Automatically adjust the size of a physical uplink control Channel, pucch, of an uplink communication subframe. In a particular embodiment, the size of a semi-static region of the pucch is adjusted. The adjustment is based on a utilization factor of the pucch over a time period. The adjustment can also be based on the connection factor (connections between the wireless terminals and the cell) and/or based on the utilization factor of a pusch (physical uplink shared Channel). The result is an efficient resource utilization on the pucch, and a properly dimensioned pucch region.
|
12. A scheduler of a cell in a wireless network to provide scheduling services to one or more wireless terminals in the network including scheduling a pucch of the cell, comprising:
a utilization determining processor configured to determine, over a time period, a shared uplink resource utilization including any one or more of a pucch utilization factor for a semi-static uci component of a semi-static pucch region, a connection factor of the cell, and a pusch utilization factor of the cell; and
a pucch adjusting processor configured to determine whether the semi-static pucch region should be adjusted based on the determined shared uplink resource utilization, and to adjust the semi-static pucch region when it so determines;
the utilization determining processor further configured to:
determine a uci component ratio of the semi-static uci component for each of a plurality of uplink subframes over the time period; and
determine the pucch utilization factor based on a distribution of the uci component ratios over the time period, wherein the uci component ratio is a ratio of an amount of semi-static pucch resources allocated for the semi-static uci component relative to an entire amount of the semi-static pucch resources available in one uplink subframe.
1. A method to schedule a physical uplink control channel (pucch) of a cell in a wireless network for one or more wireless terminals, comprising:
determining, over a time period, a shared uplink resource utilization including any one or more of a pucch utilization factor for a semi-static uplink control information (uci) component of a semi-static pucch region, a connection factor of the cell, and a physical uplink shared channel (pusch) utilization factor of the cell;
determining whether the semi-static pucch region should be adjusted based on the determined shared uplink resource utilization; and
adjusting the semi-static pucch region when it is determined that the semi-static pucch region should be adjusted;
wherein determining the pucch utilization factor for the semi-static uci component comprises:
determining a uci component ratio of the semi-static uci component for each of a plurality of uplink subframes over the time period; and
determining the pucch utilization factor based on a distribution of the uci component ratios over the time period, wherein the uci component ratio is a ratio of an amount of semi-static pucch resources allocated for the semi-static uci component relative to an entire amount of the semi-static pucch resources available in one uplink subframe.
19. A base station in a wireless network to provide scheduling services to one or more wireless terminals in the network including scheduling a pucch of a cell corresponding to a service coverage area provided by the base station, the base station comprising:
a control processor configured to coordinate and control operations of the base station to provide services to the wireless terminals;
an interface configured to communicate with the wireless terminals including receiving uplink data and control reports via pusch and pucch resources; and
a scheduling processor configured to provide scheduling services of the cell to the wireless terminals in the network, wherein the scheduling processor is configured to:
determine, over a time period, a shared uplink resource utilization including any one or more of a pucch utilization factor for a semi-static uci component of a semi-static region of the pucch, a connection factor of the cell, and a pusch utilization factor of the cell, determine whether the semi-static pucch region should be adjusted based on the determined shared uplink resource utilization, and adjust the semi-static pucch region when it determines that the semi-static pucch region should be adjusted;
wherein the scheduling processor configured to determine the pucch utilization factor for the semi-static uci component is configured to determine a uci component ratio of the semi-static uci component for each of a plurality of uplink subframes over the time period, and determine the pucch utilization factor based on a distribution of the uci component ratios over the time period, wherein the uci component ratio is a ratio of an amount of semi-static pucch resources allocated for the semi-static uci component relative to an entire amount of the semi-static pucch resources available in one uplink subframe, wherein in the plurality of the uplink subframes is a subset, less than all, of the uplink subframes of the time period, and wherein the pucch utilization factor is determined as an average, a median, a sliding average, a mode, or a range of the distribution of the uci component ratios.
