|
The ornamental design for the pair of shoes, as shown and described.
|
FIG. 1 is a perspective view of the right shoe of a pair of shoes according to my new design;
FIG. 2 is a right-side view of the right shoe of a pair of shoes according to my new design;
FIG. 3 is a left-side view of the right shoe of a pair of shoes according to my new design;
FIG. 4 is a top view of the right shoe of a pair of shoes according to my new design;
FIG. 5 is a bottom view of the right shoe of a pair of shoes according to my new design;
FIG. 6 is a front view of the right shoe of a pair of shoes according to my new design; and,
FIG. 7 is a rear view of the right shoe of a pair of shoes according to my new design.
Patent | Priority | Assignee | Title |
D541512, | Nov 14 2005 | WOLVERINE OUTDOORS, INC | Footwear upper |
D662292, | Jul 27 2010 | EARTH IPCO LLC; TERRA SHOES, LLC | Shoe |
D770150, | Aug 07 2014 | Hermes Sellier (Societe Par Actions Simplifiee) | Shoe |
D857355, | Jun 27 2018 | Shoe | |
D860619, | Oct 12 2017 | CONSITEX S A | Shoe upper |
D975980, | Nov 17 2020 | Shoe with cutouts |
Patent | Priority | Assignee | Title |
1683465, | |||
3137950, | |||
188590, | |||
D267676, | Sep 08 1980 | NBD BANK, N A | Overshoe |
D305476, | Feb 05 1987 | Autry Industries, Inc.; AUTRY INDUSTRIES, INC | Combined athletic shoe upper and sole periphery |
D337870, | Jan 29 1991 | Societe Francaise de Chaussures | Shoe |
75161, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Nov 06 2000 | Berluti | (assignment on the face of the patent) | / | |||
Jun 25 2001 | BERLUTI, OLGA | Berluti | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 011937 | /0339 |
Date | Maintenance Fee Events |
Date | Maintenance Schedule |