|
The ornamental design for a portable single beam light, as shown and described. |
|||||||||||||||||
FIG. 1 is top, front right side perspective view of a portable single beam light showing our new design;
FIG. 2 is a right side elevational view; thereof
FIG. 3 is a left side elevational view thereof;
FIG. 4 is a top plan view thereof;
FIG. 5 is a bottom plan view of thereof;
FIG. 6 is a rear elevational view thereof; and
FIG. 7 is a front elevational view thereof.
| Patent | Priority | Assignee | Title |
| D544133, | Jul 10 2006 | Futureboy, LLC | Lamp |
| D608485, | Mar 08 2009 | Bicycle light | |
| D746502, | Sep 11 2014 | Futureboy, LLC | Lamp |
| Patent | Priority | Assignee | Title |
| 1933965, | |||
| 4542447, | May 18 1984 | Flashlight attachment for firearms | |
| 208423, | |||
| D279223, | Jan 17 1983 | Tanaka Manufacturing Co., Ltd. | Portable vehicle light |
| GB681221, |
| Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
| Dec 01 1984 | RALLY ACCESSORIES, INC INTO | RALLY MANUFACTURING, INC | MERGER SEE DOCUMENT FOR DETAILS , EFFECTIVE NOV 13, 1984 | 004850 | /0450 | |
| May 21 1986 | Rally Manufacturing, Inc. | (assignment on the face of the patent) | / | |||
| Aug 13 1986 | IACOVELLI, MARC R | Rally Accessories, Inc | ASSIGNMENT OF ASSIGNORS INTEREST | 004592 | /0879 | |
| Apr 18 1988 | RALLY MANUFACTURING, INC | BARCLAYSAMERICAN BUSINESS CREDIT, INC , 111 FOUNDERS PLAZA, EAST HARTFORD, CT 06108 | SECURITY INTEREST SEE DOCUMENT FOR DETAILS | 004998 | /0101 | |
| Oct 13 1989 | CHARET, PIERRE | RALLY MANUFACTURING, INC , | ASSIGNMENT OF ASSIGNORS INTEREST | 005195 | /0998 | |
| Oct 13 1989 | KRAAI, DUKE | RALLY MANUFACTURING, INC , | ASSIGNMENT OF ASSIGNORS INTEREST | 005195 | /0998 | |
| Jan 31 1995 | BARCLAYS BUSINESS CREDIT, INC | SHAWMUT CAPITAL CORPORATION | SECURITY INTEREST SEE DOCUMENT FOR DETAILS | 007418 | /0149 | |
| Dec 18 2001 | RALLY MANUFACTURING, INC | FLEET CAPITAL CORPORAITON | SECURITY AGREEMENT | 012463 | /0386 |
| Date | Maintenance Fee Events |
| Date | Maintenance Schedule |