A brazing method includes the steps of providing a first part and a second part, at least a first portion of the first part is configured to fit inside a second portion of the second part, preplacing a first self-fluxing braze alloy on one or more of the first portion and second portion, preplacing a non-phosphorous braze alloy on the first self-fluxing braze alloy, preplacing another layer of the first self-fluxing braze alloy on the non-phosphorous braze alloy, thermally treating at least one of the first portion and second portion, to create a temperature differential between the first portion and second portion, inserting the first portion into the second portion, and heating at least one of the first portion and second portion to melt both layers of the first self-fluxing braze alloy and the non-phosphorous braze alloy. The first portion is joined by brazing to the second portion.
|
1. A brazing method comprising:
providing a first part and a second part, at least a first portion of the first part configured to fit inside a second portion of the second part;
preplacing a first self-fluxing braze alloy on one or more of the first portion and the second portion, wherein the first self-fluxing braze alloy is a bcup alloy;
preplacing a non-phosphorous braze alloy on the first self-fluxing braze alloy, wherein the non-phosphorous braze alloy is a bag alloy;
preplacing another layer of the first self-fluxing braze alloy on the non-phosphorous braze alloy;
thermally treating at least one of the first portion and the second portion, to create a temperature differential between the first portion and the second portion;
inserting the first portion into the second portion;
heating at least one of the first portion and the second portion to melt both layers of the first self-fluxing braze alloy and the non-phosphorous braze alloy; and
wherein, the first portion is joined by brazing to the second portion.
11. A brazing method comprising:
providing a first part and a second part, at least a first portion of the first part configured to fit inside a second portion of the second part;
preplacing a first self-fluxing braze alloy on one or more of the first portion and the second portion, wherein the first self-fluxing braze alloy is a bcup alloy;
preplacing a non-phosphorous braze alloy on the first self-fluxing braze alloy, wherein the non-phosphorous braze alloy is a bag alloy;
preplacing another layer of the first self-fluxing braze alloy on the non-phosphorous braze alloy;
thermally treating at least one of the first portion and the second portion, to create a temperature differential between the first portion and the second portion;
inserting the first portion into the second portion when the temperature differential has reduced;
heating both the first portion and the second portion to melt both layers of the first self-fluxing braze alloy and the non-phosphorous braze alloy; and
wherein, the first portion is joined by brazing to the second portion.
2. The brazing method of
3. The brazing method of
precleaning the first portion of the first part and the second portion of the second part.
4. The brazing method of
providing an inert gas purge inside the second portion before the heating step.
5. The brazing method of
7. The brazing method of
8. The brazing method of
cooling the first portion, to thermally contract the first portion.
9. The brazing method of
10. The brazing method of
not performing a cleaning step after the heating step.
12. The brazing method of
13. The brazing method of
14. The brazing method of
15. The brazing method of
cooling the first portion, to thermally contract the first portion.
16. The brazing method of
17. The brazing method of
18. The brazing method of
not performing a cleaning step after the heating step.
|
The invention described herein relates generally to brazing. More specifically, the invention relates to a method of brazing.
Armature stator bars in large generators are usually liquid cooled and contain a combination of individually insulated conductors, comprising both solid and hollow strands. The hollow strands are used to transmit liquid coolant, as well as electric current through the length of the armature stator bar. A header, including generator connection rings, must be leak resistant and capable of conducting electric current. This assembly is affixed to each end of each armature stator bar.
The headers and connection rings presently in service in generators serve as electrical connections between the stator bars or phase rings of the armature circuit and are also the sealed enclosure for transferring the liquid coolant to and from the stator bars. Conventional headers and connection rings are normally brazed to both the hollow and solid strands at each end of the stator bars. Thus, the liquid coolant is in direct contact with the brazed joints, which can result in liquid coolant leaks due to braze joint corrosion or braze joint imperfections. Ensuing leaks of liquid coolant can damage the armature insulation and result in costly maintenance outages.
Thus, there is a need for an improved brazing method that improves joint quality and reduces the leak problem.
In an aspect of the present invention, a brazing method includes the steps of providing a first part and a second part, at least a first portion of the first part is configured to fit inside a second portion of the second part, preplacing a first self-fluxing braze alloy on one or more of the first portion and second portion, preplacing a non-phosphorous braze alloy on the first self-fluxing braze alloy, preplacing another layer of the first self-fluxing braze alloy on the non-phosphorous braze alloy, thermally treating at least one of the first portion and second portion, to create a temperature differential between the first portion and second portion, inserting the first portion into the second portion, and heating at least one of the first portion and second portion to melt both layers of the first self-fluxing braze alloy and the non-phosphorous braze alloy. The first portion is joined by brazing to the second portion.
