A boiler system is provided comprising: a furnace adapted to receive a fuel to be burned to generate hot working gases; a fuel supply structure associated with the furnace for supplying fuel to the furnace; a superheater section associated with the furnace and positioned to receive energy in the form of heat from the hot working gases; and a controller. The superheater section may comprise a platen including a tube structure with an end portion and a temperature sensor for measuring the temperature of the tube structure end portion and generating a signal indicative of the temperature of the tube structure end portion. The controller may be coupled to the temperature sensor for receiving and monitoring the signal from the sensor.

Patent
   9541282
Priority
Mar 10 2014
Filed
Mar 10 2014
Issued
Jan 10 2017
Expiry
Nov 21 2034
Extension
256 days
Assg.orig
Entity
Large
0
201
currently ok
19. A process for monitoring a boiler system comprising a furnace for burning a fuel to generate hot working gases, a fuel supply structure for supplying fuel to the furnace, a superheater section comprising at least one platen including at least one tube structure, the one tube structure having an end portion, and a sensor for measuring the temperature of the tube structure end portion and generating a signal indicative of the temperature of the tube structure end portion, the process comprising;
monitoring the signal from the sensor, and
controlling an amount of fuel provided to the furnace based on the signal.
1. A boiler system comprising:
a furnace adapted to receive a fuel to be burned to generate hot working gases;
a fuel supply structure associated with said furnace for supplying fuel to said furnace;
a superheater section associated with said furnace and positioned to receive energy in the form of heat from the hot working gases, said superheater section comprising:
at least one platen including at least one tube structure, the one tube structure having an end portion; and
a temperature sensor for measuring the temperature of the tube structure end portion and generating a signal indicative of the temperature of said tube structure end portion; and
a controller coupled to said temperature sensor for receiving and monitoring the signal from said temperature sensor.
10. A monitoring system for a boiler system comprising a furnace adapted to receive a fuel to be burned to generate hot working gases, a fuel supply structure associated with said furnace for supplying fuel to said furnace, a superheater section associated with the furnace and positioned to receive energy in the form of heat from the hot working gases, the superheater section comprising at least one platen including at least one tube structure, the one tube structure having an end portion, the monitoring system comprising:
a sensor for measuring the temperature of the tube structure end portion and generating a signal indicative of the temperature of the tube structure end portion; and
a controller coupled to said sensor for receiving and monitoring the signal from said sensor.
2. The boiler system as set out in claim 1, wherein the controller controls an amount of fuel provided by the supply structure to the furnace based on the signal.
3. The boiler system as set out in claim 1, wherein said controller monitors the signal from said temperature sensor for rapid changes in temperature of said tube structure end portion.
4. The boiler system as set out in claim 3, wherein rapid changes in temperature of said tube structure end portion comprises a monotonic increase in temperature of least about 25 degrees Fahrenheit occurring over a time period of between about one to ten minutes and a monotonic decrease in temperature greater than zero in magnitude occurring over a time period of between about one to fifteen minutes.
5. The boiler system as set out in claim 3, wherein said controller increases an amount of fuel supplied by said supply structure to said furnace after the temperature of said tube structure end portion has experienced rapid changes.
6. The boiler system as set out in claim 1, further comprising a temperature measuring device for sensing the temperature of the working gases contacting said superheater section and generating a corresponding temperature signal to said controller.
7. The boiler system as set out in claim 6, wherein said controller controls the amount of fuel provided by said supply structure to said furnace such that the temperature of the working gases is below a threshold temperature until the temperature of said tube structure end portion has experienced rapid changes.
8. The boiler system as set out in claim 7, wherein said controller increases an amount of fuel supplied by said supply structure to said furnace after the temperature of said tube structure end portion has experienced rapid changes.
9. The boiler system as set out in claim 3, wherein said controller request an operator to input a tube structure clearing verification signal after the temperature of said tube structure end portion has experienced rapid changes.
11. The monitoring system as set out in claim 10, wherein said controller monitors the signal from said temperature sensor for rapid changes in temperature of said tube structure end portion.
12. The monitoring system as set out in claim 11, wherein rapid changes in temperature of said tube structure end portion comprises a monotonic increase in temperature of least about 25degrees Fahrenheit occurring over a time period of between about one to ten minutes and a monotonic decrease in temperature greater than zero in magnitude occurring over a time period of between about one to fifteen minutes.
13. The monitoring system as set out in claim 11, wherein said controller generates a request to an operator to input a tube structure clearing verification signal after the temperature of said tube structure end portion has experienced rapid changes.
14. The monitoring system as set out in claim 11, wherein said controller increases an amount of fuel supplied by said supply structure to said furnace after the temperature of said tube structure end portion has experienced rapid changes and an operator has input a tube structure clearing verification signal.
15. The monitoring system as set out in claim 11, wherein said controller increases an amount of fuel supplied by said supply structure to said furnace after the temperature of said tube structure end portion has experienced rapid changes and without requiring that an operator input a tube structure clearing verification signal.
16. The monitoring system as set out in claim 11, further comprising a temperature measuring device for sensing the temperature of the working gases contacting the superheater section and generating a corresponding temperature signal to said controller.
17. The monitoring system as set out in claim 16, wherein said controller controls the amount of fuel provided by said supply structure to said furnace such that the temperature of the working gases is below a threshold temperature until the temperature of said tube structure end portion has experienced rapid changes.
18. The monitoring system as set out in claim 17, wherein said controller increases an amount of fuel supplied by said supply structure to said furnace after the temperature of said tube structure end portion has experienced rapid changes.
20. The process as set out in claim 19, wherein monitoring comprises monitoring the signal from the temperature sensor for rapid changes in temperature of the tube structure end portion.
21. The process as set out in claim 19, wherein controlling comprises increasing an amount of fuel supplied by the supply structure to the furnace after the temperature of the tube structure end portion has experienced rapid changes.

