A method of offshore batch drilling includes attaching a first mcd to a high pressure wellhead of a first subsea well and attaching a second mcd to a high pressure wellhead of a second subsea well. The method further includes drilling a section of the first subsea well to below a surface casing of the first subsea well through the first mcd. The method also includes drilling a section of the second subsea well to below a surface casing of the second subsea well through the second mcd. drilling the section of the first subsea well and drilling the section of the second subsea well are performed from an offshore structure.
|
1. A method of offshore batch drilling, the method comprising:
attaching a first mudline closure device (mcd) to a high pressure wellhead of a first subsea well;
attaching a second mcd to a high pressure wellhead of a second subsea well;
drilling a section of the first subsea well to below a surface casing of the first subsea well through the first mcd, wherein a drilling riser is directly attached to the first mcd; and
drilling a section of the second subsea well below a surface casing of the second subsea well through the second mcd before drilling a lower section of the first subsea well, wherein the lower section of the first subsea well reaches below the section of the first subsea well drilled to below the surface casing of the first subsea well, and wherein drilling the section of the first subsea well and drilling the section of the second subsea well are performed from an offshore structure without using a subsea blowout preventer (BOP).
14. A method of offshore batch drilling, the method comprising:
attaching a first mudline closure device (mcd) to a high pressure wellhead attached to a surface casing of a first subsea well;
attaching a second mcd to a high pressure wellhead attached to a surface casing of a second subsea well;
drilling a section of the first subsea well to below the surface casing of the first subsea well through the first mcd; and
drilling a section of the second subsea well to below the surface casing of the second subsea well through the second mcd before drilling a lower section of the first subsea well, wherein the lower section of the first subsea well reaches below the section of the first subsea well drilled to below the surface casing of the first subsea well, and wherein drilling the section of the first subsea well and drilling the section of the second subsea well are performed from an offshore structure without using a subsea blowout preventer (BOP).
19. An offshore batch drilling system, comprising:
an offshore structure;
a first mudline closure device (mcd) attached to a first high pressure wellhead of a first subsea well; and
a second mcd attached to a second high pressure wellhead of a second subsea well, wherein the first subsea well and the second subsea well are drilled from the offshore structure without using a subsea blowout preventer (BOP), wherein a drilling riser is directly attached to the first mcd, wherein a section of the first subsea well that reaches below a surface casing of the first subsea well is drilled through the first mcd, wherein a section of the second subsea well that reaches below a surface casing of the second subsea well is drilled through the second mcd before drilling a lower section of the first subsea well, and wherein the lower section of the first subsea well reaches below the section of the first subsea well that reaches below the surface casing of the first subsea well.
2. The method of
casing the section of the first subsea well with a first intermediate casing; and
casing the section of the second subsea well with a second intermediate casing.
3. The method of
4. The method of
5. The method of
6. The method of
7. The method of
8. The method of
9. The method of
11. The method of
12. The method of
13. The method of
attaching, from the offshore structure, a third mcd to a high pressure wellhead of a third subsea well; and
drilling a section of the third subsea well to below a surface casing of the third subsea well before drilling a lower section of the first subsea well, wherein the lower section of the first subsea well reaches below the section of the first subsea well reaching below the surface casing of the first subsea well.
15. The method of
drilling the lower section of the first subsea well from the offshore structure through the first mcd, wherein the lower section of the first subsea well reaches below the section of the first subsea well drilled to below the surface casing of the first subsea well; and
drilling a lower section of the second subsea well from the offshore structure through the second mcd, wherein the lower section of the second subsea well reaches below the section of the second subsea well drilled to below the surface casing of the second subsea well and wherein drilling the lower section of the first subsea well and drilling the lower section of the second subsea well are performed after drilling the section of the first subsea well and after drilling the section of the second subsea well.
16. The method of
drilling a second lower section of the first subsea well from the offshore structure through the first mcd, wherein the second lower section of the first subsea well reaches below the lower section of the first subsea well; and
drilling a second lower section of the second subsea well from the offshore structure through the second mcd, wherein the second lower section of the second subsea well reaches below the lower section of the second subsea well and wherein drilling the second lower section of the first subsea well and drilling the second lower section of the second subsea well are performed after drilling the lower section of the first subsea well and after drilling the lower section of the second subsea well.
