestablishment according to a command from the core network control plane, and send RAB accomplishing information to the core network control plane.
15. The communication system according to claim 14, wherein the core network control plane is a serving general packet radio service (GPRS) support node (SGSN), the core network user plane anchor is a gateway GPRS support node (GGSN), and the access network device is a radio network control (RNC),
the SGSN sends tunnel resource information allocated by the GGSN for receiving uplink data to the RNC and sends tunnel resource information allocated by the RNC for receiving downlink data to the GGSN,
the GGSN updates a packet data protocol (PDP) context according to the tunnel resource information allocated by the RNC for receiving downlink data and sent from the SGSN, and recovers the downlink data tunnel between the GGSN and the RNC; and
the RNC allocates the tunnel resource information for receiving downlink data according to the received tunnel resource information allocated by the GGSN for receiving uplink data and sent from the SGSN, and sends the allocated tunnel resource information for receiving downlink data to the SGSN.
16. The communication system according to claim 15, wherein the SGSN is further configured to allocate the tunnel resource information for receiving downlink data, establish a data tunnel between the SGSN and the GGSN, and send the buffered data received via the data tunnel between the SGSN and the GGSN to the RNC according to the tunnel resource information from the RNC for receiving downlink data.

The application is a continuation of International Application No. PCT/CN2007/070475, filed Aug. 14, 2007, which claims priority to Chinese Patent Application No. 200610115276.X, filed Aug. 15, 2006, both of which are hereby incorporated by reference in their entirety.

The present invention relates to a mobile communication technology, and more particularly to a method, system, and device for recovering an invalid downlink data tunnel for a user plane between an access network and a core network, having a One Tunnel/Direct Tunnel architecture in a third generation mobile communication system.

As the high speed packet access (HSPA) and Internet protocol (IP) multimedia subsystem (IMS) are introduced into a 3rd Generation Partnership Project (3GPP) network, it is expected that the user plane data traffic will significantly increase in the coming several years. In order to improve data transmission performance of the 3GPP system and reduce the costs of network investment by the operator, the 3GPP organization has researched a network architecture called One Tunnel, which is referred to as “One Tunnel” or “Direct Tunnel” network architecture in the specification (briefly called One Tunnel). Particularly, a user plane tunnel is directly established between a radio network control (RNC) and a gateway general packet radio service (GPRS) support node (GGSN) to replace the existing two tunnels respectively between the RNC and a serving GPRS support node (SGSN) and between the SGSN and the GGSN to strip the user plane function from the SGSN node, so as to save the operator's investment on the capacity expansion of the SGSN user plane in order to cater to the traffic growth of a network user plane caused by the HSPA. In brief, the One Tunnel architecture may be generalized as a flattening of user plane levels, in which the core network retains one layer of user plane node and one tunnel is established between the access network and a user plane entity of the core network.

In the 3GPP system, the data transmission between the access network and the core network user plane uses a GPRS tunnel protocol (GTP) technology. When one end of a GTP tunnel receives a packet data sent from a peer end, the peer end locates a user plane context according to tunnel end identity (TEID) information carried in a GTP header in an external layer of the packet data and then forwards the data according to routing information stored in the context. If a node at one end of the GTP tunnel may release the user plane context due to node reset or other abnormal circumstances, once receiving the data sent from the peer end of the GTP tunnel, the node cannot locate the corresponding user plane context or forward the received packet data normally, and therefore, merely discards the received data. According to the requirements of the GTP protocol, if the GTP data packet is received but the user plane context cannot be located, an error indication message needs to be sent to the peer end while the data packet is discarded, so as to notify the peer end that the tunnel is invalid and not to send data via the current tunnel any more.

In the One Tunnel architecture, the user plane has only one data tunnel established between the RNC and the GGSN. Once the RNC releases air interface resources and context of the user due to abnormal circumstances such as reset, a relevant downlink data tunnel between the relevant RNC and the GGSN becomes invalid. If the GGSN delivers a data to the RNC via the invalid downlink data tunnel, the GGSN inevitably receives an error indication message, i.e., an error indication, returned from the RNC. According to the current processing mechanism, in this case, the GGSN deactivates a packet data protocol (PDP) context to release the entire IP bearer. If a user wants to recover the data transmission later, the user must reactivate the PDP to establish the IP bearer.