The present invention relates to a boiler system comprising a controller for monitoring a temperature of a structure in a superheater section and controlling fuel provided to a furnace based on the monitored temperature.

In a paper-making process, chemical pulping yields, as a by-product, black liquor, which contains almost all of the inorganic cooking chemicals along with lignin and other organic matter separated from the wood during pulping in a digester. The black liquor is burned in a recovery boiler. The two main functions of the recovery boiler are to recover the inorganic cooking chemicals used in the pulping process and to make use of the chemical energy in the organic portion of the black liquor to generate steam for a paper mill.

In a kraft recovery boiler, a superheater structure is placed in the furnace in order to extract heat by radiation and convection from the furnace gases. Saturated steam enters the superheater section, and superheated steam exits from the section. The superheater structure comprises a plurality of platens.

In accordance with a first aspect of the present invention, a boiler system is provided comprising: a furnace adapted to receive a fuel to be burned to generate hot working gases; a fuel supply structure associated with the furnace for supplying fuel to the furnace; a superheater section associated with the furnace and positioned to receive energy in the form of heat from the hot working gases, the superheater section comprising: at least one platen including at least one tube structure, the one tube structure having an end portion; and a temperature sensor for measuring the temperature of the tube structure end portion and generating a signal indicative of the temperature of the tube structure end portion; and a controller coupled to the temperature sensor for receiving and monitoring the signal from the sensor.

The controller may control an amount of fuel provided by the supply structure to the furnace based on the signal.

The controller may monitor the signal from the temperature sensor for rapid changes in temperature of the tube structure end portion.

Rapid changes in temperature of the tube structure end portion may comprise a monotonic increase in temperature of least about 25 degrees F. occurring over a time period of between about one to ten minutes and a monotonic decrease in temperature greater than zero in magnitude occurring over a time period of between about one to fifteen minutes.

The controller may increase an amount of fuel supplied by the supply structure to the furnace after the temperature of the tube structure end portion has experienced rapid changes.

The boiler system may further comprise a temperature measuring device for sensing the temperature of the working gases contacting the superheater section and generating a corresponding temperature signal to the controller.

The controller may control the amount of fuel provided by the supply structure to the furnace such that the temperature of the working gases is below a threshold temperature until the temperature of the tube structure end portion has experienced rapid changes.

The controller may increase an amount of fuel supplied by the supply structure to the furnace after the temperature of the tube structure end portion has experienced rapid changes.

The controller may request an operator to input a tube structure clearing verification signal after the temperature of the tube structure end portion has experienced rapid changes.

In accordance with a second aspect of the present invention, a monitoring system is provided for a boiler system. The boiler system may comprise a furnace adapted to receive a fuel to be burned to generate hot working gases, a fuel supply structure associated with the furnace for supplying fuel to the furnace, and a superheater section associated with the furnace and positioned to receive energy in the form of heat from the hot working gases. The superheater section may comprise at least one platen including at least one tube structure. The one tube structure may have an end portion. The monitoring system may comprise: a sensor for measuring the temperature of the tube structure end portion and generating a signal indicative of the temperature of the tube structure end portion; and a controller coupled to the sensor for receiving and monitoring the signal from the sensor.

The controller may monitor the signal from the temperature sensor for rapid changes in temperature of the tube structure end portion.

The controller may generate a request to an operator to input a tube structure clearing verification signal after the temperature of the tube structure end portion has experienced rapid changes.

The controller may increase an amount of fuel supplied by the supply structure to the furnace after the temperature of the tube structure end portion has experienced rapid changes and an operator has input a tube structure clearing verification signal.

The controller may increase an amount of fuel supplied by the supply structure to the furnace after the temperature of the tube structure end portion has experienced rapid changes and without requiring that an operator input a tube structure clearing verification signal.

In accordance with a third aspect of the present invention, a process is provided for monitoring a boiler system comprising a furnace for burning a fuel to generate hot working gases, a fuel supply structure for supplying fuel to the furnace, a superheater section comprising at least one platen including at least one tube structure, the one tube structure having an end portion, and a sensor for measuring the temperature of the tube structure end portion and generating a signal indicative of the temperature of the tube structure end portion. The process may comprise: monitoring the signal from the sensor, and controlling an amount of fuel provided to the furnace based on the signal.

Monitoring may comprise monitoring the signal from the temperature sensor for rapid changes in temperature of the tube structure end portion.

Controlling may comprise increasing an amount of fuel supplied by the supply structure to the furnace after the temperature of the tube structure end portion has experienced rapid changes.

While the specification concludes with claims particularly pointing out and distinctly claiming the present invention, it is believed that the present invention will be better understood from the following description in conjunction with the accompanying Drawing Figures, in which like reference numerals identify like elements, and wherein:

FIG. 1 is a schematic view of a kraft black liquor recovery boiler system constructed in accordance with the present invention;

FIG. 2 illustrates a portion of a superheater section of the boiler system of FIG. 1; wherein tube structures defining platens are illustrated schematically as rectangular structures;

FIG. 3 illustrates first, second and third tube structures of a platen; and

FIG. 4 is an example plot of a tube structure clearing event.