17. The method of
casing the section of the first subsea well with a first intermediate casing before drilling the lower section of the first subsea well; and
casing the section of the second subsea well with a second intermediate casing before drilling the lower section of the second subsea well.
18. The method of
attaching a third mcd to a high pressure wellhead attached to a surface casing of a third subsea well; and
drilling a section of the third subsea well to below the surface casing of the third subsea well through the third mcd, wherein the section of the third subsea well is drilled before drilling the lower section of the first subsea well from the offshore structure through the first mcd, wherein the lower section of the first subsea well reaches below the section of the first subsea well drilled to below the surface casing of the first subsea well.
20. The offshore batch drilling system of
|
The present application is generally related to deepwater offshore batch drilling on subsea templates, and in particular to batch drilling involving use of multiple mudline closure devices (MCDs).
In deepwater offshore drilling operations using subsea BOPs, multiple wells may be drilled in series or in a batch mode. To illustrate, a subsea template may contain multiple wells. In some series drilling operations, a typical drilling process is to drill a complete well where a respective casing is set after drilling each section of the well. For example, after a first section of the well is drilled to a target depth, the section is set with a structural casing. A second section of the well is then drilled and set with a conductor casing. Another section of the well is then drilled and set with a surface casing. A high pressure wellhead is generally attached to the surface casing prior to running this casing string. A subsea blowout preventer (BOP) is then attached to the high pressure wellhead before proceeding with further drilling below the surface casing. After the subsea BOP is installed, one or more intermediate casings are then set in respective one or more sections of the well that are drilled in series below the surface casing. The production casing is then set in a respective section of the well that is drilled below the lowest of the one or more intermediate casings. Drilling of another well is then started where the drilling of the well and setting of the casings of the second well are performed in the same manner as in the first well.
In some other offshore drilling operations, some of the well sections of multiple wells are drilled and the respective casings are set in a batch operation. To illustrate, structural casings of multiple wells may be set after drilling respective sections of the multiple wells. Conductor casings of the multiple wells may then be set after drilling respective sections of the wells below the respective structural casings. The surface casings of the multiple wells may then be set after drilling respective sections of the wells below the respective conductor casings. Once the surface casings are set with its attached high pressure wellhead, further drilling below the respective surface casings requires installation of a subsea BOP on each well surface casing. However, due to the high cost of subsea BOPs, complexity of installing a subsea BOP, and the costs and risks associated with moving a subsea BOP from one well to another, further drilling below the surface casings of the wells are performed in series. To illustrate, sections of one of the multiple wells below the surface casing of one well are drilled and set with respective one or more intermediate casings and a production casing before drilling sections of another one of the wells below its surface casing. In general, after the intermediate and production casings of a first well are set, the subsea BOP that is attached to the surface casing of the first well is moved and attached to the surface casing of another well before drilling of the sections of the second well below the surface casing of the second well.
Because of differences in the drilling process, material, and equipment used in drilling of different sections of a well, drilling corresponding sections of two or more wells for intermediate and production casings before drilling further sections of the wells may result in reduction of drilling costs. Thus, a method and system of batch drilling that allows drilling and casing of corresponding sections of multiple wells may result in significant time and cost savings.
The present application is generally related to deepwater offshore batch drilling on subsea templates, and in particular to batch drilling involving use of multiple MCDs. In an example embodiment, a method of deepwater offshore batch drilling includes attaching a first MCD to a high pressure wellhead of a first subsea well and attaching a second MCD to a high pressure wellhead of a second subsea well. The method further includes drilling a section of the first subsea well to below a surface casing of the first subsea well through the first MCD. The method also includes drilling a section of the second subsea well to below a surface casing of the second subsea well through the second MCD. Drilling the section of the first subsea well and drilling the section of the second subsea well are performed from an offshore structure.
In another example embodiment, a method of offshore batch drilling includes attaching a first MCD to a high pressure wellhead attached to a surface casing of a first subsea well. The method further includes attaching a second MCD to a high pressure wellhead attached to a surface casing of a second subsea well. The method also includes drilling a section of the first subsea well to below the surface casing of the first subsea well through the first MCD. The method further includes drilling a section of the second subsea well to below the surface casing of the second subsea well through the second MCD. Drilling the section of the first subsea well and drilling the section of the second subsea well are performed from an offshore structure.
