A method of real time field wide reservoir management comprising the steps of processing collected field wide reservoir data in accordance with one or more predetermined algorithms to obtain a resultant desired field wide production/injection forecast, generating a signal to one or more individual well control devices instructing the device to increase or decrease flow through the well control device, transmitting the signal to the individual well control device, opening or closing the well control device in response to the signal to increase or decrease the production for one or more selected wells on a real time basis. The system for field wide reservoir management comprising a CPU for processing collected field wide reservoir data, generating a resultant desired field wide production/injection forecast and calculating a target production rate for one or more wells and one or more down hole production/injection control devices.

Patent
   RE42245
Priority
Jul 20 1999
Filed
May 06 2009
Issued
Mar 22 2011
Expiry
Jul 20 2019
Assg.orig
Entity
Large
9
133
all paid
0. 125. A method for developing a reservoir, the method comprising:
performing the following operations, at least in part, at a location remote from a site of a well being drilled that penetrates the reservoir, from a site of a well being completed, or from a site of a well that is producing from the reservoir while drilling:
receiving data in real time, said data related to a characteristic of the reservoir, wherein the characteristic comprises at least one of temperature, annulus pressure, formation pressure, fluid flow rate, fluid flow type, formation resistivity, permeability, seismics, cross-well acoustic seismometry, porosity, perforation depth, surface data Logging (SDL) data, well log data, core data, water saturation data, oil saturation data, clay content data, pressure transient data, skin data, estimated reservoir boundary, hydraulic pressure, hydraulic power, or fluid characteristics;
analyzing, with a computer, the data related to the characteristic of the reservoir.
0. 99. A system for developing a reservoir, the system comprising:
a downhole sensor to collect data related to a characteristic of the reservoir, in real time wherein the characteristic comprises at least one of temperature, annulus pressure, formation pressure, fluid flow rate, fluid flow type, formation resistivity, permeability, seismics, cross-well acoustic seismometry, porosity, perforation depth, surface data Logging (SDL) data, well log data, core data, water saturation data, oil saturation data, clay content data, pressure transient data, skin data, estimated reservoir boundary, hydraulic pressure, hydraulic power, or fluid characteristics;
a processor at the surface of the Earth to process data related to the characteristic of the reservoir from downhole;
a data base accessible by the processor to store the characteristic of the reservoir; and
a control device that is to receive a control signal from the processor to control an operation related to the reservoir, while drilling a well that penetrates the reservoir.
0. 112. An article comprising a machine-readable medium storing instructions operable to cause one or more machines to perform operations comprising:
receiving, in real time at the surface of the Earth, data related to a characteristic of a reservoir, wherein the characteristic comprises at least one of temperature, annulus pressure, formation pressure, fluid flow rate, fluid flow type, formation resistivity, permeability, seismics, cross-well acoustic seismometry. porosity, perforation depth, surface data Logging (SDL) data, well log data, core data, water saturation data, oil saturation data, clay content data, pressure transient data, skin data, estimated reservoir boundary, hydraulic pressure, hydraulic power, or fluid characteristics;
analyzing the data related to the characteristic of the reservoir;
generating a control signal for a control device for an operation relating to the reservoir based, at least in part, on the analyzing of the data; and
transmitting the control signal to the control device for controlling the control device while drilling of a well for developing the reservoir.
0. 129. A method for developing a reservoir, the method comprising:
performing at least one of, drilling a well that penetrates the reservoir, completing of the well, or producing from the well while drilling;
receiving, in real time, data related to a characteristic of drilling the well, completing the well or producing from the well while drilling, wherein the characteristic comprises at least one of temperature, annulus pressure, formation pressure, fluid flow rate, fluid flow type, formation resistivity, permeability, seismics, cross-well acoustic seismometry, porosity, perforation depth, surface data Logging (SDL) data, well log data, core data, water saturation data, oil saturation data, clay content data, pressure transient data, skin data, estimated reservoir boundary, hydraulic pressure, hydraulic power, or fluid characteristics;
analyzing the data related to the characteristic;
generating a control signal for a flow control device based, at least in part, on the analyzing of the data;
transmitting the control signal to the flow control device; and
controlling the flow control device for an operation related to the well, using the control signal.