In the following detailed description of the preferred embodiments, reference is made to the accompanying drawings that form a part hereof, and in which are shown by way of illustration, and not by way of limitation, specific preferred embodiments in which the invention may be practiced. It is to be understood that other embodiments may be utilized and that changes may be made without departing from the spirit and scope of the present invention.

FIG. 1 illustrates a kraft black liquor recovery boiler system 10 constructed in accordance with the present invention. Black liquor is a by-product of chemical pulping in a paper-making process. The initial concentration of “weak black liquor” is about 15%. It is concentrated to firing conditions (65% to 85% dry solids content) in an evaporator 20, and then burned in the recovery boiler system 10. The evaporator 20 receives the weak black liquor from washers (not shown) downstream from a cooking digester (not shown).

The boiler system 10 comprises a recovery boiler 12 comprising a sealed housing 12A defining a furnace 30 where a fuel, e.g., black liquor, is burned to generate hot working gases, a heat transfer section 32 and a bullnose 34 in between the furnace 30 and the heat transfer section 32, see FIG. 1. Hence, “hot working gases,” as used herein, means the gases generated when fuel is burned in the furnace. The boiler system 10 further comprises an economizer 40, a boiler bank 50 and a superheater section 60, all of which are located in the heat transfer section 32, see FIG. 1. The hot working gases resulting from the burning of the fuel in the furnace 30 pass around the bullnose 34, travel into and through the heat transfer section 32, are then filtered through an electrostatic precipitator 70 and exit through a stack 72, see FIG. 1. It is noted that when the furnace 30 is initially fired, another fuel other than black liquor, such as natural gas or fuel oil, may be provided to the furnace 30 via injectors 137. Once the furnace 30 has reached a desired temperature, black liquor instead of natural gas or fuel oil may be used as the fuel in the furnace 30.

Vertically aligned wall tubes 130 are incorporated into vertical walls 31 of the furnace 30. As will be discussed further below, a fluid, primarily water, passes through the wall tubes 130 such that energy in the form of heat from the hot working gases generated in the furnace 30 is transferred to the fluid flowing through the wall tubes 130. The furnace 30 has primary level air ports 132, secondary level air ports 134, and tertiary level air ports 136 for introducing air for combustion at three different height levels. Black liquor BL is sprayed into the furnace 30 out of spray guns 138. The black liquor BL is supplied to the guns 138 from the evaporator 20. The injectors 137 and the spray guns 138 define fuel supply structure.

The economizer 40 receives feedwater from a supply FS. In the illustrated embodiment, the feedwater may be supplied to the economizer 40 at a temperature of about 250° F. The economizer 40 may heat the water to a temperature of about 450° F. The hot working gases moving through the heat transfer section 32 supply energy in the form of heat to the economizer 40 for heating the feedwater. The heated water is then supplied from the economizer 40 to a top drum (steam drum) 52 of the boiler bank 50, see FIG. 1. The top drum 52 functions generally as a steam-water separator. In the embodiment illustrated in FIG. 1, the water flows down a first set of tubes 54 extending from the top drum 52 to a lower drum (mud drum) 56. As the water flows down the tubes 54, it may be heated to a temperature of about 400-600° F. From the lower drum 56, a portion of the heated water flows through a second set of tubes 58 in the boiler bank 50 to the upper drum 52. A remaining portion of the heated water in the lower drum 56 is supplied to the wall tubes 130 in the furnace 30. The water flowing through the second set of tubes 58 in the boiler bank 50 and the wall tubes 130 in the furnace 30 may be heated to a saturated state. In the saturated state, the fluid is mainly a liquid, but some steam may be provided. The fluid in the wall tubes 130 is returned to the boiler bank 50 at the top drum 52. The steam is separated from the liquid in the top drum 52. The steam in the top drum 52 is supplied to the superheater section 60, while the water returns to the lower drum 56 via the first set of tubes 54.

In an alternative embodiment (not shown), the upper and lower drums 52, 56 may be replaced by a single drum, as is known to those skilled in the art, whereby steam is supplied by the single drum to a superheater section.

In the embodiment illustrated in FIG. 2, the superheater section 60 comprises first, second and third superheaters 62, 64 and 66, each of which may comprise between about 20-50 platens 62A, 64A and 66A. Steam enters the platens 62A, 64A and 66A through a corresponding manifold tube called an inlet header 62B, 64B and 66B, is superheated within the platens 62A, 64A and 66A, and exits the platens 62A, 64A and 66A as superheated steam through another manifold tube called an outlet header 62C, 64C and 66C. The platens 62A, 64A and 66A are suspended from the headers 62B, 64B, 66B, 62C, 64C and 66C, which are themselves suspended from overhead beams (not shown) by hanger rods 200. The hot working gases moving through the heat transfer section 32 supply the energy in the form of heat to the superheater section 60 for superheating the steam. It is contemplated that the superheater section 60 may comprise less than three superheaters or more than three superheaters.

A platen 62A from the first superheater 62 is illustrated in FIG. 3. The remaining platens 62A in the first superheater 62 as well as the platens 64A and 66A in the second and third superheaters 64, 66 are constructed in generally the same manner. The platen 62A may comprise first, second and third separate metal tube structures 160-162, see FIG. 3. In FIG. 2, the platens are schematically illustrated as rectangular structures, but are defined by tube structures. The tube structures 160-162 comprise inlet portions 160A-162A, which communicate with the inlet header 62B and end portions 160B-162B, which communicate with the outlet header 62C. The tube structure inlet portions 160A-162A and end portions 160B-162B are located above a roof 12B of the boiler housing 12A, see FIGS. 1 and 3, while intermediate portions 160C-162C of the tube structures 160-162 extend within the boiler housing 12A and are located within the heat transfer section 32. The tube structures 160-162 define pathways through which fluid, e.g., steam, passes from the inlet header 62B, though the tube structures 160-162 and out the outlet header 62C. It is contemplated that the platen 62A may have less than or more than three tube structures, e.g., one, two, four or five tube structures.