In another aspect of the present invention, a brazing method includes the steps of providing a first part and a second part, at least a first portion of the first part configured to fit inside a second portion of the second part, preplacing a first self-fluxing braze alloy on one or more of the first portion and the second portion, preplacing a non-phosphorous braze alloy on the first self-fluxing braze alloy, preplacing another layer of the first self-fluxing braze alloy on the non-phosphorous braze alloy, thermally treating at least one of the first portion and the second portion, to create a temperature differential between the first portion and the second portion, inserting the first portion into the second portion when the temperature differential has reduced, and heating both the first portion and the second portion to melt both layers of the first self-fluxing braze alloy and the non-phosphorous braze alloy. The first portion is joined by brazing to the second portion.
One or more specific aspects of the present invention will be described below. In an effort to provide a concise description of these aspects, all features of an actual implementation may not be described in the specification. It should be appreciated that in the development of any such actual implementation, as in any engineering or design project, numerous implementation-specific decisions must be made to achieve the developers' specific goals, such as compliance with machine-related, system-related and business-related constraints, which may vary from one implementation to another. Moreover, it should be appreciated that such a development effort might be complex and time consuming, but would nevertheless be a routine undertaking of design, fabrication, and manufacture for those of ordinary skill having the benefit of this disclosure.
When introducing elements of various aspects of the present invention, the articles “a,” “an,” “the,” and “said” are intended to mean that there are one or more of the elements. The terms “comprising,” “including,” and “having” are intended to be inclusive and mean that there may be additional elements other than the listed elements. Any examples of operating parameters and/or environmental conditions are not exclusive of other parameters/conditions of the disclosed embodiments. Additionally, it should be understood that references to “one embodiment”, “one aspect” or “an embodiment” or “an aspect” of the present invention are not intended to be interpreted as excluding the existence of additional embodiments or aspects that also incorporate the recited features.
A dynamoelectric machine is defined as a machine that converts mechanical energy to electrical energy or vice-versa, including but not limited to generators and motors. However, it is to be understood that the present invention could also be applied to turbomachines as well, or any application where an improved brazing method is desired.
A brazing method is herein described for joining two parts in a reliable manner. Brazing is generally defined as a joining process wherein coalescence is produced by heating to a suitable temperature above about 800° F. and by using a non-ferrous braze alloy, having a melting point below that of the materials to be joined.
In order to obtain high-quality brazed joints, the parts must be closely fitted, and the base metals must be exceptionally clean and free of oxides. In most cases, joint clearances of about 0.002 inches to about 0.008 inches are recommended for the best capillary action and joint strength. However, in some brazing operations it may be desirable to have joint clearances above or below this range. Cleanliness of the brazing surfaces and any preplaced braze alloy is also important, as any contamination can cause poor wetting (i.e., flow of the braze alloy), lack of adhesion to the parent metals, or unacceptable porosity in the resultant joint. The two parts 110, 120 can be joined by brazing and both portions of the joint should be clean. Two methods for cleaning parts prior to brazing, are chemical cleaning, and abrasive or mechanical cleaning. In the case of mechanical cleaning, it may be desirable to maintain a predetermined surface roughness as wetting on a rough surface occurs much more readily than on a smooth surface of the same geometry.
Multiple braze alloy layers 130, are preplaced (or deposited) on one or both parts prior to brazing. For example, multiple braze alloy layers 130 are preplaced on the first portion 112 of the first part 110. Preplacing may include deposition, mechanical placement, chemical placement or any other suitable method for preplacing the multiple braze alloy layers 130. The braze alloy layers may be sheets, bands or strips of metal, or the braze alloy layers could be applied (preplaced) in a powder form by a cold spray deposition process. Referring to
Upon application of sufficient heat, the three braze alloy layers 210, 220 and 230 all melt. The phosphorus-bearing layers 210, 230 in contact with the copper, self-flux during brazing and give good adhesion to the parts. The phosphorus-free layer 220 in between dilutes the phosphorus-rich layers 210, 230 to minimize the residual presence of Cu3P phase in the joint, which is a metallurgical phase that can serve as a site for corrosive attack. The resulting brazed joint provides enhanced corrosion protection at the point of contact with flowing fluid (e.g., cooling water, or any cooling medium).
