A change to a goal specified for an IT environment is to be made. Responsive to the changed goal, the IT environment is changed. This change is performed non-disruptively. Further, during the change, management to the existing goal is continued.

Patent
   8838467
Priority
Dec 28 2007
Filed
Dec 28 2007
Issued
Sep 16 2014
Expiry
Nov 02 2029
Extension
675 days
Assg.orig
Entity
unknown
0
236
EXPIRED
1. A computer-implemented method of managing changes within an information technology (IT) environment, said method comprising:
obtaining, by a processor, a change in a goal for an overall business application of the IT environment, the business application comprising a plurality of resources and one or more relationships between resources which provide the function of the business application, and the goal being a management goal associated with the plurality of resources used to support the business application, the management goal comprising one of an availability goal, a performance goal or other management goal for the business application, wherein the goal is to be changed to provide a new goal while continuing to enforce an existing goal;
generating, by the processor, a delta workflow to reflect one or more changes to the IT environment to enable achievement of the new goal, the delta workflow providing a programmatic difference between a current prepare workflow for the existing goal and a new prepare workflow for the new goal, the generating comprising:
traversing a list of operations for the new prepare workflow, wherein each operation is associated with a resource, and for an operation in the list of operations, determining whether the operation is in the current prepare workflow;
based on the operation not being in the current prepare workflow, checking whether the operation in the new prepare workflow supports a non-disruptive change, wherein the operation supports a non-disruptive change when the operation can be performed without impact to an existing state, and
based on the operation supporting a non-disruptive change, adding the operation to the delta workflow;
based on the operation being a disruptive change, the operation is not added to the delta workflow;
based on the operation being in the current prepare workflow, checking whether one or more of values and parameters for the operation in the new prepare workflow match the one or more values and parameters for the operation in the current prepare workflow;
based on the checking indicating a mismatch, determining whether the operation of the new prepare workflow is more stringent in being prepared to meet the new goal than the operation in the current prepare workflow is in being prepared to meet the new goal, and
 based on determining the operation of the new prepare workflow is more stringent for being prepared to meet the new goal, adding the operation of the new prepare workflow to the delta workflow, and
 based on determining the operation of the new prepare workflow is not more stringent in being prepared to meet the new goal, indicating that execution of the delta workflow results in being more prepared to meet the new goal; and
executing the delta workflow to facilitate achievement of the new goal.
15. A computer system of managing changes within an information technology (IT) environment, said computer system comprising:
a memory;
a processor in communications with the memory, wherein the computer system is configured to perform a method, said method comprising:
obtaining a change in a goal for an overall business application of the IT environment, the business application comprising a plurality of resources and one or more relationships between resources which provide the function of the business application, and the goal being a management goal associated with the plurality of resources used to support the business application, the management goal comprising one of an availability goal, a performance goal or other management goal for the business application, wherein the goal is to be changed to provide a new goal while continuing to enforce an existing goal;
generating a delta workflow to reflect one or more changes to the IT environment to enable achievement of the new goal, the delta workflow providing a programmatic difference between a current prepare workflow for the existing goal and a new prepare workflow for the new goal, the generating comprising:
traversing a list of operations for the new prepare workflow, wherein each operation is associated with a resource, and for an operation in the list of operations, determining whether the operation is in the current prepare workflow;
based on the operation not being in the current prepare workflow, checking whether the operation in the new prepare workflow supports a non-disruptive change, wherein the operation supports a non-disruptive change when the operation can be performed without impact to an existing state, and
based on the operation supporting a non-disruptive change, adding the operation to the delta workflow;
based on the operation being a disruptive change, the operation is not added to the delta workflow;
based on the operation being in the current prepare workflow, checking whether one or more of values and parameters for the operation in the new prepare workflow match the one or more values and parameters for the operation in the current prepare workflow;
based on the checking indicating a mismatch, determining whether the operation of the new prepare workflow is more stringent in being prepared to meet the new goal than the operation in the current prepare workflow is in being prepared to meet the new goal, and
 based on determining the operation of the new prepare workflow is more stringent for being prepared to meet the new goal, adding the operation of the new prepare workflow to the delta workflow, and
 based on determining the operation of the new prepare workflow is not more stringent in being prepared to meet the new goal, indicating that execution of the delta workflow results in being more prepared to meet the new goal; and
executing the delta workflow to facilitate achievement of the new goal.
10. A computer program product of managing changes within an information technology (IT) environment, said computer program product comprising:
a non-transitory computer readable storage medium readable by a processing circuit and storing instructions for execution by the processing circuit for performing a method comprising:
obtaining, by a processor, a change in a goal for an overall business application of the IT environment, the business application comprising a plurality of resources and one or more relationships between resources which provide the function of the business application, and the goal being a management goal associated with the plurality of resources used to support the business application, the management goal comprising one of an availability goal, a performance goal or other management goal for the business application, wherein the goal is to be changed to provide a new goal while continuing to enforce an existing goal;
generating, by the processor, a delta workflow to reflect one or more changes to the IT environment to enable achievement of the new goal, the delta workflow providing a programmatic difference between a current prepare workflow for the existing goal and a new prepare workflow for the new goal, the generating comprising:
traversing a list of operations for the new prepare workflow, wherein each operation is associated with a resource, and for an operation in the list of operations, determining whether the operation is in the current prepare workflow;
based on the operation not being in the current prepare workflow, checking whether the operation in the new prepare workflow supports a non-disruptive change, wherein the operation supports a non-disruptive change when the operation can be performed without impact to an existing state, and
based on the operation supporting a non-disruptive change, adding the operation to the delta workflow;
based on the operation being a disruptive change, the operation is not added to the delta workflow;
based on the operation being in the current prepare workflow, checking whether one or more of values and parameters for the operation in the new prepare workflow match the one or more values and parameters for the operation in the current prepare workflow;
based on the checking indicating a mismatch, determining whether the operation of the new prepare workflow is more stringent in being prepared to meet the new goal than the operation in the current prepare workflow is in being prepared to meet the new goal, and
 based on determining the operation of the new prepare workflow is more stringent for being prepared to meet the new goal, adding the operation of the new prepare workflow to the delta workflow, and
 based on determining the operation of the new prepare workflow is not more stringent in being prepared to meet the new goal, indicating that execution of the delta workflow results in being more prepared to meet the new goal; and
executing the delta workflow to facilitate achievement of the new goal.
2. The computer-implemented method of claim 1, further comprising:
determining whether the new prepare workflow is to be modified; and
based on determining the new prepare workflow is to be modified, modifying the new prepare workflow.
3. The computer-implemented method of claim 1, further comprising dividing operations in the delta workflow into a set of operations to be executed in advance of activating a policy to meet the new goal and a set of operations to be executed based on activating the policy.
4. The computer-implemented method of claim 1, wherein the goal comprises a quantifiable goal for the plurality of resources of the business application, the quantifiable goal being apportioned among the plurality of resources of the business application.
5. The computer-implemented method of claim 1, wherein the business application is represented by a Recovery Segment, and wherein the goal is associated with the Recovery Segment and is used in managing the business application.
6. The computer-implemented method of claim 1, further comprising subsequent to executing the delta workflow, assessing whether the delta workflow completed successfully, and based on completing successfully providing an option of making the new goal a current existing goal.
7. The computer-implemented method of claim 6, wherein based on the delta workflow completing unsuccessfully, initiating an undo process to undo changes of the delta workflow.
8. The computer-implemented method of claim 1, further comprising evaluating achievability of the new goal.
9. The computer-implemented method of claim 1, further comprising determining an ordering of operations and any dependent operations in the delta workflow.
11. The computer program product of claim 10, wherein the method further comprises:
determining whether the new prepare workflow is to be modified; and
based on determining the new prepare workflow is to be modified, modifying the new prepare workflow.
12. The computer program product of claim 10, wherein the method further comprises dividing operations in the delta workflow into a set of operations to be executed in advance of activating a policy to meet the new goal and a set of operations to be executed based on activating the policy.
13. The computer program product of claim 10, wherein the method further comprises subsequent to executing the delta workflow, assessing whether the delta workflow completed successfully, and based on completing successfully providing an option of making the new goal a current existing goal.
14. The computer program product of claim 13, wherein based on the delta workflow completing unsuccessfully, initiating an undo process to undo changes of the delta workflow.
16. The computer program product of claim 10, further comprising determining an ordering of operations and any dependent operations in the delta workflow.
17. The computer system of claim 15, wherein the method further comprises:
determining whether the new prepare workflow is to be modified; and
based on determining the new prepare workflow is to be modified, modifying the new prepare workflow.
18. The computer system of claim 15, wherein the method further comprises dividing operations in the delta workflow into a set of operations to be executed in advance of activating a policy to meet the new goal and a set of operations to be executed based on activating the policy.
19. The computer system of claim 15, wherein the method further comprises subsequent to executing the delta workflow, assessing whether the delta workflow completed successfully, and based on completing successfully providing an option of making the new goal a current existing goal.
20. The computer system of claim 15, further comprising determining an ordering of operations and any dependent operations in the delta workflow.

This invention relates, in general, to managing customer environments to provide support for business resiliency, and in particular, to non-disruptively changing the environment based on detected changes in management policy.

Today, customers attempt to manually manage and align their availability management with their information technology (IT) infrastructure. Changes in either business needs or the underlying infrastructure are often not captured in a timely manner and require considerable rework, leading to an inflexible environment.

Often high availability solutions and disaster recovery technologies are handled via a number of disparate point products that target specific scopes of failure, platforms or applications. Integrating these solutions into an end-to-end solution is a complex task left to the customer, with results being either proprietary and very specific, or unsuccessful.

Customers do not have the tools and infrastructure in place to customize their availability management infrastructure to respond to failures in a way that allows for a more graceful degradation of their environments. As a result, more drastic and costly actions may be taken (such as a site switch) when other options (such as disabling a set of applications or users) could have been offered, depending on business needs.

Coordination across availability management and other systems management disciplines is either nonexistent or accomplished via non-reusable, proprietary, custom technology.

There is little predictability as to whether the desired recovery objective will be achieved, prior to time of failure. There are only manual, labor intensive techniques to connect recovery actions with the business impact of failures and degradations.

Any change in the underlying application, technologies, business recovery objectives, resources or their interrelationships require a manual assessment of impact to the hand-crafted recovery scheme.

Based on the foregoing, a need exists for a capability to facilitate management of an IT environment. In particular, a need exists for a capability that enables the environment to be changed non-disruptively, in response to detected changes in management policy.

The shortcomings of the prior art are overcome and additional advantages are provided through the provision of a computer-implemented method to manage changes within an Information Technology environment. The method includes, for instance, determining one or more changes to be made to the IT environment, in response to a change in goal associated with a business application of the IT environment; and non-disruptively effecting the one or more changes to be made to the IT environment, wherein the non-disruptively effecting comprises continuing to manage to an existing goal of the business application.

Computer program products and systems relating to one or more aspects of the present invention are also described and claimed herein.

Additional features and advantages are realized through the techniques of the present invention. Other embodiments and aspects of the invention are described in detail herein and are considered a part of the claimed invention.

