An airborne time domain electromagnetic surveying system is provided. The system includes a tow assembly with a flexible support frame. The flexible support frame spaced apart from the aircraft includes a transmitter section with a transmitter loop and a receiver section with a sensor aligned with the central axis of the transmitter section. The flexible support frame has a lightweight modular structure that enables the surface area of the transmitter section to be increased and decreased to suit particular survey applications. The transmitter loop sends a pulse in an “ON” interval, and in an “OFF” interval the sensor measures the earth response to the pulse. The tow assembly also includes a sensor for generating selected survey data in the “ON” interval. A transmitter driver enables the creation of earthbound pulse. The system components are linked to a computer and control computer program linked thereto for controlling the functions thereof. The invention also includes a method for producing survey data using the tow assembly of the invention.
|
1. An airborne time domain electromagnetic surveying system comprising:
(a) A tow assembly for connection to an aircraft, the tow assembly including:
(i) A flexible support frame including:
(A) A transmitter section having a central axis and including a transmitter means; and
(B) A receiver section including a receiver support frame and a sensor means;
wherein the receiver section is substantially aligned with the central axis of the transmitter section; and
wherein the sensor means is flexibly connected to the receiver support frame for vibration reduction;
(b) A transmitter driver linked to the transmitter section in a spaced apart relationship from the transmitter section, such spaced apart relationship being operable to reduce noise, wherein the transmitter driver and transmitter section in cooperation enable the system in an “ON” interval to generate an earthbound electromagnetic field pulse effective for geological surveying, and wherein an earth response to the electromagnetic field pulse is sensed in an “OFF” interval by the sensor means; and
(c) A dual-mode gain amplifier linked to the sensor means that enables low linear gain amplification during the “ON” interval and switches to non-bucking high linear gain amplification during the “OFF” interval, wherein the switch is rapidly achieved.
26. An airborne time domain electromagnetic surveying system comprising:
(a) A tow assembly for connection to an aircraft, the tow assembly including:
(i) A flexible support frame including:
(A) A transmitter section including a transmitter means; and
(B) A receiver section including a sensor means;
(b) A transmitter driver linked to the transmitter section in a spaced apart relationship from the transmitter section, such spaced apart relationship being operable to reduce noise, wherein the transmitter driver and transmitter section in cooperation enable the system to generate an earthbound electromagnetic field pulse effective for geological surveying; and
(c) A gain amplifier linked to the sensor means that enables non-bucking high linear gain amplification of the earth response to the electromagnetic field pulse;
wherein an electromagnetic field pulse effective for airborne geological surveying is generated in an “ON” interval, an earth response to the electromagnetic field response is sensed in an “OFF” interval and residual currents circulate in the transmitter means during the “OFF” interval, wherein the system further comprises a current measuring unit that measures the residual currents thereby enabling the system to minimize distortions caused thereby to the earth response to the electromagnetic field pulse.
20. A method of producing survey data comprising the steps of:
(a) flying an aircraft with a lightweight survey tow assembly connected thereto, the tow assembly including:
(i) A flexible support frame including:
(A) A transmitter section in including a transmission means; and
(B) A receiver section including a sensor means;
(ii) A transmitter driver linked to the transmitter means in a spaced apart relationship from the transmitter section, such spaced apart relationship being operable to reduce noise, wherein the transmitter driver and transmitter means in cooperation enable the system to generate an earthbound electromagnetic field pulse effective for geological surveying; and
(iii) A dual-mode gain amplifier linked to the sensor means that enables non-bucking high linear gain amplification of the earth response to the electromagnetic field pulse;
Wherein the receiver section is substantially aligned with the central axis of the transmitter section;
(b) Generating an earthbound electromagnetic field pulse effective for airborne geological surveying in an “ON” interval;
(c) Sensing the earth response to the electromagnetic field response in an “OFF” interval;
(d) Amplifying the earth response in the “OFF” interval by means of the dual-mode gain amplifier wherein the amplification switches to low linear gain during the “ON” interval; and
(e) Obtaining geophysical survey data from the amplified electromagnetic field response.