As a few non-limiting examples, the non-self-fluxing braze alloy may be a BAg-18 alloy that is comprised of silver (Ag), copper (Cu) and tin (Sn), and has a melting point of at about 1,115° F., has a liquidus temperature of about 1,325° F., and is typically brazed at temperatures above 1,325° F. A Bag-24 alloy may also be used as a non-self-fluxing braze alloy, and is comprised of silver (Ag), copper (Cu), zinc (Zn) and nickel (Ni), and has a melting point of about 1,220° F. and a liquidus temperature of about 1,305° F. It is to be understood that other non-self-fluxing braze alloys may also be used as desired in the specific application. The self-fluxing braze alloy may be BCuP-5, which contains about 15% silver, 5% phosphorus, a balance of copper, and has a liquidus temperature of around 1,475° F. A brazing method using a combination of these types of braze alloys may also be referred to as a fluxless brazing method.
The multiple braze alloy layers 130 may be preplaced on at least one of the parts to be joined. For example, the multiple braze alloy layers 130 can be preplaced on part 110 in the region (i.e., portion 122) of the joint. The second part 120 can be thermally treated by preheating to thermally expand the inner diameter of portion 122. For example, the second part 120 may be preheated by induction heating to a temperature of about 400° F. to about 500° F. Other heating methods (e.g., torch heating, furnace, carbon arc, resistance, etc.) and other temperature ranges above or below those listed may also be used as desired in the specific application. After the second part 120 is preheated and portion 122 has thermally expanded, the first part 110 can be inserted into the second part 120.
Alternatively, the first part 110 and/or first portion 112 can be thermally treated by cooling to contract or shrink the first part 110 and/or first portion 112. The thermal treatment (either heating and/or cooling) creates a temperature differential between the first portion and the second portion. For example, the first portion 112 may be immersed in a nitrogen bath. The nitrogen bath may comprise liquid and/or solid nitrogen, or mixtures thereof. In this aspect, the nitrogen bath shrinks or contracts the first portion, while also providing a benefit to the method of reducing oxide formation. At cooler temperatures, oxide formation on metals (e.g., copper) is greatly reduced (or effectively eliminated) compared to a method where the metal is heated. In other aspects of the present invention, a combined cooling of the first portion and preheating of the second portion may be employed to create a compressive fit-up between the two parts.
The two parts form a compressive type fit-up and the thermal expansion of the second part (and/or thermal contraction of the first part/portion) allows for easier insertion of the first part 120 (portion 112) into the second part 120 (portion 122). After the brazing operation and upon cooling of the respective parts, a strong, mechanical bond is formed between the two parts.
A heating step can be performed on both parts, and this can be performed by induction heating or other heating method (e.g., torch heating, furnace, carbon arc, resistance, etc.). The two parts 110, 120 (and/or portions 112 and 122) may be heated to about 1,200° F. to about 1,500° F., about 1,400° F. to about 1,550° F., or any other suitable temperature range as required by the melting point of the highest-temperature braze alloy preplaced in the joint region. The heating cycle melts the flux and/or braze alloy and the braze alloy distributes along the joint through capillary action. The braze alloy bonds to both parts and forms a seal preventing any undesired leaks in the joint.
Method 400 may also include a step of providing an inert gas purge inside the second portion or an inert atmosphere in the area surrounding the joint. The thermally treating step 460 may be performed by induction heating, and one or both parts, or portions thereof may be heated to about 400° F. to about 500° F. The thermally treating step may also create a temperature differential between the first portion and the second portion of about 400° F. In addition, the thermally treating step may also cool the first portion to thermally contract the first portion, and this cooling step may be performed by immersing the first portion in a nitrogen bath. Alternatively, the temperature differential may be obtained by cooling the first portion and heating the second portion.
The heating step 480 may also be performed by induction heating, and one or both parts or portions thereof may be heated to about 1,400° F. to about 1,550° F. As a further advantage provided by the present invention, a cleaning step may be avoided so that one does not have to perform a cleaning step after the heating step. However, a cleaning step could be performed if desired.