2. The method of
3. The method of
4. The method of
5. The method of
6. The method of
7. The method of
8. The method of
determining that the semi-static pucch region should be increased when the pucch utilization factor is above an upper bound of a target pucch range for the semi-static uci component; and
determining that the semi-static pucch region should be decreased when the pucch utilization factor is below a lower bound of the target pucch range for the semi-static uci component.
9. The method of
10. The method of
determining that one or more target parameters should be adjusted; and
adjusting the one or more target parameters when it is determined that the one or more target parameters should be adjusted, wherein the step of determining that the one or more target parameters should be adjusted comprises any one or more of:
determining that the target pucch range should be adjusted when the pucch utilization factor is not within the target pucch range, determining that the target connection range should be adjusted when the connection factor is not within the target connection range, and determining that the target pusch range should be adjusted when the pusch utilization factor is not within the target pusch range.
11. The method of
13. The scheduler of
14. The scheduler of
apply the adjusted semi-static pucch region to a future time period;
set an initial configuration of the semi-static pucch region of the cell for the time period based on a cell's operation profile; and
update the operation profile of the cell with information related to an adjustment to the semi-static pucch region.
15. The scheduler of
16. The scheduler of
17. The scheduler of
18. The scheduler of
20. The base station of
21. The base station of
|
This application is the U.S. national phase of International Application No. PCT/SE2009/050062 filed 21 Jan. 2009 which designated the U.S., the entire content of which is hereby incorporated by reference.
The disclosed technology relates to controlling load on the physical uplink control channel of an uplink communication subframe through the use of self-organizing network algorithms.
Long Term Evolution, also referred to as “LTE”, is a radio access technology being standardized by the 3rd Generation Partnership Project, hereinafter referred to as “3GPP”. In LTE, all services are supported through a packet switched domain. Downlink and uplink transmission in LTE use multiple access technologies—orthogonal frequency division multiple access, referred to as “OFDMA”, for the downlink, and single-carrier frequency division multiple access, referred to as “SC-FDMA” for the uplink.
In LTE, radio communication between a user equipment, hereinafter referred to as “UE” and an eNodeB is performed through defined radio frames. Each frame is 10 ms long and is divided into 10 subframes, each 1 ms long. Each subframe is further subdivided into two slots each with 0.5 ms duration. Thus, a transmitted signal in each slot or subframe is defined by a resource grid of a number of subcarriers in the frequency domain and a number of symbols in the time domain.
In
In each PRB, there are 12 consecutive subcarriers in the frequency domain. With a normal spacing of 15 kHz between adjacent subcarriers, the frequency bandwidth of each PRB is 180 kHz. The PRB also spans 7 symbols in the time domain, i.e., the PRB spans one slot or 0.5 ms.
No dedicated channels are used in LTE to transport user data. Instead shared transport channel resources are used in both the downlink and the uplink. For the uplink, the uplink shared channel is controlled by a scheduler on the eNodeB that assigns different parts of the shared channel to different UEs for transmission of user data to the eNodeB. The uplink shared channel is mapped to the physical uplink shared channel, hereinafter referred to as “PUSCH”, on the downlink SC-FDMA subframe. The PUSCH is used primarily for data transport, and therefore, is designed to achieve high data rates.
The SC-FDMA subframe also includes the physical uplink control channel, hereinafter referred to as “PUCCH”. The PUCCH is used to carry uplink control information, or simply “UCI”, from the UEs to the eNodeB as will be explained further below.
The PUSCH resource occupies the middle subcarriers of the SC-FDMA frequency spectrum. On the spectrum band edges, a control region is located on which the PUCCHs are transmitted. As mentioned above, the PUCCHs are allocated to allow the UEs to transfer the UCIs to the eNodeB. The UCI includes channel quality indication reports, scheduling requests, and ACK/NACK responses from UEs to previously scheduled downlink user data transmission from the eNodeB. The channel quality indication and the scheduling requests may also be referred to as “CQI” and “SR”, respectively.
