A pressurized water nuclear reactor (PWR) includes a once through steam generator (OTSG) disposed in a generally cylindrical pressure vessel and a divider plate spaced apart from the open end of a central riser. A sealing portion of the pressure vessel and the divider plate define an integral pressurizer volume that is separated by the divider plate from the remaining interior volume of the pressure vessel. An internal control rod drive mechanism (CRDM) has all mechanical and electromagnetomotive components including at least a motor and a lead screw disposed inside the pressure vessel. Optionally CRDM units are staggered at two or more different levels such that no two neighboring CRDM units are at the same level. Internal primary coolant pumps have all mechanical and electromagnetomotive components including at least a motor and at least one impeller disposed inside the pressure vessel. Optionally, the pumps and/or CRDM are arranged below the OTSG.
|
1. An apparatus comprising:
a generally cylindrical pressure vessel defining a cylinder axis, the generally cylindrical pressure vessel comprising a sealing top portion, an upper vessel portion, and a lower vessel portion;
a nuclear reactor core disposed in the lower vessel portion of the generally cylindrical pressure vessel;
a steam annulus,
a feedwater annulus,
a central riser disposed coaxially inside the upper vessel portion of the generally cylindrical pressure vessel, the central riser being hollow and having an end proximate to the nuclear reactor core to receive primary coolant heated by the nuclear reactor core and an open end distal from the nuclear reactor core discharging the primary coolant;
a once-through steam generator (OTSG) comprising a plurality of tubes arranged parallel with the central riser and disposed in an annular volume defined between the central riser and the upper vessel portion of the generally cylindrical pressure vessel, the primary coolant discharged from the open end of the central riser flowing through the OTSG and heating secondary coolant also flowing through the OTSG, the primary coolant and the secondary coolant being disposed in separate flow paths in the OTSG;
neutron-absorbing control rods; and
an internal control rod drive mechanism (CRDM) configured to controllably insert and withdraw the control rods into and out of the nuclear reactor core, the internal CRDM having all mechanical and electromagnetomotive components including at least a motor and a lead screw disposed inside the lower vessel portion of the pressure vessel.
2. The apparatus as set forth in
3. The apparatus as set forth in
4. The apparatus as set forth in
internal primary coolant pumps arranged to circulate primary coolant within the pressure vessel, the internal primary coolant pumps having all mechanical and electromagnetomotive components including at least a motor and at least one impeller disposed inside the lower vessel portion of the pressure vessel, the internal primary coolant pumps arranged below the OTSG to receive primary coolant discharged from the OTSG.
5. The apparatus as set forth in
6. The apparatus as set forth in
7. The apparatus as set forth in
8. The apparatus as set forth in
9. The apparatus as set forth in
10. The apparatus as set forth in
11. The apparatus as set forth in
12. The apparatus as set forth in
|
This application is a continuation-in-part of application Ser. No. 12/891,317 filed Sep. 27, 2010 and titled “COMPACT NUCLEAR REACTOR WITH INTEGRAL STEAM GENERATOR”.
The following relates to the nuclear reactor arts, steam generator and steam generation arts, electrical power generation arts, and related arts.
Compact nuclear reactors are known for maritime and land-based power generation applications and for other applications. In some such nuclear reactors, an integral steam generator is located inside the reactor pressure vessel, which has advantages such as compactness, reduced likelihood of a severe loss of coolant accident (LOCA) event due to the reduced number and/or size of pressure vessel penetrations, retention of the radioactive primary coolant entirely within the reactor pressure vessel, and so forth.
Disclosed herein are further improvements that provide reduced cost, simplified manufacturing, and other benefits that will become apparent to the skilled artisan upon reading the following.
In one aspect of the disclosure, an apparatus comprises: a generally cylindrical pressure vessel defining a cylinder axis; a nuclear reactor core disposed in the generally cylindrical pressure vessel; a central riser disposed coaxially inside the generally cylindrical pressure vessel, the central riser being hollow and having an end proximate to the nuclear reactor core to receive primary coolant heated by the nuclear reactor core and an open end distal from the nuclear reactor core discharging the primary coolant; a once through steam generator (OTSG) disposed in an annular volume defined between the central riser and the generally cylindrical pressure vessel, the primary coolant discharged from the open end of the central riser flowing through the OTSG and heating secondary coolant also flowing through the OTSG, the primary coolant and the secondary coolant being disposed in separate flow paths in the OTSG; and internal primary coolant pumps arranged to circulate primary coolant within the pressure vessel, the internal primary coolant pumps having all mechanical and electromagnetomotive components including at least a motor and at least one impeller disposed inside the pressure vessel.