The steam is heated to a superheated state in the superheater section 60. Prior to boiler/furnace start-up, cooled liquid water may settle in lower bends of the tube structures 160-162 in the platens 62A, 64A and 66A. Until the liquid water is boiled away during boiler/furnace start-up, the liquid water prevents steam from passing through the tube structures 160-162. The steam moving through the tube structures 160-162 functions as a cooling fluid for the metal tube structures 160-162. When no steam moves through a tube structure 160-162, the tube structure may become overheated, especially at an end portion 160B-162B, which may cause damage to the tube structure 160-162.

In the present invention, start-up of the furnace 30 is monitored by a controller 210 to ensure that the furnace 30 is heated slowly until any liquid water in the tube structures 160-162 of the superheater section platens 62A, 64A and 66A has safely evaporated before the furnace 30 is heated to an elevated state.

A temperature measurement device 170, which, in the illustrated embodiment, comprises an optical pyrometer, may be provided in or near the heat transfer section 32 to measure the temperature of the hot working gases in the heat transfer section 32 and entering the superheater section 60. The temperature measuring device 170 generates a corresponding temperature signal to the controller 210. The temperature sensed by the temperature measurement device 170 provides an indication of the amount of energy in the form of heat being generated by the furnace 30. Until the controller 210 has verified that liquid water in the tube structures 160-162 has been cleared, the amount of fuel provided by the injectors 137 or the spray guns 138 to the furnace 30 is controlled by the controller 210 at a low level. That is, in the illustrated embodiment, the amount of fuel provided by the injectors 137 or the spray guns 138 to the furnace 30 is controlled by the controller 210 such that the temperature of the hot working gases in the heat transfer section 32 and entering the superheater section 60, as measured by the temperature measuring device 170, is less than a predefined initial working gas threshold temperature, such as a threshold temperature falling within the range of 800-1000 degrees F., and preferably 900 degrees F. If the temperature of the hot working gases exceeds the threshold temperature, the amount of fuel provided to the furnace 30 is reduced. Once the controller 210 has verified that liquid water in the tube structures 160 has been cleared, then the controller 210 will allow the rate at which fuel is provided to the furnace 30 to increase such that the temperature of the hot working gases entering the superheater section 60 exceeds the threshold temperature.

The controller 210 comprises any device which receives input data, processes that data through computer instructions, and generates output data. Such a controller can be a hand-held device, laptop or notebook computer, desktop computer, microcomputer, digital signal processor (DSP), mainframe, server, other programmable computer devices, or any combination thereof. The controller 210 may also be implemented using programmable logic devices such as field programmable gate arrays (FPGAs) or, alternatively, realized as application specific integrated circuits (ASICs) or similar devices.

Preferably, for each of the tube structures 160-162 in the platens 62A, 64A and 66A, a temperature sensor 220, such as a thermocouple in the illustrated embodiment, is provided at the end portion 160B-162B of the tube structure 160 to measure the temperature of the tube structure 160-162 at that location, see FIG. 3. The temperature sensors 220 generate corresponding temperature signals to the controller 210. Each tube structure end portion 160B-162B is located near its corresponding outlet header. It is contemplated that a temperature sensor 220 may not be provided for all of the tube structures 160-162 in each of the platens 62A, 64A and 66A. However, it is preferred that a temperature sensor 220 is provided for at least one tube structure 160-162 in each platen 62A, 64A and 66A.

Liquid water evaporating in a tube structure 160-162 after furnace startup is referred to herein as a “tube structure clearing event.” Such a tube structure clearing event is characterized by rapid changes in temperature at the end portion of the tube structure. In the illustrated embodiment, “rapid changes in temperature” of the end portion 160B-162B of a tube structure 160-162, as measured by a corresponding temperature sensor 220, are characterized by the temperature increasing monotonically, rapidly, e.g., over a 1-10 minute period, and significantly, e.g., by a temperature increase of at least 25 degrees F., and immediately thereafter, decreasing monotonically, rapidly, e.g., over a 1-15 minute period, by a temperature magnitude decrease equal to or less than the magnitude of the temperature increase but, in any event, the magnitude of the decrease in temperature is greater than zero.

In FIG. 4, a plot is illustrated corresponding to a measured tube structure clearing event. As shown in FIG. 4, the temperature of a tube structure end portion, as measured by a corresponding temperature sensor 220, began to monotonically increase in temperature at about 8075 seconds from about 550 degrees F. to a maximum temperature of about 700 degrees F. at about 8225 seconds. Hence, over a time period of about 150 seconds, the tube structure end portion increased in temperature by about 150 degrees F. After reaching the maximum temperature at about 8225 seconds, the temperature of the tube structure end portion immediately began to decrease monotonically to a temperature of about 610 degrees F. at about 8725 seconds. Hence, over a time period of about 500 seconds, the tube structure end portion monotonically decreased in temperature by about 90 degrees.

Hence, the temperature sensors 220 are monitored by the controller 210 for rapid temperature changes, i.e., a rapid increased in temperature immediately followed by a rapid decrease in temperature, indicating that fluid is moving through the entire length of their corresponding tube structures 160-162. In the illustrated embodiment, once all of the temperature sensors 220 have provided signals indicating that rapid temperature changes have occurred at their corresponding tube structure end portions, the controller 210 may automatically cause (without input from an operator) the injectors 137 or spray guns 138 to increase the amount of fuel provided to the furnace 30 since the temperature of the hot working gases in the heat transfer section 32 and entering the superheater section 60 can safely exceed the predefined initial working gas threshold temperature (800-1000 degrees F. in the illustrated embodiment).