One or more aspects of the present invention are particularly pointed out and distinctly claimed as examples in the claims at the conclusion of the specification. The foregoing and other objects, features, and advantages of the invention are apparent from the following detailed description taken in conjunction with the accompanying drawings in which:

FIG. 1 depicts one embodiment of a processing environment to incorporate and use one or more aspects of the present invention;

FIG. 2 depicts another embodiment of a processing environment to incorporate and use one or more aspects of the present invention;

FIG. 3 depicts yet a further embodiment of a processing environment to incorporate and use one or more aspects of the present invention;

FIG. 4 depicts one embodiment of a Business Resilience System used in accordance with an aspect of the present invention;

FIG. 5A depicts one example of a screen display of a business resilience perspective, in accordance with an aspect of the present invention;

FIG. 5B depicts one example of a screen display of a Recovery Segment, in accordance with an aspect of the present invention;

FIG. 6A depicts one example of a notification view indicating a plurality of notifications, in accordance with an aspect of the present invention;

FIG. 6B depicts one example of a notification message sent to a user, in accordance with an aspect of the present invention;

FIG. 7 depicts one example of a Recovery Segment of the Business Resilience System of FIG. 4, in accordance with an aspect of the present invention;

FIG. 8A depicts examples of key Recovery Time Objective properties for a particular resource, in accordance with an aspect of the present invention;

FIG. 8B depicts one example in which Recovery Time Objective properties collectively form an observation of a Pattern System Environment, in accordance with an aspect of the present invention;

FIGS. 9A-9C depict one embodiment of the logic to manage a non-disruptive goal policy change, in accordance with an aspect of the present invention;

FIGS. 10A-10B depict one embodiment of the logic to generate a delta workflow used in accordance with an aspect of the present invention; and

FIG. 11 depicts one embodiment of a computer program product incorporating one or more aspects of the present invention.

In managing a customer's environment, such as its business environment, there is a set of requirements unaddressed by existing technology, which causes unpredictable down time, large impact failures and recoveries, and significant extra labor cost, with resulting loss of business revenue. These requirements include, for instance:

The above set of requirements is addressed, however, by a Business Resiliency (BR) Management System, of which one or more aspects of the present invention are included. The Business Resiliency Management System provides, for instance:

One goal of the BR system is to allow customers to align their supporting information technology systems with their business goals for handling failures of various scopes, and to offer a continuum of recovery services from finer grained process failures to broader scoped site outages. The BR system is built around the idea of identifying the components that constitute a business function, and identifying successive levels of recovery that lead to more complex constructs as the solution evolves. The various recovery options are connected by an overall BR management capability that is driven by policy controls.

Various characteristics of one embodiment of a BR system include:

A Business Resilience System is capable of being incorporated in and used by many types of environments. One example of a processing environment to incorporate and use aspects of a BR system, including one or more aspects of the present invention, is described with reference to FIG. 1.

Processing environment 100 includes, for instance, a central processing unit (CPU) 102 coupled to memory 104 and executing an operating system 106. Examples of operating systems include AIX® and z/OS®, offered by International Business Machines Corporation; Linux; etc. AIX® and z/OS® are registered trademarks of International Business Machines Corporation, Armonk, N.Y., U.S.A. Other names used herein may be registered trademarks, trademarks or product names of International Business Machines Corporation or other companies.

The operating system manages execution of a Business Resilience Runtime Component 108 of a Business Resilience System, described herein, and one or more applications 110 of an application container 112.

As examples, processing environment 100 includes an IBM® System z™ processor or a pSeries® server offered by International Business Machines Corporation; a Linux server; or other servers, processors, etc. Processing environment 100 may include more, less and/or different components than described herein. (pSeries® is a registered trademark of International Business Machines Corporation, Armonk, N.Y., USA).

Another example of a processing environment to incorporate and use aspects of a BR System, including one or more aspects of the present invention, is described with reference to FIG. 2.

As shown, a processing environment 200 includes for instance, a central processing complex 202 coupled to an input/output (I/O) subsystem 204. Central processing complex 202 includes, for instance, a central processing unit 206, memory 208, an operating system 210, a database management system 212, a Business Resilience Runtime Component 214, an application container 216 including one or more applications 218, and an I/O facility 220.

I/O facility 220 couples central processing complex 202 to I/O subsystem 204 via, for example, a dynamic switch 230. Dynamic switch 230 is coupled to a control unit 232, which is further coupled to one or more I/O devices 234, such as one or more direct access storage devices (DASD).

Processing environments 100 and/or 200 may include, in other embodiments, more, less and/or different components.

In yet another embodiment, a central processing complex 300 (FIG. 3) further includes a network service 302, which is used to couple a central processing complex 300 to a processing environment 304 via a network subsystem 306.

For example, network service 302 of central processing complex 300 is coupled to a switch 308 of network subsystem 306. Switch 308 is coupled to a switch 310 via routers 312 and firewalls 314. Switch 310 is further coupled to a network service 316 of processing environment 304.

Processing environment 304 further includes, for instance, a central processing unit 320, a memory 322, an operating system 324, and an application container 326 including one or more applications 328. In other embodiments, it can include more, less and/or different components.

Moreover, CPC 300 further includes, in one embodiment, a central processing unit 330, a memory 332, an operating system 334, a database management system 336, a Business Resilience Runtime Component 338, an application container 340 including one or more applications 342, and an I/O facility 344. It also may include more, less and/or different components.

I/O facility 344 is coupled to a dynamic switch 346 of an I/O subsystem 347. Dynamic switch 346 is further coupled to a control unit 348, which is coupled to one or more I/O devices 350.

Although examples of various environments are provided herein, these are only examples. Many variations to the above environments are possible and are considered within the scope of the present invention.

In the above-described environments, a Business Resilience Runtime Component of a Business Resilience System is included. Further details associated with a Business Resilience Runtime Component and a Business Resilience System are described with reference to FIG. 4.

In one example, a Business Resilience System 400 is a component that represents the management of recovery operations and configurations across an IT environment. Within that Business Resilience System, there is a Business Resilience Runtime Component (402) that represents the management functionality across multiple distinct Recovery Segments, and provides the service level automation and the support of creation of the recovery sequences. In addition, there are user interface (404), administration (406), installation (408) and configuration template (410) components within the Business Resilience System that enable the administrative operations that are to be performed. Each of these components is described in further detail below.

Business Resilience Runtime Component 402 includes a plurality of components of the BR System that are directly responsible for the collection of observations, creation of PSEs, policy acceptance, validation, error detection, and formulation of recovery sequences. As one example, Business Resilience Runtime Component 402 includes the following components:

In addition to the Business Resilience Runtime Component of the BR system, the BR system includes the following components, previously mentioned above.

The user interface, admin mailbox, install logic and/or template components can be part of the same computing unit executing BR Runtime or executed on one or more other distributed computing units.

To further understand the use of some of the above components and their interrelationships, the following example is offered. This example is only offered for clarification purposes and is not meant to be limiting in any way.

Referring to FIG. 7, a Recovery Segment RS 700 is depicted. It is assumed for this Recovery Segment that:

Rule Resource #1 State Resource #2 State
1 App-A Degraded RS Degraded
2 App-A Unavailable RS Unavailable
3 DB2 Degraded CICS Unavailable
4 CICS Unavailable App-A Unavailable
5 CICS Degraded App-A Degraded
6 OSStorage-1 Unavailable CICS Degraded
7 OSStorage-1 Unavailable Storage Copy Set Degraded
8 DB2 User & Degraded DB2 Degraded
Log Data
9 OSStorage-2 Unavailable DB2 User & Degraded
Log Data
10 z/OS Unavailable CICS Unavailable
11 z/OS Unavailable DB2 Unavailable
12 Storage Copy Set Degraded CICS User & Degraded
Log Data
13 Storage Copy Set Degraded DB2 User & Degraded
Log Data

As a result of these conditions leading up to runtime, the following subscriptions have already taken place:

These steps highlight one example of an error detection process:

Resource Reason
OSStorage-1 Unavailable
Storage Copy Set Degraded
CICS User & Log Data Degraded
DB2 User & Log Data Degraded
DB2 Degraded
App-A Unavailable
CICS Unavailable
RS Unavailable

Resource State
OSStorage-1 Unavailable
Storage Copy Set Degraded
CICS User & Log Data Degraded
DB2 User & Log Data Degraded
DB2 Degraded
App-A Unavailable
CICS Unavailable
RS Unavailable

In addition to the above, BR includes a set of design points that help in the understanding of the system. These design points include, for instance:

Goal Policy Support

BR is targeted towards goal based policies—the customer configures his target availability goal, and BR determines the preparatory actions and recovery actions to achieve that goal (e.g., automatically).

Availability management of the IT infrastructure through goal based policy is introduced by this design. The BR system includes the ability to author and associate goal based availability policy with the resource Recovery Segments described herein. In addition, support is provided to decompose the goal policy into configuration settings, preparatory actions and runtime procedures in order to execute against the deployed availability goal. In one implementation of the BR system, the Recovery Time Objective (RTO—time to recover post outage) is a supported goal policy. Additional goal policies of data currency (e.g., Recovery Point Objective) and downtime maximums, as well as others, can also be implemented with the BR system. Recovery Segments provide the context for association of goal based availability policies, and are the scope for goal policy expression supported in the BR design. The BR system manages the RTO through an understanding of historical information, metrics, recovery time formulas (if available), and actions that affect the recovery time for IT resources.

RTO goals are specified by the customer at a Recovery Segment level and apportioned to the various component resources grouped within the RS. In one example, RTO goals are expressed as units of time intervals, such as seconds, minutes, and hours. Each RS can have one RTO goal per Pattern System Environment associated with the RS. Based on the metrics available from the IT resources, and based on observed history and/or data from the customer, the RTO goal associated with the RS is evaluated for achievability, taking into account which resources are able to be recovered in parallel.

Based on the RTO for the RS, a set of preparatory actions expressed as a workflow is generated. This preparatory workflow configures the environment or makes alterations in the current configuration, to achieve the RTO goal or to attempt to achieve the goal.

In terms of optimizing RTO, there are tradeoffs associated with the choices that are possible for preparatory and recovery actions. Optimization of recovery choice is performed by BR, and may include interaction at various levels of sophistication with IT resources. In some cases, BR may set specific configuration parameters that are surfaced by the IT resource to align with the stated RTO. In other cases, BR may request that an IT resource itself alter its management functions to achieve some portion of the overall RS RTO. In either case, BR aligns availability management of the IT resources contained in the RS with the stated RTO.

Metrics and Goal Association

In this design, as one example, there is an approach to collecting the required or desired metrics data, both observed and key varying factors, system profile information that is slow or non-moving, as well as potential formulas that reflect a specific resource's use of the key factors in assessing and performing recovery and preparatory actions, historical data and system information. The information and raw metrics that BR uses to perform analysis and RTO projections are expressed as part of the IT resources, as resource properties. BR specific interpretations and results of statistical analysis of key factors correlated to recovery time are kept as BR Specific Management data (BRMD).

Relationships Used by BR, and BR Specific Resource Pairing Information

BR maintains specific information about the BR management of each resource pairing or relationship between resources. Information regarding the BR specific data for a resource pairing is kept by BR, including information such as ordering of operations across resources, impact assessment information, operation effect on availability state, constraint analysis of actions to be performed, effects of preparatory actions on resources, and requirements for resources to co-locate or anti-co-locate.

