Methods of MDT information logging and reporting are provided. In one embodiment, a method is provided to resolve shortcomings of prior art by correlating UL measurements with QoS information to enable UL performance analysis and accurate detection of coverage problems. In another embodiment, a method is provided to resolve the shortcomings of the prior art by making DL measurements and location information collecting or logging conditional on UL measurements.
|
1. A method comprising:
detecting an availability of an uplink (UL) measurement result by a user equipment (ue) in a wireless network;
triggering a location-related performance and a downlink-related performance upon the detection of the availability of the UL measurement result;
obtaining the uplink measurement result, a location-related measurement result and a downlink measurement result based on the location-related performance and the downlink-related performance; and
correlating the location-related measurement result, the downlink measurement result and the uplink measurement results for a performance test for the ue.
11. A user equipment (ue) comprising:
a radio frequency transceiver that transmits uplink signals and receives downlink signal;
a measurement module that detecting an availability of an uplink (UL) measurement result triggers a location-related performance and a downlink-related performance upon the detection of the availability of the UL measurement result, obtains location-related measurement result, downlink measurement result, and the uplink measurement result; and
a correlator that correlates the location-related measurement result, the downlink measurement result and the uplink measurement result for a performance test for the ue.
5. A method comprising:
detecting an availability of a first uplink (UL) measurement result applicable to a user equipment (ue), by a network device in a wireless network;
performing a location-related performance and a downlink-related performance based on the availability of the first UL measurement result;
performing a second uplink measurement applicable to the ue and thereby generating a second uplink measurement result upon detecting the availability of the first UL measurement result;
obtaining a location-related measurement result, downlink measurement result, and the first uplink measurement result; and
correlating the location-related measurement result, the downlink measurement result, the first uplink measurement result, and the second uplink measurement result for a performance test for the ue.
2. The method of
3. The method of
6. The method of
7. The method of
8. The method of
9. The method of
10. The method of
12. The ue of
13. The ue of
14. The ue of
a transmitter that transmits the log to a network device.
|
This application is a continuation, and claims priority under 35 U.S.C. §120 from nonprovisional U.S. patent application Ser. No. 13/373,070, entitled “Method of Uplink MDT Measurement,” filed on Nov. 2, 2011, the subject matter of which is incorporated herein by reference. Application Ser. No. 13/373,070, in turn, claims priority under 35 U.S.C. §119 from U.S. Provisional Application No. 61/409,737, entitled “Method of MDT Information Logging and Reporting,” filed on Nov. 3, 2010, the subject matter of which is incorporated herein by reference.
The disclosed embodiments relate generally to Minimization of Drive Test (MDT), and, more particularly, to uplink MDT measurement.
3rd Generation Partnership Project (3GPP) long term evolution (LTE) system, introduced as 3GPP release 8, is an improved universal mobile telecommunication system (UMTS). An LTE system offers high peak data rates, low latency, improved system capacity, and low operating cost resulting from simple network architecture. In the LTE system, an evolved universal terrestrial radio access network (E-UTRAN) includes a plurality of evolved Node-Bs (eNBs) communicating with a plurality of mobile stations, referred as user equipment (UE).
3GPP introduces Minimization of Drive Test (MDT) to give service provider a cost effective way for coverage optimization. Radio layer coverage in a mobile system may vary depending on a location of a base station, deployment of buildings nearby, interferences during the usage of a mobile user and other environmental factors. Traditionally, service providers need to perform drive test to collect measurement result and location information. The collected information is then used to analyze the coverage. Optimizations are done by adjusting parameters based on the analysis. After each optimization, drive test has to be undertaken again to make sure the impact of the changes on the system is positive. Such tests are very costly. MDT is designed to alleviate the problem by providing a method to use UEs to perform such test. It is beneficial to collect UE measurement results on the field to enable a more efficient network optimization and it is feasible to acquire measurement results, location information and other relevant information from the UEs.