In another aspect of the disclosure, an apparatus comprises: a pressurized water nuclear reactor (PWR) including a generally cylindrical pressure vessel defining a cylinder axis, a nuclear reactor core disposed in the generally cylindrical pressure vessel, and a hollow central riser disposed coaxially inside the generally cylindrical pressure vessel with an end proximate to the nuclear reactor core to receive primary coolant heated by the nuclear reactor core and an open end distal from the nuclear reactor core discharging the primary coolant; a once through steam generator (OTSG) disposed in the pressure vessel and including a primary coolant flow path and a secondary coolant flow path, primary coolant flowing in the primary coolant flow path heating secondary coolant flowing in the secondary coolant flow path to generate secondary coolant comprising steam; and a divider plate spaced apart from the open end of the central riser. The generally cylindrical pressure vessel includes a sealing portion cooperating with the divider plate to define an integral pressurizer volume that is separated by the divider plate from the remaining interior volume of the generally cylindrical pressure vessel. The integral pressurizer volume contains primary coolant at a pressure greater than a pressure of primary coolant disposed in the remaining interior volume of the generally cylindrical pressure vessel.
In another aspect of the disclosure, an apparatus comprises: a generally cylindrical pressure vessel defining a cylinder axis; a nuclear reactor core disposed in the generally cylindrical pressure vessel; a central riser disposed coaxially inside the generally cylindrical pressure vessel, the central riser being hollow and having an end proximate to the nuclear reactor core to receive primary coolant heated by the nuclear reactor core and an open end distal from the nuclear reactor core discharging the primary coolant; a once through steam generator (OTSG) disposed in an annular volume defined between the central riser and the generally cylindrical pressure vessel, the primary coolant discharged from the open end of the central riser flowing through the OTSG and heating secondary coolant also flowing through the OTSG, the primary coolant and the secondary coolant being disposed in separate flow paths in the OTSG; neutron absorbing control rods; and an internal control rod drive mechanism (CRDM) configured to controllably insert and withdraw the control rods into and out of the nuclear reactor core, the internal CRDM having all mechanical and electromagnetomotive components including at least a motor and a lead screw disposed inside the pressure vessel.
The invention may take form in various components and arrangements of components, and in various process operations and arrangements of process operations. The drawings are only for purposes of illustrating preferred embodiments and are not to be construed as limiting the invention.
With reference to
Reactor control is provided by upper internal neutron-absorbing control rods 22 and a control rod drive mechanism (CRDM) 24 that is configured to controllably insert and withdraw the control rods into and out of the nuclear reactor core 10. Diagrammatic
The diagrammatically illustrated CRDM 24 may include one or more CRDM units including various combinations of CRDM units of the described types or other CRDM unit configurations providing gray and/or shutdown rod functionality. The illustrative CRDM 24 is an internal CRDM in which all mechanical and electromagnetomotive components, including the motor, lead screw, connecting rod, and so forth are disposed inside the pressure vessel 12, 14, 16, with only electrical wires, hydraulic lines, or other power or control leads connecting with these components. In other contemplated embodiments, the CRDM may employ external CRDM units in which the motor is mounted outside the pressure vessel, for example above or below.
With continuing reference to
Alternatively, an external pump can be employed, for example having an external stator and a rotor coupled with the pressure vessel volume via a suitable conduit or tube, or the circulation pumps may be omitted entirely, as per natural circulation reactor embodiments. The use of external pumps has the advantage of easier access for pump repair or replacement.