In the above system, after the invalidation of the downlink data tunnel between the RNC and the GGSN, the user has to reactivate the PDP to establish the IP bearer once again to recover the data transmission. Such reactivation operation inevitably affects the speed of the data transmission recovery and causes the affected users to appear offline, which is undesirable in the 3GPP systems. In addition, t reactivation of the PDP cannot ensure the IP address of the IP bearer unchanged, and the application based on the 3GPP network is therefore easily interrupted due to the change of the IP address.

In an embodiment, the present invention is directed to a method for processing an invalidation of a downlink data tunnel between networks, which is capable of improving the speed of recovering a data transmission after the downlink data tunnel becomes invalid.

In an embodiment, the present invention is directed to a communication system, which is capable of improving the speed of recovering a data transmission after the downlink data tunnel becomes invalid.

In an embodiment, the present invention is directed to a communication device, which is capable of improving the speed of recovering a data transmission after the downlink data tunnel becomes invalid.

The technical solutions of the embodiments of the present invention are realized as follows.

The present invention provides a processing method on an invalidation of a downlink data tunnel between networks, which includes the following steps: (1) receiving, by a core network user plane anchor, an error indication of data tunnel from an access network device; and (2) notifying a core network control plane to recover a downlink data tunnel if a user plane corresponding to the error indication uses a One Tunnel technology.

The present invention provides a communication system, which includes a core network control plane and a core network user plane anchor. The core network user plane anchor is adapted to receive an error indication of data tunnel from an access network device and notify the core network control plane to request recovering the downlink data tunnel after determining that the user plane corresponding to the error indication uses a One Tunnel technology. The core network control plane is adapted to recover the downlink data tunnel after receiving a notification sent by the core network user plane anchor.

The present invention provides a communication device. The device includes a receiving unit and a sending unit. The receiving unit is adapted to receive an error indication of data tunnel from an access network device. The sending unit is adapted to notify a core network control plane to recover a downlink data tunnel if a user plane corresponding to the error indication uses a One Tunnel technology.

According the technical solutions of the embodiments of the present invention, the core network user plane anchor receives the error indication of data tunnel from a access network device, and notifies a relevant core network control plane to request recovering the downlink data tunnel after determining that the user plane corresponding to the error indication uses the One Tunnel technology. The core network control plane recovers the downlink data tunnel and notifies the core network user plane anchor to update information of the user plane. Once the downlink data tunnel becomes invalid, the core network user plane anchor does not release the corresponding PDP context and notifies the core network control plane to reestablish the downlink data tunnel. Such operation improves the speed of recovering data transmission after the downlink data tunnel becomes invalid and avoids negative influences on the data transmission recovery caused by reactivation of the PDP.

The present invention will become more fully understood from the detailed description given herein below for illustration only, which thus is not limitative of the present invention, and wherein:

FIG. 1 is a schematic view of a One Tunnel architecture;

FIG. 2 is an overall flow chart of a method according to an embodiment of the present invention;

FIG. 3 is a flow chart of activating a PDP context by a user to establish an IP bearer in a method according to a first preferred embodiment of the present invention;

FIG. 4 is a flow chart of processing an invalidation of a downlink data tunnel of a user plane in the method according to the first preferred embodiment of the present invention;

FIG. 5 is a flow chart of activating a PDP context by a user to establish an IP bearer in a method according to a second preferred embodiment of the present invention;

FIG. 6 is a flow chart of processing an invalidation of a downlink data tunnel of a user plane in the method according to the second preferred embodiment of the present invention;

FIG. 7 is a schematic structural view of a system according to an embodiment of the present invention; and

FIG. 8 is a schematic structural view of a device according to an embodiment of the present invention.

In order to make the objectives, technical solutions, and advantages of the present invention comprehensible, the present invention is described in detail below with reference to the accompanying drawings.

In the embodiments of the present invention, a core network user plane anchor receives an error indication of data tunnel from an access network device and notifies a relevant core network control plane to recover the downlink data tunnel after determining that the user plane corresponding to the error indication uses a One Tunnel technology; and the core network control plane recovers the downlink data tunnel and notifies the core network user plane anchor to update information of the user plane.