To enable efficient resource utilization of the PUCCH, the SR, CQI, and ACK/NACK responses of several UEs are multiplexed on the PUCCH through code division multiplexing, also referred to as “CDM”. This allows several UEs to share one PRB of the PUCCH.
As noted previously and illustrated in
Since the PUSCH carry user data, then to increase user data throughput, the PUSCH allocation should be maximized. This can be accomplished by an aggressive allocation of the PUCCH, e.g., assigning many CDM codes so that many UEs can simultaneously transmit the CQI reports, SRs, and ACK/NACK responses, etc., on the same time-frequency resource, i.e., share the same PRB of the PUCCH to minimize the PUCCH and correspondingly increase the PUSCH. However, many UEs simultaneously using the same PRB carries a risk of unacceptable error probability due to interferences. This in turn would decrease the system and/or user throughput and degrade overall system performance.
On the other hand, an unnecessarily cautious allocation—either through increasing the amount of resources allocated to the PUCCH or reducing the amount of signaling sent on the PUCCH—also carries risks. Increase in the of PUCCH allocation correspondingly reduces the uplink resources available for the PUSCH, which can lead to reduced data throughput. A reduction in the signaling amount can lead to a performance degradation due to delay caused by sparser SR opportunities, less accurate channel information due to sparser CQI reports, and restrictions on the scheduler due to less flexibility in the number of ACK/NACK responses.
Non-limiting examples of methods and apparatuses are described that automatically adjust the size of PUCCH including methods and apparatuses that automatically adjust the size of the semi-static region of the PUCCH. According to an aspect, the adjustment is performed based on a utilization of the PUCCH over a time period. The adjustment can also be performed based on the connections between the wireless terminals, e.g., UEs, and the cell and/or based on the utilization of the PUSCH. The result is an efficient resource utilization on the PUCCH, and a properly dimensioned PUCCH region.
According to an aspect, methods and apparatuses autonomously adapt the PUCCH region to changes in the network over a long-term scale such as hourly, daily, weekly, etc. Operation on long-term time scale puts these methods in the category of self-organizing network algorithms, hereinafter referred to as “SON” algorithms.
According to an aspect, a method is performed by a scheduler to schedule the PUCCH resource of a cell in a wireless network for one or more wireless terminals. The scheduler, which can be a part of a base station, determines a PUCCH utilization factor for a semi-static UCI component of a semi-static region of the PUCCH over a time period. The time period can be one of many specified time periods, and at least one specified time period repeats in a pattern. The PUCCH utilization factor for a UCI component is a measure of an amount of PUCCH resources allocated for the UCI component relative to the amount of PUCCH resources available during the time period.
According to an aspect, scheduler adjusts—increases or decreases—the semi-static PUCCH region based on the PUCCH utilization factor. The scheduler increases the semi-static PUCCH region if the PUCCH utilization factor is above an upper bound of a PUCCH target range, and decreases the semi-static PUCCH region if the PUCCH utilization factor is below a lower bound of the PUCCH target range.
According to an aspect, the scheduler determines a connection factor and adjust the semi-static PUCCH based on the determined connection factor. The connection factor is a measure of quantity of simultaneous connections experienced between the cell and the wireless terminals over the time period.
According to an aspect, the scheduler determines a PUSCH utilization factor and adjusts the semi-static PUCCH based on the determined PUSCH utilization factor. The PUSCH utilization factor is a measure of utilization of the PUSCH available for data transport over the time period.
According to an aspect, the scheduler applies the adjusted semi-static PUCCH region to a future time period. According to an aspect, the scheduler updates an operation profile of the cell with the adjustment information so that in the future time period, configuration of the PUCCH region can be initially set.
