Tubulars are joined to each other without rotation of the tubulars. A coupling is placed between the aligned tubulars and is supported for rotation or oscillating about its longitudinal axis. The tubulars are clamped in a manner that allows a compressive force to be transmitted to the coupling as the coupling is rotated. An induction device can preheat each connection site before friction welding and/or provide heat as the connection is made and is allowed to cool down. The process can continuously create a string of casing or liner that can be run in or drilled into a wellbore.
|
1. A method of joining tubulars with friction welding for forming a tubular string to be delivered to a subterranean location, comprising:
aligning end walls ends of tubulars to be welded, each said end wall defined by an inner edge and an outer edge;
introducing a tubular segment between said tubulars, said tubular segment having opposed end walls having an inner edge and an outer edge;
bringing said tubular end walls together against opposing end walls of said segment to put said end walls ends under axial compressive stress; and
joining said tubular end walls ends to said opposing end walls of said segment using combined movement patterns of said tubular segment, wherein the combined movement comprises opposed oscillating movement at one frequency and a linear movement at a different frequency in a direction perpendicular to an axis of said aligned tubulars.
2. The method of
rotating said segment about a segment longitudinal axis in at least one direction.
4. The method of
performing said oscillating about a segment longitudinal axis.
6. The method of
maintaining a predetermined temperature at said tubular walls ends of said tubulars with said varying compressive stress.
7. The method of
sensing the temperature at one of said tubular walls ends during said joining.
9. The method of
adding or removing heat to said tubular segment before or during said joining.
12. The method of
using at least one motor to rotate said tubular segment in at least one direction.
13. The method of
providing a split in said frame to facilitate removal of said frame after said joining.
14. The method of
16. The method of
maintaining a predetermined temperature at said end walls ends of said tubulars with said varying compressive stress.
17. The method of
sensing the temperature at one of said end walls ends during said joining.
19. The method of
adding heat to said tubular segment before or during said joining.
21. The method of
|
The field of the invention is joining tubulars with friction welding and more particularly with an intermediate rotating or oscillating coupling with an optional induction unit for heating before, during or after the connection is made with compression applied to the fitting.
Tubulars such as casing or liners are most frequently joined with threaded connections. These connections when used in a drilling environment are subject to fatigue from the dynamic loads encountered during such drilling procedures. There is a need to enhance the fatigue life of such connections.
Friction stir welding techniques have been used to join tubulars where the tubulars are butted together or alternatively with a shim introduced between them and the welding apparatus is rotated around the tubulars on its own axis while pushed into the junction of the tubulars as shown in US Publication 2010/0136369. In U.S. Pat. No. 3,779,446 the axis of the welding apparatus in
The common theme to many of these techniques is to insert a ring shaped member in a notch formed by ends of adjacent tubulars and apply radial force to the ring while it is rotated. The present invention applies axial force to a rotated or oscillating coupling through the tubular ends that are to be joined to opposing ends of the coupling. An induction heating device can be deployed at each connection to preheat the connection location before the friction welding begins during or/and after the connection is made. The use of the present invention enhances energy efficiency, weld quality, material selection choices and connection reliability; while enabling reduced equipment size and cost. These and other features of the present invention will be more readily apparent from a review of the detailed description and the associated drawing while recognizing that the full scope of the invention is to be determined from the appended claims.
Tubulars are joined to each other without rotation of the tubulars. A coupling is placed between the aligned tubulars and is supported for rotation about its longitudinal axis. The tubulars are clamped in a manner that allows a compressive force to be transmitted to the coupling as the coupling is rotated. An induction device can preheat each connection site before friction welding and/or provide heat as the connection is made and is allowed to cool down. The process can continuously create a string of casing or liner that can be run in or drilled into a wellbore.
The FIGURE illustrates two tubulars with a spaced coupling that can be rotated to make a connection at opposed ends using axial compression of the coupling provided by axial force through the tubulars that form the string being assembled.
Referring to the FIGURE an upper tubular 10 is to be joined to a lower tubular 12. A coupling or short tubular segment 18 that has opposed ends 20 and 22 is gripped by a frame 14 that has a capability of rotating the segment 18.
The lower end 24 of the upper tubular 10 is aligned with end 20 of the segment 18. These ends can be parallel or notched into a v-shape with the tapered gap enlarging toward the outside surfaces 26 and 28. Similarly the upper end 30 of the lower tubular 12 is aligned with end 22 of the segment 18 with the ends being parallel or tapered with the gap enlarging toward outside surfaces 28 and 32. Arrows 34 and 36 represent schematically a device that applies a compressive force onto segment 18 as it is gripped and rotated in either clockwise or counterclockwise directions by the gripping and rotating assembly 16. There can be one or more than one gripping and rotating assembly 16. Optionally the frame 14 can be split so that it can open to release the assembly of tubulars 10 and 12 joined to segment 18 by lateral movement. Alternatively in a one piece construction of the frame 14 the assembled string can be supported with slips on the rig floor so that the frame can be cleared of the top tubular 10 and reloaded with another segment 18 for the process to repeat.
One or more induction heaters 38 or 40 can be located at opposed ends or one end of the segment 18. These can be used to preheat the friction welding locations either before the weld is made, during welding or for heat treatment after the weld is completed.
The frequency of the induction heating field can be changed in each heater and during each process step depending on material properties and process parameters to control the depth of the heating zone and temperature distribution within the weld and the parts to be connected. High frequency fields tend to concentrate the heat up zone on surface and low frequency fields (e.g. 50 Hz) allow the heat up zone to go deeper in to the parts to be treated.