Evaluation of Failure Scope

One feature of the BR function is the ability to identify the scope and impact of a failure. The BR design uses a Containment Region to identify the resources affected by an incident. The Containment Region is initially formed with a fairly tight restriction on the scope of impact, but is expanded on receiving errors related to the first incident. The impact and scope of the failure is evaluated by traversing the resource relationships, evaluating information on BR specific resource pairing information, and determining most current state of the resources impacted.

Generation and Use of Workflow

Various types of preparatory and recovery processes are formulated and in some cases, optionally initiated. Workflows used by BR are dynamically generated based on, for instance, customer requirements for RTO goal, based on actual scope of failure, and based on any configuration settings customers have set for the BR system.

A workflow includes one or more operations to be performed, such as Start CICS, etc. Each operation takes time to execute and this amount of time is learned based on execution of the workflows, based on historical data in the observation log or from customer specification of execution time for operations. The workflows formalize, in a machine readable, machine editable form, the operations to be performed.

In one example, the processes are generated into Business Process Execution Language (BPEL) compliant workflows with activities that are operations on IT resources or specified manual, human activities. For example, BRM automatically generates the workflows in BPEL. This automatic generation includes invoking routines to insert activities to build the workflow, or forming the activities and building the XML (Extensible Mark-Up Language). Since these workflows are BPEL standard compliant, they can be integrated with other BPEL defined workflows which may incorporate manual activities performed by the operations staff. These BR related workflows are categorized as follows, in one example:

Since the set of BR actions described above modify existing IT environments, visibility to the actions that are taken by BR prior to the actual execution is provided. To gain trust in the decisions and recommendations produced by BR, the BR System can run in ‘advisory mode’. As part of advisory mode, the possible actions that would be taken are constructed into a workflow, similar to what would be done to actually execute the processes. The workflows are then made visible through standard workflow authoring tooling for customers to inspect or modify. Examples of BPEL tooling include:

BR tooling spans the availability management lifecycle from definition of business objectives, IT resource selection, availability policy authoring and deployment, development and deployment of runtime monitors, etc. In one example, support for the following is captured in the tooling environment for the BR system:

The policy lifecycle for BR goal policies, such as RTO goals, includes, for example:

One of the points in determining operational state of a Recovery Segment is that this design allows for customers to configure a definition of specific ‘aggregated’ states, using properties of individual IT resources. A Recovery Segment is an availability management context, in one example, which may include a diverse set of IT resources.

The customer may provide the rules logic used within the Recovery Segment to consume the relevant IT resource properties and determine the overall state of the RS (available, degraded and unavailable, etc). The customer can develop and deploy these rules as part of the Recovery Segment availability policy. For example, if there is a database included in the Recovery Segment, along with the supporting operating system, storage, and network resources, a customer may configure one set of rules that requires that the database must have completed the recovery of in-flight work in order to consider the overall Recovery Segment available. As another example, customers may choose to configure a definition of availability based on transaction rate metrics for a database, so that if the rate falls below some value, the RS is considered unavailable or degraded, and evaluation of ‘failure’ impact will be triggered within the BR system. Using these configurations, customers can tailor both the definitions of availability, as well as the rapidity with which problems are detected, since any IT resource property can be used as input to the aggregation, not just the operational state of IT resources.

Failure During Workflow Sequences of Preparatory, Recovery, Preventive

Failures occurring during sequences of operations executed within a BPEL compliant process workflow are intended to be handled through use of BPEL declared compensation actions, associated with the workflow activities that took a failure. The BR System creates associated “undo” workflows that are then submitted to compensate, and reset the environment to a stable state, based on where in the workflow the failure occurred.

Customer Values

The following set of customer values, as examples, are derived from the BR system functions described above, listed here with supporting technologies from the BR system:

Management of the IT environment is adaptively performed, as described herein and in a U.S. patent application “Adaptive Business Resiliency Computer System for Information Technology Environments,” U.S. Ser. No. 11/966,195, Bobak et al., co-filed herewith, which is hereby incorporated herein by reference in its entirety.

Many different sequences of activities can be undertaken in creating a BR environment. The following represents one possible sequence; however, many other sequences are possible. This sequence is provided merely to facilitate an understanding of a BR system and one or more aspects of the present invention. This sequence is not meant to be limiting in any way. In the following description, reference is made to various U.S. patent applications, which are co-filed herewith.

On receiving the BR and related product offerings, an installation process is undertaken. Subsequent to installation of the products, a BR administrator may define the configuration for BR manager instances with the aid of BRM configuration templates.

Having defined the BRM configuration a next step could be to define Recovery Segments as described in “Recovery Segments for Computer Business Applications,” U.S. Ser. No. 11/965,855, Bobak et al., which is hereby incorporated herein by reference in its entirety.

Definition of a RS may use a representation of resources in a topology graph as described in “Use of Graphs in Managing Computing Environments,” U.S. Ser. No. 11/965,906, Bobak et al., which is hereby incorporated herein by reference in its entirety.

It is expected that customers will enable BR operation in “observation” mode for a period of time to gather information regarding key metrics and operation execution duration associated with resources in a RS.

At some point, sufficient observation data will have been gathered or a customer may have sufficient knowledge of the environment to be managed by BR. A series of activities may then be undertaken to prepare the RS for availability management by BR. As one example, the following steps may be performed iteratively.

A set of functionally equivalent resources may be defined as described in “Use of Redundancy Groups in Runtime Computer Management of Business Applications,” U.S. Ser. No. 11/965,877, Bobak et al., which is hereby incorporated herein by reference in its entirety.

Specification of the availability state for individual resources, redundancy groups and Recovery Segments may be performed as described in “Use of Multi-Level State Assessment in Computer Business Environments,” U.S. Ser. No. 11/965,832, Bobak et al., which is hereby incorporated herein by reference in its entirety.

Representations for the IT environment in which BR is to operate may be created from historical information captured during observation mode, as described in “Computer Pattern System Environment Supporting Business Resiliency,” U.S. Ser. No. 11/965,851, Bobak et al., which is hereby incorporated herein by reference in its entirety. These definitions provide the context for understanding how long it takes to perform operations which change the configuration—especially during recovery periods.

Information on relationships between resources may be specified based on recommended best practices—expressed in templates—or based on customer knowledge of their IT environment as described in “Conditional Computer Runtime Control of an Information Technology Environment Based on Pairing Constructs,” U.S. Ser. No. 11/965,874, Bobak et al., which is hereby incorporated herein by reference in its entirety. Pairing processing provides the mechanism for reflecting required or desired order of execution for operations, the impact of state change for one resource on another, the effect execution of an operation is expected to have on a resource state, desire to have one subsystem located on the same system as another and the effect an operation has on preparing the environment for availability management.

With preliminary definitions in place, a next activity of the BR administrator might be to define the goals for availability of the business application represented by a Recovery Segment as described in “Programmatic Validation in an Information Technology Environment,” U.S. Ser. No. 11/966,619, Bobak et al., which is hereby incorporated herein by reference in its entirety.

Managing the IT environment to meet availability goals includes having the BR system prioritize internal operations. The mechanism utilized to achieve the prioritization is described in “Serialization in Computer Management,” U.S. Ser. No. 11/965,978, Bobak et al., which is hereby incorporated herein by reference in its entirety.

Multiple operations are performed to prepare an IT environment to meet a business application's availability goal or to perform recovery when a failure occurs. The BR system creates workflows to achieve the required or desired ordering of operations, as described in “Dynamic Generation of Processes in Computing Environments,” U.S. Ser. No. 11/965,894, Bobak et al., which is hereby incorporated herein by reference in its entirety.

A next activity in achieving a BR environment might be execution of the ordered set of operations used to prepare the IT environment, as described in “Dynamic Selection of Actions in an Information Technology Environment,” U.S. Ser. No. 11/965,951, Bobak et al., which is hereby incorporated herein by reference in its entirety.

Management by BR to achieve availability goals may be initiated, which may initiate or continue monitoring of resources to detect changes in their operational state, as described in “Real-Time Information Technology Environments,” U.S. Ser. No. 11/965,930, Bobak et al., which is hereby incorporated herein by reference in its entirety. Monitoring of resources may have already been initiated as a result of “observation” mode processing.

Changes in resource or redundancy group state may result in impacting the availability of a business application represented by a Recovery Segment. Analysis of the environment following an error is performed. The analysis allows sufficient time for related errors to be reported, insures gathering of resource state completes in a timely manner and insures sufficient time is provided for building and executing the recovery operations—all within the recovery time goal, as described in “Management Based on Computer Dynamically Adjusted Discrete Phases of Event Correlation,” U.S. Ser. No. 11/965,838, Bobak et al., which is hereby incorporated herein by reference in its entirety.

A mechanism is provided for determining if events impacting the availability of the IT environment are related, and if so, aggregating the failures to optimally scope the outage, as described in “Management of Computer Events in a Computer Environment,” U.S. Ser. No. 11/965,902, Bobak et al., which is hereby incorporated herein by reference in its entirety.

Ideally, current resource state can be gathered after scoping of a failure. However, provisions are made to insure management to the availability goal is achievable in the presence of non-responsive components in the IT environment, as described in “Managing the Computer Collection of Information in an Information Technology Environment,” U.S. Ser. No. 11/965,917, Bobak et al., which is hereby incorporated herein by reference in its entirety.

With the outage scoped and current resource state evaluated, the BR environment can formulate an optimized recovery set of operations to meet the availability goal, as described in “Defining a Computer Recovery Process that Matches the Scope of Outage,” U.S. Ser. No. 11/965,862, Bobak et al., which is hereby incorporated herein by reference in its entirety.

Formulation of a recovery plan is to uphold customer specification regarding the impact recovery operations can have between different business applications, as described in “Managing Execution Within a Computing Environment,” U.S. Ser. No. 11/965,913, Bobak et al., which is hereby incorporated herein by reference in its entirety.

Varying levels of recovery capability exist with resources used to support a business application. Some resources possess the ability to perform detailed recovery actions while others do not. For resources capable of performing recovery operations, the BR system provides for delegation of recovery if the resource is not shared by two or more business applications, as described in “Conditional Actions Based on Runtime Conditions of a Computer System Environment,” U.S. Ser. No. 11/965,897, Bobak et al., which is hereby incorporated herein by reference in its entirety.

Having evaluated the outage and formulated a set of recovery operations, the BR system resumes monitoring for subsequent changes to the IT environment.

In support of mainline BR system operation, there are a number of activities including, for instance:

In order to build a BR environment that meets recovery time objectives, IT configurations within a customer's location are to be characterized and knowledge about the duration of execution for recovery time operations within those configurations is to be gained. IT configurations and the durations for operation execution vary by time, constituent resources, quantity and quality of application invocations, as examples. Customer environments vary widely in configuration of IT resources in support of business applications. Understanding the customer environment and the duration of operations within those environments aids in insuring a Recovery Time Objective is achievable and in building workflows to alter the customer configuration of IT resources in advance of a failure and/or when a failure occurs.

