A method of drilling and completing a well can include drilling a section of a wellbore, positioning a perforated shroud in the section of the wellbore, securing the perforated shroud by setting a hanger, and isolating the section of the wellbore from a remainder of the wellbore vertically above the section of the wellbore. The drilling, positioning, securing and isolating steps can be performed while the section of the wellbore is not exposed to a liquid column extending to a surface location. The drilling, positioning, securing and isolating steps can be performed in a single trip of a drill string into the wellbore.
|
1. A method of drilling and completing a well, the method comprising:
performing the following steps a)-e) in a single trip of a drill string into a wellbore:
a) drilling a section of the wellbore;
b) positioning a perforated shroud in the section of the wellbore;
c) securing the perforated shroud by setting a hanger;
d) withdrawing the drill string from the shroud; and
e) then isolating the section of the wellbore from a remainder of the wellbore vertically above the section of the wellbore.
21. A method of drilling and completing a well, the method comprising:
drilling a section of a wellbore;
positioning a perforated shroud in the section of the wellbore;
securing the perforated shroud by setting a hanger; and
isolating the section of the wellbore from a remainder of the wellbore vertically above the section of the wellbore,
wherein the drilling, positioning, securing and isolating steps are performed while the section of the wellbore is not exposed to a substantially single phase liquid column extending to a surface location, and
wherein drilling the section of the wellbore further comprises rotating a drill bit connected to the perforated shroud.
12. A method of drilling and completing a well, the method comprising:
drilling a section of a wellbore;
positioning a perforated shroud in the section of the wellbore;
securing the perforated shroud by setting a hanger; and
isolating the section of the wellbore from a remainder of the wellbore vertically above the section of the wellbore, and
wherein the drilling, positioning, securing and isolating steps are performed while the section of the wellbore is not exposed to a substantially single phase liquid column extending to a surface location, and
wherein the drilling, positioning, securing and isolating steps are performed in a single trip of a drill string into the wellbore.
15. A method of drilling and completing a well, the method comprising:
drilling a section of a wellbore;
positioning a perforated shroud in the section of the wellbore;
securing the perforated shroud by setting a hanger; and
isolating the section of the wellbore from a remainder of the wellbore vertically above the section of the wellbore,
wherein the drilling, positioning, securing and isolating steps are performed while the section of the wellbore is not exposed to a substantially single phase liquid column extending to a surface location, and
wherein isolating the section of the wellbore further comprises setting a plug in a liner string which includes the hanger and the perforated shroud.
2. The method of
3. The method of
4. The method of
5. The method of
6. The method of
7. The method of
8. The method of
9. The method of
10. The method of
11. The method of
13. The method of
14. The method of
16. The method of
17. The method of
18. The method of
19. The method of
20. The method of
|
This application claims the benefit under 35 USC §119 of the filing date of International Application Serial No. PCT/US11/20704, filed 10 Jan. 2011. The entire disclosure of this prior application is incorporated herein by this reference.
The present disclosure relates generally to equipment utilized and operations performed in conjunction with a subterranean well and, in an embodiment described herein, more particularly provides a controlled hydrostatic pressure completion system.
To prevent damage to a reservoir penetrated by a wellbore, to prevent unacceptable fluid loss to the reservoir, and to prevent excessive fluid influx from the reservoir, techniques have been developed to accurately control wellbore pressures. For example, in managed pressure drilling or optimized pressure drilling, the wellbore can be closed off from the atmosphere to enable closed-loop control of wellbore pressures via regulation of rig pump pressure, return flow through a choke manifold, a dual density fluid column, etc.
Therefore it will be appreciated that it would be beneficial to provide for a controlled hydrostatic pressure completion system.
Representatively illustrated in
The wellbore 12 is drilled by rotating a drill bit 16 on a downhole end of a generally tubular drill string 18. Drilling fluid 20 is circulated through the drill string 18 and an annulus 22 surrounding the drill string during the drilling operation.
In the
The surface location 30 could be at a land-based drilling rig, an offshore drilling rig, a jack-up drilling rig, a subsea mud line, etc. For the purposes of this disclosure, the earth's surface, whether or not covered by water, is considered a surface location.
