When surveying a borehole using an instrument responsive to the earth's magnetic field, a length of non-magnetic drill collar is necessary to house means for measuring the magnetic field in the borehole perpendicular to the direction of the borehole axis. The instrument determines the inclination angle and the highside angle from the gravitation measurements, with these measurements and the magnetic measurements, the azimuth angle is determined. Using the method of this invention a minimum length of non-magnetic material necessary for an accurate measurement may be calculated and used. Disclosed are method and apparatus for surveying a borehole including use of a survey instrument for making gravitational measurements from which the inclination and highside angles of the instrument may be determined. Measurements of two components of the local magnetic field perpendicular to the longitudinal axis of the instrument may be sensed with the instrument, and may be used to determine the azimuth angle of the instrument under the assumption that magnetic interference due to the pipe string in which the instrument is located lies solely along the longitudinal axis of the instrument. The accuracy of the azimuth determination may be enhanced by an iteration process. To the extent that the pipe string interference includes transverse field components at the instrument, the sensors of the instrument may be separated from such pipe string members by placing the instrument in non-magnetic material whose minimum length may be determined.
|
1. A system for determining the orientation of a downhole instrument positioned in a drill collar in a borehole comprising: a means for determining inclination angle of the instrument at a location thereof in said borehole; a means for determining the highside angle of said instrument at said location; a means for determining the true horizontal and vertical components of the earth's magnetic field at the location of the borehole; a means for determining components of the local magnetic field perpendicular to the direction of a primary axis of the instrument aligned with the borehole at said location, said drill collar being constructed of non-magnetic material, and having a minimum length, L, determined from the equation: ##EQU13## where Pu is the magnetic pole created by the magnetic material above the sensor, PL is the magnetic pole created by the magnetic material below the sensor, d is the displacement of the poles Pu and PL from the axis of the instrument, Bn is the North component of the earth's magnetic field at the tinstrument, and δψ is the error
in the azimuth angle. 2. The orientation system of
3. The orientation system of
4. The orientation system of
5. A method of determining the orientation of a surveying instrument in a borehole comprising the steps of: a. determining the inclination angle of the instrument in the borehole; b. determining highside angle of the instrument in the borehole; c. determining two transverse components of the local magnetic field perpendicular to the longitudinal axis of said instrument in the borehole; d. determining, without directly measuring, a value for the component of the local magnetic field along the longitudinal axis of the instrument in the borehole utilizing the inclination angle; and e. determining a value of azimuth angle of the instrument utilizing the local magnetic field components, the inclination angle and the highside angle, and without utilizing a directly measured value for the local magnetic field component along the longitudinal axis of said instrument. 6. A method as defined in claim 5 further comprising: a. providing data indicative of the earth's magnetic field at said borehole; and b. using said earth's magnetic field data in the step of determining a value for the component of the local magnetic field along the longitudinal axis of the instrument in the borehole. 7. A method as defined in claim 6 further comprising: a. utilizing the inclination angle, the highside angle, earth's magnetic field data and said transverse components of the local magnetic field perpendicular to the longitudinal axis of the instrument to obtain an approximate value of azimuth angle; b. using the approximate value of the azimuth angle also in determining the value for the component of the local magnetic field along the longitudinal axis of the instrument in the borehole; and c. so determining a more accurate value for azimuth angle. . A method as defined in claim 7 comprising the additional steps of using such more accurate value of azimuth angle as an approximate value of azimuth angle to determine a further value for the component of the local magnetic field along the longitudinal axis of the instrument in the borehole, and determining a new more accurate value of azimuth angle using said further value for the component of the local magnetic field along the longitudinal axis of the instrument as in claim 7. 9. A method as defined in claim 8 comprising the additional steps of repeating the steps of claim 8 until the obtained values of azimuth angle converge to within an acceptable error. 10. A method as defined in claim 6 wherein the earth's magnetic field data is determined by utilizing sensing means included in such a surveying instrument. 11. A method as defined in claim 6 wherein the earth's magnetic field data is determined at the surface of the earth in the vicinity of said borehole. 12. A method as defined in claim 6 wherein the earth's magnetic field data is determined in terms of horizontal and vertical components of said field. 13. A method as defined in claim 5 wherein said instrument is provided located in a drill string in said borehole, said instrument being located between the lower drill string end connecting to a drill bit and an upper drill string end connecting to the surface. 14. A method as defined in claim 5 further including providing said surveying instrument positioned in non-magnetic material having a length no shorter than a length L determined by the equation: ##EQU14##