The foregoing and other objects, features, and advantages of the invention will be apparent from the following more particular description of preferred embodiments as illustrated in the accompanying drawings in which reference characters refer to the same parts throughout the various views. The drawings are not necessarily to scale, emphasis instead being placed upon illustrating the principles of the invention.
In the following description, for purposes of explanation and not limitation, specific details are set forth such as particular architectures, interfaces, techniques, etc. in order to provide a thorough understanding of the present invention. However, it will be apparent to those skilled in the art that the present invention may be practiced in other embodiments that depart from these specific details. That is, those skilled in the art will be able to devise various arrangements which, although not explicitly described or shown herein, embody the principles of the invention and are included within its spirit and scope.
In some instances, detailed descriptions of well-known devices, circuits, and methods are omitted so as not to obscure the description of the present invention with unnecessary detail. All statements herein reciting principles, aspects, and embodiments of the invention, as well as specific examples thereof, are intended to encompass both structural and functional equivalents thereof. Additionally, it is intended that such equivalents include both currently known equivalents as well as equivalents developed in the future, i.e., any elements developed that perform the same function, regardless of structure.
Thus, for example, it will be appreciated by those skilled in the art that block diagrams herein can represent conceptual views of illustrative circuitry embodying the principles of the technology. Similarly, it will be appreciated that any flow charts, state transition diagrams, pseudocode, and the like represent various processes which may be substantially represented in computer readable medium and so executed by a computer or processor, whether or not such computer or processor is explicitly shown.
The functions of the various elements including functional blocks labeled or described as “processors” or “controllers” may be provided through the use of dedicated hardware as well as hardware capable of executing software in association with appropriate software. When provided by a processor, the functions may be provided by a single dedicated processor, by a single shared processor, or by a plurality of individual processors, some of which may be shared or distributed. Moreover, explicit use of the term “processor” or “controller” should not be construed to refer exclusively to hardware capable of executing software, and may include, without limitation, digital signal processor hardware, read only memory for storing software, random access memory, and non-volatile storage.
In the description below, 3GPP network, and particular, the LTE is used for explanation. However, the scope is not so limited. The concepts described herein are applicable to other type of wireless network. Thus, while the term PUCCH is used, the term can also refer to any physical channel capable of transferring control signals in an uplink direction from the wireless terminals to a base station of a wireless network. Similarly, the PUSCH can refer to any physical channel that is shared amongst the wireless terminals and capable of transferring user data in the uplink direction from the wireless terminals to the base station.
In allocating the uplink subframe, e.g., the SC-FDMA subframe of the 3GPP LTE, between the PUCCH and the PUSCH, there are risks associated with both aggressive and cautious approaches to set the size of the PUCCH. Thus, it is important to find a good trade-off between a quality criterion on the PUCCH and the size of the PUCCH on the uplink subframe.
However, finding a balanced trade-off between PUSCH and PUCCH sizes is difficult. Current state-of-the-art is to find a static trade-off, or to manually retune the parameters regulating the PUCCH quality and size. But as the network load changes over time, a PUCCH allocation that is adequate during one time period or an instant can quickly become overly cautious or overly aggressive. Since the trade-off can vary over time, the static allocation is not preferable to ensure that the system has an adequately sized PUCCH to secure control signalling reliability and to maximize the PUSCH resource, and thus to maximize the UL throughput.
In addition to time, the trade-offs are very likely to vary between the cells. Hence, one or more embodiments and/or methods of the disclosed technology implement adaptive tuning algorithms to tune the resources set aside for the PUCCH. According to one aspect, the adaptive tuning algorithms avoids the manual tuning of the cells and automatically follows the changes of the cells over time. The adaptive tuning can be set to be relatively aggressive or relatively cautious. For a cell in a noisy environment, the relatively cautious approach may be preferred. Conversely, for a relatively noise-free environment, the aggressive approach may be acceptable.