Instead of 360° rotation of the segment 18 it can be oscillated with either opposed rotational movements, more linear movement pattern e.g. perpendicular to the rotation axis or combined movement patterns e.g. opposed rotational movements +/−0.5° with 50 Hz and 0.2 mm radial movement with 100 Hz. Combined movement patterns support self cleaning and material unification of the weld and reduce required rotation speed of the segment.
The compressive force can be applied upon the start of the movement of the segment 18 or it can be applied thereafter. The local temperature can be monitored at the weld locations with an external sensor shown schematically as S to a desired value by control of the compressive force indicated by arrows 34 and 36.
Those skilled in the art will now appreciate that tubulars can be joined without rotating them by using an intervening segment which is rotated or oscillated while being placed in a compressive loading situation to control the formation of the friction weld. The one of the tubulars can be axially advanced toward the other or both can be forced toward the segment as it rotates or oscillates for weld formation. The segment can be preheated before being placed into welding position with preferably an induction heating device or the heating can occur just before the welding with the segment in position to preheat the segment. After the weld is completed further heating can be applied in the same manner for stress relieving or other purposes.
As another option the two tubulars can be abutted and relatively moved or rotated with axially applied compressive force to friction weld them to each other.
Cooling and gas shielding functionality can be added if needed.
The connection sleeve might be made out of a different material than the base material of the tubulars that it connects with the goal to improve weld performance parameters such as strength, expandability or quality. Some materials might be welded or expanded only with a connection sleeve made of a suitable material.
The above description is illustrative of the preferred embodiment and many modifications may be made by those skilled in the art without departing from the invention whose scope is to be determined from the literal and equivalent scope of the claims below:
Patent | Priority | Assignee | Title |
10155283, | Apr 11 2013 | FUJICO CO., LTD. | Method for manufacturing mill roll, mill roll and manufacturing apparatus of mill roll |
10926350, | Jul 28 2017 | SPINDUCTION WELD, INC | Integrated heat treatment apparatus and method for autogenous welding |
11072036, | Dec 29 2016 | SPINDUCTION WELD, INC | Concentric welded pipes with condition monitoring capability and method of manufacture |
11413699, | Aug 21 2019 | Method and system for fusing pipe segments | |
11577295, | Apr 03 2019 | System and method for connecting metal workpieces | |
11597032, | Mar 17 2020 | Method and system for modifying metal objects | |
11602802, | Aug 21 2019 | Method and system for fusing pipe segments | |
11717913, | Aug 21 2019 | Method and system for fusing pipe segments | |
11872651, | Nov 12 2019 | OSAKA UNIVERSITY | Dissimilar material solid phase bonding method, dissimilar material solid phase bonded structure, and dissimilar material solid phase bonding device |
Patent | Priority | Assignee | Title |
3538592, | |||
3609854, | |||
3745641, | |||
3753820, | |||
3779446, | |||
3820231, | |||
3848793, | |||
3874067, | |||
4060190, | Feb 21 1973 | Naphtachimie | Process for joining tubular members of great length |
4063676, | Dec 02 1974 | The Welding Institute | Friction welding methods and apparatus |
4331280, | Jul 24 1978 | Hitachi, Ltd. | Method of jointing pipes by friction welding |
5071053, | May 03 1989 | Shell Research Limited | Method and device for joining well tubulars |
5697545, | Jul 15 1994 | British Nuclear Fuels PLC | Method of friction welding |
6142360, | Mar 09 1996 | Stolt Offshore Limited | Method of friction welding tubular members |
6634540, | Jun 01 1999 | Denys, Naamloze Vennootschap | Method and device for welding elongated elements |
6637642, | Oct 02 1998 | SPINDUCTION WELD INC | Method of solid state welding and welded parts |
7168606, | Feb 06 2003 | Wells Fargo Bank, National Association | Method of mitigating inner diameter reduction of welded joints |
7267258, | Sep 30 2002 | voestalpine Schienen GmbH | Method for metallically connecting rods by oscillating friction welding |
7441689, | Jul 24 2003 | Multi Orbital Systems GmbH | Orbital friction welding method and device for carrying out said method |
20100136369, | |||
GB2322586, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Jan 10 2013 | Baker Hughes Incorporated | (assignment on the face of the patent) | / | |||
Jan 10 2013 | LEHR, JOERG | Baker Hughes Incorporated | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 029607 | /0144 |
Date | Maintenance Fee Events |
Mar 20 2015 | ASPN: Payor Number Assigned. |
Sep 20 2018 | M1551: Payment of Maintenance Fee, 4th Year, Large Entity. |
Sep 20 2022 | M1552: Payment of Maintenance Fee, 8th Year, Large Entity. |
Date | Maintenance Schedule |
Apr 07 2018 | 4 years fee payment window open |
Oct 07 2018 | 6 months grace period start (w surcharge) |
Apr 07 2019 | patent expiry (for year 4) |
Apr 07 2021 | 2 years to revive unintentionally abandoned end. (for year 4) |
Apr 07 2022 | 8 years fee payment window open |
Oct 07 2022 | 6 months grace period start (w surcharge) |
Apr 07 2023 | patent expiry (for year 8) |
Apr 07 2025 | 2 years to revive unintentionally abandoned end. (for year 8) |
Apr 07 2026 | 12 years fee payment window open |
Oct 07 2026 | 6 months grace period start (w surcharge) |
Apr 07 2027 | patent expiry (for year 12) |
Apr 07 2029 | 2 years to revive unintentionally abandoned end. (for year 12) |