A method and system for detecting an islanding condition in a grid is provided. The method comprises detecting a potential islanding condition in a grid; and, in response to the detected potential islanding condition, ramping up an amount of reactive power, active power, or a combination of active and reactive power that is generated from a power conversion system until the earlier of the power conversion system shutting down or a threshold condition being reached.
|
1. A method comprising:
detecting a potential islanding condition in a grid; and
in response to the detected potential islanding condition, ramping up an amount of reactive power, active power, or a combination of active and reactive power that is generated from a power conversion system until the earlier of the power conversion system shutting down or a threshold condition being reached.
10. A grid protection system comprising:
a detection unit for detecting a potential islanding condition in a grid; and
a variable ramp rate generation unit for, upon detection of a potential islanding condition, ramping up an amount of reactive power, active power, or a combination of active and reactive power that is generated from a power conversion system until the earlier of the power conversion system shutting down or a threshold condition being reached.
14. A solar power generation system comprising:
a power converter for receiving power from a solar power source;
a detection unit for measuring a line parameter value and using the line parameter value for identifying a potential islanding condition in a grid fed by the a power converter; and
a variable ramp rate generation unit for ramping up an amount of reactive power, active power, or a combination of active and reactive power generated from the power converter in response to an identified potential islanding condition.
2. The method of
3. The method of
4. The method of
6. The method of
7. The method of
9. The method of
11. The system of
12. The system of
13. The system of
15. The system of
16. The system of
17. The system of
18. The system of
19. The system of
|
This invention relates generally to renewable power generation and more specifically to detection of islanding for a power generation facility connected to a grid. The system and method are particularly applicable to solar, wind, and other renewable power generation systems.
Renewable energy sources such as solar energy sources, wind energy sources, and hydrokinetic energy sources have increasingly penetrated the power generation space in recent years. One challenge in feeding the power generated by renewable energy sources to the grid is islanding, which refers to a condition in which a renewable energy source continues to feed power even though the electric utility (grid) is no longer coupled to the energy source. The detection of an islanding condition is important for safety and grid stability.
A number of passive and active methods for islanding detection have been proposed. Many of these methods either have longer than desirable detection times or fail to detect all islanding conditions.
In one example of an active method of islanding detection using reactive power, a small amount of reactive power is continuously fed by the power conversion system and causes the power conversion system to be shut down upon an islanding condition. In this example, injecting a higher amount of reactive power results in shorter detection period with higher power conversion losses, whereas injecting a lower amount of reactive power results in lower losses but a longer detection period. Hence low losses and short detection time requirements appear contradictory.
Accordingly, a technique is needed to detect an islanding condition with reasonable speed and acceptable power.
In accordance with one embodiment disclosed herein, a method of detecting an islanding condition in a grid is provided. The method comprises detecting a potential islanding condition in a grid and, in response to the detected potential islanding condition, ramping up an amount of reactive power, active power, or a combination of active and reactive power that is generated from a power conversion system until the earlier of the power conversion system shutting down or a threshold condition being reached.
In accordance with another embodiment disclosed herein, a grid protection system is provided. The grid protection system comprises a detection unit for detecting a potential islanding condition in a grid; and a variable ramp rate generation unit for, upon detection of a potential islanding condition, ramping up an amount of reactive power, active power, or a combination of active and reactive power that is generated from a power conversion system until the earlier of the power conversion system shutting down or a threshold condition being reached.
In accordance with another embodiment disclosed herein, a solar power generation system is provided. The solar power generation system comprises a solar power conversion system, a detection unit for measuring a line parameter value and using the line parameter value for identifying a potential islanding condition in a grid fed by the solar power conversion system; and a variable ramp rate generation unit for ramping up an amount of reactive power, active power, or a combination of active and reactive power generated from the solar power conversion system in response to an identified potential islanding condition.