0. 81. A method for developing a reservoir, the method comprising:
performing at least one of, drilling a well that penetrates the reservoir, completing of the well, or producing from the well while drilling;
receiving, in real time, data related to a characteristic of the reservoir from downhole collected during the at least one of drilling a well that penetrates the reservoir, completing of the well, or producing from the well while drilling, wherein the characteristic comprises at least one of temperature, annulus pressure, formation pressure, fluid flow rate, fluid flow type, formation resistivity, permeability, seismics, cross-well acoustic seismometry, porosity, perforation depth, surface data Logging (SDL) data, well log data, core data, water saturation data, oil saturation data, clay content data, pressure transient data, skin data, estimated reservoir boundary, hydraulic pressure, hydraulic power, or fluid characteristics;
analyzing the data related to the characteristic of the reservoir;
generating a control signal for a controlled equipment based, at least in part, on the analyzing of the data;
transmitting the control signal to the controlled equipment; and
controlling the controlled equipment for an operation related to the well, using the control signal.
0. 1. A method comprising:
receiving data indicative of at least one reservoir characteristic;
determining, in relation to the data, a target production/injection in real time; and
determining a control device setting in relation to the target production/injection.
0. 2. The method of claim 1 further comprising:
allocating the target production/injection between one or more selected reservoir management intervals of the reservoir; and
determining the control device setting for a control device associated with at least one of the selected management intervals in relation to the target production/injection.
0. 3. The method of claim 2 further comprising:
comparing the target production/injection to an actual production/injection; and
determining the control device setting in relation to a difference between the target production/injection and the actual production/injection.
0. 4. The method of claim 1 further comprising:
comparing the target production/injection to an actual production/injection; and
determining the control device setting in relation to a difference between the target production/injection and the actual production/injection.
0. 5. The method of claim 4 wherein determining the control device setting comprises determining the control device setting if a difference between the target production/injection and the actual production/injection is greater than a specified variance.
0. 6. The method of claim 1 wherein determining the control device setting comprises determining the control device setting in real time.
0. 7. The method of claim 1 wherein determining the target production/injection in real time comprises:
monitoring for changes in the data indicative of at least one reservoir characteristic; and
if a change is detected, determining the target production/injection.
0. 8. The method of claim 1 wherein receiving data indicative of at least one reservoir characteristic comprises receiving the data in real time.
0. 9. The method of claim 1 wherein receiving data indicative of at least one reservoir characteristic comprises receiving data indicative of at least geologic data; and
wherein determining the target production/injection in real time comprises determining a reservoir model adjustment using the data indicative of at least geologic data and determining the target production/injection in relation to the reservoir model.
0. 10. The method of claim 9 wherein determining the reservoir model adjustment comprises determining the reservoir model adjustment in real time.
0. 11. The method of claim 9 further comprising determining the reservoir model adjustment with data indicative of at least one of downhole pressure, flow or temperature.
0. 12. The method of claim 9 further comprising selecting at least one well location based on the reservoir model.
0. 13. The method of claim 1 wherein determining the target production/injection comprises determining the target production/injection using at least one of nodal analysis, material balance calculations, risked economic analysis, or reservoir simulation.
0. 14. The method of claim 1 wherein determining a control device setting comprises determining a setting for at least one of a downhole control device, a surface control device, or a seabed control device.
0. 15. The method of claim 1 wherein receiving data indicative of at least one reservoir characteristic comprises receiving data indicative of at least one of pressure, temperature, viscosity, flow rate, compositional profiles, log data, core data, SDL data, or seismic data.
0. 16. The method of claim 1 wherein determining a control device setting comprises determining a setting for at least a production control device.
0. 17. The method of claim 1 wherein determining, in relation to the data, a target production/injection in real time comprises determining, in relation to the data, the target production/injection continuously.
0. 18. The method of claim 1 wherein determining, in relation to the data, a target production/injection in real time comprises determining the target production/injection based at least in part on the data.