The nuclear reactor is further described with continuing reference to
The primary coolant flow path in the illustrative reactor is as follows. The central riser 36 has a bottom end proximate to the nuclear reactor core 10 to receive primary coolant heated by the nuclear reactor core 10, and a top end distal from the nuclear reactor core 10. Primary coolant heated by the nuclear reactor core 10 flows upward through the central riser flow path 38 inside the central riser 36. At the top of the central riser 36 the primary coolant flow turns approximately 180° (that is, from flowing generally upward to flowing generally downward). The primary coolant enters the tubes 32 of the OTSG 30 and flows downward through the tubes 32. The primary coolant is discharged from the lower ends of the tubes 32 into a primary outlet plenum 44, which passes the primary coolant flow back to the reactor inlet annulus 18 and back to the reactor core 10. In the illustrative embodiment, the illustrated internal reactor coolant pumps 26 are located on the cold side below the steam generator 30. In some embodiments, the coolant pumps 26 drive the primary coolant flow. In some embodiments, the coolant pumps 26 provide assistance to natural circulation driving the primary coolant flow. In either case, the location of the coolant pumps 26 on the cold side below the steam generator 30 advantageously promotes flow of the cooled primary coolant through the complex approximately 180° turn as the primary coolant is redirected upward into the core 10. The placement of the primary coolant pumps 26 on the cold side below the steam generator 30 also reduces the temperature and thermal stress on the coolant pumps 26, thus further facilitating the use of internal reactor coolant pumps 26.
With continuing reference to
With continuing reference to
In the illustrative embodiment, the fluid flow volume of the OTSG 30 is defined by the outer and inner shrouds 40, 42 that are separate from the central riser 36 and the upper portion 14 of the pressure vessel. Advantageously, this enables the OTSG 30 to be constructed as a unit including the tubes 32 and surrounding shrouds 40, 42, and to then be installed as a unit in the upper portion 14 of the pressure vessel. However, it is also contemplated for the inner shroud to be embodied as the outer surface of the central riser 36, and/or for the outer shroud to be embodied as an inner surface of the upper portion 14 of the pressure vessel.
In embodiments which include the outer shroud 40 which is separate from the upper pressure vessel portion 14 (as in the illustrative embodiment), an annular space between the outer shroud 40 and the pressure vessel 14 may optionally be employed for a useful purpose. In the illustrative example, the annular space between the outer shroud 40 and the pressure vessel 14 defines a feedwater annulus 60 between an outer shroud 40 of the OTSG 30 and the pressure vessel (upper portion 14) buffers feedwater injected into the fluid flow volume at the feedwater inlet 50. Similarly, a steam annulus 62 between the outer shroud 40 of the OTSG 30 and the pressure vessel (upper portion 14) buffers steam discharged from the fluid flow volume at the steam outlet 52.
In some embodiments, the feedwater annulus and the steam annulus have equal inner diameters and equal outer diameters. In such embodiments the outer shroud and the relevant pressure vessel portion have constant diameters over the axial length of the annuluses. In the illustrative embodiment, however, the feedwater annulus 60 has a larger outer diameter than the steam annulus 62. This is obtained by increasing the diameter of the upper pressure vessel portion 14 surrounding the feedwater annulus 60 as compared with the diameter of the upper pressure vessel portion 14 surrounding the steam annulus 62. In the illustrative embodiment the diameter of the outer shroud 40 remains constant over the axial length of the annuluses 60, 62. This configuration allows a larger local inventory of water so that the time available for steam generator boil-off is relatively longer in the event of a loss-of-feedwater (LOFW) accident.
With reference to
With reference to
Omitting fluid couplings between the steam generator and the coolant pumps facilitates independent maintenance of the steam generator 30 and the pumps 26. For example, during an opening of the pressure vessel the steam generator 30 can be removed from the pressure vessel while leaving the coolant pumps 26 intact and in place in the pressure vessel. Conversely, if suitable manways are provided for accessing the pumps 26, an individual coolant pump 26 can be removed or replaced while leaving both the steam generator 30 and the other coolant pumps 26 in intact and in place in the pressure vessel. Removal or replacement of either the steam generator 30 or one (or more) of the pumps 26 is also advantageously simplified since there are no steam generator/pump fluid couplings to disengage or engage.