There are two different types of MDT: immediate MDT and logged MDT. In immediate MDT cases, a UE is configured to perform measurement in Radio Resource Control (RRC) Connected state. The measurement report is sent to an eNB immediately at the time of the reporting condition. In logged MDT cases, a UE is configured to perform measurement in RRC Idle state when some configured conditions are satisfied. The UE stores measurement logs and reports to an eNB at a later point of time. In either type of the MDT, how to accurately interpret the measurements and correlate different information are important to get an accurate coverage picture.
In 3GPP Release-10, there are two measurements included in MDT for the purpose of uplink (UL) coverage and performance characterization: Power Headroom (PHR) measurement by UE, and uplink signal strength and signal-to-interference plus noise ratio (SINR) measurement by eNB. PHR can be used by the eNB to calculate the path loss of the UE, which is then used in setting for SINR target. PHR indicates how much power UE is left with to start using full power, which is the difference between the current UE transmit power and the maximum UE transmit power. There are some issues with the current art in using the UL measurements for MDT.
First, uplink measurement itself is not sufficient to build an UL performance map. Current art suggests that a low PHR value is an indicator of a UL performance problem. Such predication is not accurate and is wrong in some cases. The used power level for transmission is dynamically dependent on Modulation and Coding Scheme (MCS) and the bandwidth—the number of Physical Resource Blocks (PRBs). Therefore, for services with dynamic bit rate, a low PHR is not necessarily a sign of uplink problem. For example, if a service is using a high bit rate, the PHR may be low because the base station is aggressive in the link adaptation. A low PHR may also be a result of a base station prioritizing a certain UE by allocating a wide bandwidth to this UE. Current art also suggests that a low UL signal strength or SINR is an indicator of uplink performance problems. Such predication may also be wrong. Under current link-adaptation and power control method, receive power measurement together with interference measurement in certain circumstances can represent UL performance. However, these measurements do not tell everything about coverage problems. One type of coverage problem occurs when a UE is power limited and cannot achieve a planned minimum bit rate. Many factors can result in a low UL signal strength, such as scheduled low bit rate. Low UL signal strength can also be required in order to reduce UL interference, or to save UE battery. Base stations could also choose to schedule UEs with conservative link adaptation and low power. Therefore, low signal strength is not sufficient to indicate an uplink coverage problem.
A second issue with the UL measurement for MDT is how to correlate DL measurements, location information and UL measurements. Current art suggests that location information is useful and that DL measurements may be useful, however, there has been no analysis of how to provide and correlate these information. Collecting DL measurements, location information and UL measurements are matured art if performed separately. However, there exists discrepancy in collecting the information. DL measurements can be collected all the time since the reference transmissions are always ongoing. UL measurements, on the other hand, can only be collected when data transmission occurs. Therefore, for MDT purposes, many DL measurements and location information have no relevance for UL observations.
The present invention addresses two main issues in the current art for MDT. The first issue is how to correlate UL measurement data with QoS information to find UE performance problems. The second issue is how to better schedule and correlate DL measurement, location information, and UL measurement to improve MDT measurement and logging efficiency.
Methods of MDT information logging and reporting are provided. In one embodiment, a method is provided to resolve shortcomings of prior art by correlating UL measurements with QoS information to enable UL performance analysis and accurate detection of coverage problems. In another embodiment, a method is provided to resolve the shortcomings of the prior art by making DL measurements and location information collecting or logging conditional on UL measurements.
Embodiments of the present invention provide a method to correlate UL measurement with relevant QoS information, the method including: transmitting uplink data from a user device (UE) to a network device over a wireless uplink channel; measuring transmission power of the uplink channel and thereby generating transmission power information; obtaining transmission Quality of Service (QoS) information of the uplink channel; and correlating the transmission power information with the transmission QoS information and thereby determining uplink performance of the UE.
In other embodiments of the present invention, a method is provided including: receiving, by a network device, uplink data from a user device (UE) over an uplink channel in a wireless network; receiving transmission power information from the UE; obtaining transmission Quality of Service (QoS) information; and correlating the transmission power information with the transmission QoS information and thereby determining uplink performance of the UE.