An “increase in the amount of fuel provided to the furnace” is intended to encompass increasing the rate at which fuel is input into the furnace 30 by either the injectors 137 or the spray guns 138. Hence, an increase in the amount of fuel provided to the furnace 30 may result when the injectors 137 increase the rate at which natural gas or fuel oil is input into the furnace 30; when the injectors 137 stop inputting natural gas or fuel oil while, at that same time, the spray guns 138 begin inputting black liquor into the furnace 30 at a rate which exceeds the rate at which natural gas or fuel oil was injected into the furnace 30; or when the spray guns 138 increase the rate at which black liquor is input into the furnace.

In accordance with a further aspect of the present invention, once all of the temperature sensors 220 have provided signals to the controller 210 indicating that rapid temperature changes have occurred at their corresponding tube structure end portions, the controller 210 may generate a message or otherwise indicate to an operator that a tube structure clearing event has occurred and/or request that the operator input a tube structure clearing verification signal. In an embodiment, the controller 210 will not automatically cause the injectors 137 or spray guns 138 to increase the amount of fuel provided to the furnace 30 once all of the temperature sensors 220 have provided signals to the controller 210 indicating that rapid temperature changes have occurred at their corresponding tube structure end portions, as is done by the embodiment discussed above. Instead, the controller 210 will wait until it receives a verification signal input from the operator, via a keypad, keyboard or other input device, indicating that the operator has verified that a tube structure clearing event has occurred. In this embodiment, only after receiving the verification signal input by the operator will the controller 210 cause the injectors 137 or spray guns 138 to increase the amount of fuel provided to the furnace 30. In another embodiment, without waiting to receive a verification signal input from the operator (but may occur before or after generating a message indicating to an operator that a tube structure clearing event has occurred, after being preferable), the controller 210 will automatically cause the injectors 137 or spray guns 138 to increase the amount of fuel provided to the furnace 30 once all of the temperature sensors 220 have provided signals to the controller 210 indicating that rapid temperature changes have occurred at their corresponding tube structure end portions, as is done in the embodiment discussed above.

The controller 210, temperature measuring device 170 and temperature sensors 220, as discussed above with regards to FIGS. 1 and 3, define a monitoring system for the boiler system 10.

While particular embodiments of the present invention have been illustrated and described, it would be obvious to those skilled in the art that various other changes and modifications can be made without departing from the spirit and scope of the invention. It is therefore intended to cover in the appended claims all such changes and modifications that are within the scope of this invention.