In yet another example embodiment, an offshore batch drilling system includes an offshore structure, a first MCD attached to a first high pressure wellhead of a first subsea well, and a second MCD attached to a second high pressure wellhead of a second subsea well. The first subsea well and the second subsea well are drilled from the offshore structure. A section of the first subsea well that reaches below a surface casing of the first subsea well is drilled through the first MCD. A section of the second subsea well that reaches below a surface casing of the second subsea well is drilled through the second MCD.
These and other aspects, objects, features, and embodiments will be apparent from the following description and the appended claims.
Reference will now be made to the accompanying drawings, which are not necessarily drawn to scale, and wherein:
The drawings illustrate only example embodiments and are therefore not to be considered limiting in scope. The elements and features shown in the drawings are not necessarily to scale, emphasis instead being placed upon clearly illustrating the principles of the example embodiments. Additionally, certain dimensions or placements may be exaggerated to help visually convey such principles. In the drawings, reference numerals designate like or corresponding, but not necessarily identical, elements.
In some example embodiments, the systems and methods of the present application include batch drilling systems and operations involving two or more subsea wells. In general, batch drilling includes drilling multiple wells from a single structure, such as an offshore platform (e.g., a floating drilling rig). Typically, in a subsea well, the structural casing is the first casing string that is set below the mudline. Conductor casing is generally the second string of casing set below the mudline. There may be more than one conductor casings. A reference to a conductor casing may mean more than one conductor casing. Surface casing is the string of casing(s) to which the high pressure wellhead is attached. Intermediate casings are the next strings of casing set below the surface casing and are run through the high pressure wellhead. Production casing is the deepest string of casing and run across the productive interval that is targeted for production and/or injection.
To illustrate, in some example embodiments, after all or at least two of the structural sections are drilled and structural casings set, all or at least two of the conductor sections are drilled and conductor casings are set. Then, all or at least two surface sections are drilled and surface casings are set. A respective high pressure wellhead is attached prior to setting the surface casing. After the two or more MCDs are attached to two or more surface casings, each with its high pressure wellhead, two or more intermediate sections of two or more of the subsea wells are drilled and intermediate casings are set. Then, if applicable, two or more of lower intermediate sections are drilled and respective intermediate casings set. Two or more production sections are then drilled and respective production casings set. In some example embodiments, one or more MCDs may be moved from one or more respective high pressure wellheads and attached to another one or more respective high pressure wellheads during the drilling of one or more intermediate sections or of one or more production sections and/or casing of one or more production sections is being performed on a different subset of subsea wells. For example, one MCD could be moved from a first subsea well to a third subsea well while drilling of a second subsea well is being performed through a second MCD that is attached to the surface casing of the second subsea well.
In the following paragraphs, particular embodiments will be described in further detail by way of example with reference to the drawings. In the description, well-known components, methods, and/or processing techniques are omitted or briefly described. Furthermore, reference to various feature(s) of the embodiments is not to suggest that all embodiments must include the referenced feature(s).
Turning to the drawings,
The section of each subsea well 104, 106 that is set with the conductor casing 202 may be drilled up to a target depth for receiving the conductor casing 202. The section of each subsea well 104, 106 corresponding to the conductor casing 202 is drilled from the offshore drilling structure 102. For example, the section of the subsea well 104 that is set with the conductor casing 202 may be drilled first from the offshore drilling structure 102 followed by drilling, from the offshore drilling structure 102, the section of the subsea well 106 that is set with the conductor casing 202.
The mud used in drilling the section of the subsea well 104 that is set with the conductor casing 202 may be used to drill the corresponding section of the subsea well 106 that is set with the conductor casing 202. To illustrate, the section of the subsea well 104 that is set with the conductor casing 202 may be drilled and set with the conductor casing 202 before drilling and casing the corresponding section of the subsea well 106 that is set with the conductor casing 202, which may be drilled before further lower sections of the subsea well 104 are drilled. The conductor casing 202 of each subsea well 104, 106 is cemented before drilling lower sections of the subsea wells 104, 106.
After setting the conductor casing 202 in the corresponding section of each subsea well 104, 106 as described above, a lower section of each subsea well 104, 106 is drilled and set with a surface casing 204. The lower section of each subsea well 104, 106 that is set with the surface casing 204 may be drilled up to a target depth for receiving the surface casing 204. The surface casing 204 of each subsea well 104, 106 extend down from the seafloor through the conductor casing 202.