0. 19. The method of claim 1 further comprising communicating the determined control device setting to a control device.
0. 20. The method of claim 19 wherein the control device is remote from the location at which the control device setting is determined.
0. 21. The method of claim 19 wherein communicating the determined control device setting to a control device comprises communicating the determined control device setting over a communication network.
0. 22. The method of claim 21 wherein the communication network is a telephone network.
0. 23. The method of claim 19 wherein communicating the determined control device setting to a control device comprises communicating the control device setting to a person involved in communicating the control device setting to the control device.
0. 24. The method of claim 1 wherein determining the control device setting comprises determining an adjustment to the control device.
0. 25. An article comprising a machine-readable medium storing instructions operable to cause one or more machines to perform operations comprising:
determining, in real time, a target production/injection in relation to received data indicative of at least one reservoir characteristic; and
determining a setting for a control device in relation to the target production/injection.
0. 26. The article of claim 25 wherein the instructions are further operable to cause one or more machines to perform operations comprising:
allocating the target production/injection between one or more selected reservoir management intervals;
determining the control device setting for a control device associated with at least one of the selected management intervals in relation to the target/production injection.
0. 27. The article of claim 26 wherein the instructions are further operable to cause one or more machines to perform operations comprising:
comparing the target production/injection to an actual production/injection; and
determining the control device setting in relation to a difference between the target production/injection and the actual production/injection.
0. 28. The article of claim 25 wherein the instructions are further operable to cause one or more machines to perform operations comprising:
comparing the target production/injection to an actual production/injection; and
determining the control device setting in relation to a difference between the target production/injection and the actual production/injection.
0. 29. The article of claim 28 wherein determining the control device setting comprises determining the control device setting if a difference between the target production/injection and the actual production/injection is greater than a specified variance.
0. 30. The article of claim 25 wherein determining the control device setting comprises determining the control device setting in real time.
0. 31. The article of claim 25 wherein determining the target production/injection in real time comprises:
monitoring for changes in the data indicative of at least one reservoir characteristic; and
if a change is detected, determining the target production/injection.
0. 32. The article of claim 25 wherein the received data indicative of at least one reservoir characteristic is received in real time.
0. 33. The article of claim 25 wherein the received data indicative of at least one reservoir characteristic comprises data indicative of at least geologic data; and
wherein determining, in real time, a target production/injection comprises determining a reservoir model adjustment using the data indicative of at least geologic data and determining the target production/injection in relation to the reservoir model.
0. 34. The article of claim 33 wherein determining a reservoir model adjustment comprises determining the reservoir model adjustment in real time.
0. 35. The article of claim 33 wherein determining a reservoir model adjustment comprises determining the reservoir model adjustment using further data indicative of at least one of downhole pressure, flow or temperature.
0. 36. The article of claim 33 wherein the instructions are further operable to cause one or more machines to perform operations comprising selecting at least one well location based on the reservoir model.
0. 37. The article of claim 25 wherein determining a target production/injection comprises determining the target production/injection using at least one of model analysis, material balance calculations, risked economic analysis, or reservoir simulation.
0. 38. The article of claim 25 wherein determining a setting for a control device comprises determining a setting for at least one of a downhole control device, a surface control device, or a seabed control device.
0. 39. The article of claim 25 wherein the received data indicative of at least one reservoir characteristic comprises data indicative of at least one of pressure, temperature, viscosity, flow rate, compositional profiles, log data, core data, SDL data, or seismic data.
0. 40. The article of claim 25 wherein determining a setting for a control device comprises determining a setting for at least a production control device.
0. 41. The article of claim 25 wherein determining, in real time, a target production/injection comprises determining a target production/injection continuously.
0. 42. The article of claim 25 wherein determining, in real time a target production/injection in relation to received data comprises determining, in real time a target production/injection based at least in part on the received data.
0. 43. The article of claim 25 wherein the instructions are further operable to cause one or more machines to perform operations comprising:
communicate the setting for the control device to the control device.
0. 44. The article of claim 43 wherein the control device is remote from the location at which the control device setting is determined.