Sargent, Mark, Fuhrmann, David, Carlier, Tim, Jones, Andrew K

Patent Priority Assignee Title
Patent Priority Assignee Title
2416462,
2819702,
2830440,
2832323,
2962006,
2966896,
3028844,
3040719,
3161180,
3207134,
3246635,
3274979,
3291106,
3362384,
3364903,
3439376,
3452722,
3575002,
3955358, Aug 08 1974 Westinghouse Electric Corporation Combined cycle electric power plant and a heat recovery steam generator with improved fluid level control therefor
3965675, Aug 08 1974 Westinghouse Electric Corporation Combined cycle electric power plant and a heat recovery steam generator having improved boiler feed pump flow control
3974644, Aug 08 1974 Westinghouse Electric Corporation Combined cycle electric power plant and heat recovery steam generator having improved multi-loop temperature control of the steam generated
4004647, Jan 30 1976 The Babcock & Wilcox Company Load cell arrangement
4028884, Dec 27 1974 Westinghouse Electric Corporation Control apparatus for controlling the operation of a gas turbine inlet guide vane assembly and heat recovery steam generator for a steam turbine employed in a combined cycle electric power generating plant
4031404, Aug 08 1974 Westinghouse Electric Corporation Combined cycle electric power plant and a heat recovery steam generator having improved temperature control of the steam generated
4037469, Aug 11 1975 FLINTAB AB , A CORP OF SWEDEN Force measuring apparatus
4085438, Nov 11 1976 CLYDE BLOWERS PLC Digital sootblower control systems and methods therefor
4099384, Jan 02 1975 Foster Wheeler Energy Corporation Integral separator start-up system for a vapor generator with constant pressure furnace circuitry
4237825, Nov 06 1978 Combustion Engineering, Inc. Furnace heat absorption control
4339998, Apr 25 1980 Fuel level indicator
4351277, Jan 23 1981 Tranter, Inc. Sootblower for economizer
4359800, Mar 05 1981 BABCOCK & WILCOX COMPANY, A CORP OF DE Sootblower feed and lance tube structure with improved turbulizer system
4375710, Sep 10 1981 DIAMOND POWER INTERNATIONAL, INC Roller supporting means for long retracting sootblowers
4377134, Aug 03 1981 Combustion Engineering, Inc. Steam temperature control with overfire air firing
4380843, Dec 08 1980 ABB ALSTOM POWER INC Droop correction structure and condensate control in sootblowers
4411204, Dec 07 1981 ALSTOM POWER INC Method of firing a pulverized fuel-fired steam generator
4421067, Sep 07 1982 JASON NEVADA, INC ; DELTAK, L L C ; DELTAK NEVADA, INC Apparatus and method for soot cleaning in high-pressure heat exchangers
4422882, Dec 29 1981 DIAMOND POWER INTERNATIONAL, INC Pulsed liquid jet-type cleaning of highly heated surfaces
4430963, Dec 03 1982 STOCK EQUIPMENT COMPANY, INC System for generating dry coal weight signal for coal feeder and control system based thereon
4454840, Jul 14 1983 ELSAG INTERNATIONAL B V , A CORP OF THE NETHERLANDS Enhanced sootblowing system
4466383, Oct 12 1983 ELSAG INTERNATIONAL B V , A CORP OF THE NETHERLANDS Boiler cleaning optimization with fouling rate identification
4475482, Aug 06 1982 ELSAG INTERNATIONAL B V , A CORP OF THE NETHERLANDS Sootblowing optimization
4488516, Nov 18 1983 Combustion Engineering, Inc. Soot blower system
4492187, Dec 05 1983 DIAMOND POWER INTERNATIONAL, INC Sootblower apparatus
4539840, Nov 14 1983 ELSAG INTERNATIONAL B V , A CORP OF THE NETHERLANDS Sootblowing system with identification of model parameters
4565324, Jun 01 1983 DIAMOND POWER INTERNATIONAL, INC Nozzle structure for sootblower
4567622, Mar 16 1984 The Babcock & Wilcox Company Sootblower nozzle apparatus
4599975, Sep 01 1983 471199 ONTARIO LIMITED DOUGLAS REEVE & ASSOCIATES Control of boiler operations
4621583, Jun 28 1985 Measurex Corporation System for controlling a bark-fired boiler
4716856, Jun 12 1985 Metallgesellschaft AG Integral fluidized bed heat exchanger in an energy producing plant
4718363, Feb 28 1985 WILLIAMES HI-TECH INTERNATIONAL PTY LTD , A CORP OF VICTORIA Multi-purpose seeding machine
4718376, Nov 01 1985 BABCOCK & WILCOX COMPANY, THE Boiler sootblowing control system
4779690, Sep 15 1987 PYRENE CORPORATION System for weighing containers
4803959, Mar 24 1988 DIAMOND POWER INTERNATIONAL, INC Indexing sootblower
4887431, Apr 05 1989 THE BABCOCK & WILCOX POWER GENERATION GROUP, INC Superheater outlet steam temperature control
4920994, Sep 12 1989 The United States of America as represented by the United States Laser removal of sludge from steam generators
4957049, Feb 22 1990 Electrodyne Research Corp. Organic waste fuel combustion system integrated with a gas turbine combined cycle
4980674, Nov 27 1989 Electric Power Research Institute, Inc. Acoustic ash deposition monitor apparatus and method
4986391, Nov 30 1989 Otis Elevator Company Elevator load weighing
4996951, Feb 07 1990 Westinghouse Electric Corp. Method for soot blowing automation/optimization in boiler operation
5027751, Jul 02 1990 SIEMENS ENERGY, INC Method and apparatus for optimized boiler operation
5048636, Feb 07 1990 DIAMOND POWER INTERNATIONAL, INC Low noise wallbox for sootblower
5050108, Nov 30 1989 APTECH ENGINEERING SERVICES, INC , A CORP OF CA Method for extending the useful life of boiler tubes
5063632, Dec 04 1990 DIAMOND POWER INTERNATIONAL, INC Sootblower with condensate separator
5065472, Jan 24 1991 DIAMOND POWER INTERNATIONAL, INC Spring loaded brake assembly for indexing sootblower
5090087, Apr 12 1991 DIAMOND POWER INTERNATIONAL, INC Hub assembly for sootblower
5113802, Mar 26 1991 Union Camp Corporation Method and apparatus for removing deposit from recovery boilers
5181482, Dec 13 1991 STONE & WEBSTER PROCESS TECHNOLOGY, INC Sootblowing advisor and automation system