Embodiments of the present invention may be applied to an existing 3GPP system and an evolving 3GPP system.

The One Tunnel technology involved in the existing 3GPP system includes two schemes. According to one scheme, an SGSN retains the user plane function. For example, in the scenario of a roaming user, prepaid user, or the like, in order to reduce the changes made to the core network user plane anchor, i.e., a GGSN, the user plane is continued to be established in a conventional manner, instead of the One Tunnel manner. FIG. 1 is a schematic view of a One Tunnel architecture in the existing systems. As shown in FIG. 1, a large part of the user plane traffic is directly transmitted between an RNC and the GGSN via a tunnel using the One Tunnel technology, as indicated by the thick solid line in FIG. 1; and a small part of the user plane traffic is still transmitted between the RNC and the GGSN via the SGSN, as indicated by the thin solid line in FIG. 1 and the signaling interaction of the control plane is indicated by the dashed in FIG. 1. Hereinafter, this scheme is briefly called a One Tunnel scheme in which the SGSN retains the user plane function.

According to the other scheme of the One Tunnel technology, the SGSN does not have the user plane function, and the tunnel between the RNC and the GGSN is used to transmit data in all scenarios. If this scheme is adopted, the GTP user plane (GTPU) tunnel between the RNC, the SGSN, and the GGSN no longer exists. Hereinafter, this scheme is briefly called a complete One Tunnel scheme.

In the evolving 3GPP system, the realization of the One Tunnel technology is substantially similar to the above complete One Tunnel scheme, but is slightly different from the existing 3GPP system in certain specific entities. For example, the function of the core network control plane, i.e., the function realized by the SGSN in the above complete One Tunnel scheme is realized by a mobility management entity (MME), and the function of the above RNC is realized by an E-NodeB.

The solutions of embodiments of the present invention are illustrated in detail below through being applied to, for example, the existing 3GPP system.

FIG. 2 is an overall flow chart of a method according to an embodiment of the present invention. As shown in FIG. 2, the method includes the following steps.

In Step 201, a GGSN receives an error indication from an RNC, and notifies a relevant SGSN to recover a downlink data tunnel after determining that the user plane corresponding to an error indication uses a One Tunnel technology.

In Step 202, the SGSN sends a radio access bearer (RAB) reestablishment request to the corresponding RNC, in which the RAB reestablishment request carries tunnel resource information allocated by the GGSN for receiving uplink data.

In Step 203, the RNC accomplishes an RAB reestablishment and returns tunnel resource information allocated by the RNC itself for receiving downlink data to the SGSN, and then the SGSN notifies the GGSN to update a PDP context through the tunnel resource information allocated by the RNC for receiving the downlink data.

In Step 204, the GGSN updates the corresponding PDP context according to the received tunnel resource information allocated by the RNC and recovers the downlink data tunnel.

Furthermore, during a process of activating the PDP context by the user, it determines whether the SGSN and the GGSN support the One Tunnel architecture or not, so as to decide whether to use the One Tunnel technology. If it decides to use the One Tunnel technology, the PDP context of the GGSN records that the One Tunnel technology is used.

In the above One Tunnel scheme in which the SGSN retains the user plane function, once the downlink data tunnel between the RNC and the GGSN is invalid, the GGSN may send a downlink data to the RNC via the SGSN before the downlink data tunnel between the GGSN and the RNC is recovered, so as to further improve the speed of recovering the downlink data transmission and lower the requirements on the data buffering function of the GGSN.

The above two One Tunnel schemes are respectively illustrated in detail below through preferred embodiments.

In the method according to a first preferred embodiment of the present invention, the One Tunnel scheme in which the SGSN retains the user plane function is adopted. FIG. 3 is a flow chart of activating a PDP context by a user to establish an IP bearer in a method according to a first preferred embodiment of the present invention. As shown in FIG. 3, the flow includes the following steps.

In Step 301, a mobile station (MS) sends an activate PDP context request to an SGSN.

In Step 302a, the SGSN selects a GGSN and sends a create PDP context request to the selected GGSN.