During drilling, an open hole (uncased) section of the wellbore 12 is exposed to hydrostatic pressure in the wellbore due to a weight of the drilling fluid 20, fluid friction due to flow of the fluid through the annulus 22, pressure applied by a rig pump 32, and backpressure due to restriction to flow of the drilling fluid through a choke manifold 34. These influences on the pressure in the wellbore 12 can be controlled using techniques known to those skilled in the art as managed, optimized, underbalanced, at balance, etc., drilling.
A fluid conditioning facility 40 can separate gas and solids from the drilling fluid 20, and otherwise condition the fluid as it is circulated from the choke manifold 34 to the rig pump 32. In this example, the fluid conditioning facility 40 comprises the rig's mud system, e.g., including a degasser, shale shakers, mud tanks, mixing tanks, etc. The density of the drilling fluid 20 can be varied as needed in the facility 40, to thereby change the hydrostatic pressure exerted by the drilling fluid in the wellbore 12.
If desired, pressure can be added to the drilling fluid 20 by means of a backpressure or makeup pump 36, fluid can be diverted from the drill string 18 to the choke manifold 34 during cessation of drilling fluid flow through the drill string (such as, while making connections in the drill string, etc.), and the hydrostatic pressure of the drilling fluid can be decreased by adding a relatively low density fluid 38 (such as nitrogen gas, gas-filled glass spheres, etc.) to the drilling fluid before or after the drilling fluid is pumped through the drill string 18.
By using these techniques and others, pressure in the wellbore 12 section directly exposed to the formation 14 can be maintained greater than, equal to, and/or less than pore pressure of the formation in that section of the wellbore. In different circumstances, it may be desired to drill into the formation 14 while pressure in the exposed section of the wellbore 12 is maintained overbalanced, underbalanced or balanced with respect to pore pressure in the formation.
Referring additionally now to
In
A suitable perforated shroud for use as the shroud 48 is the CAPS™ shroud marketed by Halliburton Energy Services, Inc. of Houston, Tex. USA. The shroud 48 could be another type of perforated liner in other examples. As used herein, the term “perforated shroud” includes perforated liners, slotted liners, well screen shrouds and similar equipment.
As the drill string 18 rotates, the drill bit 16, shroud 48 and liner hanger 50 also rotate, and the drill bit penetrates the formation 14. Alternatively, or in addition, the drill bit 16 (but not the shroud 48 and liner hanger 50) may be rotated by use of a conventional mud motor (not shown) interconnected in the drill string 18 above the drill bit. Eventually, a desired total depth of the wellbore 12 is reached.
In
Note that a plug 52 is set in the liner string 42, preferably using the drill string 18 as it is being withdrawn from the wellbore 12. The plug 52 can be latched into a suitable profile in the liner string 42, can be set by application of pressure, force, etc., or otherwise sealingly engaged in the liner string. This plug 52 isolates the section of the wellbore 12 directly exposed to the formation 14 from hydrostatic pressure due to the fluid column 56 vertically above that section of the wellbore.
Note, also, that the wellbore 12 in this example has been drilled into the formation 14, the shroud 48 has been positioned in the open hole section of the wellbore, the liner string 42 has been secured by setting the hanger 50, and the plug 52 has been set in the liner string, without exposing the formation to hydrostatic pressure of a full liquid column, and in only a single trip of the drill string 18 into the wellbore.
The formation 14 is not exposed to hydrostatic pressure of a full liquid column, because while the wellbore 12 is being drilled with the liner string 42, two-phase drilling fluid 20 is circulated through the drill string 18 (e.g., with low density fluid, such as nitrogen gas, being added to the drilling fluid), so that the drilling fluid comprises both liquid and gas. After the plug 52 is set (e.g., by latching the plug into a suitable profile in the liner string 42), the fluid column 56 might comprise a full liquid column extending to the surface location 30, but the plug will isolate that liquid column from the formation 14.
Separate trips of the drill string 18 into the wellbore 12 are not needed to separately drill the wellbore into the formation 14, run the liner string 42 and set the liner hanger 50, set the plug 52, etc. Wellbore pressure control is simplified, and less time and expense are required, if the number of trips into the wellbore 12 can be minimized.