Method 400 may also include the steps of providing the first part 110 made of copper and the second part 120 made of copper. A thermal expansion during the thermal treatment of the first part/portion and/or second part/portion provides a compression fitting (or fit-up) between the first portion 112 and the second portion 122 upon cooling (or temperature equilibration) of the first portion 112 and second portion 122.
This written description uses examples to disclose the invention, including the best mode, and also to enable any person skilled in the art to practice the invention, including making and using any devices or systems and performing any incorporated methods. The patentable scope of the invention is defined by the claims, and may include other examples that occur to those skilled in the art. Such other examples are intended to be within the scope of the claims if they have structural elements that do not differ from the literal language of the claims, or if they include equivalent structural elements with insubstantial differences from the literal languages of the claims.
Witney, Andrew Batton, Breznak, Jeffrey Michael, Rakozy, Kurt Allen
Patent | Priority | Assignee | Title |
10014740, | May 26 2014 | POWER SOLUTIONS GAMMA FRANCE | Chamber for conductors of electric machines |
10112248, | Sep 09 2014 | CELLTECH METALS, INC | Method of creating a bonded structure and apparatuses for same |
10702939, | Apr 05 2018 | Hamilton Sundstrand Corporation | Cold-spray braze material deposition |
9511437, | Aug 20 2013 | General Electric Company | Chamber-less thermal joining system |
9969000, | Jul 08 2015 | GE INFRASTRUCTURE TECHNOLOGY LLC | Additive manufacturing of joining preforms |
Patent | Priority | Assignee | Title |
3633266, | |||
5573414, | Mar 16 1995 | MECHANICAL DYNAMICS & ANALYSIS, LTD | Two piece electrical and fluidic connector and installation method therefore |
5793010, | Apr 22 1996 | General Electric Company | Electromagnetic field enhanced brazing method |
6159305, | Jul 14 1998 | General Electric Company | High speed induction motor rotor and method of fabrication |
6345433, | Jan 14 1998 | General Electric Company | Fabrication method for high speed induction motor rotor |
6534891, | Jan 15 1992 | General Electric Company | High speed induction motor rotor and method of fabrication |
6577038, | Dec 26 2000 | General Electric Company | Stator bar header with hollow strand package |
7451906, | Nov 21 2001 | Dana Canada Corporation | Products for use in low temperature fluxless brazing |
7735718, | Nov 21 2001 | Dana Canada Corporation | Layered products for fluxless brazing of substrates |
8196801, | Sep 08 2008 | Method of brazing of a special gas delivery system using fittings having purge orifices | |
20020079773, | |||
20030232132, | |||
20040035910, | |||
20040038070, | |||
20060027625, | |||
20080099538, | |||
20080160332, | |||
20090140073, | |||
20110259876, | |||
GB2394479, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Mar 22 2012 | RAKOZY, KURT ALLEN | General Electric Company | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 027914 | /0912 | |
Mar 22 2012 | BREZNAK, JEFFREY MICHAEL | General Electric Company | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 027914 | /0912 | |
Mar 22 2012 | WITNEY, ANDREW BATTON | General Electric Company | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 027914 | /0912 | |
Mar 23 2012 | General Electric Company | (assignment on the face of the patent) | / | |||
Nov 10 2023 | General Electric Company | GE INFRASTRUCTURE TECHNOLOGY LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 065727 | /0001 |
Date | Maintenance Fee Events |
Nov 28 2016 | M1551: Payment of Maintenance Fee, 4th Year, Large Entity. |
Oct 21 2020 | M1552: Payment of Maintenance Fee, 8th Year, Large Entity. |
Oct 22 2024 | M1553: Payment of Maintenance Fee, 12th Year, Large Entity. |
Date | Maintenance Schedule |
May 28 2016 | 4 years fee payment window open |
Nov 28 2016 | 6 months grace period start (w surcharge) |
May 28 2017 | patent expiry (for year 4) |
May 28 2019 | 2 years to revive unintentionally abandoned end. (for year 4) |
May 28 2020 | 8 years fee payment window open |
Nov 28 2020 | 6 months grace period start (w surcharge) |
May 28 2021 | patent expiry (for year 8) |
May 28 2023 | 2 years to revive unintentionally abandoned end. (for year 8) |
May 28 2024 | 12 years fee payment window open |
Nov 28 2024 | 6 months grace period start (w surcharge) |
May 28 2025 | patent expiry (for year 12) |
May 28 2027 | 2 years to revive unintentionally abandoned end. (for year 12) |