5209324, Jun 03 1991 Safematic Oy Method for controlling a sootblower lubrication system
5230306, Jul 25 1991 The Babcock & Wilcox Company Ceramic sootblower element
5237718, May 01 1992 DIAMOND POWER INTERNATIONAL, INC Sootblower with lance bypass flow
5241723, Oct 21 1991 DIAMOND POWER INTERNATIONAL, INC Nozzle structure with improved stream coherence
5261965, Aug 28 1992 Texas Instruments Incorporated Semiconductor wafer cleaning using condensed-phase processing
5267533, Jul 20 1992 DIAMOND POWER INTERNATIONAL, INC Self-adjusting packing gland for sootblower
5271356, Oct 01 1992 BABCOCK AND WILCOX COMPANY, THE Low profile sootblower nozzle
5286063, Jan 08 1993 THE BABCOCK & WILCOX POWER GENERATION GROUP, INC Ball and socket floating seal assembly
5299533, Mar 22 1993 DIAMOND POWER INTERNATIONAL, INC Open beam sootblower
5305713, Jul 29 1992 Vadakin, Inc. Angular rotation rotary cleaning device
5320073, Feb 03 1993 DIAMOND POWER INTERNATIONAL, INC Method and apparatus of preheating a sootblower lance
5348774, Aug 11 1993 AlliedSignal Inc. Method of rapidly densifying a porous structure
5353996, Feb 18 1993 LEHMAN COMMERCIAL PAPER INC , AS COLLATERAL AGENT Sootblower frame and drive assembly
5365890, Mar 22 1993 DIAMOND POWER INTERNATIONAL, INC Open beam sootblower
5375771, Feb 10 1993 3003442 CANADA INC Advanced sootblower nozzle design
5379727, Oct 01 1992 DIAMOND POWER INTERNATIONAL, INC Low profile sootblower nozzle
5398623, May 13 1992 Noell Abfall- und Energietechnik GmbH Method for incinerating refuse, and a control process therefor
5416946, May 01 1992 DIAMOND POWER INTERNATIONAL, INC Sootblower having variable discharge
5423272, Apr 11 1994 Alstom Technology Ltd Method for optimizing the operating efficiency of a fossil fuel-fired power generation system
5423483, Nov 12 1993 CLYDE INDUSTRIES INC Sootblower
5429076, Mar 22 1993 DIAMOND POWER INTERNATIONAL, INC Open beam sootblower
5477683, Dec 20 1991 ABB Carbon AB Method and device during starting and low-load operation of a once-through boiler
5505163, Mar 18 1994 CLYDE INDUSTRIES INC Sootblower nozzle
5509607, Jun 30 1994 DIAMOND POWER INTERNATIONAL, INC Convertible media sootblower lance tube
5522348, Sep 02 1991 NIPPON FURNACE CO , LTD Boiler
5530987, Jul 24 1992 DIAMOND POWER INTERNATIONAL, INC Condensate drain controller
5549079, Mar 22 1993 DIAMOND POWER INTERNATIONAL, INC Open beam sootblower
5549305, Apr 07 1995 Sootblower packing gland
5553778, Feb 10 1993 3003442 CANADA INC Advanced sootblower nozzle design
5605117, Nov 21 1994 DIAMOND POWER INTERNATIONAL, INC Articulating sootblower
5606924, Dec 29 1993 Martin GmbH fuer Umwelt-und Energietechnik Process for regulating individual factors or all factors influencing combustion on a furnace grate
5615734, Nov 16 1994 WESTINGHOUSE ELECTRIC CO LLC Sludge lance inspection and verification system
5619771, Aug 11 1995 CLYDE INDUSTRIES INC Oscillating and reverse cleaning sootblower
5626184, Aug 24 1995 ALSTOM POWER INC Sootblower
5663489, Nov 14 1994 BETZDEARBORN INC Methods and apparatus for monitoring water process equipment
5675863, Aug 28 1995 ALSTOM POWER INC Full coverage sootblower
5740745, Sep 20 1996 FUEL TECH, INC Process for increasing the effectiveness of slag control chemicals for black liquor recovery and other combustion units
5745950, Aug 28 1995 ALSTOM POWER INC Hub and drive assembly for full coverage sootblower
5756880, Feb 13 1997 BetzDearborn Inc. Methods and apparatus for monitoring water process equipment
5765510, Apr 26 1996 BANK OF AMERICA, N A , AS ADMINISTRATIVE AGENT Retractable, sealed sootblower for high pressure, high temperature applications
5769034, Jan 17 1997 NORTHAMERICAN INDUSTRIAL SERVICES, INC Device, system and method for on-line explosive deslagging
5769035, Oct 24 1996 McDermott Technology, Inc Boiler furnace puff sootblower
5778830, Jan 02 1997 ALSTOM POWER INC Closed frame sootblower with top access
5778831, Mar 18 1994 CLYDE INDUSTRIES INC Sootblower lance with expanded tip
5793014, Dec 27 1995 Electricite de France - Service National Process and device for restoring the tightness of connecting elements such as water boxes of alternators with a mixed water-hydrogen cooling system
5836268, Jan 02 1997 ABB ALSTOM POWER INC Sootblower with travelling limit switch
5894806, Sep 20 1996 FUEL TECH, INC Process for increasing the effectiveness of slag and/or corrosion control chemicals for combustion units
5920951, Apr 03 1997 DIAMOND POWER INTERNATIONAL, LLC Parameter sensing sootblower
5943865, Dec 03 1998 ALSTOM POWER INC Reheating flue gas for selective catalytic systems
5983639, Mar 02 1995 Siemens Aktiengesellschaft Method and system for starting up a continuous flow steam generator
6065528, Aug 09 1999 ARVOS TECHNOLOGY LIMITED; ARVOS INC Air preheater cleaner
6073641, May 30 1995 Clyde Bergemann GmbH Drive system for a water lance blower with a housing for blocking and flushing medium and a method for its operation
6105590, Apr 24 1997 Martin GmbH fur Umwelt-und Energietechnik Method and arrangement for removing deposits in and on feed nozzles or feed pipes of firing installations
6109096, Feb 13 1997 BetzDearborn Inc. Methods and apparatus for monitoring water process equipment
6170117, Nov 15 1999 ALSTOM POWER INC Multiple rake sootblower with internal valving manifold
6178924, Dec 19 1996 Kvaerner Power Oy Method for upgrading a boiler
6244098, Sep 26 1997 BetzDearborn Inc. Methods and apparatus for monitoring water process equipment
6321690, Jan 17 1997 North American Industrial Services, Inc. Device, system and method for on-line explosive deslagging
6323442, Dec 07 1999 International Paper Company System and method for measuring weight of deposit on boiler superheaters