0. 45. The article of claim 43 wherein communicating the determined control device setting to a control device comprises communicating the determined control device setting over a communication network.
0. 46. The article of claim 45 wherein the communication network is telephone network.
0. 47. The article of claim 43 wherein communicating the setting for the control device to the control device comprises communicating the control device setting to a person involved in communicating the control device setting to the control device.
0. 48. The article of claim 25 wherein determining a setting for a control device comprises determining an adjustment to the control device.
0. 49. A system comprising:
at least one processor; and
at least one memory coupled to the processor and storing instructions operable to cause the processor to perform operations comprising:
determining, in real time, a target production/injection in relation to received data indicative of at least one reservoir characteristic; and
determining a setting for a control device in relation to the target production/injection.
0. 50. The system of claim 49 wherein the instructions are further operable to the processor to perform operations comprising:
allocating the target production/injection between one or more selected reservoir management intervals;
determining the control device setting for a control device associated with at least one of the selected management intervals in relation to the target/production injection.
0. 51. The system of claim 50 wherein the instructions are further operable to cause the processor to perform operations comprising:
comparing the target production/injection to an actual production/injection; and
determining the control device setting in relation to a difference between the target production/injection and the actual production/injection.
0. 52. The system of claim 49 wherein the instructions are further operable to cause the processor to perform operations comprising:
comparing the target production/injection to an actual production/injection; and
determining the control device setting in relation to a difference between the target production/injection and the actual production/injection.
0. 53. The system of claim 52 wherein determining the control device setting comprises determining the control device setting if a difference between the target production/injection and the actual production/injection is greater than a specified variance.
0. 54. The system of claim 49 wherein determining the control device setting comprises determining the control device setting in real time.
0. 55. The system of claim 49 wherein determining the target production/injection in real time comprises:
monitoring for changes in the data indicative of at least one reservoir characteristic; and
if a change is detected, determining the target production/injection.
0. 56. The system of claim 49 wherein the received data indicative of at least one reservoir characteristic is received in real time.
0. 57. The system of claim 49 wherein the received data indicative of at least one reservoir characteristic comprises data indicative of at least geologic data; and
wherein determining, in real time, a target production/injection comprises determining a reservoir model adjustment using the data indicative of at least geologic data and determining the target production/injection in relation to the reservoir model.
0. 58. The system of claim 57 wherein determining a reservoir model adjustment comprises determining the reservoir model adjustment in real time.
0. 59. The system of claim 57 wherein determining a reservoir model adjustment comprises determining the reservoir model adjustment using further data indicative of at least one of downhole pressure, flow or temperature.
0. 60. The system of claim 57 wherein the instructions are further operable to cause the processor to perform operations comprising selecting at least one well location based on the reservoir model.
0. 61. The system of claim 49 wherein determining a target production/injection comprises determining the target production/injection using at least one of nodal analysis, material balance calculations, risked economic analysis, or reservoir simulation.
0. 62. The system of claim 49 wherein determining a setting for a control device comprises determining a setting for at least one of a downhole control device, a surface control device, or a seabed control device.
0. 63. The system of claim 49 wherein the received data indicative of at least one reservoir characteristic comprises data indicative of at least one of pressure, temperature, viscosity, flow rate, compositional profiles, log data, core data, SDL data, or seismic data.
0. 64. The system of claim 49 wherein determining a setting for a control device comprises determining a setting for at least a production control device.
0. 65. The system of claim 49 wherein determining, in real time, a target production/injection comprises determining a target production/injection continuously.
0. 66. The system of claim 49 wherein determining, in real time a target production/injection in relation to received data comprises determining, in real time a target production/injection based at least in part on the received data.
0. 67. The system of claim 49 wherein the instructions are further operable to cause one or more machines to perform operations comprising:
communicate the setting for the control device to a control device.
0. 68. The system of claim 67 wherein the control device is remote from the location at which the control device setting is determined.
0. 69. The system of claim 67 wherein communicating the determined control device setting to a control device comprises communicating the determined control device setting over a communication network.
0. 70. The system of claim 67 wherein the communication network is a telephone network.
