|
The ornamental design for a spa, as shown and described. |
FIG. 1 is a top perspective view of a spa showing my new design;
FIG. 2 is another top perspective view thereof;
FIG. 3 is a top plan view thereof;
FIG. 4 is a cross sectional view taken on line 4--4 in FIG. 3;
FIG. 5 is a sectional view taken on either of lines 5--5 in FIG. 3;
FIG. 6 is a sectional view taken on either of lines 6--6 in FIG. 3; and
FIG. 7 is a sectional view taken on line 7--7 in FIG. 3.
The fragmentary broken line representations of a bathroom island installation in FIGS. 1 and 2 are for purposes of illustration only.
Patent | Priority | Assignee | Title |
D301060, | Nov 18 1986 | KOHLER CO | Hydrotherapy spa or the like |
D518181, | Aug 25 2004 | Lloyds IP Holdings, LLC | Spa shell |
D590951, | Feb 22 2008 | Watkins Manufacturing Corporation | Spa shell |
D601263, | Feb 22 2008 | Watkins Manufacturing Corporation | Spa shell |
D759832, | Jan 14 2015 | Watkins Manufacturing Corporation | Spa shell |
D820462, | Jun 30 2017 | Watkins Manufacturing Corporation | Spa shell |
Patent | Priority | Assignee | Title |
240084, | |||
D265345, | Jul 25 1980 | Kohler Co. | Hydrotherapy spa |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Apr 15 1983 | DOMAN, DONALD W | KOHLER CO , KOHLER, WIS , | ASSIGNMENT OF ASSIGNORS INTEREST | 004122 | /0411 | |
Apr 25 1983 | Kohler Co. | (assignment on the face of the patent) | / |
Date | Maintenance Fee Events |
Date | Maintenance Schedule |