The PUCCH includes a dynamically configured region and a semi-statically configured region. In the dynamically configured PUCCH region, the allocated resources are valid only for a specific time period such as one slot or subframe. For the most part, the ACK/NACK resources for the wireless terminals, e.g., user equipments, are scheduled dynamically so that each recipient wireless terminal may provide responses to downlink data directed to the wireless terminal carried on a physical downlink shared channel, hereinafter referred to as “PDSCH”, on a previously received OFDM subframe.
In contrast, the semi-statically scheduled resources are valid for the wireless terminal in the cell until the wireless terminal loses synchronization, ends the service session, performs a handover, or if the resource is otherwise revoked. For example, the PUCCH resources allocated to carry the channel status reports, e.g., CQI reports, and scheduling requests are semi-static. There are also ACK/NACKs that can be semi-statically allocated.
According to one aspect, an example adaptive tuning algorithm is implemented on a scheduler of a cell of a wireless network. Note that scheduler is normally associated with, e.g., is a part of, a base station and that a “cell” is not necessarily equivalent to a “base station”. However, the cell and the base station are related in that the cell refers to a radio coverage area provided by the base station. Thus, a scheduler of a cell can refer to a scheduler of a base station providing the coverage corresponding to the cell.
But initially, the example adaptive tuning algorithm is generally described so that a context to understand the details can be provided. In general, the algorithm evaluates a performance of the cell or the wireless system in general. Then based on the evaluation, the algorithm decides whether to decrease the PUCCH region, increase the PUCCH region, or leave the PUCCH region unchanged.
For clarification, the PUCCH region or size in this context refers to the semi-statically allocated PUCCH region unless specifically stated otherwise. Also, the UCI components refer to the semi-static UCI components including the semi-static ACK/NACK component unless stated other wise.
In the PUCCH region, the uplink PRB resources are allocated to carry, from the wireless terminals, the CQI, SR, and the ACK/NACK responses related to semi-persistently scheduled downlink data. The wireless terminals can also report precoding matrix indicators and rank indications on the PRBs of the semi-static PUCCH region. The precoding matrix indicator and the rank indication can also be referred to as “PMI” and “RI”, respectively.
The example adaptive tuning algorithm operates over a long time scale such as hourly, daily, weekly, and so on. For semi-static PUCCH allocations, being able to react instantaneously to fast changing conditions is not critical. Thus, the algorithm need not be responsive on a short time scale. The example adaptive tuning algorithm is thus categorized as a type of a SON algorithm since it adapts, perhaps gradually to changes over the long time scale. Historical performances over the long time scale can be considered in the algorithm when tuning the PUCCH region.
Generally, the automatic setting of the PUCCH region is based on the load and the capacity of the PUCCH region. The setting can also be based on, among others, the load on the PUSCH and on the connections between the cell and the wireless terminals. The algorithm can autonomously adapt the PUCCH region to changes in the network load. The result is an efficient resource utilization of the PUCCH, and a properly dimensioned PUCCH region.
The example algorithm facilitates an automatic setting of the size of the PUCCH region based on evaluations of the UCI components. In one specific application of the SON algorithm, the utilization of the PUCCH resources corresponding to the CQI component is averaged over time and compared to a set of thresholds. Based on the comparison, a decision is made regarding whether the size of the PUCCH should be increased, decreased, or kept unchanged.
While
To implement the method, the utilization determining unit 320 determines a PUCCH resource utilization for over a time period in step S510. Note that the utilization determining unit 320 can also determine a connection utilization in step S540 and/or determine a PUSCH resource utilization in step S550 over the time period. Each of the steps S510, S540, and S550 are examples of determining utilization of shared uplink resources.
In step S520, the PUCCH adjusting unit 330 determines whether or not to adjust the PUCCH region based on the shared uplink resource utilization by the utilization determining unit 320. If it so determines, then in step S530, the PUCCH adjusting unit 330 makes the appropriate adjustment. For example, when the PUCCH utilization is determined, the PUCCH adjusting unit 330 adjusts the PUCCH region when it determines that the adjustment is needed based on the PUCCH utilization. The PUCCH adjusting unit 330 can perform similar determinations and take appropriate adjustment actions in steps S520 and S530 taking into account the connection utilization and/or the PUSCH resource utilization when one or both are determined.