where PU is the magnetic pole of magnetic material above said non-magnetic material, PL is the magnetic pole of magnetic material below said non-magnetic material, d is the displacement of the poles PU and PL from the axis of the instrument, Bn is the north component of the earth's magnetic field at the borehole, and δψ is an acceptable error in the azimuth angle. 15. A method as defined in claim 14 wherein the transverse components of the local magnetic field are determined by utilizing sensing means included in such a surveying instrument and located at least one third of said length of said non-magnetic material from an end of said non-magnetic material. 16. A method of determining the orientation of a surveying instrument in a borehole, comprising the steps of: a. determining the inclination angle of the instrument in the borehole; b. determining the highside angle of the instrument in the borehole; c. providing data indicative of the earth's magnetic field at the borehole; d. determining two transverse components of the local magnetic field perpendicular to the longitudinal axis of the instrument in the borehole; e. calculating, without directly measuring, a value for the component of the local magnetic field along the longitudinal axis of the instrument in the borehole utilizing the earth's magnetic field data; and f. determining a value for the azimuth angle of the instrument utilizing said local magnetic field components, the inclination angle and the highside angle, and without utilizing a directly measured value for the local magnetic field component along the longitudinal axis of the instrument in the borehole. 17. A method according to claim 16 wherein said value for the component of the local magnetic field along the longitudinal axis of the instrument is determined also utilizing the inclination angle and an approximation of the azimuth angle of the instrument. 18. A method according to claim 17 wherein the approximation of the azimuth angle of the instrument is determined from the inclination angle, the highside angle, the transverse components of the local magnetic field perpendicular to the longitudinal axis of the instrument, and earth's magnetic field data. 19. A method according to claim 17 comprising the additional steps of determining a further value for the component of the local magnetic field along the longitudinal axis of the instrument utilizing the previously determined value for the azimuth angle, and determining a new, more accurate value for the azimuth angle utilizing said further value for the component of the local magnetic field along the longitudinal axis of the instrument. 20. A method according to claim 19 comprising the additional steps of repeating the steps of claim 19 until the obtained values of azimuth angle converge to within an acceptable error. 21. A method according to claim 16 which comprises: a. utilizing the inclination angle, the highside angle, earth's magnetic field data and the transverse components of the local magnetic field perpendicular to the longitudinal axis of the instrument to obtain an approximate value of the azimuth angle for the instrument; b. utilizing the inclination angle and said approximate value for the azimuth angle also in determining said value for the component of the local magnetic field along the longitudinal axis of the instrument; and c. so determining a more accurate value for the azimuth angle. 22. A method according to claim 21 comprising the additional steps of utilizing such more accurate value for the azimuth angle as an approximate value for the azimuth angle to determine a further value for the component of the local magnetic field along the longitudinal axis of the instrument, and determining a new, more accurate value for the azimuth angle using said further value for the component of the local magnetic field along the longitudinal axis of the instrument as in claim 21. 23. A method according to claim 22 comprising the additional steps of repeating the steps of claim 22 until the obtained values of azimuth angle coverage to within an acceptable error. 24. A method according to claim 16 wherein the local magnetic field components are determined by utilizing sensing means included in such a surveying instrument. 25. A method according to claim 16 wherein the earth's magnetic field data is determined by utilizing sensing means included in such a survey instrument. 26. A method according to claim 16 wherein the earth's magnetic field data is determined at the surface of the earth in the vicinity of said borehole. 27. A method according to claim 16 wherein said instrument is provided located in a drill string in said borehole, said instrument being located between a lower drill string end connecting to a drill bit and an upper drill string end connecting to the surface. 28. Apparatus for determining the orientation of a surveying instrument in a borehole, comprising: a. means for determining the inclination angle for the instrument in the borehole; b. means for determining the highside angle of the instrument in the borehole; c. means for storing data indicative of the earth's magnetic field at the borehole; d. means for determining two transverse components of the local magnetic field perpendicular to the longitudinal axis of the instrument in the borehole; e. first calculating means for calculating, without directly measuring, a value for the component of the local magnetic field along the longitudinal axis of the instrument in the borehole utilizing the earth's magnetic field data; and f. second calculating means for calculating a value for the azimuth angle of the instrument utilizing said local magnetic field components, the inclination angle and the highside angle, and without utilizing a directly measured value for the local magnetic field component along the longitudinal axis for the instrument in the borehole. |
of a predetermined length contains a survey instrument 18 in accordance with the invention. As shown in FIG. 6, the survey instrument 18 comprises a fluxgate section 22 and an accelerometer section 24. The accelerometer section 24 comprises three accelerometers arranged to sense components of gravity in three mutually orthogonal directions, once one of which is preferably coincident with the longitudinal axis of the drill string. The fluxgate section 22 comprises two fluxgates arranged to measure magnetic field strength in two of the three mutually orthogonal directions namely along axes OX and OY as will be described with reference to FIG. 2. Additionally, the survey instrument comprises associated signal processing apparatus as will be described hereinafter with reference to FIG. 6.
