FIG. 1 is a top left perspective view of a pipette, without showing a dispensing head attached to the front side;
FIG. 2 is a bottom plan view thereof;
FIG. 3 is a top plan view thereof;
FIG. 4 is a left side elevation view thereof;
FIG. 5 is a rear elevation view thereof;
FIG. 6 is a front elevation view thereof;
FIG. 7 is a top left perspective view of the pipette of FIG. 1, with a dispensing head attached to a front end thereof;
FIG. 8 is a bottom plan view thereof;
FIG. 9 is a top plan view thereof;
FIG. 10 is a left side elevation view thereof;
FIG. 11 is a rear elevation view thereof; and,
FIG. 12 is a left side elevation view thereof.
The broken lines depict portions of the pipette that form no part of the claimed design.
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Oct 19 2018 | | Mettler-Toledo (Changzhou) Measurement Technology Co., Ltd. | (assignment on the face of the patent) | | / |
Oct 19 2018 | | Mettler-Toledo (Changzhou) Precision Instrument Co., Ltd. | (assignment on the face of the patent) | | / |
Oct 19 2018 | | Mettler-Toledo International Trading (Shanghai) Co., Ltd. | (assignment on the face of the patent) | | / |
Nov 01 2018 | ZHAO, BO | METTLER-TOLEDO INTERNATIONAL TRADING SHANGHAI CO , LTD | CORRECTIVE ASSIGNMENT TO CORRECT THE THIRD RECEIVING PARTY DATA PREVIOUSLY RECORDED AT REEL: 047414 FRAME: 0802 ASSIGNOR S HEREBY CONFIRMS THE ASSIGNMENT | 048047 | /0575 |
pdf |
Nov 01 2018 | HE, WENQIN | METTLER-TOLEDO CHANGZHOU PRECISION INSTRUMENT CO , LTD | CORRECTIVE ASSIGNMENT TO CORRECT THE THIRD RECEIVING PARTY DATA PREVIOUSLY RECORDED AT REEL: 047414 FRAME: 0802 ASSIGNOR S HEREBY CONFIRMS THE ASSIGNMENT | 048047 | /0575 |
pdf |
Nov 01 2018 | ZHAO, BO | METTLER-TOLEDO CHANGZHOU PRECISION INSTRUMENT CO , LTD | CORRECTIVE ASSIGNMENT TO CORRECT THE THIRD RECEIVING PARTY DATA PREVIOUSLY RECORDED AT REEL: 047414 FRAME: 0802 ASSIGNOR S HEREBY CONFIRMS THE ASSIGNMENT | 048047 | /0575 |
pdf |
Nov 01 2018 | HE, WENQIN | METTLER-TOLEDO CHANGZHOU MEASUREMENT TECHNOLOGY CO , LTD | CORRECTIVE ASSIGNMENT TO CORRECT THE THIRD RECEIVING PARTY DATA PREVIOUSLY RECORDED AT REEL: 047414 FRAME: 0802 ASSIGNOR S HEREBY CONFIRMS THE ASSIGNMENT | 048047 | /0575 |
pdf |
Nov 01 2018 | ZHAO, BO | METTLER-TOLEDO CHANGZHOU MEASUREMENT TECHNOLOGY CO , LTD | CORRECTIVE ASSIGNMENT TO CORRECT THE THIRD RECEIVING PARTY DATA PREVIOUSLY RECORDED AT REEL: 047414 FRAME: 0802 ASSIGNOR S HEREBY CONFIRMS THE ASSIGNMENT | 048047 | /0575 |
pdf |
Nov 01 2018 | HE, WENQIN | METTLER-TOLEDO INTERNATIONAL TRADE SHANGHAI CO , LTD | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 047414 | /0802 |
pdf |
Nov 01 2018 | ZHAO, BO | METTLER-TOLEDO INTERNATIONAL TRADE SHANGHAI CO , LTD | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 047414 | /0802 |
pdf |
Nov 01 2018 | HE, WENQIN | METTLER-TOLEDO CHANGZHOU PRECISION INSTRUMENT CO , LTD | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 047414 | /0802 |
pdf |
Nov 01 2018 | ZHAO, BO | METTLER-TOLEDO CHANGZHOU PRECISION INSTRUMENT CO , LTD | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 047414 | /0802 |
pdf |
Nov 01 2018 | HE, WENQIN | METTLER-TOLEDO CHANGZHOU MEASUREMENT TECHNOLOGY CO , LTD | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 047414 | /0802 |
pdf |
Nov 01 2018 | ZHAO, BO | METTLER-TOLEDO CHANGZHOU MEASUREMENT TECHNOLOGY CO , LTD | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 047414 | /0802 |
pdf |
Nov 01 2018 | HE, WENQIN | METTLER-TOLEDO INTERNATIONAL TRADING SHANGHAI CO , LTD | CORRECTIVE ASSIGNMENT TO CORRECT THE THIRD RECEIVING PARTY DATA PREVIOUSLY RECORDED AT REEL: 047414 FRAME: 0802 ASSIGNOR S HEREBY CONFIRMS THE ASSIGNMENT | 048047 | /0575 |
pdf |