In other embodiments of the present invention, a method to correlate DL measurement and location information with UL measurement is provided, the method including: performing a location-related measurement and thereby generating a location measurement result by a user equipment (UE) in a wireless network; performing a downlink measurement and thereby generating a downlink measurement result by the UE; obtaining an uplink measurement result; and correlating the location-related measurement result and the downlink measurement result with the uplink measurement result.
In other embodiments of the present invention, a method is provided including: receiving, by a network device, a location-related measurement result from a user equipment (UE) in a wireless network; receiving a downlink measurement result from the UE; obtaining an uplink measurement and thereby generating an uplink measurement result; and correlating the location-related measurement result and the downlink measurement result with the uplink measurement result.
Other embodiments and advantages are described in the detailed description below. This summary does not purport to define the invention. The invention is defined by the claims.
Reference will now be made in detail to some embodiments of the invention, examples of which are illustrated in the accompanying drawings.
The UL power information is relevant to understand the character of a coverage problem. For example, if UE 103, which is at the edge of the cell, is using all its power and still cannot achieve planned performance, there is a cell-edge-performance problem related to coverage. The coverage or radio layer or RF problems that are normally related to Signal to Noise Ratio (SNR) or SINR, can be resolved by changing antennas, power amplifiers, filters, etc. In a cellular system, changes to radio layer usually affect the behavior and performance of the whole cell that is visible to all layers of the communication. One solution to improve the radio layer problem might be to increase the receiving sensitivity in a particular direction by changing the direction of serving cell antennas. Such changes, however, may create coverage holes that are hard to detect and have high impact on UE connectivity. Therefore, relevant factors need to be considered together with UL measurement in MDT to make such high impact coverage adjustments.
On the other hand, for example, if UE 105, which is in an area that has no coverage problem, cannot achieve its planned performance while not using all its power, the problem may be Radio Resource Manager (RRM) related rather than coverage related. In such cases, it is possible for Radio Access Node (RAN) to change the character of radio transmission, such as characteristics of inter-cell load balancing. Normally, if RRM decisions go wrong, a UE still has an option to make another attempt and stay in service. For example, if RAN aggressively steers a UE in inter-cell load balancing, the UE may lose connection to its serving cell. However, the UE may still recover a connection with another more suitable cell. UL power is balanced between neighboring cells at cell edge to have a stable interference environment and a maximum UL bit rate performance while minimizing UE output power and battery impact. Therefore, inter-cell load balancing and other RRM algorithms should also be factors related to UL measurement for network coverage optimization.
Further, as shown in
An exemplary block diagram of UE 102 that carries out embodiments of the present invention is shown in
Several types of transmission power information can be considered. If the transmission power information logging is done in the UE, then the absolute transmit power level may be used because the UE always knows its absolute power used at a transmission and this would be the most useful metric to estimate UL performance. Another way is to use PHR. The advantage of using PHR is to maximize reuse and minimize standards impact. It can also minimize additional testing required. PHR can be used either in the UE, or reported to the network and logged by the network. Upon decoding PHR, an estimated absolute transmission power can be deduced. Yet in some other cases, a Boolean indicator of whether the UE is power-limited or not is sufficient transmission power information. For example, when the logging needs to be limited to “real” observed data (no extrapolation calculations to estimate what could be achieved at other power levels than the used one), a Boolean indicator would be enough for power information. Another example is in cases when power limited scenario is the main interest, such as when UE is asked to transmit at maximum data rate at current radio conditions. In some cases, implicit power information is deduced based on power control command or defined UE power control behavior. For example, there may be limitations in PHR reporting when RAN may not receive a PHR for every received transmission. In such scenarios, RAN will do power control for each transmission, tracking and estimating the used UE power in between received PHRs. Such estimation may not be perfectly accurate, but the implicitly deduced information can still be of value for MDT purposes.