In
The gas 60 reduces the density of the fluid column 56, thereby providing a means of controlling hydrostatic pressure in the wellbore 12. More or less gas 60 can be flowed via the annular space 62 to respectively decrease or increase the hydrostatic pressure exerted by the fluid column 56.
In
As depicted in
A suitable valve for use as the isolation valve 70 is the FS-2 Fluid Loss Device marketed by Halliburton Energy Services, Inc. A suitable packer for use as the gravel pack packer is the VERSA-TRIEVE™, also marketed by Halliburton Energy Services, Inc. However, other types of isolation valves, fluid loss control devices and packers may be used in keeping with the principles of this disclosure.
The sand control assembly 64 is conveyed into the wellbore 12 by a work string 76. The packer 74 is set in the liner string 42, thereby securing and sealing the sand control assembly 64 in the liner string.
The open hole section of the wellbore 12 can optionally be gravel packed by flowing a gravel slurry through the work string 76, and outward via the crossover 72 into the annulus 22. However, it is not necessary to gravel pack the open hole section of the wellbore 12 in keeping with the principles of this disclosure.
If the wellbore 12 is gravel packed, gravel 78 (not shown in
The work string 76 is then retrieved from the well. As the work string 76 is withdrawn from the sand control assembly 64, the isolation valve 70 is closed, thereby again isolating the now gravel packed section of the wellbore 12 while the injection liner 58 is retrieved from the well and an upper completion string 80 is installed. During this process, a filter cake treatment may be applied, if desired.
In
In
In
In
This alternate version of the method 44 now proceeds to the step depicted in
Although specific examples of equipment, components, elements, etc. of the well system 10 are described above, and specific steps and techniques are described above for certain examples of the method 44, it should be clearly understood that this disclosure is not limited to only these specific examples. Many variations of well systems and methods may be practiced using the principles of this disclosure.
In one example, this disclosure describes a method 44 of drilling and completing a well. The method 44 can include performing the following steps a)-d) in a single trip of a drill string 18 into a wellbore 12:
Steps a)-d) are preferably performed while the section of the wellbore 12 is not exposed to a liquid column extending to a surface location 30.
Steps a)-d) can be performed while the section of the wellbore 12 is exposed to a two-phase fluid column 56.
Setting the hanger 50 can include expanding the hanger 50.
Isolating the section of the wellbore 12 can involve setting a plug 52 in a liner string 42 which includes the hanger 50 and the perforated shroud 48.
The method 44 may include gravel packing the section of the wellbore 12. The gravel packing step can include unsetting the plug 52, positioning a sand control assembly 64 in the liner string 42, and flowing a gravel 78 slurry into an annulus 22 between the sand control assembly 64 and the section of the wellbore 12. The gravel packing can be performed in a single trip of a work string 76 into the wellbore 12.
The method 44 can include installing an injection liner 58 in a casing string 46, and flowing a gas 60 into the casing string 46 through an annular space 62 between the injection liner 58 and the casing string 46. Installing the injection liner 58 can be performed after isolating the open hole section of the wellbore 12 and prior to gravel packing the open hole section of the wellbore 12. Installing the injection liner 58 can be performed prior to drilling the open hole section of the wellbore 12.
Drilling the open hole section of the wellbore 12 can include rotating a drill bit 16 connected to the perforated shroud 48.
A method 44 of drilling and completing a well can include: drilling a section of a wellbore 12; positioning a perforated shroud 48 in the section of the wellbore 12; securing the perforated shroud 48 by setting a hanger 50; and isolating the section of the wellbore 12 from a remainder of the wellbore 12 vertically above the section of the wellbore 12. The drilling, positioning, securing and isolating steps are performed while the section of the wellbore 12 is not exposed to a liquid column extending to a surface location 30.
It is to be understood that the various embodiments of the present disclosure described herein may be utilized in various orientations, such as inclined, inverted, horizontal, vertical, etc., and in various configurations, without departing from the principles of the present disclosure. The embodiments are described merely as examples of useful applications of the principles of the disclosure, which is not limited to any specific details of these embodiments.
In the above description of the representative embodiments of the disclosure, directional terms, such as “above,” “below,” “upper,” “lower,” etc., are used for convenience in referring to the accompanying drawings. In general, “above,” “upper,” “upward” and similar terms refer to a direction toward the earth's surface along a wellbore, and “below,” “lower,” “downward” and similar terms refer to a direction away from the earth's surface along the wellbore.