The section of each subsea well 104, 106 corresponding to the surface casing 204 is drilled from the offshore drilling structure 102. For example, the section of the subsea well 104 that is set with the surface casing 204 may be drilled first from the offshore drilling structure 102 followed by drilling, from the offshore drilling structure 102, of the section of the subsea well 106 that is then set with the surface casing 204.
The mud used in drilling the section of the subsea well 104 that is set with the surface casing 204 may be used to drill the corresponding section of the subsea well 106 that is set with the surface casing 204. To illustrate, the section of the subsea well 104 that is set with the surface casing 204 may be drilled and set with the surface casing 204 before drilling and casing the corresponding section of the subsea well 106 that is set with the surface casing 204, which may be drilled before further lower sections of the subsea well 104 are drilled. The surface casing 204 of each subsea well 104, 106 is cemented before drilling lower sections of the subsea wells 104, 106. For example, cement 212 may be formed around the surface casing 204 of each subsea well 104, 106 by pumping down cement from the offshore drilling structure 102 or from another offshore structure known to those of ordinary skill in the art. For example, the offshore drilling structure 102 may be a floating drilling rig.
After setting the surface casing 204 in the corresponding section of each subsea well 104, 106 as described above, a respective high pressure wellhead 222 may be attached to the surface casing 204 of each subsea well 104, 106 prior to drilling lower sections of the wells 104, 106. In some alternative embodiments, the high pressure wellhead 222 may be attached to a casing other than the surface casing 204.
After the respective high pressure wellhead 222 is attached to the surface casing 204 of each subsea well 104, 106, an MCD 224 may be attached to the high pressure wellhead 222 of each subsea well 104, 106. For example, the MCD 224 could be run on a drill pipe (or some other pipe-based running string) after cementing the surface casings. The MCD 224 can also be run using a wire from a drill rig or other vessel. The MCD 224 can also be attached to a drilling riser. Alternatively, the MCD 224 may be attached to the high pressure wellhead 222 at the offshore drilling structure 102 before running the high pressure wellhead 222 along with the MCD 224 to the seafloor.
Referring now to
Referring now to
The mud used in drilling the section of the subsea well 104 that is set with the intermediate casing 206 may be used to drill the corresponding section of the subsea well 106 that is set with the intermediate casing 206. To illustrate, the section of the subsea well 104 that is set with the intermediate casing 206 of the subsea well 104 may be drilled and set with the intermediate casing 206 of the subsea well 104 before drilling and casing the corresponding section of the subsea well 106 that is set with the intermediate casing 206 of the subsea well 106, which is drilled before further lower section(s) of the subsea well 104 are drilled. The intermediate casing 206 of each subsea well 104, 106 is cemented before drilling further lower sections of the subsea wells 104, 106. For example, cement 216 may be formed around the intermediate casing 206 of each subsea well 104, 106 between the intermediate casing 206 and earth formation 214 by pumping down cement from the offshore drilling structure 102 or from another offshore structure known to those of ordinary skill in the art.
In some example embodiments, another one or more intermediate casings are set in respective one or more sections drilled in each subsea well 104, 106 to a target depth below the intermediate casing 206. For example, an additional intermediate casing of the subsea well 104 is set in a corresponding additional section drilled in the subsea well 104 and an additional intermediate casing of the subsea well 106 is set in a corresponding additional section drilled in the subsea well 106 before a lower section below the additional intermediate casing of the subsea wells 104, 106 is drilled and set with an additional intermediate casing or a production casing. Mud used in drilling an additional section in the subsea well 104 that is set with an additional intermediate casing can be used in drilling a corresponding additional section in the subsea well 106 that is set with an additional intermediate casing.
In some example embodiments, after setting the intermediate casing 206 in the corresponding section of each subsea well 104, 106 as described above, a lower section of each subsea well 104, 106 is drilled and set with the respective production casing 208. Alternatively, a lower section of each subsea well 104, 106 is drilled and set with a production casing 208 after setting additional one or more intermediate casings in the corresponding one or more sections of each subsea well 104, 106 that are drilled below the corresponding intermediate casing 206.