The create PDP context request carries a permanent ID of the MS, a mobile phone number, a quality of service (QoS) requested by the MS, an access point name (APN) requested to be activated, a user plane IP address and a GTP TEID allocated by the SGSN for receiving downlink data, as well as other information.

In Step 302b, the GGSN creates a PDP context and returns a create PDP context response message to the SGSN.

The create PDP context response message carries a negotiated QoS, a user plane IP address and a GTP TEID allocated by the GGSN for receiving uplink data, an indication for whether the GGSN supports the One Tunnel, as well as other information. The SGSN updates the corresponding PDP context according to the create PDP context response message returned by the GGSN.

In Step 303, the SGSN decides whether to adopt the One Tunnel architecture to establish a user plane or not according to subscription information, a roaming status of the user, a factor whether the GGSN supports the One Tunnel architecture, and the like.

In Step 304a, the SGSN delivers an RAB assignment request message to the RNC.

If the One Tunnel architecture is adopted, the RAB assignment request message carries the user plane IP address and the TEID information allocated by the GGSN for receiving uplink data. If the One Tunnel architecture is not adopted, a normal flow of establishing the user plane is performed, and the RAB assignment request message carries a user plane IP address and TEID information allocated by the SGSN for receiving uplink data.

In Step 304b, the RNC allocates resources to the newly-established context and returns an RAB assignment response message.

The RAB assignment response message carries a user plane IP address and GTP TEID information allocated by the RNC for receiving downlink data and an approved QoS.

In Step 305a, if the user plane is established by adopting the One Tunnel architecture or the SGSN determines that the QoS sent by the RNC via the RAB assignment response message is different from the QoS returned by the GGSN via the create PDP context response message, the SGSN needs to initiate an update PDP context request to the GGSN.

If the user plane is established by adopting the One Tunnel architecture, the update PDP context request message carries the user plane IP address and the GTP TEID information allocated by the RNC for receiving downlink data and an indication that the user plane adopts the One Tunnel architecture, i.e., a One Tunnel flag. If the two QoSs are different, the update PDP context request message carries the QoS returned by the RNC.

In Step 305b, the GGSN updates corresponding information in the PDP context according to the received update PDP context request message and returns an update PDP context response message.

After receiving the update PDP context response message, the SGSN updates the corresponding PDP context according to information carried in the update PDP context response message. Here, if the user plane is established by adopting the One Tunnel architecture, the GGSN also saves a flag in the successfully created PDP context to indicate that the user plane is established by adopting the One Tunnel architecture.

In Step 306, the SGSN delivers an activate PDP context accept message to the MS. The activate PDP context accept message carries the IP address allocated by the GGSN and a QoS finally determined through negotiation.

After the IP bearer is established through the flow shown in FIG. 3, FIG. 4 is a flow chart of processing an invalidation of a downlink data tunnel of a user plane in the method according to the first preferred embodiment of the present invention. As shown in FIG. 4, the flow specifically includes the following steps.

In Step 401, after receiving a downlink data message of a user, a GGSN locates a corresponding PDP context, performs a GTP encapsulation on the downlink data message to form a downlink GTP data packet, and then sends the downlink GTP data packet to a corresponding GTP tunnel according to stored routing information in the PDP context.

In Step 402, an RNC receives the downlink GTP data packet, fails to locate a user plane context, and returns an error indication message to a source end of a GTP tunnel that sends the downlink GTP data packet.

In Step 403, the GGSN receives the error indication message returned by the RNC, and sends a user plane setup request to a corresponding SGSN according to information about the SGSN included in the control plane information stored in the PDP context, after determining that the corresponding PDP context adopts the One Tunnel architecture to establish a user plane.

Here, if the GGSN receives the error indication message returned by the RNC and determines that the corresponding PDP context does not adopt the One Tunnel architecture to establish the user plane, the GGSN directly releases the PDP context.

In Step 404a, after receiving the user plane setup request, the SGSN allocates a user plane IP address and a GTP TEID for receiving downlink data, carries the allocated information in an update PDP context request message, and sends the update PDP context request message to the GGSN. Meanwhile, the message indicates that the PDP context does not adopt the One Tunnel architecture to establish the user plane.