A characterization of IT configurations within a customer location is built by having knowledge of the key recovery time characteristics for individual resources (i.e., the resources that are part of the IT configuration being managed; also referred to as managed resources). Utilizing the representation for a resource, a set of key recovery time objective (RTO) metrics are specified by the resource owner. During ongoing operations, the BR manager gathers values for these key RTO metrics and gathers timings for the operations that are used to alter the configuration. It is expected that customers will run the BR function in “observation” mode prior to having provided a BR policy for availability management or other management. While executing in “observation” mode, the BR manager periodically gathers RTO metrics and operation execution durations from resource representations. The key RTO metrics properties, associated values and operation execution times are recorded in an Observation log for later analysis through tooling. Key RTO metrics and operation execution timings continue to be gathered during active BR policy management in order to maintain currency and iteratively refine data used to characterize customer IT configurations and operation timings within those configurations.

Examples of RTO properties and value range information by resource type are provided in the below table. It will be apparent to those skilled in the art that additional, less, and/or different resource types, properties and/or value ranges may be provided.

Resource Type Property Value Range
Operating System Identifier Text
State Ok, stopping, planned stop,
stopped, starting, error, lost
monitoring capability, unknown
Memory Size Units in MB
Number of systems in sysplex, if integer
applicable
Last IPL time of day Units in time of day/clock
Type of last IPL Cold, warm, emergency
Total Real Storage Available Units in MB
GRS Star Mode Yes or No
Complete IPL time to reach Units of elapsed time
‘available’
Total CPU using to reach Units of elapsed time
available during IPL
Total CPU delay to reach Units of elapsed time
available during IPL
Total Memory using to reach Units in MB
available during IPL
Total Memory delay to reach Units of elapsed time
available during IPL
Total i/o requests Integer value, number of requests
Total i/o using to reach available Units of elapsed time
during IPL
Total i/o delay to reach available Units of elapsed time
during IPL
Computer System (LPAR, Identifier Text
Server, etc.)
State Ok, stopping, stopped, planned
down, starting, error, lost
monitoring capability, unknown
Type of CPU - model, type, Text value
serial
Number of CPUs integer
Number of shared processors integer
Number of dedicated processors integer
Last Activate Time of Day Units in time of day/clock
Network Components
Group of Network Connections Identity
Operational State Ok, Starting, Disconnected,
Stopping, Degraded, Unknown
State of each associated Network Text
Application Connection
Performance Stats on loss and Complex
delays
Recovery Time for any Units in elapsed time
associated application network
connections
Number of active application Integer
network connections associated
at time of network problem
Stopped Time/duration for Units in elapsed time
group of connectoins
Maximum Network Recovery Units in elapsed time
Time for any application
connection in group
Maximum Number of active Integer
connections at time of network
problem encountered, for any
application connection in group
Maximum Number of Integer
connections processed at time of
network recovery, for the group
of connections
Maximum network connection Units in elapsed time
recovery time/duration for any
application connection in the
group
Maximum Number of Integer
connections dropped at time of
application network connection
recovery, for any application
connection in the group
Network Application Connection Identity Text
State Ok, Stopping, Degraded, Error,
Unknown
Configuration Settings Complex
Associated TCP/IP Parameter Text
Settings
Requirement Policies QoS or BR policies
Performance Statistics, rules, Complex
service class, number of active
Network OS services
State update Interval Units of elapsed time
Last restart time of day Units in time of day/clock
Last Restart Time/Duration Units in elapsed time
Network Recovery Time for app Units in elapsed time
connection
Number of active connections at Integer
time of network problem
encountered, on a per app
connection basis
Number of connections Integer
processed at time of network
recovery, for the app connection
application network connection Units in elapsed time
recovery time/duration
Number of connections at time of Integer
application network connection
problem encountered
Number of connections Integer
processed at time of application
network connection recovery
Number of connections dropped Integer
at time of application network
connection recovery
Network Host Connection Identity Text
State Ok, Stopping, Degraded, Error,
Unknown
Configuration Settings Complex
Associated TCP/IP Parameter Text
Settings
Requirement Policies QoS or BR policies
Performance Statistics, rules, Complex
service class, number of active
Network OS services
State update Interval Units of elapsed time
Last restart time of day Units in time of day/clock
Last Restart Time/Duration Units in elapsed time
Number of QoS Events, Integer
indicating potential degradation
Number of QoS Events handled, Integer
Last handled QoS Event Text
Database Subsystem Name, identifier Text
Operational State Operational, Nonoperational,
starting, stopping, in recovery,
log suspended, backup initiated,
restore initiated, restore
complete, in checkpoint,
checkpoint completed, applying
log, backing out inflights,
resolving indoubts, planned
termination, lost monitoring
capability
Time spent in log apply Units of elapsed time
Time spent during inflight Units of elapsed time
processing
Time spent during indoubt Units of elapsed time
processing
Total time to restart Units of elapsed time
Checkpoint frequency Units of time
Backout Duration Number of records to read back
in log during restart processing
CPU Used during Restart Units of elapsed time
CPU Delay during Restart Units of elapsed time
Memory Used during Restart Units in MB
Memory Delay during Restart Units of elapsed time
I/O Requests during restart Integer value of number of
requests
I/O using during restart Units of elapsed time
I/O Delay during restart Units of elapsed time
Database Datasharing Group Identifer Text
Operational State Operational, nonoperational,
degraded (some subset of
members non operational), lost
monitoring capability
Number of locks in Shared Integer value
Facility
Time spent in lock cleanup for Elapsed time value
last restart
Database Identifier Text
Tablespace Identifier Text
Transaction Region Identifier Text
Name Text
Associated job name Text
Maximum number of tasks/ Integer value
threads
Restart type for next restart Warm, cold, emergency
Forward log name Text
System log name Text
Operational State Operational, nonoperational, in
recovery, starting, stop normal
first quiesce, stop normal second
quiesce, stop normal third
quiesce
Time spent in log apply Units of elapsed time
Time during each recovery stage Units of elapsed time
Total time to restart Units of elapsed time
CPU Used during Restart Units of elapsed time
CPU Delay during Restart Units of elapsed time
Memory Used during Restart Units in MB
Memory Delay during Restart Units of elapsed time
I/O Requests during restart Integer value of number of
requests
I/O connect time during restart Units of elapsed time
I/O Delay during restart Units of elapsed time
System Logsize Units in MB
Forward Logsize Units in MB
Activity Keypoint frequency Integer - number of writes before
activity checkpoint taken
Average Transaction Rate for Number of transactions per
this region second, on average
Transaction Group Group name Text
Transaction Region File Filename Text
Region Name Text
Dataset Name Text
Operational State Operational/enabled,
nonoperational/disabled
Open status Open, closed, closing
Transaction Identifier Text
Operational State Running, failed, shunted, retry in
progress
Region Name (s) that can run this Text
transaction
Program Name Text
Logical Replication Group of Identity Text
related datasets
State
Required currency characteristics Complex
for datasets
Required consistency Complex
characteristics for datasets
Replication Group Identity
State
Replication Session Identity
State Established, in progress
replication, replication successful
complete
Type of Session Flash copy, metro mirror, etc.
Duration of last replication Units in elapsed time
Time of Day for last replication Units in time of day/clock
Amount of data replicated at last Units in MB
replication
Roleset Identity Text
State
CopySet Identity Text
State
Dataset Identity Text
State Open, Closed
Storage Group Identity Text
State
Storage Volume Identity Text
State Online, offline, boxed, unknown
Logical Storage Subsystem Identity Text
State
Storage Subsystem Identity Text
State
Subsystem I/O Velocity - ratio of
time channels are being used
Replication Link (Logical) Identity Text
between Logical Subsystems
State Operational, nonoperational,
degraded redundancy
Number of configured pipes Integer
Number of operational pipes Integer

A specific example of key RTO properties for a z/OS® image is depicted in FIG. 8A. As shown, for a z/OS® image 800, the following properties are identified: GRS mode 802, CLPA? (i.e., Was the link pack area page space initialized?) 804, I/O bytes moved 806, real memory size 808, # CPs 810, CPU speed 812, and CPU delay 814, as examples.

The z/OS® image has a set of RTO metrics associated therewith, as described above. Other resources may also have its own set of metrics. An example of this is depicted in FIG. 8B, in which a Recovery Segment 820 is shown that includes a plurality of resources 822a-m, each having its own set of metrics 824a-m, as indicated by the shading.

Further, in one example, the RTO properties from each of the resources that are part of the Recovery Segment for App A have been gathered by BR and formed into an “observation” for recording to the Observation log, as depicted at 850.

Resources have varying degrees of functionality to support RTO goal policy. Such capacity is evaluated by BR, and expressed in resource property RTOGoalCapability in the BRMD entry for the resource. Two options for BR to receive information operation execution timings are: use of historical data or use of explicitly customer configured data. If BR relies on historical data to make recovery time projections, then before a statistically meaningful set of data is collected, this resource is not capable of supporting goal policy. A mix of resources can appear in a given RS—some have a set of observations that allow classification of the operation execution times, and others are explicitly configured by the customer.

Calculation of projected recovery time can be accomplished in two ways, depending on customer choice: use of historical observations or use of customers input timings. The following is an example of values for the RTOGoalCapability metadata that is found in the BRMD entry for the resource that indicates this choice:

UseHistoricalObservations The resource has a collection of statistically
meaningful observations of recovery time,
where definition of ‘statistically valid’ is
provided on a resource basis, as default by
BR, but tailorable by customers
UseCustomerInputTimings The customer can explicitly set the
operation timings for a resource

If the customer is in observation mode, then historical information is captured, regardless of whether the customer has indicated use of explicitly input timings or use of historical information.

The administrator can alter, on a resource basis, which set of timings BR is to use. The default is to use historical observations. In particular, a change source of resource timing logic is provided that alters the source that BR uses to retrieve resource timings. The two options for retrieving timings are from observed histories or explicitly from admin defined times for operation execution. The default uses information from the observed histories, gathered from periodic polls. If the customer defines times explicitly, the customer can direct BR to use those times for a given resource. If activated, observation mode continues and captures information, as well as running averages, and standard deviations. The impact to this logic is to alter the source of information for policy validation and formulation of recovery plan.

With respect to the historical observations, there may be a statistically meaningful set of observations to verify. The sample size should be large enough so that a time range for each operation execution can be calculated, with a sufficient confidence interval. The acceptable number of observations to qualify as statistically meaningful, and the desired confidence interval are customer configurable using BR UI, but provided as defaults in the BRMD entry for the resource. The default confidence interval is 95%, in one example.

There are metrics from a resource that are employed by BR to enable and perform goal management. These include, for instance:

Metric Qualification
Last observed recovery/restart time In milliseconds;
or alternately specifying units to use in calculations
The key factors and associated Captured at last observed recovery time, and capturable
values of the resource that affect at a point in time by BR
recovery time
The key factors and associated Captured at last observed recovery time, and capturable
values of the resource that affect at a point in time by BR
other dependent resources’ recovery
times
Observed time interval from ‘start’ If there are various points in the resource recovery
state to each ‘non-blocking’ state lifecycle at which it becomes non-blocking to other
resources which depend upon it, then:
Observed time interval from ‘start’ state to each
‘non-blocking’ state
Resource Consumption Information If the resource can provide information about its
consumption, or the consumption of dependent
resources, on an interval basis, then BR will use this
information in forming PSEs and classifying timings.
One example of this is: cpu, i/o, memory usage
information that is available from zOS WLM for an
aggregation of processes/address spaces over a given
interval.