27. A method of producing survey data comprising the steps of:
(a) flying an aircraft with a lightweight survey tow assembly connected thereto, the tow assembly including:
(i) A flexible support frame including:
(A) A transmitter section in including a transmission means; and
(B) A receiver section including a sensor means;
(ii) A transmitter driver linked to the transmitter means in a spaced apart relationship from the transmitter section, such spaced apart relationship being operable to reduce noise, wherein the transmitter driver and transmitter means in cooperation enable the system to generate an earthbound electromagnetic field pulse effective for geological surveying; and
(iii) A gain amplifier linked to the sensor means that enables non-bucking high linear gain amplification of the earth response to the electromagnetic field pulse;
Wherein the receiver section is substantially aligned with the central axis of the transmitter section;
(b) Generating an earthbound electromagnetic field pulse effective for airborne geological surveying in an “ON” interval;
(c) Sensing the earth response to the electromagnetic field response in an “OFF” interval;
(d) Amplifying the earth response by means of a gain amplifier; and
(e) Obtaining geophysical survey data from the amplified electromagnetic field response; and
(f) measuring residual currents circulating in the transmission means during the “OFF” interval by means of a current measuring unit, and thereby enabling distortions caused thereby to the earth response to the electromagnetic field pulse to be minimized.
2. An airborne time domain electromagnetic surveying system as claimed in
3. An airborne time domain electromagnetic surveying system as claimed in
4. An airborne time domain electromagnetic surveying system as claimed in
5. An airborne time domain electromagnetic surveying system as claimed in
6. An airborne time domain electromagnetic surveying system as claimed in
7. An airborne time domain electromagnetic surveying system as claimed in
8. An airborne time domain electromagnetic surveying system as claimed in
9. An airborne time domain electromagnetic surveying system as claimed in
10. An airborne time domain electromagnetic surveying system as claimed in
11. An airborne time domain electromagnetic surveying system as claimed in
12. An airborne time domain electromagnetic surveying system as claimed in
13. An airborne time domain electromagnetic surveying system as claimed in
14. An airborne time domain electromagnetic surveying system as claimed in
15. An airborne time domain electromagnetic surveying system as claimed in
16. An airborne time domain electromagnetic surveying system as claimed in
17. An airborne time domain electromagnetic surveying system as claimed in
18. An airborne time domain electromagnetic surveying system as claimed in
19. An airborne time domain electromagnetic surveying system as claimed in
21. The method claimed in
22. The method claimed in
23. The method claimed in
24. The method as claimed in
25. The method of
|
One embodiment of the support frame 20 of the present invention described consists of tube sections 22 and elbow sections 27 (not shown) whereby adding additional tube sections 22 or multiple pieces together providing one of the tube sections 22, as well as additional elbow sections 24, provides a support frame 20 having a greater surface area. It should be understood that tube sections 22 and elbow sections 24 can be added or removed to increase or decrease the surface area.
While the support frame 20 shown in the Figures has an octagonal shape, it should be understood that the present invention also contemplates support frames 15 having other polygonal shapes, although a polygonal shape approximating a circular shape is generally preferred. It should be understood that the modular pieces together providing the support frame 20 can be modified to provide a support frame 20 having a substantially circular profile. Also, in applications of the present invention where transportation and adjustment of the size of the flexible frame 15 is not required, the support frame can be provided in a single unitary construction, as opposed to the modular construction described above.
It should be understood that the construction of the support flame 20 described herein enables a relatively large surface area while the support frame 20 of the present invention is also relatively lightweight. By way of example only, it was found that the construction described herein easily permitted an increase of the transmitter loop diameter (or more than) up to 26 meters while permitting maneuvering of the aircraft 12 with the tow assembly 14 in tow.
The support frame 20, as best shown in
The rope 26 is then attached to a central tow cable in a manner that is known.
The support frame 20 bears a known multi-turn transmitter coil 28 so as to provide the transmitter function of the transmitter section 16. In the embodiment of the invention shown in
In another aspect of the support frame construction of the present invention, the invention also provides flexibility in the ability to make changes in receiver loop turns and loop area, and also by adding receiver coils in other axes, without change to the to disclosed tow assembly 14 configuration.
In accordance with the present invention, a known electronic transmitter driver 32 that feeds the transmitter coil 28 is installed in the aircraft 12. The transmitter driver 32 is connected to the transmitter coil 28 as illustrated in FIG. 8. This connection is generally provided by wiring the transmitter coil 28 to the transmitter driver 32 along the central tow cable and at least one of the ropes 26 supporting the support frame 20.