These and other features, aspects, and advantages of the present disclosure will become better understood when the following detailed description is read with reference to the accompanying drawings in which like characters represent like parts throughout the drawings, wherein:
Unless defined otherwise, technical and scientific terms used herein have the same meaning as is commonly understood by one of ordinary skill in the art to which this disclosure belongs. The terms “first”, “second”, and the like, as used herein do not denote any order, quantity, or importance, but rather are used to distinguish one element from another. Also, the terms “a” and “an” do not denote a limitation of quantity, but rather denote the presence of at least one of the referenced items. The term “or” is meant to be inclusive and mean one, some, or all of the listed items. The use of “including,” “comprising” or “having” and variations thereof herein are meant to encompass the items listed thereafter and equivalents thereof as well as additional items. The terms “connected” and “coupled” are not restricted to physical or mechanical connections or couplings, and can include electrical connections or couplings, whether direct or indirect. Furthermore, the terms “circuit” and “circuitry” and “controller” may include either a single component or a plurality of components, which are either active and/or passive and are connected or otherwise coupled together to provide the described function.
Embodiments disclosed herein relate generally to a system and method for detecting an islanding condition of a grid which is fed by a power conversion system. The term “power conversion system” as used herein may include any suitable power conversion configuration. For example, for solar applications, the power conversion system will typically comprise either a dual or two stage system with a DC-to-DC power converter coupled to a DC-to-AC inverter at a DC link or a single stage DC-to-AC inverter. For wind and hydrokinetic applications, for example, the power conversion system will typically comprise either a dual or two stage system with an AC-to-DC power converter coupled to a DC-to-AC inverter at a DC link or a single stage AC-to-AC converter.
The variable ramp rate generation unit 108 is configured for ramping up an amount of reactive power (Q), active power (P), or a combination of active and reactive power generated from power conversion system and injected into a grid 122 in response to the potential islanding condition, when identified. Conventional power components such as transformers and filters may be present between the power converter 103 and the grid 122 with a medium voltage (MV) transformer 120 being illustrated in
The combination of the detection unit 106 and the variable ramp rate generation unit 108 may be embodied in a supervisory control and data acquisition (SCADA) system 116. The power generation system may further include a relay 118 which is configured to shut down the power conversion system 102 feeding the grid 122 during an actual islanding condition. The detection unit 106, the variable ramp rate generation unit 108, and the relay 118 may either comprise separate elements as shown for purposes of example or may be integrated into the control unit 104 if desired. In one exemplary embodiment, the power generation system 100 may further include a power converter sensor 124 for measuring a value of a line parameter at the output of the power converter 103. In one embodiment the power converter 103, control unit 104 and power converter sensor 124 can be integrated into the housing (not shown) of the power conversion system 102.
As used herein the “potential islanding condition” in a grid refers to an either an actual islanding condition or a grid disturbance. A temporary grid disturbance may occur as a result of deviation in grid impedance or grid voltage, for example. Such grid disturbances can result in false alarms. An actual islanding condition refers to a condition in which a distributed generation (DG) system continues to feed power even though the electric grid is no longer coupled to the energy source.
If the line parameter value indicates that there is nominal power conversion system operation, then the process returns to step 302 for continued measurement. In one exemplary embodiment of the present invention, even after the identification of the potential islanding condition the measurement of the line parameters is continued in parallel with the ramping procedure described below.
With continued reference to
In one embodiment the line parameter and/or first variation value may be used when setting the ramp rate. The ramping waveform of amount of active power, reactive power or a combination of active and reactive power, in one embodiment, can be illustrated by a mathematical function. Such functions include a polynomial function, an exponential function, a parabolic function, a linear function or any other equivalent mathematical function. The amount of power ramped up is such that the ramping up may be at a constant ramp rate or a varying ramp rate. For example, in some embodiments, the varying ramp rate may include a progressively increasing ramp rate or a progressively decreasing ramp rate or a combination of segments of progressively increasing and decreasing ramp rates. In one specific embodiment, reactive power is not injected (that is, reactive power of zero value is injected) under normal operating conditions, and, upon the identification of the potential islanding condition, ramping of reactive power starts from zero.