There is also a set of information about the resource that is employed—this information is provided as defaults in the BRMD entry for the resource, but provided to the BR team in the form of best practices information/defaults by the domain owners:

In addition to the resources defined herein as part of the IT configuration that is managed, there are other resources, referred to herein as assessed resources. Assessed resources are present primarily to provide observation data for PSE formation, and to understand impact(s) on managed resources. They do not have a decomposed RTO associated with them nor are they acted on for availability by BR. Assessed resources have the following characteristics, as examples:

Similarly, there are likely scenarios where a resource exists in a customer environment that already has an alternative availability management solution, and does not require BR for its availability. However, since other resources that are managed by BR may be dependent on them, they are observed and assessed in order to collect observation data and understand their impacts on managed resources. Additionally, there may be resources that do not have alternative management solutions, but the customer simply does not want them managed by BR, but other managed resources are dependent upon them. They too are classified as assessed resources.

These assessed resources share many of the same characteristics of managed resources, such as, for example:

Finally, there are a few restrictions that BR imposes upon assessed resources, in this embodiment:

To facilitate the building of the customer's IT configuration, observations regarding the customer's environment are gathered and stored in an observation log. In particular, the observation log is used to store observations gathered during runtime in customer environments, where each observation is a collection of various data points. They are created for each of the Recovery Segments that are in “observation” mode. These observations are used for numerous runtime and administrative purposes in the BR environment. As examples the observations are used:

BR gathers observations during runtime when “observation mode” is enabled at the Recovery Segment level. There are two means for enabling observation mode, as examples:

The administrator may also disable observation mode for a Recovery Segment, which stops it from polling for data and creating subsequent observation records for insertion in the log. However, the accumulated observation log is not deleted. In one example, an RS remains in observation mode throughout its lifecycle. The UI displays the implications of disabling observation mode.

In BR, the observations that are collected by BR during runtime can be grouped into two categories, as examples:

A periodic poll observation is a point-in-time snapshot of the constituent resources in a Recovery Segment. Observation data points are collected for those resources in the Recovery Segment(s) which have associated BR management data for any of the following reasons, as examples:

The full value of these observations is derived for an RS when they include data that has been gathered for its constituent resources, plus the resources that those are dependent upon. In one embodiment, the administrator is not forced to include all dependent resources when defining a Recovery Segment, and even if that were the case, there is nothing that prevents them from deleting various dependent resources. When defining a Recovery Segment, the BR UI provides an option that allows the customer to display the dependency graph for those resources already in the Recovery Segment. This displays the topology from the seed node(s) in the Recovery Segment down to and including the dependent leaf nodes. The purpose of this capability is to give the customer the opportunity to display the dependent nodes and recommend that they be included in the Recovery Segment.

Preparatory and recovery workflows are built by the BR manager to achieve the customer requested RTO policy based on resource operations timings. During active policy monitoring by the BR manager, measurements of achieved time for operations are recorded in observations to the log and used to maintain the running statistical data on operation execution times. Observations written to the log may vary in the contained resource RTO metrics and operation execution timings.

Observations are also collected from any of the BPEL workflows created by BR in the customer's environment. There is a standard template that each BR BPEL workflow uses. As part of that template, observation data is captured at the start of, during, and at the completion of each workflow. Specifically, in one example, one observation is created at the end of the workflow with data accumulated from completion of each activity. This information is used to gather timings for workflow execution for use in creating subsequent workflows at time of failure.

In accordance with an aspect of the present invention, a capability is provided to detect changes in management policy (a.k.a., goal) of an IT environment, and to non-disruptively change the environment, based on the detected changes.

Customer environments, business application criticality, and service level agreements for availability or other management goal change over time. Existing facilities for availability management require customers to explicitly change individual product configuration information to adapt to changes. Individual product controls are not directly related to business application service level agreements or criticality. Product level controls are not consistent in defining what is altered and there is practically no means for determining the effect changing product controls will have on other products or on the customers' business application. Significant problems caused by existing facilities include:

In one implementation, BR accepts specification of a goal from the customer, such as an availability goal specified as a Recovery Time Objective (RTO) policy associated with a collection of resources being used to support a business application identified as a Recovery Segment. In accordance with an aspect of the present invention, this goal, however, can be programmatically changed, while continuing to perform IT management functions.

As one example, changes to goal specification and associated validation of the changed policy are addressed herein. In the example described herein, the goal is RTO; however, in other examples, the goal can be other than RTO. Specifically, BR (or other disciplines—BR is only one example) provides the ability to, for instance:

BR policy can be dynamically changed during runtime operations for a RS, with certain restrictions. The currently active environment is not to degrade automatically without an explicit deactivation from the BR Administrator. Changes that can occur without disruption of the current environment are allowed to proceed as part of policy change.

For a policy change, the customer defines and validates the policy to “switch to”, and an initiation of change causes BR to produce a “delta” workflow which is the difference between what is currently prepared and what is required to support the change in goal. Specific restrictions are enforced for changing the policy for a RS that shares resources with other RS(s), or is a subset/superset of another RS. If the policy change will cause disruption, then, in one embodiment, the Administrator is to explicitly deactivate the RS for monitoring, change the policy, re-prepare, and reactivate. These explicit actions will be a planned activity for the Administrator, which is employed, in one example, for a disruptive change.

In one implementation, changing the BR RTO goal policy is a megaflow or complex task that includes a plurality of individual tasks or actions. One example of the logic to manage megaflows is described in U.S. patent application “Adaptive Computer Sequencing of Actions,” U.S. Ser. No. 11/965,899, Bobak et al., which is hereby incorporated herein by reference in its entirety. Alternatively, the customer may execute the individual tasks through invocation of the BR UI, or the individual tasks can be pieced together using nested transaction scopes if the selected runtime environment supports that concept. Examples of the individual tasks to be performed to change a goal are described below. In one example, each task is run in a transaction, but no overall transaction scope exists. In another example, the one or more of the tasks are not run as transactions.

These tasks are described in further detail below.

Megaflow Tasks Details

Alter the RTO Associated with a Business Application (Represented to BR as a Recovery Segment) while Continuing to Enforce the Existing RTO.

Through interaction with the BR administrator, a new RTO for a specific customer environment is established. Definition of a revised RTO objective follows the same process as used in initial definition of BR policy, an embodiment of which is described in a U.S. patent application “Programmatic Validation in an Information Technology Environment,” U.S. Ser. No. 11/966,619, Bobak et al., which is hereby incorporated herein by reference in its entirety.

In one implementation, a PSE is a representation of a customer environment used to characterize the manner in which the goal of a business application is to be processed. A PSE has associated with it a set of one or more date and time ranges. For example, each Monday through Friday from 8 a.m. to 5 p.m. except holidays. A PSE is associated with a business application which in one implementation may be represented by a Recovery Segment. Therefore, the PSE is associated with a collection of IT resources. Each of the associated IT resources may have one or more supported operations for one or more discrete functions, such as recovery or preparing the environment for recovery. For each such resource operation, the PSE has an operation execution duration. As operation execution duration may change over time, the monitoring function of the BR system gathers real-time operation execution duration time and updates the PSE. A PSE may be formed by programmatic processes acting on data gathered from the customer environment. In one implementation, observation mode is enabled for a RS resulting in monitoring functions gathering data on the resources associated with the RS, including operation execution duration. This data is recorded to a log from which programmatic processes may evaluate characteristics of the customer environment resulting in a suggested set of PSE(s).

A BR policy is associated with a representation of the customer's environment termed a Pattern System Environment (PSE). Alternatively, operation execution time may be specified through a file or database table containing identification of resource, operation on the resource and execution time for the operation.

In one example, a goal may be defined manually or through use of the processing described herein. Defining a goal includes, for instance, associating a quantitative goal, such as a Recovery Time Objective (RTO), with a business application. In one implementation, a business application is represented programmatically by a Recovery Segment (RS). RTO goals are specified by the customer at a Recovery Segment level and apportioned to the various component resources grouped within the RS. In one example, RTO goals are expressed as units of time intervals, such as seconds, minutes, and hours. Each RS can have one RTO goal per Pattern System Environment associated with the RS. Based on the metrics available from the IT resources, and based on observed history and/or data from the customer, the RTO goal associated with the RS is evaluated for achievability, taking into account which resources are able to be recovered in parallel.

Evaluate the Achievability of the RTO Specification for the Environments Specified by the Customer.

Prior to altering the existing IT environment, changes in RTO specification are evaluated against the PSE(s) specified to determine if achievement of the RTO goal is possible. Validation insures operation execution duration timings exist (either from observed history or from customer specification) for resources contained in the RS. A combination of validation (as described in a U.S. patent application “Programmatic Validation in an Information Technology Environment,” U.S. Ser. No. 11/966,619, Bobak et al., which is hereby incorporated herein by reference in its entirety, and generation of preparatory workflow (as described in a U.S. patent application “Dynamic Generation of Processes in Computing Environments,” U.S. Ser. No. 11/965,894, Bobak et al., which is hereby incorporated herein by reference in its entirety) creates a preparatory workflow based on the new RTO goal and builds a recovery plan starting with the assumption that all resources in the RS are to be recovered. An assessment of the achievability of the recovery plan is performed by validation based on operation execution timings associated with the specified PSE. The new preparatory workflow is preserved for subsequent analysis and generation of a delta workflow. Further details regarding validation are described below.

When a goal is associated with a business application, it is desirable to predict whether or not that goal is achievable. That is the responsibility of validation. Validation can be performed by human inspection of the resources supporting the business application, followed by an analysis of recovery operations those resources may support and a further analysis of the ordering and execution time of the set of recovery operations.

Alternatively, the validating process is programmatic and performs the following steps, in one example. A goal in the form of a policy is specified by the BR administrator through the BR provided User Interface (UI). Additionally, a representation of the customer environment may be specified, as in one implementation through a RS. A worst case scenario in which recovery for all resources associated with the RS is used to determine if the goal is achievable. Recovery operations for each resource and the execution duration time for each recovery operation could be specified through a file or database table. Alternatively, recovery operations and related execution duration times, in the context of a particular customer environment, may be associated with a PSE. Further, recovery operations which result in a resource becoming available from a failed or degraded state may be represented through pairings. In one example, a recovery operation is selected from potential recovery operations. For instance, the recovery operation having the smallest operation execution duration time is selected.

Having selected recovery operations for resources supporting the business application, any dependencies those operations may have on other operations are identified. This identification could be through specification or dependencies in a file or database table. Alternatively, operation ordering dependencies may be specified through pairings. Operations which are depended on are added to the set of recovery operations. Subsequently, any ordering dependencies among recovery operations in the set is identified and used to sequence operations. Ordering dependencies may be specified through a file or database table. Alternatively, ordering dependencies may be specified through pairings. From the ordered set of operations, a total recovery time may be calculated manually. Alternatively, a programmatic representation of the recovery set of operations may be generated in the form of a Gantt chart from which the maximum time for executing the sequence of recovery operations may be determined.