The time period can be of a long time scale such as an hour, four hours, days, weeks, and so on. Also, the time period can be one of one or more specified time periods. One specified time period may be “7:00 AM-9:00 AM” and another may be “4:00 PM-6:00 PM”.
Further, some or all specified time periods may repeat in a pattern. For example, “weekday morning rush” may be defined as “7:00 AM-9:00 AM, Monday-Friday”. In a very simple example, one time period can be defined as “one hour starting at the top of the hour” that continually repeats.
The processing unit 310 applies the adjustment to the PUCCH region to a future time period. For example, an adjustment based on the evaluation made during the “7:00 AM-9:00 AM” on a Monday may be applied to the same time period on a Tuesday since it is likely the cell will be used similarly (e.g., both are part of the “weekday morning rush” period). In the very simple example of the one time period that repeats, the processing unit 310 adjustment based on a previous hour may be applied to a next hour.
Also, some “smoothing” can be applied to the adjustment—either by the processing unit 310 or by the PUCCH adjusting unit 330—to lessen the effect of an occurrence of an aberrant event. For example, a road may be closed unexpectedly for repairs. Then the utilization of a cell near the closed road would be unexpectedly low even during “weekday morning rush” time period. Applying the adjustment made based solely on one evaluation of the time period to the next day's “weekday morning rush” time period may be inappropriate when the road opens. So when adjusting the PUCCH region, a form of smoothing such as a sliding average—e.g., average based on past five observations of the “weekday morning rush” time periods—may be applied.
To enable adjustments to be applied to the future time periods, an operation profile for the cell may be maintained, e.g., in the storage unit 340. In the operation profile, one or more specific time periods can be defined and the configuration information for the PUCCH region specified for each specific time period. At the beginning of a particular time period, the processing unit 310 can initially set the configuration of the semi-static PUCCH region based on the operation profile. When the PUCCH adjustment is deemed necessary after evaluation over the particular time period, the PUCCH adjusting unit 330 can update the operation profile with information related to the adjustment to the adjusted semi-static PUCCH region for the particular time period. Then at the next instance of the particular time period, the PUCCH region can be initially configured with the adjustment.
As noted, the decision to adjust the PUCCH region can be made based on the PUCCH utilization. In an aspect, PUCCH utilization factor of one or more UCI components is determined. The PUCCH utilization factor for a particular UCI component can be viewed as a measure of what portion of the available PUCCH resources are allocated to carry the particular UCI component during the specified period. As an example, the PUCCH utilization factor for the CQI component would reflect the amount of the PUCCH resources allocated to carry the CQI reports relative to the amount of the PUCCH resources available during the time period.
The utilization determining unit 320 then determines the PUCCH utilization factor based on the distribution of the UCI component ratios over the time period. For example, average, sliding average, median, mode, etc. of the distribution of the UCI component ratios can be determined to be the PUCCH utilization factor for the UCI component. Preferably, the time period is of a duration such that sufficient number of data points, e.g., UCI component ratios, can be collected to make the PUCCH utilization factor meaningful. That is, there should a level of confidence that the PUCCH utilization factor is an accurate representation of a general behavior of the cell during the time period.
To reduce the computational load, the UCI component ratios need not be determined for all uplink subframes during the time period. That is, the determination can be made for a subset of the subframes. When the time period's duration is long such as an hour, the number of subframes is rather large. In LTE, there are 3.6 million SD-FDMA subframes in one hour. Even if the UCI component ratio is determined for every 1000 subframes, 3,600 UCI component ratios can be determined. This may be sufficient to make the PUCCH utilization factor meaningful. The selection of the subset of the uplink subframes can be modified as needed or desired.
