|
The ornamental design for a modular building system peak connector, as shown and described. |
FIG. 1 is a perspective environmental view of a modular building system peak connector;
FIG. 2 is a perspective environmental view of the modular building system peak connector in a steep pitch configuration;
FIG. 3 is an enlarged isometric view thereof;
FIG. 4 is a top plan view thereof;
FIG. 5 is a front elevational view thereof;
FIG. 6 is a rear elevational view thereof;
FIG. 7 is a bottom plan view thereof; and
FIG. 8 is an end elevational view thereof; and,
FIG. 9 is an opposite end elevational view.
The broken line showing of a rafter, column and fasteners in FIGS. 1 and 2 is for illustrative purposes only and forms no part of claimed design.
Patent | Priority | Assignee | Title |
11118349, | Jan 29 2020 | Rafter reinforcement bracket apparatus | |
D602340, | Mar 12 2009 | WURDACK, KIRK A | Modular panel key lock |
D730545, | Dec 30 2013 | Simpson Strong-Tie Company, Inc | Joist and rafter connector |
D732708, | Dec 30 2013 | Simpson Strong-Tie Company, Inc | Flared joist and rafter connector |
D768470, | Jun 29 2010 | Shark Products, LLC | Hurricane tie fastener |
D791982, | Jun 06 2014 | Baseboard and corner kit | |
D839455, | Jun 06 2014 | Baseboard and inside corner kit | |
ER6200, | |||
ER67, |
Patent | Priority | Assignee | Title |
5577353, | Jan 27 1995 | Steel frame building system and truss assembly for use therein | |
5579621, | Nov 23 1994 | Screen fixtures | |
5697725, | Jun 18 1996 | Simpson Strong-Tie Company, Inc. | Stud to plate tie |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Date | Maintenance Fee Events |
Date | Maintenance Schedule |