The claimed invention relates to the power industry and can be used for locating short circuits in power transmission lines by measuring the instantaneous current and voltage values when unsynchronized measurements are taken at both ends of the line. It is a technological object of the invention to improve the accuracy of damage location. The technical result of the invention is achieved by accurately synchronizing the current and voltage values measured at the ends of the line and unsynchronized in time on measurement. Synchronization is effected by aligning the oscillograms at both ends of the line with the short circuit start section.
|
1. A method for locating a short circuit point in an overhead power transmission line by taking unsynchronized measurements at both ends thereof, said line having a length l, a real resistance r, and an inductive resistance xl and connecting two supply systems, said method comprising measuring the phase currents and voltages unsynchronized in time at both ends of the line during a short circuit; identifying the damaged phases; and determining the relative distance n to the short circuit point at the end of the line marked by ′ from the formula l′=n*l, where l′ represents when a short circuit occurs in the line; wherein the instantaneous values of phase currents (i′A,i′B,i′C) and (i″A,i″B,i″C) and voltages (u′A,u′B,u′C) and (u″A,u″B,i″C) are measured at both ends of the line (′ designates one end of the line and ″ marks the other end of the line) during a short circuit; oscillograms are constructed for currents and voltages; the oscillograms at both ends of the line are aligned in the short circuit start section; a section in the oscillograms of damaged phase current and voltage is chosen within the interval of two to ten periods from the start of the short circuit; the instantaneous values of currents i′ and i″ and voltages u′ and u″ are read off in the section and at neighboring points; time-specific current derivatives di′/dt and di″/dt are calculated; and the relative distance n to the short circuit point is determined from the formula:
wherein:
u′ and u″ are instantaneous voltage values obtained in the section of the damaged phase voltage oscillograms at one and the other ends of the line (V);
i′ and i″ are instantaneous current values obtained in the section of the damaged phase current oscillograms at one and the other ends of the line (A);
di′/dt and d″/dt are time-specific current derivatives (A/C); and
r and xl are the real and inductive phase resistances of the line (Ohms).
|
Applicant claims priority under 35 U.S.C. §119 of Russian Application No. 2012145289 filed on Oct. 24, 2012, the disclosure of which is incorporated by reference.
The claimed invention relates to the power industry and is suitable for locating a short circuit in power transmission lines by unsynchronized measurements taken at both ends thereof.
The invention relates to a prioritized area in the development of science and engineering, “Technologies for Developing Energy-Efficient Systems for Transmission, Distribution, and Consumption of Heat and Electric Power (Alphabetical and Subject Index to the International Patent Classification of Priority Development Areas of Science and Technologies),” Yu. G. Smirnov, Ye. V. Skidanova, and S. A. Krasnov, Patent Publishers, Moscow, 2008, p. 97), because it reduces delays in electric power delivery to consumers in consequence of damage caused to power transmission lines.
A prior art method for locating damage to overhead electric power transmission lines (Application RU No. 2009137563/28, G01R31/08, January 2006, published on Apr. 20, 2011) provides for measuring phase voltages and currents at both ends of the line, converting the measured values to compound rated values using the formulas claimed in the application, and further using the imaginary parts of the rated values to calculate the relative and physical distances of the damage point from the ends of the line. The prior art method does not use the equivalent parameters of the supply systems, and it eliminates the influence of the transient resistance.
The prior art invention has the following features identical to the essential features of the claimed method: measurement taken at both ends of the line (′ designates one end of the line and ″ marks the second end of the line) that are not synchronized according to the angles of phase currents (İ′A,İ′B,İ′C) and (İ″A,İ″B,İ″C) and voltages ({dot over (U)}′A,{dot over (U)}′B,{dot over (U)}′C) and ({dot over (U)}″A,{dot over (U)}″B,{dot over (U)}″C) of the reference frequency at the short circuit time by calculation using the results of measurements taken at both ends of the line, and determination of the relative distance n to the short circuit point and the distance lk=n·l to the short circuit point.