In order to validate the achievability of a quantitative goal, the preconditioned state of the IT environment is evaluated, in one example. Preconditioning may include specific actions taken on each resource. For example, establishing a flash copy set for storage resource, establishing an active data sharing environment for a database resource, or establishing a level of redundancy in containers supporting application logic. Manual inspection of the IT environment may be performed to make the required evaluation and to identify preparatory actions required to make achievement of the availability goal possible. Alternatively, this evaluation is performed programmatically.

The current state of resources is determined and used in conjunction with preparatory effect pairing constructs to determine if the current state of a resource can meet the recovery goals or if operations to alter the current state of the resource, preparatory operations, are needed to enable achievement of the recovery goal. For example, if a RTO of 30 seconds is to be achieved, and the business application uses a DB2® database, the storage backing the database may or may not have a duplicate copy maintained by synchronous replication. Suppose the storage for the database does not have a duplicate initially. Recovery operations would require restoring a previous copy of the database and application of database log records from the point in time the copy was created until the failure of the storage volume was detected. This process would in all likelihood not meet the 30 second RTO goal. Alternatively, if a duplicate copy of the storage volume is established and maintained through synchronous replication, at the time of failure of the storage volume a recovery operation which switches to the duplicate copy can complete well within the 30 second RTO goal. Therefore, given the recovery times associated with having or not having a duplicate copy of the storage volume, it is determined that creation of a duplicate copy of the storage volume and ongoing synchronous replication is a required preparatory operation to achieve the specified RTO goal. Many such examples exist depending on the resource and the different recovery operations which may be performed predicated on the state of the resource at the time of failure and the ability to precondition the resource to achieve a RTO.

Where preparatory operations are required, precursor operations and dependencies among the set of operations is determined using pairings. The set of preparatory operations may then be formed into a workflow and provided to the customer for programmatic execution or manual execution. After the IT environment has been altered by a set of preconditioning actions, a subsequent validation of achievability for the goal detects the alternations resulting in a potentially different set or a null set of preconditioning actions.

In the cases referenced above where pairing constructs are utilized, those constructs may be conditionally included in BR system processing based on trigger rules and real-time IT environment conditions.

If preconditioning actions (a.k.a., preparatory processing) is employed, some of the preparatory operations may fail to execute correctly. Should a failure of a preparatory operation occur, the IT environment may need to be returned to the prior state. An undo set of operations is formed, in one example, and executed manually through human intervention. An alternative implementation provides a programmatic formation of an undo workflow process to be conditionally executed should a preparatory workflow result in failed operations. Formation of the undo workflow uses pairing constructs to identify undo operations.

When an IT environment has been preconditioned through preparatory actions to assure achievability of a goal, it is monitored to insure prepared resources do not become changed such that the goal would fail to be achievable. Monitoring of the prepared environment may be achieved through manual, human intervention or through monitoring associated with individual products and coordinated by the customer.

For example, preparatory operations which are selected for the new workflow are evaluated to determine if a disruptive change to the current environment will occur. By changing the RTO, the required state of resources in advance of an outage may also change. If changing the RTO causes a resource to have a less stringent state of preparedness, the customer is notified. BR does not automatically lower the stringency state of preparedness of a resource. If a more stringent state of preparedness is required for a resource, operations affecting that state may be capable of being executed without impact to the current environment. Non-disruptive operations are added to the new workflow. Operations which would be disruptive to the current environment are not added to the workflow. BR provides notification to the customer if disruptive operations are required by the change in RTO.

Recognition of stringency of preparedness of a resource resulting from preparatory operation execution is achieved through use of metadata associated with the resource and operations on the resource. An example implementation of reducing stringency is described below. BR metadata on resource operations is also used to determine if execution of an operation is disruptive or non-disruptive to the current IT environment.

Generate a Delta Workflow Reflecting Changes to the Environment which Enable Achievement of the New RTO. Determine if the Delta Workflow can be Executed Non-Disruptively.

After a new preparatory workflow has been constructed based on the new RTO goal, a comparison of the existing environment with the required state of preparedness for the new RTO is assessed. For each operation in the new prepare workflow, BR determines if the operation is non-disruptive. In particular, as one example, the metadata associated with operations on the resource indicate if the operation can be performed without impact to some currently existing state. For example, if a storage volume supports both synchronous and asynchronous copy, changing from asynchronous to synchronous may be achievable non-disruptively or may not. Changing from synchronous to asynchronous may not be achievable non-disruptively or may depending on the capabilities of the storage facility. BR determines if the operation has previously been performed with the same execution options and if the operation results in a more or less stringent state of preparedness for the resource. Operations which are non-disruptive, have not been executed or are to be executed with different options and result in a more stringent state of preparedness for the resource are included in a delta workflow.

After determining what operations are to be included in the delta workflow, BR assesses the required ordering of operations and includes any dependent operations. In one implementation, ordering of operations and including dependent operations is achieved by BR based on pairing information. Pairing information is described in a co-filed application, entitled “Conditional Computer Runtime Control of an Information Technology Environments Based on Pairing Constructs,” U.S. Ser. No. 11/965,874. Alternatively, ordering of operations may be represented in a file or database table.

In one example, operations in the delta workflow are divided into those that should be executed in advance of activating the policy and those that should be performed when the policy is made active for BR management to the RTO goal. One example implementation to generate a delta workflow is described below.

In a further embodiment, BR builds a list of operations that would be required to undo the effect of operations in the delta workflow based on pairing information. The list of undo operations is ordered and dependent operations are included based on pairing information. The resulting list of undo operations is preserved to be used if the delta workflow does not execute successfully.

Execute the Generated Workflow Reflecting a Delta to the Existing Configuration for Enabling Achievement of the New RTO.

After the delta workflow has been created, it is presented to the customer for consideration. If the customer chooses to have the IT environment prepared to achieve the new RTO goal, the delta workflow is submitted for execution. In one implementation, submission of the delta workflow for execution and monitoring the delta workflow follows similar processes as for an initial preparatory workflow (described in U.S. patent application “Dynamic Generation of Processes in Computing Environments,” U.S. Ser. No. 11/965,894, Bobak et al., which is hereby incorporated herein by reference in its entirety).

Monitor the Generated Workflow for Successful or Unsuccessful Completion.

As the delta workflow executes, individual preparatory operations are assessed for successful or unsuccessful execution. For example, if an operation completes with a return code of, for instance, 0, it is successful. Further, the state of the resource on which the operation was executed can be assessed to determine if the expected state is achieved based on operation effect pairings. Progress of the workflow as a whole is monitored on a periodic basis by BR. When the delta workflow has ended, an assessment is made to determine if it completed successfully or unsuccessfully. On successful execution, the customer is notified and given the option of making the new RTO goal the current policy. On unsuccessful execution, the undo process is initiated.

In one implementation, the following steps are taken during the monitoring of the delta workflow:

On failure to successfully execute the delta workflow, BR uses the undo operation list created when the delta workflow was formed. From the undo operation list, a workflow is created and submitted. The undo workflow is monitored for successful or unsuccessful execution. If the undo workflow is unsuccessful, in one example, a mailbox, notification is sent to the BR Administrator.

Megaflow for Non-Disruptive Goal Policy Change

One embodiment of the logic to provide a non-disruptive goal policy change is described with reference to FIGS. 9A-9B. As one example, this logic is invoked via the BR Administrator interface to change the BR RTO goal policy of a business application (i.e., Recovery Segment) that already has a goal policy being enforced. This logic is a megaflow and, in one example, follows the pattern described in a U.S. patent application “Adaptive Computer Sequencing of Actions,” U.S. Ser. No. 11/965,899, Bobak et al., which is hereby incorporated herein by reference in its entirety. The individual steps are invoked between various interactions with the BR UI, and each step in this particular megaflow is run in a transaction, although no overall transaction scope exists. In another example, one or more of the steps are non-transactional.

In one example, this megaflow is invoked when an explicit change policy action is initiated via the BR UI by the BR Administrator.

This logic assumes that the BR Administrator defines a new policy for the Recovery Segment. An alternate logic is possible where an existing goal policy for the Recovery Segment is chosen, instead of defining a new one.

One embodiment of the logic to generate a delta workflow is described with reference to FIGS. 10A-10B. In one example, this logic is invoked via the BR Administrator interface when changing the BR RTO goal policy of a business application (i.e., Recovery Segment) that already has a goal policy in place, being monitored, and being enforced.

After the ordered list of operations for the new prepare workflow, OP_ORDER_WF_LIST_NEW, has been traversed, the delta workflow has been populated in OP_ORDER_WF_LIST_DELTA. That delta workflow is to be split into two categories, in this example: prepare time (i.e., P1) and 1st phase activate time (i.e., P2). The “Split Prepare Workflow” logic is invoked, STEP 1022 (FIG. 10B). One implementation of this logic is described below and in “Dynamic Selection of Actions in an Information Technology Environment” U.S. Ser. No. 11/965,951, Bobak et al., co-filed herewith, which is hereby incorporated herein by reference in its entirety.

As one example, the following steps are performed to split the workflow:

The output from this flow is two ordered list of operations:

After the delta workflow is split, an undo ordered list of operations is created for the OP_ORDER_WF_LIST_P1 list, by invoking the “Op Order Undo” logic, STEP 1024. One implementation of this logic is described herein and in a U.S. patent application “Dynamic Selection of Actions in an Information Technology Environment” U.S. Ser. No. 11/965,951, Bobak et al., co-filed herewith, which is hereby incorporated herein by reference in its entirety.

For example:

The output from this logic is an Undo Prepare time ordered list of operations denoted by OP_ORDER_UNDO_WF_LIST_P1.

Subsequent to generating the undo ordered lists of operations, a check for dependencies between operations to be done at 1st phase active time and operations not done at 1st phase active time. For each operation in the list OP_ORDER_WF_LIST_P2, STEP 1026:

After the search for dependencies in OP_ORDER_WF_LIST_P2 is complete, STEP 1026, a Gantt chart for the delta workflow is generated. The “Build Gantt Chart” logic is invoked using the prepare time ordered list of operations OP_ORDER_WF_LIST_P1, STEP 1034. One implementation of this logic is described below and in a U.S. patent application “Dynamic Selection of Actions in an Information Technology Environment” U.S. Ser. No. 11/965,951, Bobak et al., co-filed herewith, which is hereby incorporated herein by reference in its entirety.

In one example, processing is performed in, for instance, two phases. In the first phase, a table is built that includes one row for each unique path through the sequence of operations. The input ordered_op_list is indexed by the variable i_order_op_list. The result of phase one processing is a table, outlist_table. An index, i_next_avail_row, indicates the row within outlist_table where the next unique sequence through the set of operations is to be built. Processing proceeds by locating each input operation with the lowest operations sequence number. Each of these is a root of unique paths through the set of operations. The set of these operations is processed sequentially with unique paths through the set of operations for the first root completing before processing the unique paths through the set of operations for the second root.