0. 71. The system of claim 67 wherein communicating the setting for the control device to the control device comprises communicating the control device setting to a person involved in communicating the control device setting to the control device.
0. 72. The system of claim 49 wherein determining a setting for a control device comprises determining an adjustment to the control device.
0. 73. A method comprising:
monitoring data indicative of at least one reservoir characteristic in real time;
if a variance in the data is detected, updating at least one of a nodal analysis, a material balance analysis, reservoir simulation or risked economics analysis; and
determining a control device setting in relation to at least one of the nodal analysis, material balance analysis, reservoir simulation or risked economics analysis.
0. 74. The method of claim 73 wherein determining a control device setting comprises:
determining a production/injection forecast; and
determining the control device setting in relation to the production/injection forecast.
0. 75. The method of claim 73 wherein determining a control device setting comprises determining a control device setting in real time.
0. 76. The method of claim 73 wherein determining a control device setting comprises determining a setting for at least one of a downhole control device, a surface control device, or a seabed control device.
0. 77. The method of claim 73 wherein determining a control device setting comprises determining a setting for at least a production control device.
0. 78. The method of claim 73 wherein the nodal analysis comprises determining rate versus pressure for a system.
0. 79. The method of claim 73 wherein material balance analysis comprises determining one or more of a hydrocarbon volume, a reservoir drive mechanism and a production profile.
0. 80. The method of claim 73 wherein risked economics analysis comprises determining one or more of rate of economic return, net present value, payout, profit versus investment ratio.
0. 82. The method of claim 81, wherein the transmitting the control signal to the controlled equipment is in real time.
0. 83. The method of claim 81, wherein controlling the controlled equipment for an operation related to the well comprises controlling the controlled equipment for at least one of a downhole operation or a surface operation.
0. 84. The method of claim 81, wherein receiving data related to the characteristic of the reservoir comprises receiving at the surface of the Earth, data related to the characteristic of the reservoir.
0. 85. The method of claim 81, wherein transmitting the control signal to the controlled equipment comprises transmitting, in real time, a control signal from a location at the surface of the Earth to the controlled equipment.
0. 86. The method of claim 81, wherein generating the control signal for the controlled equipment comprises generating the control signal for a downhole apparatus.
0. 87. The method of claim 86, wherein the downhole apparatus comprises a downhole sensor.
0. 88. The method of claim 81, wherein generating the control signal for the controlled equipment comprises generating the control signal for a downhole sensor to collect data for pressure.
0. 89. The method of claim 81, wherein generating the control signal for the controlled equipment comprises generating the control signal for a downhole sensor to collect data for temperature.
0. 90. The method of claim 81, wherein generating the control signal for the controlled equipment comprises generating the control signal for controlling a valve.
0. 91. The method of claim 81, wherein generating the control signal for the controlled equipment comprises generating the control signal for at least one of a downhole control device, a surface control device, or a seabed control device.
0. 92. The method of claim 81, wherein analyzing the data comprises analyzing the data at a location that is remote to the drilling of the well.
0. 93. The method of claim 92, wherein receiving the data related to the characteristic of the reservoir comprises receiving over a communication network, the data related to the characteristic of the reservoir.
0. 94. The method of claim 81, wherein transmitting the control signal to the controlled equipment comprises transmitting the control signal to the controlled equipment over a communication network, the data related to the characteristic of the reservoir.
0. 95. The method of claim 81, wherein seismics comprises cross-well and acoustic seismometry.
0. 96. The method of claim 81, further comprising repeating the operations in real time.
0. 97. The method of claim 81, wherein the characteristic comprises at least one of fluid density, a characteristic derived from data from an ultrasonic sensor, a characteristic derived from data from a low energy density sensor, a characteristic derived from data from a venturi flow meter, a characteristic derived from data from a multi-electrode resistivity sensor, well resistivity tomography, resistivity map, fluid pressure gradients, a pressure boundary, fluid velocity, water production, or gas entry.
