|
The ornamental design for combination pulley and weight anchor device, substantially as shown and described. |
FIG. 1 is a front, partial top and a side perspective view of a combination pulley and weight anchor device showing our new invention;
FIG. 2 is a side elevation thereof;
FIG. 3 is a front elevation thereof;
FIG. 4 is a rear elevation thereof;
FIG. 5 is a top plan view thereof;
FIG. 6 is a sectional view thereof taken along plane VI--VI of FIG. 2;
FIG. 7 is a front, partial top and a side perspective view of a second embodiment thereof;
FIG. 8 is a side elevation thereof;
FIG. 9 is a front elevation thereof, the rear elevation being substantially identical to that of FIG. 4;
FIG. 10 is a top plan view thereof;
FIG. 11 is a sectional view thereof taken along plane XI--XI of FIG. 9;
FIG. 12 is a sectional view thereof taken along plane XII--XII of FIG. 9;
FIG. 13 is a front, partial top and a side perspective view of a third embodiment thereof;
FIG. 14 is a side elevation thereof;
FIG. 15 is a fragmentary, front perspective view of the lower half thereof;
FIG. 16 is a rear elevation thereof;
FIG. 17 is a front, partial top and a side perspective view of a fourth embodiment thereof;
FIG. 18 is a side elevation thereof; and
FIG. 19 is a fragmentary, front elevation thereof, the rear elevation being substantially identical to that of FIG. 16.
Hahn, Richard F., Soby, John P.
Patent | Priority | Assignee | Title |
7121222, | Feb 25 2005 | Anchor assembly and method | |
D304013, | Jul 20 1987 | Wedge clamp housing for a downrigger fishing assembly | |
D315136, | Feb 19 1988 | Sea anchor | |
D587807, | Feb 09 2008 | Surgical suture anchor |
Patent | Priority | Assignee | Title |
1321356, | |||
1418, | |||
1493489, | |||
1771406, | |||
2023526, | |||
203569, | |||
2315513, | |||
3055332, | |||
3187705, | |||
3431879, | |||
3754524, | |||
4090463, | Feb 11 1976 | Anchoring means | |
704730, | |||
136547, | |||
191726, | |||
D260963, | Jan 14 1980 | Schaefer Marine, Inc. | Marine block |
D280316, | Apr 04 1983 | Anchor for small boats |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Date | Maintenance Fee Events |
Date | Maintenance Schedule |