In one embodiment (not shown in the flowchart
With continued reference to
With continued reference to
In one embodiment the ramping up of the amount of power may be done based on an empirical testing depending on reaction of the grid to the ramping up of amount of power. In another embodiment the decision on the ramping up can be taken based on a look up value stored in a database learning system. In another embodiment the ramping up can be done offline or in a close loop condition.
The database learning system could also or alternatively include an artificial neural network based system or a fuzzy logic based system for example. The memory unit may include RAM, ROM and the equivalents thereof. The database learning system may be used to adjust the envelope for nominal operation, if desired. In this way, the database learning system keeps learning, updating, and adapting itself to the grid conditions. In one embodiment of the present invention, the database learning system is employed within the SCADA System 116 of the power generation system shown in
With continued reference to
In a non-limiting example of
While the invention has been described with reference to exemplary embodiments, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the invention without departing from the essential scope thereof. Therefore, it is intended that the invention not be limited to the particular embodiment disclosed as the best mode contemplated for carrying out this invention, but that the invention will include all embodiments falling within the scope of the appended claims.
Panosyan, Ara, Schramm, Simon Herbert, El-Barbari, Said Farouk Said
Patent | Priority | Assignee | Title |
9746511, | Nov 25 2015 | Hitachi, LTD | Estimating the locations of power system events using PMU measurements |
Patent | Priority | Assignee | Title |
6429546, | Nov 20 1998 | Georgia Tech Research Corporation | Systems and methods for preventing islanding of grid-connected electrical power systems |
6810339, | Nov 24 1997 | Beacon Power, LLC | Anti-islanding method and apparatus for distributed power generation |
7408268, | Aug 04 2005 | MARICI HOLDINGS THE NETHERLANDS B V | Anti-islanding method and system for distributed power generation systems |
7843082, | Nov 10 2005 | ABLEREX ELECTRONICS CO , LTD | Islanding detection apparatus for a distributed generation power system and detection method therefor |
7945413, | Sep 04 2007 | ENPHASE ENERGY, INC | Voltage-sensed system and method for anti-islanding protection of grid-connected inverters |
8334618, | Nov 13 2009 | EATON INTELLIGENT POWER LIMITED | Method and area electric power system detecting islanding by employing controlled reactive power injection by a number of inverters |
8681515, | Sep 05 2011 | OCI POWER CO , LTD | Energy generation system and anti islanding protecting method thereof |
20080204044, | |||
20100157634, | |||
20100185336, | |||
20110115301, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Dec 09 2011 | EL-BARBARI, SAID FAROUK SAID | General Electric Company | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 028053 | /0823 | |
Dec 09 2011 | SCHRAMM, SIMON HERBERT | General Electric Company | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 028053 | /0823 | |
Dec 09 2011 | PANOSYAN, ARA | General Electric Company | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 028053 | /0823 | |
Dec 14 2011 | General Electric Company | (assignment on the face of the patent) | / |
Date | Maintenance Fee Events |
Nov 03 2014 | ASPN: Payor Number Assigned. |
Jun 11 2018 | M1551: Payment of Maintenance Fee, 4th Year, Large Entity. |
May 19 2022 | M1552: Payment of Maintenance Fee, 8th Year, Large Entity. |
Date | Maintenance Schedule |
Dec 09 2017 | 4 years fee payment window open |
Jun 09 2018 | 6 months grace period start (w surcharge) |
Dec 09 2018 | patent expiry (for year 4) |
Dec 09 2020 | 2 years to revive unintentionally abandoned end. (for year 4) |
Dec 09 2021 | 8 years fee payment window open |
Jun 09 2022 | 6 months grace period start (w surcharge) |
Dec 09 2022 | patent expiry (for year 8) |
Dec 09 2024 | 2 years to revive unintentionally abandoned end. (for year 8) |
Dec 09 2025 | 12 years fee payment window open |
Jun 09 2026 | 6 months grace period start (w surcharge) |
Dec 09 2026 | patent expiry (for year 12) |
Dec 09 2028 | 2 years to revive unintentionally abandoned end. (for year 12) |