Processing for a root begins by assigning the current row in the outlist_table to the index, current_orow_index, and incrementing the i_next_avail_row index. Within the row being processed, an index to the current operation being processed is maintained, index_for_ops. Processing proceeds through the list of operations in the input. A new row is created in outlist_table when more than one input operation is to occur after the current operation being processed. Two indicators are kept with each row of the outlist_table in, for instance, a header column. Header includes, for instance, a row_changed indicator and a row_end indicator. The row_changed indicator is used to cause a copy of the row to be made before a new operation which is to occur later in the sequence is added. Associated with each row are two fields used to save progress in processing the sequence: an ordered_op_next field, which includes an index into the input ordered_op_list for the last operation in the sequence; and an op_next field, which includes an index into the row for the last operation in the sequence. Entries in the row include an index into the input ordered_op_list for operations comprising the sequence.

When a new row is created, it is initialized with the sequence of operations in the current row that have been accumulated to that point of processing. The second indicator associated with each row, row_end, is used to identify a row which is a complete path through the sequence of operations.

The next row is processed in the same manner as the first row of a root. Processing for a root is determined to have recorded every unique path through the sequence of operations when there were no copied rows made during processing of the current row. When the unique paths through the set of operations for the first root has completed, processing continues with the second and subsequent roots.

The second phase of processing builds the output of the routine, Gantt_table and maxtime. The maximum time for execution of the sequence of operations is set in maxtime. The Gantt_table includes one row for each opentry in the ordered_op_list input. An entry in the Gantt_table includes, for example, the opentry provided as input, a start time relative to 0, and an end time relative to 0 for the operation.

The prepare time ordered list of operations OP_ORDER_WF_LIST_P1 is also used to create the delta workflow in BPEL format by invoking the “Build Prep Workflow” task, STEP 1036. One implementation of this logic is described herein and in a U.S. patent application “Dynamic Generation of Processes in Computing Environments”, U.S. Ser. No. 11/965,894, Bobak et al., which is hereby incorporated herein by reference in its entirety.

For example, processing performed by the Build WF routine may include:

In a further implementation, the stringency of a prepared resource is reduced (i.e., to lower the expected preparedness to meet a lower RTO). This is initiated by the BR Administrator explicitly, or in response to a change policy that caused a potential lowering of the stringency to be skipped in favor of preserving the running environment without disruption (e.g., mailbox notification from STEP 1020 in Generate Delta Workflow).

In one implementation reducing the stringency (i.e., to lower the expected preparedness to meet a lower RTO) of a shared resource (i.e., resource included in multiple Recovery Segments) is a megaflow and follows the pattern described in a U.S. patent application “Adaptive Computer Sequencing of Actions,” U.S. Ser. No. 11/965,899, Bobak et al., co-filed herewith, which is hereby incorporated herein by reference in its entirety. Alternatively, the customer may execute the individual tasks through invocation of the BR UI, or the individual tasks can be pieced together using nested transaction scopes if the selected runtime environment supports that concept. The individual tasks are as follows, and each is run in a transaction, but no overall transaction scope exists. In a further example, one or more of the tasks are non-transactional:

Task1: Find set of RS that include the resource.

Task2: Validate the set—see what impact the change may have.

Task3: Customer decides to prepare and lower the stringency.

Task4: For each RS potentially affected, UI offers customer option to validate the policy.

Megaflow Tasks Details

The input to this routine is, for instance, the resource for which the BR Administrator has chosen to lower the stringency. A temporary entry in the metadata entry for that resource (i.e., BRMD) includes the lower stringency.

Described in detail herein is a capability for non-disruptively changing an IT environment based on a change in goal for one or more business applications of the environment.

One or more aspects of the present invention can be included in an article of manufacture (e.g., one or more computer program products) having, for instance, computer usable media. The media has therein, for instance, computer readable program code means or logic (e.g., instructions, code, commands, etc.) to provide and facilitate the capabilities of the present invention. The article of manufacture can be included as a part of a computer system or sold separately.

One example of an article of manufacture or a computer program product incorporating one or more aspects of the present invention is described with reference to FIG. 11. A computer program product 1100 includes, for instance, one or more computer usable media 1102 to store computer readable program code means or logic 1104 thereon to provide and facilitate one or more aspects of the present invention. The medium can be an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system (or apparatus or device) or a propagation medium. Examples of a computer readable medium include a semiconductor or solid state memory, magnetic tape, a removable computer diskette, a random access memory (RAM), a read-only memory (ROM), a rigid magnetic disk and an optical disk. Examples of optical disks include compact disk-read only memory (CD-ROM), compact disk-read/write (CD-R/W) and DVD.

A sequence of program instructions or a logical assembly of one or more interrelated modules defined by one or more computer readable program code means or logic direct the performance of one or more aspects of the present invention.

Advantageously, a capability is provided for non-disruptively providing a process to effect a change in an IT environment responsive to a change in policy. During the change to the environment, management to the existing goal is continued. Advantageously, the capability enables dynamic switching to the new goal non-disruptively for the business application, such that explicit deactivation of the old policy and explicit activation of the new policy are not typically required.

Although various embodiments are described above, these are only examples. For example, the processing environments described herein are only examples of environments that may incorporate and use one or more aspects of the present invention. Environments may include other types of processing units or servers or the components in each processing environment may be different than described herein. Each processing environment may include additional, less and/or different components than described herein. Further, the types of central processing units and/or operating systems or other types of components may be different than described herein. Again, these are only provided as examples.

Moreover, an environment may include an emulator (e.g., software or other emulation mechanisms), in which a particular architecture or subset thereof is emulated. In such an environment, one or more emulation functions of the emulator can implement one or more aspects of the present invention, even though a computer executing the emulator may have a different architecture than the capabilities being emulated. As one example, in emulation mode, the specific instruction or operation being emulated is decoded, and an appropriate emulation function is built to implement the individual instruction or operation.

In an emulation environment, a host computer includes, for instance, a memory to store instructions and data; an instruction fetch unit to obtain instructions from memory and to optionally, provide local buffering for the obtained instruction; an instruction decode unit to receive the instruction fetched and to determine the type of instructions that have been fetched; and an instruction execution unit to execute the instructions. Execution may include loading data into a register for memory; storing data back to memory from a register; or performing some type of arithmetic or logical operation, as determined by the decode unit. In one example, each unit is implemented in software. For instance, the operations being performed by the units are implemented as one or more subroutines within emulator software.

Further, a data processing system suitable for storing and/or executing program code is usable that includes at least one processor coupled directly or indirectly to memory elements through a system bus. The memory elements include, for instance, local memory employed during actual execution of the program code, bulk storage, and cache memory which provide temporary storage of at least some program code in order to reduce the number of times code must be retrieved from bulk storage during execution.

Input/Output or I/O devices (including, but not limited to, keyboards, displays, pointing devices, DASD, tape, CDs, DVDs, thumb drives and other memory media, etc.) can be coupled to the system either directly or through intervening I/O controllers. Network adapters may also be coupled to the system to enable the data processing system to become coupled to other data processing systems or remote printers or storage devices through intervening private or public networks. Modems, cable modems, and Ethernet cards are just a few of the available types of network adapters.

Further, although the environments described herein are related to the management of availability of a customer's environment, one or more aspects of the present invention may be used to manage aspects other than or in addition to availability. Further, one or more aspects of the present invention can be used in environments other than a business resiliency environment.

Yet further, many examples are provided herein, and these examples may be revised without departing from the spirit of the present invention. For example, in one embodiment, the description is described in terms of availability and recovery; however, other goals and/or objectives may be specified in lieu of or in addition thereto. Additionally, the resources may be other than IT resources. Further, there may be references to particular products offered by International Business Machines Corporation or other companies. These again are only offered as examples, and other products may also be used. Additionally, although tables and databases are described herein, any suitable data structure may be used. There are many other variations that can be included in the description described herein and all of these variations are considered a part of the claimed invention.

Further, for completeness in describing one example of an environment in which one or more aspects of the present invention may be utilized, certain components and/or information is described that is not needed for one or more aspects of the present invention. These are not meant to limit the aspects of the present invention in any way.

One or more aspects of the present invention can be provided, offered, deployed, managed, serviced, etc. by a service provider who offers management of customer environments. For instance, the service provider can create, maintain, support, etc. computer code and/or a computer infrastructure that performs one or more aspects of the present invention for one or more customers. In return, the service provider can receive payment from the customer under a subscription and/or fee agreement, as examples. Additionally or alternatively, the service provider can receive payment from the sale of advertising content to one or more third parties.

In one aspect of the present invention, an application can be deployed for performing one or more aspects of the present invention. As one example, the deploying of an application comprises providing computer infrastructure operable to perform one or more aspects of the present invention.

As a further aspect of the present invention, a computing infrastructure can be deployed comprising integrating computer readable code into a computing system, in which the code in combination with the computing system is capable of performing one or more aspects of the present invention.

As yet a further aspect of the present invention, a process for integrating computing infrastructure, comprising integrating computer readable code into a computer system may be provided. The computer system comprises a computer usable medium, in which the computer usable medium comprises one or more aspects of the present invention. The code in combination with the computer system is capable of performing one or more aspects of the present invention.

The capabilities of one or more aspects of the present invention can be implemented in software, firmware, hardware, or some combination thereof. At least one program storage device readable by a machine embodying at least one program of instructions executable by the machine to perform the capabilities of the present invention can be provided.

The flow diagrams depicted herein are just examples. There may be many variations to these diagrams or the steps (or operations) described therein without departing from the spirit of the invention. For instance, the steps may be performed in a differing order, or steps may be added, deleted, or modified. All of these variations are considered a part of the claimed invention.

Although embodiments have been depicted and described in detail herein, it will be apparent to those skilled in the relevant art that various modifications, additions, substitutions and the like can be made without departing from the spirit of the invention and these are therefore considered to be within the scope of the invention as defined in the following claims.

Swanson, Michael D., Bobak, Mythili K., McConnell, Tim A.