The example process illustrated in
In another variant of the step S610, the subset of subframes are chosen so that within each chosen subframe, the UCI component ratios are determined for a predetermined component number, which has an advantage of distributing the computational load. In a special case, the predetermined component number can be set to one. In this instance, the utilization determining unit 320 determines the UCI component ratio for a single UCI component within one subframe. In subsequent subframes, the UCI component ratio for other components can be determined.
For example, in subframes sf(n), sf(n+1), sf(n+2), and sf(n+3) of the time period, the component ratios for the CQI, SR, ACK/NACK, and PMI may be respectively determined. This process can be repeated to obtain the distribution of the ratios for some or all UCI components during the time period. Also, it is not necessary that successive subframes be used. That is, the subframes sf(n+1), sf(n+2), sf(n+3), etc. can be generalized as sf(n+a), sf(n+b), sf(n+c), etc. where “a”, “b”, “c”, etc. are not necessarily consecutive.
After the PUCCH utilization factor for the UCI component is determined, the PUCCH adjusting unit 330 determines whether or not the PUCCH region should be adjusted in step S520.
The target PUCCH range need not be the same for all UCI components. As an example, the target PUCCH range for the CQI and the SR need not be the same. Also, each UCI component can have a corresponding target PUCCH range that is valid for the time period. As an example, the target PUCCH range of the CQI can differ from one time period to another.
In an embodiment, the information regarding the target PUCCH ranges for each of the UCI components for each of the time period can be recorded in the operation profile. When a particular time period is entered, the appropriate target PUCCH ranges can be provided to the PUCCH adjusting unit 330 to so that proper evaluation may be carried out during the particular time period.
Note that the steps S510, S520, and S530 may be performed for more than one UCI component during the time period. Similarly, steps S540 and S550, which is described in further detail below, can also be performed during the same time period.
Referring back to
Then in step S622, the utilization determining unit 320 determines the connection factor based on the simultaneous connections tracking. Similar to the operation performed to determine the PUSCH utilization factor, the connection factor can be determined based on the distribution of the tracked simultaneous connections. To reduce the computational load, the number of simultaneous connections can be tracked for a subset of the uplink subframes. Preferably, the number of subframes is enough so that the connection factor is meaningful. It should be noted that the individual subframes used for tracking the simultaneous connections in step S612 need not be the same subframes used to determine the UCI component ratios in step S610.
When the connection factor is determined, then as illustrated in
The logic behind incorporating the connection factor, and for incorporating the connection utilization in general, is that the PUCCH requirement generally increases with the number of simultaneous users so that most or all wireless terminals would have some PUCCH allocations. For small number of simultaneous connections, it may be justified to decrease the PUCCH region, which in turn increases the PUSCH region for increased throughput. For example, if the number of simultaneous connections falls below 10 for more during the time period, then the PUCCH region could be reduced by one PRB per band edge. If the number remains above 20 over the time period, then the PUCCH region could be increased by two PRBs per band edge. While this is not a perfect measure since the generated PUCCH load varies between users, it still provides a level of adaptability that would not be present otherwise.
Again referring back to
Then as illustrated in
The logic behind incorporating the PUSCH utilization factor, and for incorporating the PUSCH utilization in general, is as follows. If the PUSCH is sparsely utilized, i.e., a low PUSCH utilization factor, then an increased PUCCH region does not degrade performance noticeably. This means that the cost of a larger PUCCH region is relatively small. On the other hand, if the PUSCH is highly utilized, i.e., a high PUSCH utilization factor, the uplink throughput can be negatively affected by an increase of the PUCCH region.
The methods described above evaluate the performance of the cell and adjust the PUCCH region based on the evaluation. According to one or more embodiments, the evaluations performed in one time period are used to adjust the PUCCH region in another time period.