The prior art method is disadvantageous because it requires the imaginary components of the rated values only to be used.
This disadvantage may cause an error in locating the damage point because of insufficient data of the parameters used.
Another prior art method is used to locate a short circuit point in an overhead power transmission line by measuring the instantaneous current and voltage values at one end of the line (“Methods and Devices for Locating Short Circuit in a Line,” Textbook, Ivanovo State Electrical Engineering University, 1998).
The method of the textbook provides for measuring the phase current, zero-sequence current, and phase voltage at one end of the line and choosing the time moment when current at the short circuit point is equal to zero as suggestion that the voltage drop at the transient resistance is equal to zero, and the distance to the short circuit point is found from the ratio of the instantaneous voltage value at that end of the line to the specific voltage drop per kilometer of the line.
The distance to the short circuit point is found similarly by measurements at the other end of the line.
The features of the prior art method that are identical to the essential features of the claimed method include measurement of the phase currents (i′A,i′B,i′C) and (i″A,i″B,i″C) and voltages (u′A,u′B, u′C) and (u″A,u″B,u″C) unsynchronized in time on short circuit occurrence, and finding the relative distance n to the short circuit point and the distance lk=n·l to the short circuit point by calculations based on measurements at both ends of the line.
The prior art method is disadvantageous because it gives no consideration to the shift angle between the vector diagrams at the ends of the line at the short circuit time and requires the zero-sequence current to be measured in addition to the phase current. Besides, the method is practiced in integral values only and is only described analytically in instantaneous values. It is not clear, therefore, how the instantaneous voltage at the given end of the line and the specific voltage drop per kilometer of the line at the moment when the zero-sequence current i0 crosses the zero instantaneous value is substituted with the calculated projection to an imaginary axis normal to the vector of the zero-sequence current I0 of the integral values UΦ, and ΔUΦ and the distance to the short circuit point is determined from the imaginary values of the said integral quantities.
This disadvantage may result in error in locating the damage point because of insufficient data of the parameters used.
A further prior art method for locating the damage point in an overhead power transmission line (“Technology of Parameter Vector Registration and Its Use for Controlling the Operation Modes of the Russian Integrated Power System,” Electro, No. 2, 2011, pp. 2-5) chosen by the applicants as immediate prior art dispenses with the need for using imaginary rated values. The prior art method provides for preliminary measurement of the angle between currents at the ends of the line by using digital communication channels between the line ends or by satellite time synchronization. When digital communication channels are used, the angles are measured by taking samples synchronized in time or by constantly calculating the time it takes the signal to pass between the differential line protection half-sets. When satellite time synchronization is used, time synchronization pulses are received from GLONASS (GPS) signal receivers. Next, phase voltages and currents are measured at both ends of the line and converted to rated compound values using the formulas given in the method description, and then the integral parts of the rated values are used to calculate relative and physical distances of the damage point from the line ends. The method does not use the equivalent parameters of the supply systems and it eliminates the influence of the transient resistance.
The features of the immediate prior art method identical to the essential features of the claimed method include measuring phase currents and voltages at the time of short circuit in the line at both ends thereof, giving consideration to the angle between the currents and voltages at the ends of the line, and determining the distance to the short circuit point from the ratio of the quantities measured.
The basic distinction of the prior art method is the possibility of consideration being given to the influence of supply coming from the opposite end of the line and the error caused by the transient resistance at the short circuit point being eliminated. The method does not require a full-scale simulation of the grid, that is, a program for calculating the steady and emergency operating modes of the grid. Besides, it does not require preliminary measurements of the load current to be made and used to compensate for the error caused by load.
The prior art method is disadvantageous because it requires complicated equipment, such as digital communication channels between the ends of the line to be used when the angles are measured taking synchronized time samples or calculating continuously the time a signal needs to pass between the differential protection half-sets, or satellite time-synchronization equipment when time synchronization pulses are received from GLONASS (GPS) signal receivers.