Of course, a person skilled in the art would, upon a careful consideration of the above description of representative embodiments of the disclosure, readily appreciate that many modifications, additions, substitutions, deletions, and other changes may be made to the specific embodiments, and such changes are contemplated by the principles of the present disclosure. Accordingly, the foregoing detailed description is to be clearly understood as being given by way of illustration and example only, the spirit and scope of the present invention being limited solely by the appended claims and their equivalents.
Penno, Andrew D., Bullock, Raymond R.
Patent | Priority | Assignee | Title |
11371304, | Jun 28 2018 | Saudi Arabian Oil Company | Liner hanger system |
Patent | Priority | Assignee | Title |
4194567, | Oct 27 1977 | Compagnie Francaise des Petroles | Method and apparatus for balancing pressures in an oil well |
5865251, | Jan 05 1995 | SUPERIOR ENERGY SERVICES, L L C | Isolation system and gravel pack assembly and uses thereof |
6302208, | May 15 1998 | SUPERIOR ENERGY SERVICES, L L C | Gravel pack isolation system |
6354378, | Nov 18 1998 | Schlumberger Technology Corporation | Method and apparatus for formation isolation in a well |
6745834, | Apr 26 2001 | Schlumberger Technology Corporation | Complete trip system |
6766862, | Oct 27 2000 | Halliburton Energy Services, Inc. | Expandable sand control device and specialized completion system and method |
6799645, | Dec 10 2002 | SHELL USA, INC | Method and apparatus for drilling and completing a well with an expandable sand control system |
7108083, | Oct 27 2000 | Halliburton Energy Services, Inc. | Apparatus and method for completing an interval of a wellbore while drilling |
7188687, | Dec 22 1998 | Wells Fargo Bank, National Association | Downhole filter |
7234542, | Oct 14 1994 | Weatherford/Lamb, Inc. | Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells |
7243742, | Nov 26 2003 | Drill pipe screen | |
7708076, | Aug 28 2007 | Baker Hughes Incorporated | Method of using a drill in sand control liner |
7757762, | Oct 02 2007 | Baker Hughes Incorporated | Downhole tools having screens for insertion into gravel disposed in wellbores and methods of installing same |
7784552, | Oct 03 2007 | Schlumberger Technology Corporation | Liner drilling method |
20030183395, | |||
20050077086, | |||
20090173543, | |||
20090200085, | |||
RU2266391, | |||
RU89872, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Oct 18 2011 | PENNO, ANDREW D | Halliburton Energy Services, Inc | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 027421 | /0395 | |
Oct 24 2011 | BULLOCK, RAYMOND R | Halliburton Energy Services, Inc | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 027421 | /0395 | |
Dec 20 2011 | Halliburton Energy Services, Inc. | (assignment on the face of the patent) | / |
Date | Maintenance Fee Events |
Apr 24 2013 | ASPN: Payor Number Assigned. |
Sep 11 2013 | ASPN: Payor Number Assigned. |
Sep 11 2013 | RMPN: Payer Number De-assigned. |
Jul 25 2016 | M1551: Payment of Maintenance Fee, 4th Year, Large Entity. |
Sep 02 2020 | M1552: Payment of Maintenance Fee, 8th Year, Large Entity. |
Sep 24 2024 | M1553: Payment of Maintenance Fee, 12th Year, Large Entity. |
Date | Maintenance Schedule |
May 07 2016 | 4 years fee payment window open |
Nov 07 2016 | 6 months grace period start (w surcharge) |
May 07 2017 | patent expiry (for year 4) |
May 07 2019 | 2 years to revive unintentionally abandoned end. (for year 4) |
May 07 2020 | 8 years fee payment window open |
Nov 07 2020 | 6 months grace period start (w surcharge) |
May 07 2021 | patent expiry (for year 8) |
May 07 2023 | 2 years to revive unintentionally abandoned end. (for year 8) |
May 07 2024 | 12 years fee payment window open |
Nov 07 2024 | 6 months grace period start (w surcharge) |
May 07 2025 | patent expiry (for year 12) |
May 07 2027 | 2 years to revive unintentionally abandoned end. (for year 12) |