The instrument sensors measure local field components within a "nonmagnetic" drill collar 12 which is itself part of the drill string, the collar being located close to the drilling bit 10. The outputs from the two mutually orthogonal fluxgates comprise the components Bx and By of the local magnetic field along the axes OX and OY respectively. The outputs from the three accelerometers in the accelerometer section 24 comprise the components gx, gy, and gz of the local gravitation field along the axes OX, OY and OZ.
The five output components gx,gy,gz, Bx , and By and By are in the form of proportional voltages which are applied to a circuit processing unit 26 comprising analog to digital converters. The outputs gx,gy, and gz from the analog to digital converters in the circuit processing unit 26 are ultimately processed through a digital computing unit 28 to yield values of highside angle φ and inclination θ. This computing operation may be performed within the survey instrument and the computed values stored in a memory section 30 which preferably comprises one or more solid-state memory packages. However, instead of storing four values φ, θ, Bx and By it will usually be more convenient to provide the memory section 30 with sufficient capacity to store the five outputs from the analog to digital converters in the circuit processing unit 26 and to provide the computing unit 28 in the form of a separate piece of apparatus to which the instrument is connected after extraction from the borehole. Alternatively, the values may be directly transferred to the surface units via conventional telemetry means (not shown).
The instrument 18 may also comprise a pressure transducer 32 arranged to detect the cessation of pumping of drilling fluids through the drill string, this being indicative that the survey instrument is stationary. The measurements are preferably made when the instrument is stationary. Other means of detecting the nonmovement of the instrument may be used such as motion sensors.
Power for the instrument may be supplied by a battery power pack 34, downhole power generator or power line connected with a surface power supply unit.
The preferred form of the invention, using two fluxgates and three accelerometers as described above, has the advantage of not requiring any accurately pivoted components, the only moving parts being the proof masses of the accelerometers.
FIG. 2 shows a borehole 20 and illustrates various reference axes relative to which the orientation of the borehole 20 may be defined. A set of earth-fixed axes (ON, OE and OV) are illustrated with OV being vertically down and ON being a horizontal reference position. A corresponding instrument-case-fixed set of axes OX, OY and OZ are illustrated where OZ is the longitudinal axis of the borehole (and therefore of the instrument case) and OX and OY, which are in a plane perpendicular to the borehole axis represented by a chain-dotted line, are the two above-mentioned directions in which the accelerometers and fluxgates are oriented.
A spatial survey of the path of a borehole is usually derived from a series of measurements of an azimuth angle ψ and an inclination angle θ. Measurements of (θ, ψ) are made at successive stations along the path, and the distance between these stations is accurately known. The set of case-fixed orthogonal axes OX, OY and OZ are related to an earth-fixed set of axes ON, OE and OV through a set of angular rotations (ψ, θ, φ). Specifically, the earth-fixed set of axes (ON, OE, OV) rotates into the case-filled set of axes (OX, OY, OZ) via three successive clockwise rotations; through the azimuth angle ψ about OV shown in FIG. 3; through the inclination angle θ, about OE shown in FIG. 4; and through the highside angle φ, about OZ shown in FIG. 5. In If UN, UE and UV are unit vectors in the ON, OE and OV directions respectively, then the vector operation equation is:
UNEV =[ψ][θ][φ]UXYZ (1)
which represents the transformation between unit vectors in the two frames of reference (ONEV) and OXYZ) where: ##EQU2## The vector operation equation for a transformation in the reverse direction can be written as,
UXYZ =(φ)T (θ)T (ψ)T UNEV
UXYZ =[φ]T [θ]T [ψ]T UNEV (5)
The computing operation performed by the computing unit 28 will now be described. The first stage is to calculate the inclination angle θ and the highside angle φ. Use of the vector operation equation 5 to operate on the gravity vector; ##EQU3## yields gravity components in the OXYZ frame
gx =-g sin θ cos φ (7)
gy =g sin θ sin φ (8)
gz =g cos θ (9)
Thus, the highside angle φ can be determined from
tan φ=-[gy /gx ] (10)
and the inclination angle from ##EQU4## The next step is to obtain the value of Bn and Bv, the true horizontal and vertical components of the earth's magnetic field, respectively, from published geomagnetic survey data or otherwise. If geomagnetic survey data is not available, the probe itself The probe itself, or a similar sensor with at least one fluxgate or the like, may be used to measure Bn and Bv the measurement being made at a location close to the top of the borehole but sufficiently remote from any ferromagnetic structure which may cause the true earth's magnetic field to be modified. By "true" is meant magnetic measurements not influenced by magnetic material of the drill string.
