A grout hopper and dispenser which may be raised on a fork lift so that grout may be placed in a concrete block wall. The grout hopper and dispenser includes an auger in the bottom thereof which forces the grout out through a tube which is connected to a flexible tube which is used by the workman in directing the grout to the appropriate location. The auger may be remotely controlled by the operator of the forklift truck which has lifted the grout hopper and dispenser into position.
|
1. A grout dispenser comprising:
(a) a grout hopper having four sides of substantially equal length joined together at corners to form a hopper chamber having an opening facing in a first direction, and wherein two of said hopper sides are disposed with lower ends closer together than upper ends forming a narrowed, bottom region of the hopper;
(b) an elongated tube mounted to a first end of said hopper near the narrowed region of the hopper and extending longitudinally away from said hopper to a first tube end;
(c) an aperture formed in a sidewall of said tube, said aperture facing in a second direction substantially opposite to the first direction that the opening of the hopper faces;
(d) a flexible hose mounted to the tube at the aperture, permitting fluid communication between a hose interior and a tube interior;
(e) an auger removably mounted in the hopper and the tube, said auger extending through the tube and within the narrowed region of the hopper to be drivingly linked to a means for rotating the auger, said rotating means mounted at a second, opposite hopper end for rotating said auger to move grout from the narrowed region of said hopper, through said tube and through the aperture in said tube into said flexible hose; and
(f) an auger removal cap mounted on the first tube end opposite the rotating means, wherein said cap is removably mounted to said tube for permitting removal of said auger from said tube through the first tube end.
2. A grout dispenser in accordance with
3. A grout dispenser in accordance with
|
In cement block building construction, it often times is necessary to place grout inside of the cement blocks after the blocks have been laid in place. Historically this has involved labor intensive activity especially if the grout is being placed at the first or second story level. One technique is to use a grout pump which takes a lot of time to set up and dismantle. An average of 200 feet of two inch hose is required to get from the pump to the location. This involves three to four men moving hoses during pumping. The other historical approach is to use a mortar tub, shovel and five gallon buckets. The five gallon buckets are filled from the mortar tub and raised by hand to a place to where the grout or mortar would be put into the cement block. This is also very labor intensive. An attempt to solve this problem is shown in U.S. Pat. No. 5,592,760 Kohout which uses a scoop to load grout into the scoop and there is an auger connected to an opening, the auger being hydraulically operated. In use, the opening is placed near the location where the grout is to be delivered. This limits the flexibility of use of the device and also there is no provision to stop the flow of the grout from the opening.
Applicant's grout hopper and dispenser utilizes a container into which grout may be placed. The bottom of the container has an auger which moves the grout into a tube. When the auger is not turning, it functions as a shut off valve in the tube and when the auger is moving, the grout moves through a flexible hose so that the grout may be placed conveniently in the preferred locations in the cement block construction. The auger is hydraulically operated and remotely controlled by the operator of a forklift which is used to lift the entire container and dispenser into position above the cement block portion of the building into which the mortar or grout is to be introduced. The auger is remotely controlled by the forklift operator responding to visual signals from the workman who is placing the grout in the cement block construction.
It is therefore an object of this invention to provide a combined grout hopper and dispenser in which the flow of the grout from the dispenser may be remotely controlled.
It is a further object of this invention to provide such a grout hopper and dispenser wherein the flow of mortar from the dispenser can be carefully positioned in the cement block with a minimum amount of labor.
This together with other objects of the invention, will become apparent from the following detailed description of the invention and the accompanying drawings.
FIG. 1. Applicant's grout hopper and dispenser positioned on a forklift.
FIG. 2. Applicant's combined grout hopper and dispenser on the forklift with the grout hopper in position so that gravity flow with the help of the auger will permit the grout to be directed to the appropriate position in the concrete block wall under construction.
Referring now to
Referring now to
It will be noted that when the auger 26 is not turning, because of its placement in the tube 13, and because of the nature of the product being delivered, it acts as an effective shut off valve to prevent more of the grout to flow through the tube.
In use the grout hopper and dispenser 10 may be slid over the forklift arms 25—25 (see
By utilizing Applicant's invention, a minimum amount of labor is required and the workmen are able to place the grout with great accuracy in the concrete block openings. The forklift can move the grout hopper and dispenser 10 slightly on command from the workman 19 to the forklift operator as needed. When the grout is fully discharged from the grout hopper and dispenser 10, it may be readily brought back down to a level where it may be refilled, thus making for a very efficient, cost effective operation.
While this invention has been shown and described with respect to a detailed embodiment thereof, it will be understood by those skilled in the art that various changes in form and detail thereof may be made without departing from the scope of the claims of the invention.
Patent | Priority | Assignee | Title |
D630653, | May 19 2010 | RICK MERITT INVESTMENTS, LTD | Commodity caddy |
Patent | Priority | Assignee | Title |
2365441, | |||
2606645, | |||
2901148, | |||
3318473, | |||
4374790, | Jul 08 1980 | MC ACQUISITION CORPORATION | Method and apparatus for pumping concrete to form structure at elevated heights |
4798510, | Jan 14 1988 | Concrete bucket assembly rigidly mounted for vertical tilting and rotational movement to a forklift vehicle | |
5116189, | Nov 05 1990 | SHAMMOUT, MOHAMMAD; SHAMMOUT, AHMAD OMAR; SHAMMOUT, KALED; SHAMMOUT, ABDUL KAREEM | Loader bucket with power lift apparatus |
5182057, | Dec 27 1991 | Method for in situ dispensing of cementitious materials at remote locations | |
5263572, | May 11 1992 | General Electric Capital Corporation | Volumetric feeder with removable auger drive assembly |
5308003, | Dec 18 1992 | Rotary auger screw cartridge | |
5314100, | Sep 25 1992 | Grout delivery system | |
5458169, | Jan 06 1994 | Grout distributing device | |
5465829, | Jan 31 1994 | Sudenga Industries, Inc. | Pallet with hopper and auguer and method for distributing particular material |
5592760, | Jul 25 1995 | Labor-saving materials dispenser | |
5715976, | Jul 20 1995 | General Electric Capital Corporation | Cartridge bearing assembly for volumetric feeder |
5735386, | May 15 1996 | Tube and belt conveyor | |
5823218, | Aug 26 1993 | Putzmeister Concrete Pumps GmbH | Large manipulator, especially for self-propelled concrete pumps, and method for operating it |
5878921, | Dec 06 1995 | Mud King, LLC | Grout delivery apparatus and method |
6112955, | Feb 02 1999 | Liftable grout hopper and dispenser |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Date | Maintenance Fee Events |
Sep 18 2007 | M2552: Payment of Maintenance Fee, 8th Yr, Small Entity. |
Sep 20 2011 | M2553: Payment of Maintenance Fee, 12th Yr, Small Entity. |
Date | Maintenance Schedule |
May 22 2010 | 4 years fee payment window open |
Nov 22 2010 | 6 months grace period start (w surcharge) |
May 22 2011 | patent expiry (for year 4) |
May 22 2013 | 2 years to revive unintentionally abandoned end. (for year 4) |
May 22 2014 | 8 years fee payment window open |
Nov 22 2014 | 6 months grace period start (w surcharge) |
May 22 2015 | patent expiry (for year 8) |
May 22 2017 | 2 years to revive unintentionally abandoned end. (for year 8) |
May 22 2018 | 12 years fee payment window open |
Nov 22 2018 | 6 months grace period start (w surcharge) |
May 22 2019 | patent expiry (for year 12) |
May 22 2021 | 2 years to revive unintentionally abandoned end. (for year 12) |