At Step 204, the UE obtains transmission quality of service (QoS) information. In one embodiment of the present invention, data rate is one of the QoS information that can be used to correlate with the UL measurement. If knowing the scheduled physical layer (L1) data rate and the UE power, accurate power used by the UE can be deduced. For example, we assume that the scheduled physical layer data rate is the number of bits allocated to be transmitted across a time transmission interval (TTI), divided by the length of the TTI. If UE is using all its power, or almost all its power, it can be reasonable concluded that the scheduled physical layer bit rate is close to the maximum limit that could be achieved in the specific geographical location with the current radio layer setting. However, if the UE is not using all its power, information of UE's remaining power and the scheduled L1 data rate could be used to estimate the maximum limit bit rate extrapolation. Therefore, the QoS information of data rate, together with UL measurement and location information would be useful to accurately find locations where planned bit rate cannot be achieved. The data rate can be either guaranteed bit rate (GBR) or prioritized bit rate (PBR), or bit rate calculated as transport block size or transmission time.
Similarly, transport block size would also be useful QoS information for MDT report. If the TTI length is known, then the scheduled physical layer data rate can be easily calculated by knowing the transport block size. Therefore, instead of data rate, transport block sized could also be logged and used the same way as data rate to deduce accurate coverage information by combining it with UL measurement and location information. Moreover, using transport block size has advantage for its simplicity because the detailed definition of a data rate measurement does not need to be considered.
In one embodiment of the present invention, if MCS and the transmission bandwidth (BW) are known for a certain radio access technology (RAT), it would be possible to deduce the transport block size for the transmission. For CDMA systems, an equivalent would be a spreading factor. Thus, according to the above analysis, if these parameters are logged and reported, they can be used as data rate to achieve the same results as logging data rate. An advantage of logging MCS and BW separately is that they have different characteristics from power usage and transmission robustness point of view. Therefore, if they are provided separately, the combination will give better insights into the detail operation of the RRM and better clues for how to optimize RRM algorithm. Furthermore, if RRM algorithm operation is known and predictable, MCS information is also useful to provide information on achievable bit rate in certain locations.
In another embodiment of the present invention, QoS information of number of soft combinations by HARQ or macro diversity is used for MDT purposes. In some cases, a certain transmission may fail and that multiple receptions may be needed in order to make the data transmission or reception successful. Thus, the number of transmission would both reflect latency and radio-resource-usage setting limits for the actual multi-transmit data rates. Such information provides insights to RRM algorithm operation that controls the trade-off between latency, power usage and latency. Logging and reporting these data in MDT would give good estimation on RRM and QoS optimization.
In yet other embodiments of the present invention, received power or signal strength or received interference are QoS information that can be logged in MDT. If received power or signal strength could be known together with the transmission power, it would be easy to calculate the radio propagation conditions. Furthermore, if the received interference could also be known, the main physical factors limiting QoS would be known. The deduced information makes it easy to determine the needs to re-plan or change network coverage settings.
At Step 205, after obtaining the transmit power information at Step 203, and the QoS information at Step 204, the above information are correlated. The correlation can be done at the UE or at the network. Doing the logging and correlation in the UE has several advantages. The UE can obtain accurate transmission power information for every piece of data transmitted without incurring additional overhead to signal the information. UE also has access to most of the QoS information discussed in the present invention, such as data rate, transport block size, MCS, transmission bandwidth, number of resource blocks and number of soft combinations by HARQ. Logging and correlating at the network also has some advantages. It can take advantage of the network-only measurements that measures physical phenomena limits to QoS, such as received signal strength and received interference level, can be used for correlation.
In one embodiment, the problem condition represents a low data rate while the UE is power limited. Examples of such condition include data rate smaller than a minimum data rate, and PHR is smaller than a first threshold or transmission power is greater than a second threshold. When PHR is smaller than the first threshold or the transmission power is greater than the second threshold, it means that the UE is power limited or almost power limited and therefore, it is transmitting at or close to its peak data rate. If at the same time the observed data rate is smaller than a planned minimum data rate, then there is a problem with network coverage or interference or both. Such area would be a problem area subject to optimization activities.