Patent Priority Assignee Title
Patent Priority Assignee Title
4979105, Jul 19 1988 International Business Machines Method and apparatus for automatic recovery from excessive spin loops in an N-way multiprocessing system
5023873, Jun 15 1989 International Business Machines Corporation Method and apparatus for communication link management
5386561, Mar 31 1992 International Business Machines Corporation; INTERNATIONAL BUSINESS MACHINES CORPORATION A CORPORATION OF NEW YORK Method of integrated system load control through dynamic time-slicing in a virtual storage environment
5452452, Jun 11 1990 RPX Corporation System having integrated dispatcher for self scheduling processors to execute multiple types of processes
5481694, Sep 26 1991 SAMSUNG ELECTRONICS CO , LTD High performance multiple-unit electronic data storage system with checkpoint logs for rapid failure recovery
5530802, Jun 22 1994 THE CHASE MANHATTAN BANK, AS COLLATERAL AGENT Input sequence reordering method for software failure recovery
5537542, Apr 04 1994 International Business Machine Corporation Apparatus and method for managing a server workload according to client performance goals in a client/server data processing system
5604863, Nov 01 1993 International Business Machines Corporation Method for coordinating executing programs in a data processing system
5631831, Feb 26 1993 GSLE Development Corporation; SPX Corporation Diagnosis method for vehicle systems
5652908, Oct 02 1991 RPX Corporation Method and apparatus for establishing communications sessions in a remote resource control environment
5734837, Jan 14 1994 ACTION TECHNOLOGIES, INC Method and apparatus for building business process applications in terms of its workflows
5790780, Jul 16 1996 Hewlett Packard Enterprise Development LP Analysis of failures in a computing environment
5797005, Dec 30 1994 International Business Machines Corporation Shared queue structure for data integrity
5797129, Oct 31 1991 Texas Instruments Incorporated; TEXAS INSTRUMENTS INCORPORATED A CORP OF DELAWARE Predicting resource usage in a multiple task, multiple resource environment
5826080, Aug 11 1994 Cegelec Method of scheduling successive tasks
5887168, Dec 30 1994 International Business Machines Corporation Computer program product for a shared queue structure for data integrity
6012044, Dec 10 1997 FINANCIAL ENGINES, INC User interface for a financial advisory system
6012152, Nov 27 1996 TELEFONAKTIEBOLAGET LM ERICSSON PUBL Software fault management system
6041306, Dec 05 1996 GOOGLE LLC System and method for performing flexible workflow process execution in a distributed workflow management system
6125442, Dec 12 1997 Maves International Software, Inc. Method, system and data structures for computer software application development and execution
6336138, Aug 25 1998 Hewlett Packard Enterprise Development LP Template-driven approach for generating models on network services
6385613, Jun 25 1996 Oracle International Corporation Resource management using resource domains
6393386, Mar 26 1998 VISUAL NETWORKS OPERATIONS, INC Dynamic modeling of complex networks and prediction of impacts of faults therein
6393485, Oct 27 1998 International Business Machines Corporation Method and apparatus for managing clustered computer systems
6408277, Jun 21 2000 International Business Machines Corporation System and method for automatic task prioritization
6449688, Dec 24 1997 CERBERUS BUSINESS FINANCE, LLC, AS COLLATERAL AGENT Computer system and process for transferring streams of data between multiple storage units and multiple applications in a scalable and reliable manner
6480944, Mar 22 2000 INTERWOVEN, INC Method of and apparatus for recovery of in-progress changes made in a software application
6625751, Aug 11 1999 Oracle America, Inc Software fault tolerant computer system
6732118, Mar 26 2001 MICRO FOCUS LLC Method, computer system, and computer program product for monitoring objects of an information technology environment
6785768, Dec 24 1997 CERBERUS BUSINESS FINANCE, LLC, AS COLLATERAL AGENT Computer system and process for transferring streams of data between multiple storage units and multiple applications in a scalable and reliable manner
6862696, May 03 2000 Synopsys, Inc System and method for software certification
6874010, Oct 01 1999 Accenture Global Services Limited Base service architectures for netcentric computing systems
6934247, Nov 24 2000 International Business Machines Corporation Recovery following process or system failure
6954786, Dec 08 2000 VALTRUS INNOVATIONS LIMITED Method and architecture for a high performance cache for distributed, web-based management solutions
6983321, Jul 10 2000 BMC SOFTWARE, INC System and method of enterprise systems and business impact management
6983362, May 20 2000 Ciena Corporation Configurable fault recovery policy for a computer system
7032186, Sep 28 2001 EMC IP HOLDING COMPANY LLC Methods and apparatus for representing resources in a computing system environment
7039827, Feb 13 2001 NetApp, Inc Failover processing in a storage system
7047337, Apr 24 2003 LENOVO INTERNATIONAL LIMITED Concurrent access of shared resources utilizing tracking of request reception and completion order
7058947, May 02 2000 Microsoft Technology Licensing, LLC Resource manager architecture utilizing a policy manager
7111297, May 02 2000 Microsoft Technology Licensing, LLC Methods and architectures for resource management
7197749, Dec 19 2000 Xerox Corporation Method and system for executing batch jobs by delegating work to independent service providers
7243267, Mar 01 2002 AVAYA LLC Automatic failure detection and recovery of applications
7281018, May 26 2004 Microsoft Technology Licensing, LLC Form template data source change
7313573, Sep 17 2003 GLOBALFOUNDRIES Inc Diagnosis of equipment failures using an integrated approach of case based reasoning and reliability analysis
7325161, Jun 30 2004 Veritas Technologies LLC Classification of recovery targets to enable automated protection setup
7395537, Dec 08 2003 TERADATA US, INC Administering the workload of a database system using feedback
7409356, Jun 21 2000 VELOXITI, INC Method and system for intelligent supply chain collaboration
7437611, Oct 21 2004 GLOBALFOUNDRIES Inc System and method for problem determination using dependency graphs and run-time behavior models
7463648, Aug 23 1999 Oracle America, Inc Approach for allocating resources to an apparatus based on optional resource requirements
7490265, May 10 2006 International Business Machines Corporation Recovery segment identification in a computing infrastructure
7499954, Nov 01 2004 International Business Machines Corporation Consistent reintegration of a failed primary instance
7509529, Jul 18 2003 American Power Conversion Corporation System and method for performing user recovery of guided procedures for an uninterruptible power supply
7523359, Mar 31 2005 International Business Machines Corporation Apparatus, system, and method for facilitating monitoring and responding to error events
7529981, Apr 17 2003 KYNDRYL, INC System management infrastructure for corrective actions to servers with shared resources
7536585, Jun 23 2005 Hewlett Packard Enterprise Development LP Method of estimating storage system availability
7568019, Feb 15 2002 ENTRUST, INC Enterprise management system for normalization, integration and correlation of business measurements with application and infrastructure measurements
7587483, Jun 12 2002 EMC IP HOLDING COMPANY LLC System and method for managing computer networks
7610512, Jan 06 2006 THE CONUNDRUM IP LLC System and method for automated and assisted resolution of it incidents
7620953, Oct 05 2004 Azul Systems, Inc System and method for allocating resources of a core space among a plurality of core virtual machines
7627728, Dec 29 2005 Veritas Technologies LLC System and method for efficient generation of application snapshots
7650341, Dec 23 2005 Hewlett Packard Enterprise Development LP Data backup/recovery
7661033, Dec 11 2003 International Business Machines Corporation Method and system for establishing network connections
7707173, Jul 15 2005 TWITTER, INC Selection of web services by service providers
7707451, Jun 28 2005 Alcatel-Lucent USA Inc Methods and devices for recovering from initialization failures
7730363, Sep 30 2004 Toshiba Solutions Corporation Reliability evaluation system, reliability evaluating method, and reliability evaluation program for information system
7743001, Jun 21 2005 Amazon Technologies, Inc. Method and system for dynamic pricing of web services utilization
7747730, Jun 28 2002 Netfuel, Inc. Managing computer network resources
7752310, Jan 18 2006 Fujitsu Limited Computer program, method, and apparatus for managing reservation of it resources
7774457, Mar 25 2005 VALTRUS INNOVATIONS LIMITED Resource evaluation for a batch job and an interactive session concurrently executed in a grid computing environment
7774458, Jul 10 2000 BMC Software, Inc. System and method of enterprise systems and business impact management
7818421, Jun 22 2005 NEC Corporation Autonomous handling management system, autonomous handling management method, and program
7865582, Mar 24 2004 Hewlett Packard Enterprise Development LP System and method for assigning an application component to a computing resource
7917814, Apr 08 2005 Hewlett-Packard Development Company, L.P.; Hewlett-Packard Development Company LP System and method of reporting error codes in an electronically controlled device
7933872, Aug 30 2004 Corio, Inc. Database backup, refresh and cloning system and method
7934119, Nov 29 2005 Hitachi, Ltd. Failure recovery method
7937706, Aug 22 2005 ALTAIR ENGINEERING, INC Method and system for performing fair-share preemption
7958393, Dec 28 2007 International Business Machines Corporation Conditional actions based on runtime conditions of a computer system environment
7962590, Jul 17 2002 International Business Machines Corporation Automated discovery of a multitier compute infrastructure
8051106, Mar 12 2003 GLOBAL SAAS SOLUTIONS PTE LTD Automated application discovery and analysis system and method
8065554, Jul 06 2006 GRYPHONET LTD Communication device and a method of self-healing thereof
8086758, Nov 27 2006 Disney Enterprises, Inc. Systems and methods for interconnecting media applications and services with centralized services
8260893, Jul 06 2004 Veritas Technologies LLC Method and system for automated management of information technology
20010056398,
20010056554,
20020022952,
20020049749,
20020059512,
20020069102,
20020078130,
20020078381,
20020091991,
20020194045,
20020198727,
20030051186,
20030056013,
20030078823,
20030084100,
20030093672,
20030135384,
20030135609,
20030139956,
20030200482,
20030212580,
20030212685,
20030225602,
20030236677,
20040034553,
20040054690,
20040078373,
20040111702,
20040119752,
20040143470,
20040158777,
20040162741,
20040181476,
20040186905,
20040193476,
20040199768,
20040210452,
20040243699,
20050015641,
20050027835,
20050033600,
20050043977,
20050049906,
20050060662,
20050071470,
20050086091,
20050091351,
20050096949,
20050119905,
20050125768,
20050172306,
20050177406,
20050198244,
20050228707,
20050228852,
20050235248,
20050262242,
20060004265,
20060010234,
20060020866,
20060037022,
20060041505,
20060064335,
20060074731,
20060074736,
20060074993,
20060106626,
20060111921,
20060112383,
20060117221,
20060123022,
20060129562,
20060149842,
20060161444,
20060161466,
20060179136,
20060190368,
20060190583,
20060190775,
20060218558,
20060224702,
20060236061,
20060245354,
20060245369,
20060248546,
20060259526,
20060287875,
20060293942,
20070011331,
20070027734,
20070038490,
20070038492,
20070061385,
20070067296,
20070079097,
20070100712,
20070112847,
20070143166,
20070150571,
20070165525,
20070179826,
20070198678,
20070198789,
20070234408,
20070266029,
20070271219,
20070276885,
20070286219,
20070294406,
20070300204,
20080005739,
20080016335,
20080052719,
20080063423,
20080140495,
20080147452,
20080215909,
20080294777,
20080295100,
20080317217,
20090037363,
20090077210,
20090113383,
20090125751,
20090150456,
20090150887,
20090171703,
20090171704,
20090171705,
20090171706,
20090171707,
20090171708,
20090171730,
20090171731,
20090171733,
20090172149,
20090172460,
20090172461,
20090172470,
20090172668,
20090172669,
20090172670,
20090172671,
20090172674,
20090172682,
20090172687,
20090172688,
20090172689,
20090172769,
20090249337,
20100280863,
20110004564,
WO9910814,
/
Executed onAssignorAssigneeConveyanceFrameReelDoc
Dec 28 2007International Business Machines Corporation(assignment on the face of the patent)
Date Maintenance Fee Events


Date Maintenance Schedule
Sep 16 20174 years fee payment window open
Mar 16 20186 months grace period start (w surcharge)
Sep 16 2018patent expiry (for year 4)
Sep 16 20202 years to revive unintentionally abandoned end. (for year 4)
Sep 16 20218 years fee payment window open
Mar 16 20226 months grace period start (w surcharge)
Sep 16 2022patent expiry (for year 8)
Sep 16 20242 years to revive unintentionally abandoned end. (for year 8)
Sep 16 202512 years fee payment window open
Mar 16 20266 months grace period start (w surcharge)
Sep 16 2026patent expiry (for year 12)
Sep 16 20282 years to revive unintentionally abandoned end. (for year 12)