0. 98. The method of claim 81, wherein analyzing the data related to the characteristic of the reservoir comprises at least one of analyzing water content to avoid water conning, analyzing resistivity tomography for monitoring movement of flood fronts across a reservoir, mapping a saturation change across a reservoir, analyzing fluid pressure gradients or contours, analyzing pressure boundaries, analyzing zones that have different reservoir pressures, analyzing water production, or analyzing gas entry.
0. 100. The system of claim 99, wherein the processor to control an operation related to the reservoir comprises the processor to control at least one of a downhole operation or a surface operation.
0. 101. The system of claim 99, wherein the control device is to control the downhole operation during recovery of hydrocarbons from the reservoir while drilling a well for developing the reservoir.
0. 102. The system of claim 99, wherein the downhole sensor comprises a downhole sensor to collect seismic data.
0. 103. The system of claim 99, wherein the downhole sensor comprises a downhole sensor to collect data for temperature.
0. 104. The system of claim 99, wherein the downhole sensor comprises a downhole sensor to collect data for pressure.
0. 105. The system of claim 99, wherein the control device is for at least one of a downhole control device, a surface control device, or a seabed control device.
0. 106. The system of claim 99, wherein the control device is remote from the location of the processor.
0. 107. The system of claim 106, wherein the control device is to receive the control signal over a communication network.
0. 108. The system of claim 107, wherein the communication network is a telephone network.
0. 109. The system of claim 99, wherein seismics comprises cross-well and acoustic seismometry.
0. 110. The system of claim 99, wherein the characteristic comprises at least one of fluid density, a characteristic derived from data from an ultrasonic sensor, a characteristic derived from data from a low energy density sensor, a characteristic derived from data from a venturi flow meter, a characteristic derived from data from a multi-electrode resistivity sensor, well resistivity tomography, resistivity map, fluid pressure gradients, a pressure boundary, fluid velocity, water production, or gas entry.
0. 111. The system of claim 99, wherein the processor is to perform at least one of the following operations: analyze water content to avoid water conning, analyze resistivity tomography for monitoring movement of flood fronts across a reservoir, map a saturation change across a reservoir, analyze fluid pressure gradients or contours, analyze pressure boundaries, analyze zones that have different reservoir pressures, analyze water production, or analyze gas entry.
0. 113. The article of claim 112, wherein generating a control signal for a control device for an operation related to the reservoir comprises generating a control signal for a control device to control at least one of a downhole operation, or a surface operation.
0. 114. The article of claim 112, wherein the transmitting the control signal to the control device comprises transmitting the control signal to the control device in real time.
0. 115. The article of claim 112, wherein controlling the control device for the downhole operation occurs, at least in part, during recovery of hydrocarbons from the reservoir while drilling a well for developing the reservoir.
0. 116. The article of claim 112, wherein generating the control signal for the control device comprises generating the control signal for a downhole sensor.
0. 117. The article of claim 112, wherein generating the control signal for the control device comprises generating the control signal for a downhole sensor to collect data for pressure.
0. 118. The article of claim 112, wherein generating the control signal for the control device comprises generating the control signal for a downhole sensor to collect data for temperature.
0. 119. The article of claim 112, wherein generating the control signal for the control device comprises generating the control signal for a valve.
0. 120. The article of claim 112, wherein generating the control signal for the control device comprises generating the control signal for at least one of a downhole control device, a surface control device, or a seabed control device.
0. 121. The article of claim 112, wherein seismics comprises cross-well and acoustic seismometry.
0. 122. The article of claim 112, further comprising repeating the operations in real time.
0. 123. The article of claim 112, wherein the characteristic comprises at least one of fluid density, a characteristic derived from data from an ultrasonic sensor, a characteristic derived from data from a low energy density sensor, a characteristic derived from data from a venturi flow meter, a characteristic derived from data from a multi-electrode resistivity sensor, well resistivity tomography, resistivity map, fluid pressure gradients, a pressure boundary, fluid velocity, water production, or gas entry.
0. 124. The article of claim 112, wherein analyzing the data related to the characteristic of the reservoir comprises at least one of analyzing water content to avoid water conning, analyzing resistivity tomography for monitoring movement of flood fronts across a reservoir, mapping a saturation change across a reservoir, analyzing fluid pressure gradients or contours, analyzing pressure boundaries, analyzing zones that have different reservoir pressures, analyzing water production, or analyzing gas entry.