The section of subsea well 104, 106 that is set with the production casing 208 may be drilled up to a target depth for receiving the production casing 208. The production casing 208 of each subsea well 104, 106 extends down from the seafloor through the conductor casing 202, the surface casing 204 and the intermediate casing 206, and any other additional intermediate casings that are below the intermediate casing 206. To illustrate, the section of subsea well 104 that is set with the production casing 208 may be drilled through the MCD 224 of the subsea well 104 and set with the respective production casing 208 and may be followed by drilling through the MCD 224 of the subsea well 106 the section of subsea well 106 that is set with the production casing 208 of the subsea well 106 and set with the respective production casing 208.
As more clearly shown in
In some example embodiments, an optional respective production liner 210 may be set in a corresponding section of each subsea well 104, 106 drilled to below the respective production casing 208 of each subsea well 104, 106. Cement 220 may be formed around the production liner 210 between the production liner 210 and the earth formation 214 by pumping down cement using methods known to those of ordinary skill in the art.
The MCD 224 installed on the high pressure wellhead 222 of each subsea well 1024, 106 is much lighter than a subsea BOP and generally contains all of the on board power necessary to function. By using two or more MCDs at the seafloor, batch offshore drilling operations may be performed at a much lower cost, complexity, and risks than any batch drilling operations that may use subsea BOPs. Use of multiple MCDs allows continued batch drilling operations after the high pressure wellhead is attached to subsea wells.
Although two subsea wells 104, 106 are shown in
At step 506, the method 500 includes drilling a section of the first subsea well to below a surface casing of the first subsea well through the first MCD. To illustrate, a section of the subsea well 104 that is set with the intermediate casing 206 may be drilled to below the surface casing 204 of the subsea well 104. The section of the subsea well 104 that is set with the intermediate casing 206 may be drilled through the MCD 224 of the subsea well 104.
At step 508, the method 500 includes drilling a section of the second subsea well below a surface casing of the second subsea well through the second MCD. To illustrate, a section of the subsea well 106 that is set with the intermediate casing 206 may be drilled to below the surface casing 204 of the subsea well 106. The section of the subsea well 106 that is set with the intermediate casing 206 may be drilled through the MCD 224 of the subsea well 106. The section of the first subsea well and the section of the second subsea well may be performed from an offshore structure such as the offshore drilling structure 102.
In some example embodiments, the method 500 may include casing the section of the first subsea well drilled at step 506 with a first intermediate casing. For example, the section of subsea well 104 that is drilled to below the surface casing 204 may be set with the intermediate casing 206. The method 500 may also include casing the section of the second subsea well with a second intermediate casing. For example, the section of subsea well 106 that is drilled to below the surface casing 204 may be set with the intermediate casing 206.
In some example embodiments, the method 500 may include, after drilling the section of the first subsea well to below the surface casing of the first subsea well and after drilling the section of the second subsea well to below the surface casing of the second subsea well, drilling a lower section of the first subsea well from the offshore structure through the first MCD. The lower section of the first subsea well reaches below the first intermediate casing. To illustrate, the section of the subsea well 104 that is set with the production casing 208 may be drilled through the MCD 224 (i.e., through the opening of the MCD 224) of the subsea well 104 after the section of the subsea well 104 that is set with the intermediate casing 206 and after the section of the subsea well 106 that is set with the intermediate casing 206 are drilled. Thus, the same mud may be used to drill the section of the subsea well 104 and the section of the subsea well 106 that are set with the respective intermediate casing 206.
In some example embodiments, the method 500 includes casing the lower section of the first subsea well 104 with the production casing 208. Alternatively, the lower section of the first subsea well 104 may be set with another intermediate casing.
In some example embodiments, the method 500 may include, after drilling the section of the first subsea well to below the surface casing of the first subsea well and after drilling the section of the second subsea well to below the surface casing of the second subsea well, drilling a lower section of the second subsea well from the offshore structure through the second MCD 104. The lower section of the second subsea well reaches below the second intermediate casing. To illustrate, the section of the subsea well 106 that is set with the production casing 208 may be drilled through the MCD 224 (i.e., through the opening of the MCD 224) of the subsea well 106 after the section of the subsea well 104 that is set with the intermediate casing 206 and after the section of the subsea well 106 that is set with the intermediate casing 206 are drilled. Thus, the same mud may be used to drill the section of the subsea well 104 and the section of the subsea well 106 that are set with the respective intermediate casing 206.