This disadvantage complicates damage point location significantly and, for this reason, the method cannot be used everywhere because of the lack of appropriate equipment.
The disadvantages listed above make location of the damage point significantly more complicated, and the method is not fit for any point because of the lack of equipment needed.
It is an object of the claimed invention to develop technologies helping to improve power supply efficiency.
The technical result of this invention lies in improved accuracy of damage point location achieved by accurate synchronization of currents and voltages measured at the ends of the line that are not synchronized in time upon measurement.
This technical result is achieved in a method for locating a short circuit point in a power transmission line by taking measurements at both ends thereof, the line having a length l, a real phase resistance R, and an inductive phase resistance XL and connecting two supply systems, said method comprising measuring the instantaneous values of the phase currents (i′A,i′B, i′C) and (i″A,i″B,i″C) and voltages (u′A,u′B,u′C) and (u″A,u″B,u″C) that are not synchronized in time on short circuit occurrence at both ends of the line (′ designates one end of the line and ″ marks the second end of the line) and identifying the type of short circuit; according to the invention, producing current and voltage oscillograms; aligning the oscillograms at both ends of the line along the short circuit starting section; choosing a section for the damaged phase current and voltage oscillograms at a distance of two or three periods from the start of short circuit; and measuring the relative distance n to the short circuit point from the formula:
wherein:
At the next step, the distance from the line end marked by ′ to the short circuit point is found from formula: l′=n·l.
The distinctions of the claimed method from the immediate prior art are proof of the novelty of the claimed embodiments of the invention as recited in the claim.
The applicants' new approach helps synchronize voltages and currents at the ends of the line when the measurements made at both ends thereof are not synchronized by aligning the oscillograms at the two ends of the line along the short circuit start section; improve the accuracy of damage location; and make the method practicable through the use of simple devices and methods, in the absence of complicated equipment and laborious calculations and complex mathematical conversions, all these advantages confirming compliance of the claimed inventions with the “industrial applicability” patentability criterion.
The essential distinguishing features of the claimed methods recited in the claim are not disclosed in prior art, which is evidence of their compliance with the “inventive level” patentability criterion.
The invention is illustrated by the drawings wherein:
IR1B is an oscillogram of current at the head of the damaged phase line;
IR2B is an oscillogram of current at the end of the damaged phase line;
V10B is an oscillogram of voltage across the buses at the head of the line; and
V20B is an oscillogram of voltage across the buses at the end of the line.
With reference to
Voltage drop upstream of the short circuit point at both ends of the line (
Following conversion, equation (2) is transformed to equation (1).
To perform the method described by formula (1), the instantaneous values of phase currents (i′A,i′B,i′C) and (i″A,i″B,i″C) and voltages (u′A,u′B,u′C) and (u″A,u″B,u″C) that are not synchronized in time are measured on short circuit occurrence; damaged phases are identified; current and voltage oscillograms are constructed; the oscillograms are aligned at both ends along the short circuit start section (
The values of di′/dt and di″/dt are found by any common method, for example, by using the m-th i(mT) and preceding i(mT−T) samples of the instantaneous current values in the section area:
wherein:
i(mT) is a sequence of instantaneous current values read off the oscillograms (a), and T is the sampling period (angle or time between two neighboring points of an oscillogram).
The time-specific current derivative can be found similarly from the formula:
wherein: Im is current amplitude (a) and φk is the angle from the head of the current sine wave to the section in the selected period (in degrees).