Here, the SGSN sends the update PDP context request message to the GGSN, which aims at establishing a GTP tunnel between the SGSN and the GGSN. Thus, the update PDP context request message indicates that the PDP context does not adopt the One Tunnel architecture to establish the user plane.

In Step 404b, the GGSN updates the corresponding PDP context according to the information carried in the update PDP context request message, updates the downlink user plane GTP tunnel from the tunnel between the GGSN and the RNC to a tunnel between the GGSN and the SGSN, and returns an update PDP context response message to the SGSN.

Afterwards, the GGSN forwards received downlink user data to the SGSN via the updated GTP tunnel between the GGSN and the SGSN, and the SGSN buffers the downlink data forwarded by the GGSN.

In Step 405a, the SGSN initiates an RAB assignment process to the RNC, i.e., send an RAB assignment request message to the RNC, after receiving the user plane setup request from the GGSN or receiving the downlink data forwarded by the GGSN via the updated GTP tunnel.

The RAB assignment request message carries a user plane IP address and GTP TEID information allocated by the GGSN for receiving uplink data that are recorded in the PDP context of the SGSN.

If the SGSN does not receive the user plane setup request from the GGSN or the downlink data forwarded by the GGSN, the flow ends.

In Step 405b, the RNC returns an RAB assignment response message.

The message carries a user plane IP address and GTP TEID information allocated by the RNC for receiving downlink data or further carries a QoS and other tunnel resource information. If the SGSN has buffered some data, the SGSN delivers the data to the RNC according to the tunnel resource information designated by the information returned by the above RNC.

In Step 406a, the SGSN sends an update PDP context request message to the GGSN.

The update PDP context request message carries the user plane IP address and the GTP TEID information allocated by the RNC for receiving downlink data and an indication that the user plane adopts the One Tunnel architecture. In addition, if the QoS returned by the RNC is different from a corresponding QoS from the GGSN, the update PDP context request message further carries the QoS returned by the RNC.

In Step 406b, the GGSN updates the corresponding information in the PDP context according to the update PDP context request message, updates the tunnel between the GGSN and the SGSN back to a tunnel between the GGSN and the RNC, and returns an update PDP context response message to the SGSN.

After the flow shown in FIG. 4 is accomplished, the downlink data tunnel between the GGSN and the RNC is recovered, so that the data can be sent to the user via the downlink data tunnel.

In a method according to a second preferred embodiment of the present invention, the complete One Tunnel scheme is adopted. FIG. 5 is a flow chart of activating a PDP context by a user to establish an IP bearer in a method according to a second preferred embodiment of the present invention. As shown in FIG. 5, the flow specifically includes the following steps.

In Step 501, an MS sends an activate PDP context request to an SGSN.

In Step 502a, the SGSN selects a GGSN and sends a create PDP context request message to the selected GGSN.

The create PDP context request message carries a permanent ID of the MS, a mobile phone number, a QoS requested by the MS, an APN requested to be activated, a user plane IP address and a GTP TEID allocated by the SGSN for receiving downlink data, an indication whether the SGSN supports a One Tunnel architecture, as well as other information.

In Step 502b, the GGSN creates a PDP context for the MS according to the information carried in the create PDP context request message and returns a create PDP context response message to the SGSN.

The create PDP context response message carries a negotiated QoS, a user plane IP address and GTP TEID information allocated by the GGSN for receiving uplink data, and an indication whether the GGSN supports the One Tunnel architecture.

In Step 503, if the SGSN determines that the SGSN itself and the GGSN both support the One Tunnel architecture, the SGSN decides to establish a user plane by adopting the One Tunnel architecture; otherwise, the One Tunnel architecture is not adopted when establishing the user plane.

In Step 504a, the SGSN delivers an RAB assignment request message to the RNC.

If the SGSN decides to establish the user plane by adopting the One Tunnel architecture, the RAB assignment request message carries the user plane IP address and the TEID information allocated by the GGSN for receiving uplink data; otherwise, a normal flow of establishing the user plane is performed, and the RAB assignment request message carries the user plane IP address and the TEID information allocated by the SGSN for receiving uplink data.