0. 126. The method of claim 125, further including the operation:
generating, based at least in part on the analyzing of the data, a control signal for a controlled equipment used for drilling the well, completing the well, or producing from the well while drilling.
0. 127. The method of claim 125, wherein the characteristic comprises at least one of fluid density, a characteristic derived from data from an ultrasonic sensor, a characteristic derived from data from a low energy density sensor, a characteristic derived from data from a venturi flow meter, a characteristic derived from data from a multi-electrode resistivity sensor, well resistivity tomography, resistivity map, fluid pressure gradients, a pressure boundary, fluid velocity, water production, or gas entry.
0. 128. The method of claim 126, wherein analyzing the data related to the characteristic of the reservoir comprises at least one of analyzing water content to avoid water conning, analyzing resistivity tomography for monitoring movement of flood fronts across a reservoir, mapping a saturation change across a reservoir, analyzing fluid pressure gradients or contours, analyzing pressure boundaries, analyzing zones that have different reservoir pressures, analyzing water production, or analyzing gas entry.
0. 130. The method of claim 129, wherein the transmitting the control signal to the controlled equipment is in real time.
0. 131. The method of claim 129, wherein generating the control signal for the flow control device comprises generating the control signal for controlling a valve.
0. 132. The method of claim 129, wherein analyzing the data comprises analyzing the data at a location that is remote to the drilling of the well.
0. 133. The method of claim 129, further comprising repeating the operations in real time.
0. 134. The method of claim 126 further including the operation:
transmitting the control signal to the controlled equipment.
0. 135. The method of claim 134, wherein the analyzing, generating and transmitting operations are in real time.

The present application is a continuation of U.S. patent application Ser. No. 09/976,573, filed Oct. 12, 2001 now U.S. Pat. No. 6,853,921 which is a continuation-in-part of U.S patent application Ser. No. 09/816,044 now U.S. Pat. No. 6,356,844, filed Mar. 23, 2001 which is a continuation of Ser. No. 09/357,426 now U.S. Pat. No. 6,266,619, filed Jul. 20, 1999, all of which are hereby incorporated by reference in their entirety as if reproduced herein. This Reissue application Ser. No. 12/436,632, filed May 6, 2009, is a divisional of Reissue application Ser. No. 11/704,369, filed on Feb. 8, 2007, currently pending, both reissue applications are a reissue of U.S. application Ser. No. 10/929,584, filed Aug. 30, 2004, now U.S. Pat. No. 7,079,952, which is a continuation of U.S. patent application Ser. No. 09/976,573, filed Oct. 12, 2001 now U.S. Pat. No. 6,853,921 which is a continuation-in-part of U.S. patent application Ser. No. 09/816,044 filed Mar. 23, 2001, now U.S. Pat. No. 6,356,844, which is a continuation of U.S. patent application Ser. No. 09/357,426, filed Jul. 20, 1999, now U.S. Pat. No. 6,266,619. The disclosures of the prior applications are considered part of (and are incorporated by reference in) the disclosure of this application.

Historically, most oil and gas reservoirs have been developed and managed under timetables and scenarios as follows: a preliminary investigation of an area was conducted using broad geological methods for collection and analysis of data such as seismic, gravimetric, and magnetic data, to determine regional geology and subsurface reservoir structure. In some instances, more detailed seismic mapping of a specific structure was conducted in an effort to reduce the high cost, and the high risk, of an exploration well. A test well was then drilled to penetrate the identified structure to confirm the presence of hydrocarbons, and to test productivity. In lower-cost onshore areas, development of a field would commence immediately by completing the test well as a production well. In higher cost or more hostile environments such as the North Sea, a period of appraisal would follow, leading to a decision as to whether or not to develop the project. In either case, based on inevitably sparse data, further development wells, both producers and injectors would be planned in accordance with a reservoir development plan. Once production and/or injection began, more dynamic data would become available, thus, allowing the engineers and geoscientists to better understand how the reservoir rock was distributed and how the fluids were flowing. As more data became available, an improved understanding of the reservoir was used to adjust the reservoir development plan resulting in the familiar pattern of recompletion, sidetracks, infill drilling, well abandonment, etc. Unfortunately, not until the time at which the field was abandoned, and when the information is the least useful, did reservoir understanding reach its maximum.