Another example of the problem condition is transport block size is smaller than a minimum transport block size, and PHR is smaller than a first threshold or transmission power is greater than a second threshold. Similarly, instead of observing the data rate directly, small transport block size can be directly translated into small data rate. It is therefore, a sign of network coverage problem.
In yet another example, the triggering condition can be MCS smaller than a minimum MCS threshold, and PHR is smaller than a first threshold or the transmission power is greater than a second threshold. Assuming a certain predictable selection of transmission bandwidth, a certain MCS would map to a certain possible range of bit rates. Therefore, assuming a certain bandwidth allocation algorithm, if MCS is below what is needed to support a planned bit rate, it might be a clear sign of problem as observing data rate or TB size.
To resolve the prior art problems of generating significant amounts of DL measurements and location measurements that are non-relevant for the uplink, it is proposed to directly or indirectly make the DL measurements and location measurements conditional on the availability of UL measurement results.
In one embodiment of the present invention, from UE perspective, the collecting and logging of location-related information and DL measurement result are triggered by uplink data transmission. In other words, when an UL measurement (e.g., PHR) becomes available, DL measurements and location measurements are performed, and/or available DL measurements and available location measurements are logged. This solves the problem that there is excessive DL measurement result or location information or both while there is no relevant UL measurement result. Similarly, from the network perspective, the same method can be used by the network. The receiving of the uplink data triggers the network to obtain additional UL measurement result (e.g., UL QoS), and to correlate the additional UL measurement result with DL measurement result and location-related information.
In another approach, the network makes the UE to do real time reporting for DL measurements and location information conditional on the UL. Such approach further reduces the reporting overhead over the air interface.
UL measurement is important information in MDT to analyze UE performance and detect network coverage problem for network planning and optimization. To resolve the shortcomings of prior art, correlation of UL transmit power information and QoS information are designed to enable adequate and non-ambiguous observation interpretations for the UL so as to give more accurate picture of the coverage condition. Furthermore, to reduce the excessive non-relevant DL measurement and location information, the collecting and logging of DL measurement and location information is triggered by UL event.
Although the present invention has been described in connection with certain specific embodiments for instructional purposes, the present invention is not limited thereto. Accordingly, various modifications, adaptations, and combinations of various features of the described embodiments can be practiced without departing from the scope of the invention as set forth in the claims.
Roberts, Michael, Hsu, Chia-Chun, Chen, Yih-Shen, Johansson, Per Johan Mikael
Patent | Priority | Assignee | Title |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Oct 31 2011 | JOHANSSON, PER JOHAN MIKAEL | MEDIATEK INC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 032682 | /0639 | |
Oct 31 2011 | CHEN, YIH-SHEN | MEDIATEK INC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 032682 | /0639 | |
Oct 31 2011 | HSU, CHIA-CHUN | MEDIATEK INC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 032682 | /0639 | |
Jan 09 2012 | ROBERTS, MICHAEL | MEDIATEK INC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 032682 | /0639 | |
Apr 14 2014 | MEDIATEK INC. | (assignment on the face of the patent) | / | |||
Jun 30 2018 | MEDIATEK INC | HFI INNOVATION INC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 047070 | /0294 |
Date | Maintenance Fee Events |
Jan 18 2021 | M1551: Payment of Maintenance Fee, 4th Year, Large Entity. |
Date | Maintenance Schedule |
Jul 18 2020 | 4 years fee payment window open |
Jan 18 2021 | 6 months grace period start (w surcharge) |
Jul 18 2021 | patent expiry (for year 4) |
Jul 18 2023 | 2 years to revive unintentionally abandoned end. (for year 4) |
Jul 18 2024 | 8 years fee payment window open |
Jan 18 2025 | 6 months grace period start (w surcharge) |
Jul 18 2025 | patent expiry (for year 8) |
Jul 18 2027 | 2 years to revive unintentionally abandoned end. (for year 8) |
Jul 18 2028 | 12 years fee payment window open |
Jan 18 2029 | 6 months grace period start (w surcharge) |
Jul 18 2029 | patent expiry (for year 12) |
Jul 18 2031 | 2 years to revive unintentionally abandoned end. (for year 12) |