In Step 504b, after receiving the RAB assignment request message, the RNC allocates resources to the newly-established PDP context and returns an RAB assignment response message to the SGSN.

The RAB assignment response message carries a user plane IP address and GTP TEID information allocated by the RNC for receiving downlink data and an approved QoS.

In Step 505a, if the user plane is established by adopting the One Tunnel architecture or the QoS returned by the RNC is different from the corresponding QoS from the GGSN, the SGSN needs to send an update PDP context request message to the GGSN.

If the user plane is established by adopting the One Tunnel architecture, the update PDP context request message carries the user plane IP address and the GTP TEID information allocated by the RNC for receiving downlink data. If the QoS returned by the RNC is different from the QoS returned by the GGSN, the message carries the QoS returned by the RNC.

In Step 505b, the GGSN updates corresponding information in the PDP context according to the update PDP context request message and returns an update PDP context response message.

The GGSN can determine whether to adopt the One Tunnel architecture to establish the user plane according to the information whether the GGSN itself supports the One Tunnel architecture and the information whether the SGSN supports the One Tunnel architecture carried in the create PDP context request message from the SGSN in Step 502, and if the user plane is established by adopting the One Tunnel architecture here, a flag is saved in the successfully created PDP context to indicate that the user plane is established by adopting the One Tunnel architecture.

In Step 506, the SGSN delivers an activate PDP context accept message to the MS.

The message carries the IP address allocated to the user by the GGSN and a QoS finally determined through negotiation.

After the IP bearer has been established, FIG. 6 is a flow chart of processing an invalidation of a downlink data tunnel of a user plane in the method according to the second preferred embodiment of the present invention. As shown in FIG. 6, the flow specifically includes the following steps.

In Step 601, after receiving a downlink data message of a user, a GGSN locates a corresponding PDP context, performs a GTP encapsulation on the downlink data message to form a downlink GTP data packet, and then sends the downlink GTP data packet to a corresponding GTP tunnel according to stored routing information in the PDP context.

In Step 602, an RNC receives a downlink GTP data packet, fails to locate a user plane context, and returns an error indication message to a source end of a GTP tunnel that sends the downlink GTP data packet.

In Step 603, the GGSN receives the error indication message returned by the RNC and sends a user plane setup request to a corresponding SGSN according to information about the SGSN included in the control plane information stored in the PDP context, after determining that the corresponding PDP context adopts the One Tunnel architecture to establish a user plane.

Here, if the GGSN receives the error indication message returned by the RNC and determines that the corresponding PDP context does not adopt the One Tunnel architecture to establish the user plane, the GGSN directly releases the PDP context.

In Step 604a, the SGSN initiates an RAB assignment process to the RNC, i.e., sends an RAB assignment request message to the RNC.

The RAB assignment request message carries a user plane IP address and GTP TEID information allocated by the GGSN for receiving uplink data that are recorded in the PDP context of the SGSN.

In Step 604b, the RNC returns an RAB assignment response message.

The RAB assignment response message carries a user plane IP address and GTP TEID information allocated by the RNC for receiving downlink data and an approved QoS.

In Step 605a, the SGSN sends an update PDP context request message to the GGSN.

The update PDP context request message carries the user plane IP address and the GTP TEID information allocated by the RNC for receiving downlink data. If the QoS returned by the RNC is different from the QoS from the GGSN, the message further carries the QoS returned by the RNC.

In Step 605b, the GGSN updates the corresponding information in the PDP context according to the update PDP context request message, updates a data tunnel between the GGSN and the SGSN back to a tunnel between the GGSN and the RNC, and returns an update PDP context response message.

Based on the above method, FIG. 7 is a schematic structural view of a system according to an embodiment of the present invention. As shown in FIG. 7, the system includes a core network control plane 701 and a core network user plane anchor 702.

The core network user plane anchor 702 is adapted to receive an error indication of data tunnel from an access network device, and notify the core network control plane 701 to request recovering the downlink data tunnel, after determining that a user plane corresponding to the error indication uses a One Tunnel technology.

The core network control plane 701 is adapted to recover the downlink data tunnel and notify the core network user plane anchor 702 to update information of the user plane.