With reference to
The stator 2602 and the rotor 2604 cooperatively define a motor imparting torque that turns the rotating assembly 2604, 2612, 2614. Substantially any motor design can be employed. In the illustrative example of
Because the internal primary coolant pumps 26 are not coupled with the steam 30, the inlet 2608 and outlet 2610 of the pump 26 are not constrained to have any particular coupling connector or other particular configuration. In the illustrative pump 26 diagrammatically shown in
The placement of the illustrative internal primary coolant pumps 26 is advantageous for the illustrative embodiment, since it facilitates fluid flow through the dogleg at the primary outlet plenum 44. In other embodiments, a different placement of the internal primary coolant pumps may be advantageous. In general, because the internal coolant pumps 26 are not coupled with the steam generator or any other component, they can be placed anywhere in the primary coolant flow circuit. Placement in the cold leg, as illustrated, advantageously reduces operating temperature and thermal stress on the pumps 26; however, placement in the hot leg is also contemplated. Although not illustrated, placement higher up in the pressure vessel, for example in the central riser flow path 38 inside the central riser 36 (which would place the pumps in the hot leg of the primary coolant flow circuit), is also contemplated so as to improve accessibility of the pumps for maintenance or replacement. Still further, it is contemplated to place internal primary coolant pumps at various places in the primary coolant flow circuit—for example, the embodiment illustrated in
As previously mentioned, the illustrative nuclear reactor is a pressurized water reactor (PWR) in which the primary coolant is sub-cooled and maintained under positive pressure. In some embodiments, the pressurization of the primary coolant is provided by an external pressurizer. However, in the illustrative embodiment the pressurization of the primary coolant is provided by an internal pressurizer. In this configuration, the flow diverter 72 also serves as a part of the divider plate 75 spaced apart from the top end of the central riser 36 by the aforementioned primary inlet plenum 74. The generally cylindrical pressure vessel 12, 14, 16 (and, more precisely, the upper pressure vessel portion 14) includes a sealing top portion 78 cooperating with the divider plate 75 to define an integral pressurizer volume 80 that is separated by the divider plate 75 from the remaining interior volume of the generally cylindrical pressure vessel 12, 14, 16. In the operating state of the PWR, the integral pressurizer volume 80 contains fluid (saturated primary coolant, liquid and steam) at a temperature that is greater than the temperature of the primary coolant disposed in the remaining interior volume of the generally cylindrical pressure vessel 12, 14, 16. In this embodiment, the saturation temperature is maintained by pressurizer heaters 82 (shown only in
Having set forth an illustrative integral PWR as an illustrative example in
In one illustrative quantitative example, the reactor core 10 in the operating state operates at 425 MW thermal. The hot reactor coolant water flows in a circuit, called the hot leg, which includes the space above the core flowing around the CRDM's 24. The hot leg extends up the central riser 36 to the inlet plenum 74, wherein the reactor coolant subsequently enters into the tubes 32 of the straight-tube OTSG 30 via the central riser flow path 38. The straight-tube OTSG 30 encircles the central riser 36 and includes the annular array of steam generator tubes 32 disposed in the annulus between the central riser 36 and the outer shroud 40 of the OTSG 30. An advantage of this configuration is that the central riser 36 is a high pressure component separating the high pressure reactor primary coolant at 1900 psia (in this illustrative quantitative embodiment) from the lower pressure secondary coolant which in this example is at 825 psia. The use of an internal pressure part via the central riser 36 yields a compact and efficient design since the primary pressure boundary is internal to the steam generator 30 and serves the dual use as a riser defining the flow path 38 for the hot leg. One design consideration is that there is differential thermal expansion between central riser 36, the tubes 32, and the upper vessel 14. The differential expansion is further complicated by the feedwater annulus 60 containing feedwater at a substantially lower temperature than the steam in the steam annulus 62, which results in a range of temperatures in the upper vessel 14, causing additional thermal stress.