The flexible frame 20 also includes a stabilizer as shown in FIG. 1. The stabilizer 36, as best shown in
In an embodiment of the present invention, as best shown in
As best shown in
Much as in the case of the support frame 20, the receiver frame 45 has a modular construction whereby additional receiver tube sections 44 and receiver elbow sections 46 may be added to provide a receiver frame 45 having a greater or lesser surface area. Also similarly, the receiver frame 45 can in accordance with the present invention be provided in accordance with alternate polygonal structures or in fact a circular structure. In addition, a unitary construction as opposed to a modular construction may be desirable.
In accordance with one embodiment of the present invention, the receiver frame 45 is mounted on the tension ropes 40 by leading the tension ropes 40 through a series of loops 48 disposed on the receiver frame 45 as best shown in FIG. 4.
The receiver frame 45 is provided with a sensor coil 50. Sensor coil and or sensor loop are synonymous terms being used interchangeably throughout. In accordance with an embodiment of the present invention, the sensor coil 50 is disposed inside a shell 52 disposed inside the receiver frame 45, as shown in
In addition, the shell 52 is elastically suspended using a series of elastics 54 (one shown only) attached to points 56 along the inner wall of the receiver frame 45 tubing and elastically supporting the shell 52. The sensor coil 50, in turn, is elastically supported by a series of elastics 54 (one shown only) attached to points 56 along the inner wall of the shell 52.
The elastic suspension of the sensor coil 50 inside the shell 52 minimizes the effect of vibration.
In one particular embodiment of the present invention, the sensor coil 50 output is connected to a non linear preamplifier 63 mounted in a box on the shell 52 outer surface (not shown). This is illustrated in FIG. 8.
The result of the above is that metallic parts except wires and the preamplifier 63 are generally concentrated in the aircraft 12 far enough from field generating and the sensitive components of the flexible frame 12. This results in relatively small parasitic eddy currents whereby useful signals dominate.
A further result of the tow assembly construction described above, is that the tow assembly consists generally of the tubular fiberglass parts described above whereby generally more than a half of the bird weight belongs to transmitter coil wires.
Generally a transmitter coil 30 having relatively thick wires with low resistance that can reach higher intensity of the transmitting magnetic field is used. Of course, the overall weight must not exceed values that would otherwise unduly burden the aircraft 12 or negatively affect maneuverability.
In addition to the fiberglass or carbon fiber tubing, the tow assembly 14 uses the ropes discussed above. This reduces the need for additional plastic or metal spokes. The ropes reduce air drag and allows for higher flight speed.
As best illustrated in
The signal from the sensor coil 50, which is proportional to dB/dt, goes through the amplifier 62 and low pass filter 62. The ADC 60 continuously converts the signal to digits. The computer 58 includes a microprocessor (not shown) and is linked to a memory. A computer program 66 is installed on the computer 58 for analyzing the digital data to produce the survey data illustrated in FIG. 7. The computer program can produce arbitrary output waveforms including square, trapezoidal and triangular waveforms in order to meet the particular survey requirements. The computer program 66 also permits pulse repetition rate to be dynamically altered to lower repetition rates being more suitable for very conductive targets or higher for less conductive targets.
The sensor coil 50 parameters define the necessary sensitivity so that the signal does not exceed the input range of the non linear preamplifier.
The preamplifier 63 is a differential amplifier with a specially designed, fast recovery, dual-mode gain. In relation to the TDEM process, the differential amplifier has a high linear gain of the signal within a set range equal to the expected measurement signal level with the pulse off and rapidly turns the amplified signal to low gain when the signal exceeds this limit during the “on” pulse. In that way the preamplifier limits output voltage during “ON TIME” pulse and provides low distortion and has fast recovery and high gain during off time.
This in turn allows the sensor coil 50 to be placed in the optimal position in the center of the transmitting section 16 without the need for any bucking of the primary transmitted pulse. This then allows the use merely of vibration isolation of the sensor coil 50 (as described above) thus increasing our signal to noise ratio.
By using this dual-mode gain amplifier method over the bucking method, a transmitter loop diameter and corresponding size of the support frame, as well as the number of loop turns can be selected to suit particular geological targets simply and on site.
Alteration of these parameters in the context of a bucking system is generally discouraged because the bucking system would be lose effectiveness in the advent of such alteration. Thus the bucking method is generally less flexible than the present invention.
In another aspect of the invention, the support frame 20 is also adapted to measure the signal during the on-time so as to provide in-phase information. This has been found to improve survey data, for example, in the case of ore bodies of relatively high conductance, for example, nickel. This is achieved by taking signal off of the transmitter coil 28, or alternatively a separate receiver coil is looped tightly to the transmitter coil for this purpose.