The evaluations compare the cell utilization factors to target parameters such as the target PUCCH range, the target connection range, and the target PUSCH range. Just as the PUCCH region adjustment is applied to a future time period, the target parameters can also be adjusted for use in the future time period as well. This allows the target parameters to automatically adapt to the adjustments to the PUCCH region over time as well.
In
As one of many advantages, the disclosed technology can be used to avoid manual tuning of PUCCH region for individual cells. Also, a more regular adaptation of the PUCCH region to changes in the traffic characteristics is made possible. As a result, the PUCCH resource may be efficiently utilized, which lead to higher capacity in the network being secured.
Although the description above contains many specificities, these should not be construed as limiting the scope of the invention but as merely providing illustrations of some of the preferred embodiments. Therefore, it will be appreciated that the scope of the invention fully encompasses other embodiments, and the scope of the invention is accordingly not to be limited. All structural, and functional equivalents to the elements of the above-described preferred embodiment that are known to those of ordinary skill in the art are expressly incorporated herein by reference and are intended to be encompassed hereby. Moreover, it is not necessary for a device or method to address each and every problem described herein or sought to be solved by the present technology, for it to be encompassed hereby. Furthermore, no element, component, or method act in the present disclosure is intended to be dedicated to the public.
Johansson, Anders, Faronius, Carola, Östergaard, Jessica, Moberg, Peter, Hedlund, Leo
Patent | Priority | Assignee | Title |
10142262, | May 31 2016 | TWINGATE INC | System and method for improving an aggregated throughput of simultaneous connections |
10182020, | May 31 2016 | TWINGATE INC | System and method for improving an aggregated throughput of simultaneous connections |
10243929, | Mar 30 2016 | Qualcomm Incorporated | Uplink control channel scheduling for jamming resilience |
Patent | Priority | Assignee | Title |
20020093983, | |||
20080200203, | |||
20080247375, | |||
20080311919, | |||
20090088178, | |||
20090124259, | |||
20090290549, | |||
WO2009093944, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Jan 21 2009 | Telefonaktiebolaget L M Ericsson (publ) | (assignment on the face of the patent) | / | |||
Jan 22 2009 | JOHANSSON, ANDERS | TELEFONAKTIEBOLAGET LM ERICSSON PUBL | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 026614 | /0050 | |
Jan 22 2009 | HEDLUND, LEO | TELEFONAKTIEBOLAGET LM ERICSSON PUBL | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 026614 | /0050 | |
Jan 22 2009 | OSTERGAARD, JESSICA | TELEFONAKTIEBOLAGET LM ERICSSON PUBL | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 026614 | /0050 | |
Jan 22 2009 | MOBERG, PETER | TELEFONAKTIEBOLAGET LM ERICSSON PUBL | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 026614 | /0050 | |
Jan 23 2009 | FARONIUS, CAROLA | TELEFONAKTIEBOLAGET LM ERICSSON PUBL | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 026614 | /0050 |
Date | Maintenance Fee Events |
May 27 2019 | REM: Maintenance Fee Reminder Mailed. |
Nov 11 2019 | EXP: Patent Expired for Failure to Pay Maintenance Fees. |
Date | Maintenance Schedule |
Oct 06 2018 | 4 years fee payment window open |
Apr 06 2019 | 6 months grace period start (w surcharge) |
Oct 06 2019 | patent expiry (for year 4) |
Oct 06 2021 | 2 years to revive unintentionally abandoned end. (for year 4) |
Oct 06 2022 | 8 years fee payment window open |
Apr 06 2023 | 6 months grace period start (w surcharge) |
Oct 06 2023 | patent expiry (for year 8) |
Oct 06 2025 | 2 years to revive unintentionally abandoned end. (for year 8) |
Oct 06 2026 | 12 years fee payment window open |
Apr 06 2027 | 6 months grace period start (w surcharge) |
Oct 06 2027 | patent expiry (for year 12) |
Oct 06 2029 | 2 years to revive unintentionally abandoned end. (for year 12) |