One approach for mitigating the effect of these differential stresses is to balance the stresses over the operational and non-operational range of conditions of the steam generator. In one illustrative example, the tubes 32 are made of an austenitic nickel-chromium-based alloy, such as Inconel™ 690, and the tubes 32 are secured in a support made of steel. The support includes an upper tubesheet 90 and a lower tubesheet 92 (diagrammatically indicated in
With brief reference to
In some embodiments, in the operating state the OTSG 30 defines an integral economizer that heats feedwater injected into the fluid flow volume at the feedwater inlet 50 to a temperature at or below a boiling point of the feedwater. In such embodiments, the straight-tube OTSG 30 is an integral economizer (IEOTSG) design since the feedwater is heated by flow outside of the tubes 32. Feedwater enters through the feedwater nozzles 50, distributes throughout the feedwater annulus 60, and enters the tubes 32 via a gap or other passage (not shown) between the bundle shroud 40 and the lower tubesheet 92. In the operating mode, feedwater flows outside of the tubes 32 and there is forced convection heat transfer from the primary coolant flow to the feedwater flow followed by subcooled and saturated boiling to form the steam flow. Once the critical heat flux is reached at approximately 95% steam quality, the steam goes through a transition to stable film boiling followed by dryout at 100% steam quality. Thereafter in the tube bundle, the forced convection to steam raises the temperature to superheated conditions at which the steam exits the steam generator via the steam outlet annulus 62 and the steam outlet nozzle 52. The superheated steam does not require moisture separators before the steam is delivered to the steam turbine (although it is contemplated to include moisture separators in some embodiments). Some further aspects of the integral pressurizer are next described. The pressurizer controls the pressure of the primary coolant via the pressurizer heaters 82 and the pressurizer spray nozzles 84. To increase system pressure, the heaters 82 are turned on by a reactor control system (not shown). To decrease pressure, the spray nozzles 84 inject cold leg water from the top of the reactor inlet annulus 18 on the discharge side of the reactor coolant pumps 26 via a small external line (not shown). The pressurizer volume 80 is formed by a divider plate 70 which separates the space between the primary inlet plenum 74 and the pressurizer volume 80. The divider plate 70 optionally also serves as a flow diverter by including a perforated cylinder 124 (
The central riser 36 forms a path 38 for the primary coolant flow leaving the reactor core 10 to reach the primary inlet plenum 74 of the steam generator 30. In this embodiment there is no horizontal run of piping for this purpose. As a result, if the reactor is operated in a natural circulation mode with the reactor coolant pumps 26 turned off (as may occur during a malfunction or loss of electrical power causing the pumps 26 to stop operating), the hot rising primary coolant is only impeded by the upper internals (e.g., the CRDM's 24). This flow resistance is not large compared to the flow resistance of the care 10 and the steam generator tubes 32 because the flow area is relatively large. The flow resistance of the central riser 36 is also a relatively small percentage of the total because of the large diameter of the path 38. The large inlet 2608 and outlet 2610 of the coolant pumps 26 further reduces flow resistance.
In some existing nuclear steam supply systems, after a loss of coolant accident (LOCA) steam and non-condensable gases can collect at the high points of the reactor coolant pipes, and can inhibit the natural circulation loop between the reactor core and the steam generators. Advantageously, the straight-tube OTSG 30 with integral pressurizer volume 80 disclosed herein automatically removes non-condensable gases from the primary coolant circulation loop since there is only one high point at the top of the pressurizer volume 80. Buoyancy causes the non-condensable gases and vapor to go to the top of the pressurizer volume 80, where these gases and vapor do not interfere with the natural circulation loop.
Another advantage of the disclosed straight-tube OTSG 30 is that it can optionally operate in multiple modes to remove decay heat from the reactor core 10. Starting with the normal operating state, if the reactor coolant pumps 26 stop operating, then the primary coolant water continues to circulate, albeit now via natural circulation, through the core 10 and through the steam generator tubes 32. As long as there is feedwater supplied to the inlet 50 of the steam generator 30, there is a large tube surface area to remove radioactive fission product heat from the core 10. If the primary coolant level falls below the level of the primary inlet plenum 74 during a LOCA, then the straight-tube OTSG 30 can operate as a condenser. In this mode, steam from boiling water in the reactor core 10 rises to fill the primary inlet plenum 74 and the pressurizer volume 80. The lower temperature water and steam on the secondary side (that is, in the fluid flow volume defined outside the tubes 32 by the shrouds 40, 42) causes condensation inside the steam generator tubes 30. By gravity alone, the condensate flows out of the steam generator tubes 32 into the primary outlet plenum 44 where it is returned to the core 10.