It will be appreciated that any data indicative of the earth's magnetic field may be determined. For example, the combination of the total magnetic field strength and the field dip angle is equivalent to the combination of the north and vertical components of the field (the east component is always zero). The present calculations to obtain a correct azimuth may be effected in terms of any equivalent field data. Also, where the survey instrument or other sensor is used to determine "true" field data, the measurements need not be absolute, that is, the fluxgates need only be calibrated relative to each other.
The azimuth angle, ψ, is calculated using an iteration loop iterative procedure in which the input values being are the highside angle φ, inclination angle θ, and the magnetic field components Bx, By, Bv and Bn. The initial value of azimuth angle, θo ψo , is calculated from ##EQU5## Successive values of azimuth angle, ψn ψn , may be used to determine Bz by equation:
Bx =Bn cos ψn sin θ+Bv cos θ(12)
Using Bz, the azimuth angle, ψ, may be determined using the equation ##EQU6## Equations (12) and (13) are convenient to mechanize in a computing step until (ψn+1 -ψn) approaches a small preselected value. Measurement of the local magnetic and gravitational field components in the instrument case-fixed frame thus provides sufficient information to determine the azimuth value.
Measurements by the fluxgates must be made through non-magnetic material. Consequently, the drill collar 12 in the immediate vicinity of the fluxgate section 22 of the survey instrument 18 must be made of non-magnetic material. The remainder of the drill collar 12 and the drill string in general may be constructed of magnetic material, and a correct value for azimuth achieved with the foregoing method provided the effect of the magnetic material on the fluxgate measurements lies only along the longitudinal axis OZ of the survey instrument. This will be the case provided the drill string members, such as drill collars and drill pipe, which contribute to the measurable error in the fluxgate measurements, are cylindrically symmetric, for example, so that the magnetic poles of such members so interfering lie along the longitudinal axis of the sensor instrument 18.
The source of the field of the magnetic material of a pipe string member is distributed in an annular region which is the pipe or drill collar itself; there is no source of magnetic field along the axis of the pipe or drill collar, which is hollow. Any anisotropies in the drill string member, for example due to lack of concentricity between the inside diameter and the outside diameter of the member, variation in the material density of the member, etc., may, but won't necessarily, cause the effective magnetic pole at the end of the member to be off-axis, resulting in transverse field components along the longitudinal axis of the drill string at the survey instrument. At some distance from the end of a magnetic section of drill collar or drill pipe, for example many diameters of the drill string member away, the fluxgates may nevertheless sense only a point pole along the tool axis due to the magnetic material if the transverse field due to the pipe string member is sufficiently weak to be undetectable at such distance. However, if a transverse field is generated by the drill string member, and if the drill string member is sufficiently close to the sensor instrument 18 that the fluxgates detect the transverse field, the assumption that the magnetic flux influence due to the magnetic material in the drill string lies only along the longitudinal axis of the survey instrument fails.