In some example embodiments, the method 500 includes moving the first MCD to a third subsea well. To illustrate, after the production casing 208 of the first subsea well 104 is set and cemented, the MCD 224 of the subsea well 104 may be detached from the surface casing 204 of the subsea well 104 and attached to the surface casing of another subsea well such as the subsea well 702 of
In some example embodiments, the method 500 may include attaching, from the offshore structure, a third MCD to a high pressure wellhead of a third subsea well. To illustrate, instead of moving the MCD 224 from the subsea well 104 to the subsea well 702, an additional (i.e., a third) MCD 224 may be attached to the surface casing of the subsea well 702. For example, the intermediate casings of the subsea wells 104, 106, 702 may be set in the respective sections of the subsea wells 104, 106, 702 prior to drilling a lower section for the production casing of any of the subsea wells 104, 106, 702.
In some example embodiments, the method 500 may include additional steps or one or more steps may be omitted or performed in a different order than described without departing from the scope of this disclosure.
At step 606, the method 600 includes drilling a section of the first subsea well to below the surface casing of the first subsea well through the first MCD. To illustrate, a section of the subsea well 104 that is set with the intermediate casing 206 may be drilled to below the surface casing 204 of the subsea well 104. The section of the subsea well 104 that is set with the intermediate casing 206 may be drilled through the MCD 224 of the subsea well 104.
At step 608, the method 600 includes drilling a section of the second subsea well below a surface casing of the second subsea well through the second MCD. To illustrate, a section of the subsea well 106 that is set with the intermediate casing 206 may be drilled to below the surface casing 204 of the subsea well 106. The section of the subsea well 106 that is set with the intermediate casing 206 may be drilled through the MCD 224 of the subsea well 106. The section of the first subsea well and the section of the second subsea well may be performed from an offshore structure such as the offshore drilling structure 102.
In some example embodiments, the method 600 may include drilling a lower section of the first subsea well from the offshore structure through the first MCD, where the lower section of the first subsea well reaches below the section of the first subsea well drilled to below the surface casing of the first subsea well. For example, a section of the subsea well 104 may be drilled through the MCD 224 (i.e., through opening of the MCD 224) of the subsea well 104 to a target depth that is below the intermediate casing 206 and set with the production casing 208. The method 600 may also include drilling a lower section of the second subsea well from the offshore structure through the second MCD, where the lower section of the second subsea well reaches below the section of the second subsea well drilled to below the surface casing of the second subsea well. For example, a section of the subsea well 106 may be drilled through the MCD 224 (i.e., through opening of the MCD 224) of the subsea well 104 to a target depth that is below the intermediate casing 206 and set with the production casing 208. As explained above, the sections of the subsea wells 104, 106 to be set with the production casing 208 are drilled after the sections of the subsea wells 104, 106 to be set with the intermediate casing 208. Alternatively, subsequent intermediate casings may be set in sections of the drilled to below the subsea wells 104, 106 that are drilled to below the intermediate casing 206 of the subsea wells 104, 106.
In some example embodiments, the method 600 may include drilling a second lower section of the first subsea well from the offshore structure through the first MCD, where the second lower section of the first subsea well reaches below the lower section of the first subsea well. The method 600 may also include drilling a second lower section of the second subsea well from the offshore structure through the second MCD, where the second lower section of the second subsea well reaches below the lower section of the second subsea well. Drilling the second lower section of the first subsea well and drilling the second lower section of the second subsea well are performed after drilling the lower section of the first subsea well and after drilling the lower section of the second subsea well. To illustrate, the lower section of each subsea well 104, 106 may be set with a second intermediate casing below the intermediate casing 206, and the second lower section of each subsea well 104, 106 may be set with the production casing 208.
In some example embodiments, the method 600 may include setting the section of the subsea well 104, 106 with the respective intermediate casing 206 before drilling the lower section of the subsea well 104, 106 that is set with the respective production casing 206 or with another respective intermediate casing.
In some example embodiments, the method 600 may include attaching a third MCD to a high pressure wellhead attached to a surface casing of a third subsea well. To illustrate, instead of moving the MCD 224 from the subsea well 104 to the subsea well 702 as described below with respect to
In some example embodiments, the method 600 may include additional steps or one or more steps may be omitted or performed in a different order than described without departing from the scope of this disclosure.
