|
The ornamental design for a barrier post, as shown and described.
|
FIG. 1 is a front elevational view of barrier post, as set forth in the following specification. The barrier is shown in broken lines for illustration purpose only and forms no part of the claimed design.
FIG. 2 is a top plan view thereof;
FIG. 3 is a bottom view thereof;
FIG. 4 is a right side elevational view thereof;
FIG. 5 is front left side perspective view of present invention with barrier shown in broken lines for illustration purpose only and forms no part of the claimed design.
FIG. 6 is a second embodiment of the right side elevational view thereof;
FIG. 7 is a second embodiment of the front left side perspective view with barrier shown in broken lines for illustration purpose only and forms no part of the claimed design.
FIG. 8 is a cross sectional of present invention taken along 8--8 of FIG. 4; and,
FIG. 9 is a cross sectional of present invention taken along 9--9 of FIG. 4.
Patent | Priority | Assignee | Title |
10081949, | Jun 26 2015 | Interchangeable bracket flange system | |
D555812, | Sep 22 2006 | Post | |
D560826, | Jan 09 2007 | Post | |
D782074, | Feb 07 2014 | Gate rail support block | |
D785210, | Nov 20 2015 | Pyramid handrail support |
Patent | Priority | Assignee | Title |
4557466, | Feb 27 1984 | ENERGY ABSORPTION SYSTEMS, INC ONE EAST WACKER DRIVE CHICAGO ILLINOIS 60601 | Inertial barrier |
6036399, | Mar 15 1996 | Les Profiles du Centre S.A. | Crash barrier and method of erecting |
D324920, | Apr 13 1989 | TRUSTEES OF THE UNIVERSITY OF PENNSYLVANIA, THE, | Collapsible bollard |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Date | Maintenance Fee Events |
Date | Maintenance Schedule |