In another aspect of the invention a current measuring unit (not shown) is added to the system of the present invention. The current measuring unit measures the residual currents circulating in the transmitter coil 28 during the “OFF” interval thereby enabling the system to minimize distortions caused by these residual currents to the earth response to the electromagnetic field pulse. This is especially important in the time immediately after the transmit pulse when current leakage and current oscillations may exist for a short time. These currents cause errors in the received signals. One implementation of the current measuring unit consists of an air-core transformer and preamplifier which is then connected to an AD converter. The transformer is preferably designed like a Rogowski coil which includes wide dynamic and frequency ranges, high stability and linearity of its characteristics and easy calibration. The primary winding of the transformer is connected in serial with the transmitter coil so that the current flowing through the coil generates emf=M*dl/dt at the secondary winding of the transformer. The signal-processing computer 58 is connected to the transformer and therefore sample signal therefrom much as the receiver signal and uses this data for further correction of the receiver signal. In one particular implementation thereof the current measuring unit is housed in a box (not shown) and is mounted on the tow cable.
Other modifications are possible. For example, additional receiver coils oriented in the X-axis and/or the Y-axis can be added. The use of a mechanically flexible relationship between the transmitter coil and the receiver coil. This simplifies and greatly reduces the necessary weight of the support structure as well as allowing the user to use a much larger loop diameter thus giving the system higher dipole moment. The ability to rotate the entire structure 90 degrees so that the transmitter flies in the X-axis direction thus allowing for better detection of vertical conductive bodies.
Morrison, Edward Beverly, Kuzmin, Petr Valentinovich, Tishin, Pavel
Patent | Priority | Assignee | Title |
10254429, | Aug 17 2012 | CGG DATA SERVICES AG | Airborne electromagnetic system with large suspension coil assembly |
9817147, | Aug 17 2012 | CGG DATA SERVICES AG | Airborne electromagnetic system with large suspension coil assembly |
Patent | Priority | Assignee | Title |
3105934, | |||
3325778, | |||
3978396, | Nov 06 1968 | TRW Inc. | Method and apparatus for measuring electromagnetic conductivity of a medium and for detecting anomalies therein |
4628266, | Jun 10 1981 | Instytut Gornictwa Naftowego | Apparatus for direct airborne electromagnetic prospecting of hydrocarbon deposits. |
4641100, | Jun 10 1981 | Instytut Gornictwa Naftowego i Gazownictwa | Multifrequency method for direct airborne electromagnetic prospecting of hydrocarbon deposits |
5119028, | Apr 26 1990 | Grumman Aerospace Corporation | Method and system for determining the depth of an electrically conductive body in a medium having a known conductivity and a known permeability by measuring phase difference between a primary and secondary magnetic field |
6244534, | Dec 19 1997 | Airborne electromagnetic system | |
20020027438, | |||
20030169045, | |||
CA2187952, | |||
CA2232105, | |||
GB899606, | |||
RU2201603, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Dec 23 2008 | Geotech Airborne Limited | (assignment on the face of the patent) | / | |||
Jun 07 2017 | Geotech Airborne Limited | GEOTECH LTD | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 042807 | /0262 |
Date | Maintenance Fee Events |
Jun 18 2014 | M1552: Payment of Maintenance Fee, 8th Year, Large Entity. |
Jun 19 2014 | ASPN: Payor Number Assigned. |
Jun 27 2018 | M1553: Payment of Maintenance Fee, 12th Year, Large Entity. |
Date | Maintenance Schedule |
Mar 15 2014 | 4 years fee payment window open |
Sep 15 2014 | 6 months grace period start (w surcharge) |
Mar 15 2015 | patent expiry (for year 4) |
Mar 15 2017 | 2 years to revive unintentionally abandoned end. (for year 4) |
Mar 15 2018 | 8 years fee payment window open |
Sep 15 2018 | 6 months grace period start (w surcharge) |
Mar 15 2019 | patent expiry (for year 8) |
Mar 15 2021 | 2 years to revive unintentionally abandoned end. (for year 8) |
Mar 15 2022 | 12 years fee payment window open |
Sep 15 2022 | 6 months grace period start (w surcharge) |
Mar 15 2023 | patent expiry (for year 12) |
Mar 15 2025 | 2 years to revive unintentionally abandoned end. (for year 12) |