An example of a line model circuit is considered below (with reference to
Length of the line
50
km
Length of the damaged portion of the line
25
km
Real resistance of the line
0.945
Ohm
Inductive resistance of the line
13.25
Ohm
Power of System 1
8.000
MVA
Power of System 2
6.000
MVA
The instantaneous values of currents i′ and i″ and voltages u′ and u″ in the damaged phase are found from the oscillogram in
Head of the line. u′=100051.9 V
Angle
i′
di′/dt
(degrees)
(A)
(A/C)
4
884.160249
13387.81654
13
2915.84763
12934.13451
22
4891.09925
12574.85299
31
6766.020629
11936.13030
40
8484.176007
10938.12610
49
9995.400262
9620.76054
58
11274.61084
8143.71012
67
12271.64261
6347.30675
76
12967.68365
4431.13867
84
13343.92206
2694.61136
93
13387.81654
279.44118
102
13099.36709
−1836.32774
111
12484.84437
−3912.17649
120
11556.78964
−5908.18489
129
10352.82675
−7664.67230
138
8891.767611
−9301.39920
147
7217.506714
−10658.68491
156
5373.938535
−11736.52946
165
3404.957555
−12534.93282
End of the line. u″=79091 V
Angle
i″
di″/dt
(degrees)
(A)
(A/C)
4
605.86822
8682.428808
13
1961.5448
8630.51245
22
3270.97202
8336.07963
31
4383.23304
7080.87955
40
5515.67301
7209.34285
49
6509.61656
6327.64651
58
7336.60089
5264.75021
67
7975.70463
4068.66421
76
8376.51193
2551.62068
84
8604.51026
1632.91913
93
8643.76322
249.89232
102
8459.8789
−1170.64493
111
8059.57337
−2548.42631
120
7523.35094
−3413.70090
129
6739.28661
−4991.51277
138
5783.69898
−6083.46493
147
4682.16308
−7012.60126
156
3458.95065
−7787.21877
The short circuit point is found from the instantaneous current and voltage values at a section angle of 58° from Equation (1):
The calculated distance to the damage point is:
l′=n·l=0.5001·50=25.005 km.
The actual distance to the short circuit point is equal to 25 km. The check has, therefore, confirmed the high accuracy of the claimed method for locating the damage point.
The claimed method is also suitable for locating other types of short circuits—two-phase shorting, ground shorting, and three-phase shorting.
Damage location by the claimed method for the circuit of
Measured instantaneous currents and voltages in a damaged phase can, therefore, be used to achieve accurate time synchronization in an unsynchronized two-way measurement by aligning the oscillogram at both ends of the line with the section marking the start of short circuit and, as a result, determine more accurately the distance to the short circuit point and an accurate angle between the voltages and currents at the ends of the line.
The readings of the angle between voltages and currents at the ends of the line can be used for other purposes, for example, for analyzing the operating mode of another portion of the grid.
Visyaschev, Alexandr Nikandrovich, Plenkov, Eduard Ruslanovich, Tiguntsev, Stepan Georgievich
Patent | Priority | Assignee | Title |
10033213, | Sep 30 2014 | CPS Technology Holdings LLC | Short circuit wake-up system and method for automotive battery while in key-off position |
11038363, | Sep 30 2014 | CPS Technology Holdings LLC | Battery system to be implemented in an automotive vehicle, wake-up control unit configured to determine whether a short circuit is expected to be present in an electrical system, and short circuit detection unit of an electrical system |
Patent | Priority | Assignee | Title |
6002260, | Sep 23 1997 | Pacific Gas & Electric Company | Fault sensor suitable for use in heterogenous power distribution systems |
RU2009137563, |
Date | Maintenance Fee Events |
Jan 28 2019 | REM: Maintenance Fee Reminder Mailed. |
Jul 15 2019 | EXP: Patent Expired for Failure to Pay Maintenance Fees. |
Date | Maintenance Schedule |
Jun 09 2018 | 4 years fee payment window open |
Dec 09 2018 | 6 months grace period start (w surcharge) |
Jun 09 2019 | patent expiry (for year 4) |
Jun 09 2021 | 2 years to revive unintentionally abandoned end. (for year 4) |
Jun 09 2022 | 8 years fee payment window open |
Dec 09 2022 | 6 months grace period start (w surcharge) |
Jun 09 2023 | patent expiry (for year 8) |
Jun 09 2025 | 2 years to revive unintentionally abandoned end. (for year 8) |
Jun 09 2026 | 12 years fee payment window open |