To the extent that the drill string introduces field components in a transverse direction, for example along one or both of the OX and OY axes, measurable at the fluxgates, the value of the azimuth determined by the foregoing method will be incorrect. However, the correct azimuth may be determined by eliminating the transverse field components due to the drill string from sensing by the fluxgates. This can be done by separating the magnetic material in the drill string from the fluxgates a sufficient distance so that the fluxgates cannot detect the transverse field effects generated by the magnetic material of the drill string. Such separation between the fluxgates and the magnetic material of the drill string may be achieved by lengthening the section of non-magnetic material in which the sensor instrument 18 is located. The minimum length of non-magnetic material, such as may be provided by the drill collar 12, that is necessary to prevent transverse magnetic fields from destroying the validity of the assumption that the only field effects due to the drill string lie along the longitudinal axis of the sensor instrument 18 may be calculated. The length of non- magnetic drill collar need to avoid error due to drill string interference transverse to the longitudinal axis of the survey instrument is small compared to that needed to avoid error in the longitudinal direction without the method of the present invention.
The length of the nonmagnetic drill collar may be determined as a function of the tolerable transverse error field Berr, as shown in FIG. 8 in which survey instrument 18 is located within the drill collar 12 having a minimum length, L, and an outer diameter, OD. The transverse field error will be created by the proximity of the magnetic material in the drill string 16 above and the drill collar or bit 10 below. The magnetic material of these two sources will create poles, PU and PL, respectively. In the worst case, the poles may be assumed to be displaced from center by
d=OD/600 (14)
The transverse error field may be determined by ##EQU7## where η is the angle between the axis and the poles having a vertex at the survey instrument 18. Therefore:
Sin η=d/(L/2)=2/d/L sin η=d/(L/2) (16)
The error caused in the azimuth angle in radians is determined by expanding the azimuth angle in a Taylor series as a function of the transverse field (Bt). ##EQU8## Therefore, the error in azimuth, δψ, is given by
δψ=(ψδ/δBt)Berr δψ=(δψ/δBt)Berr (18)
By definition,
Bt2 =BT2 -Bz2
where BT is the earth's magnetic field strength.
Therefore:
Bt (ψBt /δψ)=-Bz (δBz /δψ) Bt (δBt /δψ)=-Bz (δBz /δψ) (19)
Bt is approximately constant between about 20,000 and 60,000 μT as determined from (for example) pages 75-76 of the U.S. Geological Survey publication by E. B. Fabiano, N. W. Peddie. D. R. Barraclough and A. Zunde entitled "International Geomagnetic Reference Field 1980: Charts and Grid Values".
From Equation (12),
δBz /δψ=-Bn sin ψsin θ (20)
Using average values, <Bz /Bt >≈1, ##EQU9## then
δBt /δψ=Bn /2 (21)
By definition, Berr =(δBt /δψ)δψ(21)
From equation (21)
Berr =(Bn /2)δψ (22)
From Equation (16), ##EQU10## Solving equation (23) for L, ##EQU11## For |PU |+|L |=2000 micro Webers |PU |+|PL |=2000 micro Webers and a collar having an outer diameter of 71/2", d, from equation (14), equals 0.013 in. Equation (14) may vary slightly with configuration of collar.
For an acceptable error in azimuth angle, ψ, of 0.25 degrees in the Gulf Coast, the minimum nonmagnetic collar length is
L=6.4 ft.
FIG. 7 illustrates the error incurred in the calculation of azimuth angle as a function of collar length, L, for Bn equals 25 micro Tesla, a value for the Gulf Coast region. As the length of non-magnetic collar is increased, the extraneous transverse magnetic field strength is reduced and the calculated azimuth approaches the true azimuth.
Therefore a minimum L of between about 5 to 7 feet will result in a calculated azimuth angle falling within the acceptable error region of FIG. 7 for the Gulf Coast. Other collar lengths will be calculated accordingly for different regions, collar configuration and outside diameter.
Using this determination, a system of this invention for determining the orientation of a downhole instrument in a borehole would comprise a means for determining inclination angle of the instrument at a location thereof in said borehole; a means for determining the highside angle of said instrument at said location; a means for determining the true horizontal and vertical components of the earth's magnetic field at the location of the borehole; a means for determining components of the local magnetic field perpendicular to the direction of a primary axis of the instrument aligned with the borehole at said location, said drill collar being constructed of non-magnetic material, and having a minimum length, L, determined as follows: ##EQU12##
Numerous variations and modifications may obviously be made in the apparatus herein described without departing from the present invention. Accordingly, it should be clearly understood that the forms of the invention described herein and shown in the figures of the accompanying drawings are illustrative only and are not intended to limit the scope of the invention.