The system further includes an access network device 703 adapted to send the error indication of data tunnel to the core network user plane anchor 702 according to the determined invalidation information of the data tunnel, perform an RAB reestablishment according to a command from the core network control plane 701, and send RAB accomplishing information to the core network control plane 701.

In the actual applications, the core network control plane 701 may be an SGSN, the core network user plane anchor 702 may be a GGSN, and the access network device 703 may be an RNC.

The SGSN sends tunnel resource information allocated by the GGSN for receiving uplink data to the RNC and sends tunnel resource information allocated by the RNC for receiving downlink data to the GGSN.

The GGSN updates a PDP context according to the tunnel resource information allocated by the RNC for receiving the downlink data sent from the SGSN and recovers the downlink data tunnel between the GGSN and the RNC.

The RNC allocates the tunnel resource information for receiving the downlink data according to the received tunnel resource information allocated by the GGSN for receiving the uplink data sent from the SGSN and sends the tunnel resource information allocated by the RNC itself to the SGSN.

In the One Tunnel scheme in which the SGSN retains the user plane function, the SGSN further allocates tunnel resource information for receiving downlink data according to the tunnel resource information allocated by the GGSN for receiving the uplink data stored in the PDP context, establishes a data tunnel between the SGSN and the GGSN, and sends the buffered data received via the data tunnel between the SGSN and the GGSN to the RNC according to the tunnel resource information allocated by the RNC for receiving the downlink data.

During the process of activating the PDP context by the user, in the One Tunnel scheme in which the SGSN retains the user plane function, the SGSN may further decide whether to establish the user plane by adopting the One Tunnel architecture or not according to subscription information, a roaming status of the user, an indication whether the GGSN supports the One Tunnel architecture, and the like. In the complete One Tunnel scheme, the SGSN may decide whether to establish the user plane by adopting the One Tunnel architecture or not according to information whether the SGSN itself and the GGSN both support the One Tunnel architecture.

FIG. 8 is a schematic structural view of a device according to an embodiment of the present invention. As shown in FIG. 8, the device is a GGSN device and specifically includes a receiving unit 801 and a sending unit 802.

The receiving unit 801 is adapted to receive an error indication of data tunnel from an access network device.

The sending unit 802 is adapted to notify a core network control plane to request recovering the downlink data tunnel after determining that a user plane corresponding to the error indication uses a One Tunnel technology.

In addition, the device further includes a storage unit 803 adapted to update a PDP context according to tunnel resource information allocated by the access network device received by the receiving unit 801 from the core network control plane and recover the downlink data tunnel between the access network device and GGSN.

In the subsequent evolving 3GPP system, a control plane and a user plane of a core network are separated from each other. The core network has only one layer of user plane including a core network user plane entity (UPE) and an inter access system anchor (IASA), which are combined into one network entity called a core network user plane anchor in the future evolving network architecture. The UPE and the IASA are called at the early time of evolving 3GPP system and are replaced by Serving Gateway and PDN (Packet Data Networks) Gateway respectively recently, i.e., the UPE corresponds to the Serving Gateway and the IASA corresponds to the PDN Gateway. The specific functions of the core network user plane anchor are substantially the same as that performed by the above GGSN. The control plane of the core network, called an MME in the specification, is an independent entity, whose specific functions are substantially the same as that performed by the SGSN in the complete One Tunnel scheme. In addition, in the subsequent evolving 3GPP system, an E-NodeB realizes the functions of the above RNC. Therefore, the above method and system on the present invention are not only applicable to the One Tunnel architecture of the 3GPP system prior to the Rel7, but also applicable to the above evolving 3GPP system. After the present invention is applied to the 3GPP system, the function performed by the core network user plane anchor which has the UPE and IASA functions about recovering the downlink data tunnel is similar to that of the GGSN. The function performed by the core network control plane about recovering the downlink data tunnel is similar to that of the SGSN, and the function performed by the E-NodeB about recovering the downlink data tunnel is similar to that of the RNC. The specific signaling names may be different from the above second embodiment, but the specific processing flows are substantially the same, which thus will not be described herein again.