6325025, Nov 09 1999 DIAMOND POWER INTERNATIONAL, LLC Sootblowing optimization system
6425352, Nov 09 1999 DIAMOND POWER INTERNATIONAL, LLC Sootblowing optimization system
6431073, Jan 14 1998 North American Industrial Services, Inc. Device, system and method for on-line explosive deslagging
6437285, Jun 02 1998 General Lasertronics Corporation Method and apparatus for treating interior cylindrical surfaces and ablating surface material thereon
6575122, Jul 20 2001 DIAMOND POWER INTERNATIONAL, INC Oscillating sootblower mechanism
6581549, Aug 31 2000 ANTARES CAPITAL LP, AS AGENT Sootblower lance port with leak resistant cardon joint
6604468, Jan 17 1997 North American Industrial Services, Inc. Device, system and method for on-line explosive deslagging
6644201, Jan 17 1997 NorthAmerican Industrial Services, Inc. Device, system and method for on-line explosive deslagging
6710285, Jun 01 2002 First Call Explosive Solutions, Inc. Laser system for slag removal
6715499, Mar 01 2000 Clyde Bergmann GmbH Water lance blower with monitoring device for quality of a water jet and method of operating the same
6725911, Sep 28 2001 Gas Technology Institute Corrosion resistance treatment of condensing heat exchanger steel structures exposed to a combustion environment
6736089, Jun 05 2003 General Electric Company Method and system for sootblowing optimization
6755156, Sep 13 1999 NorthAmerican Industrial Services, Inc. Device, system and method for on-line explosive deslagging
6764030, Jan 12 2001 DIAMOND POWER INTERNATIONAL, LLC Sootblower nozzle assembly with an improved downstream nozzle
6772775, Dec 22 2000 LLOYDS INTERNATIONAL CREDIT, LLC Sootblower mechanism providing varying lance rotational speed
6782902, Jan 12 2000 DIAMOND POWER INTERNATIONAL, LLC Sootblower lance tube for dual cleaning media
6892679, Jul 09 2002 ANTARES CAPITAL LP, AS AGENT Multi-media rotating sootblower and automatic industrial boiler cleaning system
6964709, Jan 14 2000 MITSUBISHI HITACHI POWER SYSTEMS, LTD Acoustic soot blower, and method for operating the same
7017500, Mar 30 2004 International Paper Company Monitoring of fuel on a grate fired boiler
7028926, Jan 12 2001 DIAMOND POWER INTERNATIONAL, LLC Sootblower nozzle assembly with nozzles having different geometries
7055209, Apr 04 2003 CLYDE INDUSTRIES INC Method and apparatus for converting a sootblower from a single motor to a dual motor drive
7204208, Jun 17 2003 KURION, INC Method and apparatuses to remove slag
7267134, Mar 15 2004 SHOCKSYSTEM, INC Control of detonative cleaning apparatus
7341067, Sep 27 2004 International Paper Company Method of managing the cleaning of heat transfer elements of a boiler within a furnace
7395760, Jan 14 1998 NorthAmerican Industrial Services, Inc. Device, system and method for on-line explosive deslagging
7458342, Jun 05 2003 GE DIGITAL HOLDINGS LLC Method and system for sootblowing optimization
7584024, Feb 08 2005 GE DIGITAL HOLDINGS LLC Method and apparatus for optimizing operation of a power generating plant using artificial intelligence techniques
7633033, Jan 09 2004 General Lasertronics Corporation Color sensing for laser decoating
7735435, May 24 2006 DIAMOND POWER INTERNATIONAL, LLC Apparatus for cleaning a smelt spout of a combustion device
9091182, Dec 20 2010 SCHNEIDER ELECTRIC SYSTEMS USA, INC Feedwater heater control system for improved rankine cycle power plant efficiency
20020043192,
20040006841,
20040226758,
20050199743,
20050252458,
20060065291,
20060236696,
20090090311,
20090151656,
20100064470,
20100077946,
20100101462,
20100199930,
20110011315,
20120270162,
20130152973,
20140150825,
20160025600,
CA2387369,
EP71815,
EP602244,
EP905308,
EP1063021,
EP2784477,
GB1022254,
GB1376805,
GB2271440,
GB2428312,
GB802032,
JP10274408,
JP2003156211,
JP62278217,
RE32723, Feb 04 1987 Neundorfer, Inc. Apparatus for deslagging steam generator tubes
RU2143087,
SU1291031,
SU464031,
WO3104547,
WO2006037018,
WO2007028447,
WO2008057039,
WO2009139714,
WO2010098946,
WO2014068325,
WO9305338,
WO9827384,
//////
Executed onAssignorAssigneeConveyanceFrameReelDoc
Apr 15 2014JONES, ANDREW K International Paper CompanyASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0330050840 pdf
Apr 23 2014FUHRMANN, DAVIDInternational Paper CompanyASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0330050888 pdf
May 02 2014SARGENT, MARKInternational Paper CompanyASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0330050983 pdf
Jun 12 2015CARLIER, TIMINTEGRATED TEST & MEASUREMENTASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0360400313 pdf
Jul 20 2020CARLIER, TIMInternational Paper CompanyASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0532910363 pdf
Jul 20 2020INTEGRATED TEST & MEASUREMENTInternational Paper CompanyASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0532910363 pdf
Date Maintenance Fee Events
Jun 24 2020M1551: Payment of Maintenance Fee, 4th Year, Large Entity.
Jun 20 2024M1552: Payment of Maintenance Fee, 8th Year, Large Entity.


Date Maintenance Schedule
Jan 10 20204 years fee payment window open
Jul 10 20206 months grace period start (w surcharge)
Jan 10 2021patent expiry (for year 4)
Jan 10 20232 years to revive unintentionally abandoned end. (for year 4)
Jan 10 20248 years fee payment window open
Jul 10 20246 months grace period start (w surcharge)
Jan 10 2025patent expiry (for year 8)
Jan 10 20272 years to revive unintentionally abandoned end. (for year 8)
Jan 10 202812 years fee payment window open
Jul 10 20286 months grace period start (w surcharge)
Jan 10 2029patent expiry (for year 12)
Jan 10 20312 years to revive unintentionally abandoned end. (for year 12)