After production casing 208 is set in the subsea well 104, the MCD 224 of the subsea well 104 may be removed from the subsea well 104 and moved to subsea well 702 as shown in
Although some embodiments have been described herein in detail, the descriptions are by way of example. The features of the embodiments described herein are representative and, in alternative embodiments, certain features, elements, and/or steps may be added or omitted. Additionally, modifications to aspects of the embodiments described herein may be made by those skilled in the art without departing from the spirit and scope of the following claims, the scope of which are to be accorded the broadest interpretation so as to encompass modifications and equivalent structures. One of ordinary skill in the art will appreciate that in the development of any such actual embodiment, numerous implementation-specific decisions must be made to achieve the developers' specific goals, such as compliance with system-related constraints, which will vary from one implementation to another. Moreover, it will be appreciated that such a development effort might be complex and time-consuming, but would nevertheless be a routine undertaking for those of ordinary skill in the art having the benefit of this disclosure.
Patent | Priority | Assignee | Title |
Patent | Priority | Assignee | Title |
4163477, | Mar 02 1978 | SOUTHWEST RESEARCH INSTITUTE, A TEXAS CORP | Method and apparatus for closing underwater wells |
5458199, | Aug 28 1992 | AKER SOLUTIONS SINGAPORE PTE LTD | Assembly and process for drilling and completing multiple wells |
5560435, | Apr 11 1995 | ABB Vecto Gray Inc. | Method and apparatus for drilling multiple offshore wells from within a single conductor string |
7921917, | Jun 08 2007 | Cameron International Corporation | Multi-deployable subsea stack system |
8342249, | Jul 23 2009 | BP Corporation North America Inc. | Offshore drilling system |
8622139, | Dec 15 2010 | Vetco Gray Inc.; Vetco Gray Inc | Emergency subsea wellhead closure devices |
9033051, | Jun 14 2011 | TRENDSETTER ENGINEERING, INC | System for diversion of fluid flow from a wellhead |
9187973, | Mar 15 2013 | Cameron International Corporation | Offshore well system with a subsea pressure control system movable with a remotely operated vehicle |
9200493, | Jan 10 2014 | TRENDSETTER ENGINEERING, INC | Apparatus for the shearing of pipe through the use of shape charges |
9238943, | Oct 05 2011 | SINGLE BUOY MOORINGS, INC | Method and apparatus for drilling multiple subsea wells from an offshore platform at a single site |
9255446, | Jul 18 2013 | ConocoPhillips Company | Pre-positioned capping device for source control with independent management system |
9341024, | Oct 18 2011 | TOTALENERGIES ONETECH PREVIOUSLY TOTALENERGIES ONE TECH | Floating offshore facility and a method for drilling a well |
9341025, | Oct 18 2011 | TOTALENERGIES ONETECH PREVIOUSLY TOTALENERGIES ONE TECH | Floating offshore facility and a method for drilling a well |
9347270, | Jul 18 2013 | ConocoPhillips Company | Pre-positioned capping device and diverter |
9404333, | Jul 31 2012 | Schlumberger Technology Corporation | Dual barrier open water well completion systems |
20150021038, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Jan 13 2016 | BERGERON, HENRY ANTHONY | CHEVRON U S A INC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 037488 | /0873 | |
Jan 14 2016 | Chevron U.S.A. Inc. | (assignment on the face of the patent) | / |
Date | Maintenance Fee Events |
May 02 2017 | ASPN: Payor Number Assigned. |
Jan 25 2021 | REM: Maintenance Fee Reminder Mailed. |
Jul 12 2021 | EXP: Patent Expired for Failure to Pay Maintenance Fees. |
Date | Maintenance Schedule |
Jun 06 2020 | 4 years fee payment window open |
Dec 06 2020 | 6 months grace period start (w surcharge) |
Jun 06 2021 | patent expiry (for year 4) |
Jun 06 2023 | 2 years to revive unintentionally abandoned end. (for year 4) |
Jun 06 2024 | 8 years fee payment window open |
Dec 06 2024 | 6 months grace period start (w surcharge) |
Jun 06 2025 | patent expiry (for year 8) |
Jun 06 2027 | 2 years to revive unintentionally abandoned end. (for year 8) |
Jun 06 2028 | 12 years fee payment window open |
Dec 06 2028 | 6 months grace period start (w surcharge) |
Jun 06 2029 | patent expiry (for year 12) |
Jun 06 2031 | 2 years to revive unintentionally abandoned end. (for year 12) |