Patent | Priority | Assignee | Title |
10584575, | Dec 12 2011 | Schlumberger Technology Corporation | Utilization of dynamic downhole surveying measurements |
10890062, | Aug 02 2018 | Halliburton Energy Services, Inc. | Inferring orientation parameters of a steering system for use with a drill string |
10900346, | Dec 15 2017 | Halliburton Energy Services, Inc. | Azimuth determination while rotating |
5155916, | Mar 21 1991 | Scientific Drilling International | Error reduction in compensation of drill string interference for magnetic survey tools |
5321893, | Feb 26 1993 | Scientific Drilling International | Calibration correction method for magnetic survey tools |
5452518, | Nov 19 1993 | Baker Hughes Incorporated | Method of correcting for axial error components in magnetometer readings during wellbore survey operations |
5564193, | Nov 17 1993 | Baker Hughes Incorporated | Method of correcting for axial and transverse error components in magnetometer readings during wellbore survey operations |
5806194, | Jan 10 1997 | Halliburton Energy Services, Inc | Method for conducting moving or rolling check shot for correcting borehole azimuth surveys |
6321456, | Aug 22 1997 | Halliburton Energy Services, Inc. | Method of surveying a bore hole |
6480119, | Aug 19 1999 | Halliburton Energy Services, Inc | Surveying a subterranean borehole using accelerometers |
6842990, | Jun 20 2002 | 1008795 B C LTD ; R S T INSTRUMENTS LTD | Inclinometer system |
6957156, | Dec 13 2003 | Samsung Electro-Mechanics Co., Ltd. | Method for searching for dip angle using tilt-compensated electronic compass |
6966211, | Feb 04 2003 | Wells Fargo Bank, National Association | Downhole calibration system for directional sensors |
8028577, | Jan 14 2009 | MICRO-G LACOSTE, INC | Gravity survey with relative and absolute gravimeters |
8061047, | Apr 08 2009 | Schlumberger Technology Corporation | Active positioning of downhole devices using spherical motors |
9273547, | Dec 12 2011 | Schlumberger Technology Corporation | Dynamic borehole azimuth measurements |
9982525, | Dec 12 2011 | Schlumberger Technology Corporation | Utilization of dynamic downhole surveying measurements |
Patent | Priority | Assignee | Title |
3862499, | |||
3935642, | Nov 11 1970 | BAROID TECHNOLOGY, INC , A CORP OF DE | Directional drilling of bore holes |
4021774, | May 12 1975 | Teleco Inc. | Borehole sensor |
4071959, | Mar 26 1975 | BAROID TECHNOLOGY, INC , A CORP OF DE | Gyro-stabilized single-axis platform |
4083117, | Sep 24 1976 | BAROID TECHNOLOGY, INC , A CORP OF DE | All angle borehole tool |
4163324, | Feb 25 1977 | NATWEST USA CREDIT CORP | Surveying of boreholes |
4199869, | Dec 18 1978 | Applied Technologies Associates | Mapping apparatus employing two input axis gyroscopic means |
GB1578053, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Nov 21 1990 | Baroid Technology, Inc. | (assignment on the face of the patent) | / | |||
Feb 02 2003 | BAROID TECHNOLOGY, INC | Halliburton Energy Services, Inc | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 013821 | /0799 |
Date | Maintenance Fee Events |
Sep 24 1992 | M184: Payment of Maintenance Fee, 8th Year, Large Entity. |
Oct 19 1992 | ASPN: Payor Number Assigned. |
Sep 27 1996 | M185: Payment of Maintenance Fee, 12th Year, Large Entity. |
Date | Maintenance Schedule |
Oct 08 1994 | 4 years fee payment window open |
Apr 08 1995 | 6 months grace period start (w surcharge) |
Oct 08 1995 | patent expiry (for year 4) |
Oct 08 1997 | 2 years to revive unintentionally abandoned end. (for year 4) |
Oct 08 1998 | 8 years fee payment window open |
Apr 08 1999 | 6 months grace period start (w surcharge) |
Oct 08 1999 | patent expiry (for year 8) |
Oct 08 2001 | 2 years to revive unintentionally abandoned end. (for year 8) |
Oct 08 2002 | 12 years fee payment window open |
Apr 08 2003 | 6 months grace period start (w surcharge) |
Oct 08 2003 | patent expiry (for year 12) |
Oct 08 2005 | 2 years to revive unintentionally abandoned end. (for year 12) |