It will be apparent to those skilled in the art from the above detailed descriptions that the present invention can be implemented by means of software plus a necessary universal hardware platform, which definitely can also be implemented by hardware. However, in most cases, the former is a preferable implementation. Accordingly, the technical solutions of the present invention in essence or a part of the technical solutions that makes contributions to the existing systems may be embodied in the form of a software product. The computer software product is stored in a storage medium and includes several instructions to enable a computer device (may be a personal computer, a server, or a network device) to implement the methods according to the embodiments of the present invention.

Finally, it should be understood that the above embodiments are only used to explain, but not to limit the technical solution of the present invention. In despite of the detailed description of the present invention with referring to above preferred embodiments, it should be understood that various modifications, changes or equivalent replacements can be made by those skilled in the art without departing from the scope of the present invention and covered in the claims of the present invention.

Hu, Weihua

Patent Priority Assignee Title
10172166, Oct 16 2014 LG Electronics Inc Method and apparatus for handling E-RAB switch problem for dual connectivity in wireless communication system
10582427, Oct 16 2014 LG Electronics Inc. Method and apparatus for handling E-RAB switch problem for dual connectivity in wireless communication system
10721780, Aug 15 2006 Huawei Technologies Co., Ltd. Method, system and device for recovering invalid downlink data tunnel between networks
10938601, Oct 11 2007 Huawei Technologies Co., Ltd. Method and system for setting up a bearer
8243675, Oct 11 2007 HUAWEI TECHNOLOGIES CO , LTD Method and system for setting up a bearer
8331306, Oct 11 2007 Huawei Technologies Co., Ltd. Method and system for setting up a bearer
8867339, Aug 15 2006 HUAWEI TECHNOLOGIES CO , LTD Method, system and device for recovering invalid downlink data tunnel between networks
8989116, Oct 11 2007 Huawei Technologies Co., Ltd. Method and system for setting up a bearer
9848450, Aug 15 2006 HUAWEI TECHNOLOGIES CO , LTD Method, system and device for recovering invalid downlink data tunnel between networks
9871678, Oct 11 2007 Huawei Technologies Co., Ltd. Method and system for setting up a bearer
9992692, Oct 03 2014 TELEFONAKTIEBOLAGET LM ERICSSON PUBL Network node, a mobility management node and methods therein for handling GTP tunnel failures in a radio communications network
Patent Priority Assignee Title
7054945, Apr 09 2001 Intellectual Ventures I LLC Technique for providing announcements in mobile-originated calls
20020006114,
20030021256,
20050172012,
20080186912,
20100046362,
20100061386,
CN101128041,
CN1659908,
CN1671119,
WO3105493,
WO2008080717,
////
Executed onAssignorAssigneeConveyanceFrameReelDoc
Jan 06 2009HU, WEIHUAHUAWEI TECHNOLOGIES CO , LTD ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0222440565 pdf
Feb 11 2009Huawei Technologies Co., Ltd.(assignment on the face of the patent)
Apr 07 2015HU, WEIHUAHUAWEI TECHNOLOGIES CO , LTD ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0354460508 pdf
May 15 2015HU, WEIHUAHUAWEI TECHNOLOGIES CO , LTD ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0357540407 pdf
Date Maintenance Fee Events
Aug 12 2015M1551: Payment of Maintenance Fee, 4th Year, Large Entity.
Aug 16 2019M1552: Payment of Maintenance Fee, 8th Year, Large Entity.
Aug 16 2023M1553: Payment of Maintenance Fee, 12th Year, Large Entity.


Date Maintenance Schedule
Feb 28 20154 years fee payment window open
Aug 28 20156 months grace period start (w surcharge)
Feb 28 2016patent expiry (for year 4)
Feb 28 20182 years to revive unintentionally abandoned end. (for year 4)
Feb 28 20198 years fee payment window open
Aug 28 20196 months grace period start (w surcharge)
Feb 28 2020patent expiry (for year 8)
Feb 28 20222 years to revive unintentionally abandoned end. (for year 8)
Feb 28 202312 years fee payment window open
Aug 28 20236 months grace period start (w surcharge)
Feb 28 2024patent expiry (for year 12)
Feb 28 20262 years to revive unintentionally abandoned end. (for year 12)