In the straight-tube OTSG 30, the primary coolant pressure is inside the tubes 32. The primary coolant is at a substantially higher pressure than the secondary coolant flowing through the fluid flow volume defined outside the tubes 32 by the shrouds 40, 42. In some embodiments, in the operating state of the nuclear reactor the primary coolant flowing inside the tubes 32 is at a pressure that is at least twice a pressure of the secondary fluid (feedwater or steam) in the fluid flow volume. This enables the use of a thinner tube wall in tension. In contrast, if the primary coolant flows outside the tubes then the tube is in compression and a thicker tube wall is generally required. Some analyses have indicated that the tube wall in the tension design of the present OTSG embodiments can be made about one-half as thick as the tube wall thickness required for tubes placed in compression (for comparable tube diameter).
The use of thinner tube walls translates into the OTSG 30 being substantially lighter and including substantially less Inconel™ 690 or other nickel-chromium-based alloy material used for the tubes 32. The weight saving of the straight-tube OTSG 30 is advantageous for an integral nuclear reactor. For example, in the illustrative embodiment of
The straight-tube OTSG 30 also has service and maintenance advantages. Manways are readily provided proximate to the pressurizer volume 80 and the primary inlet plenum 74 to provide service access. Inspection of the tubes 32 can be performed during a plant outage via the primary inlet plenum 74 without removing the steam generator 30 from the pressure vessel. Eddy current inspection thusly performed can reveal tube thinning and tube cracks. If tube plugging is indicated by such inspection, the steam generator 30 can be removed during the outage and tube plugs can be installed at the lower tubesheet 92 and the upper tubesheet 90. In another approach, both tube inspection and tube plugging can be done during refueling when the steam generator 30 is placed off to the side of the reactor. In this case, there is easy access from the bottom for tube inspection and plugging.
With reference back to
With reference to
As the pressurizer volume 80 of the embodiment of
As another illustrative variation (not shown), the tubes of the OTSG can be placed in different locations within the pressure vessel. In the illustrative embodiments of
As other illustrative variations, it has already been noted that the separate inner shroud 42 may instead be embodied as an outer surface of the central riser 36, and/or for the separate outer shroud 40 may instead be embodied as an inner surface of the upper portion 14 of the pressure vessel. Additionally, it is contemplated to integrate the lower tubesheet 92 with the mid-flange 16.
With reference back to
The preferred embodiments have been illustrated and described. Obviously, modifications and alterations will occur to others upon reading and understanding the preceding detailed description. It is intended that the invention be construed as including all such modifications and alterations insofar as they come within the scope of the appended claims or the equivalents thereof.
Malloy, John D., Ales, Mathew W.
Patent | Priority | Assignee | Title |
Patent | Priority | Assignee | Title |
4045283, | Dec 30 1974 | Combustion Engineering, Inc. | Control rod and/or instrument tree assembly |
4072563, | Jun 24 1976 | The Babcock & Wilcox Company | Industrial technique for an integral compact reactor |
5045274, | Jun 13 1988 | Rolls-Royce and Associates Limited | Water cooled nuclear reactors |
6357114, | Nov 01 1999 | BABCOCK & WILCOX CANADA, LTD | Hydraulic expansion pre-straining of heat exchanger tubing |
20100316181, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Oct 25 2010 | Babcock & Wilcox mPower, Inc. | (assignment on the face of the patent) | / |
Date | Maintenance Fee Events |
Date | Maintenance Schedule |
Mar 24 2018 | 4 years fee payment window open |
Sep 24 2018 | 6 months grace period start (w surcharge) |
Mar 24 2019 | patent expiry (for year 4) |
Mar 24 2021 | 2 years to revive unintentionally abandoned end. (for year 4) |
Mar 24 2022 | 8 years fee payment window open |
Sep 24 2022 | 6 months grace period start (w surcharge) |
Mar 24 2023 | patent expiry (for year 8) |
Mar 24 2025 | 2 years to revive unintentionally abandoned end. (for year 8) |
Mar 24 2026 | 12 years fee payment window open |
Sep 24 2026 | 6 months grace period start (w surcharge) |
Mar 24 2027 | patent expiry (for year 12) |
Mar 24 2029 | 2 years to revive unintentionally abandoned end. (for year 12) |