Limited and relatively poor quality of reservoir data throughout the life of the reservoir, coupled with the relatively high cost of most types of well intervention, implies that reservoir management is as much an art as a science. Engineers and geoscientists responsible for reservoir management discussed injection water, fingering, oil-water contacts rising, and fluids moving as if these were a precise process. The reality, however, is that water expected to take three years to break through to a producing well might arrive in six months in one reservoir but might never appear in another. Text book “piston like” displacement rarely happens, and one could only guess at flood patterns.

For some time, reservoir engineers and geoscientists have made assessments of reservoir characteristics and optimized production using down hole test data taken at selected intervals. Such data usually includes traditional pressure, temperature and flow data is well known in the art. Reservoir engineers have also had access to production data for the individual wells in a reservoir. Such data as oil, water and gas flow rates are generally obtained by selectively testing production from the selected well at selected intervals.

Recent improvements in the state of the art regarding data gathering, both down hole and at the surface, have dramatically increased the quantity and quality of data gathered. Examples of such state of the art improvements in data acquisition technology include assemblies run in the casing string comprising a sensor probe with optional flow ports that allow fluid inflow from the formation into the casing while sensing wellbore and/or reservoir characteristics as described and disclosed in international PCT application WO. 97/49894, assigned to Baker Hughes, the disclosure of which is incorporated herein by reference. The casing assembly may further include a microprocessor, a transmitting device, and a controlling device located in the casing string for processing and transmitting real time data. A memory device may also be provided for recording data relating to the monitored wellbore or reservoir characteristics. Examples of down hole characteristics which may be monitored with such equipment include: temperature, pressure, fluid flow rate and type, formation resistivity, cross-well and acoustic seismometry, perforation depth, fluid characteristics and logging data. Using a microprocessor, hydrocarbon production performance may be enhanced by activating local operations in additional downhole equipment. A similar type of casing assembly used for gathering data is described and illustrated in international PCT application WO 98/12417, assigned to BP Exploration Operating Company Limited, the disclosure of which is incorporated by reference.

Recent technology improvements in downhole flow control devices are disclosed in UK Patent Application GB 2,320,731A which describes a number of downhole flow control devices which may be used to shut off particular zones by using downhole electronics and programing with decision making capacity, the disclosure of which is incorporated by reference.

Another important emerging technology that may have a substantial impact on managing reservoirs is time lapsed seismic, often referred to a 4-D seismic processing. In the past, seismic surveys were conducted only for exploration purposes. However, incremental differences in seismic data gathered over time are becoming useful as a reservoir management tool to potentially detect dynamic reservoir fluid movement. This is accomplished by removing the non-time varying geologic seismic elements to produce a direct image of the time-varying changes caused by fluid flow in the reservoir. By using 4-D seismic processing, reservoir engineers can locate bypassed oil to optimize infill drilling and flood pattern. Additionally, 4-D seismic processing can be used to enhance the reservoir model and history match flow simulations.

International PCT application WO 98/07049, assigned to Geo-Services, the disclosure of which is incorporated herein by reference, describes and discloses state of the art seismic technology applicable for gathering data relevant to a producing reservoir. The publication discloses a reservoir monitoring system comprising: a plurality of permanently coupled remote sensor nodes, wherein each node comprises a plurality of seismic sensors and a digitizer for analog signals; a concentrator of signals received from the plurality of permanently coupled remote sensor nodes; a plurality of remote transmission lines which independently connect each of the plurality of remote sensor nodes to the concentrator, a recorder of the concentrated signals from the concentrator, and a transmission line which connects the concentrator to the recorder. The system is used to transmit remote data signals independently from each node of the plurality of permanently coupled remote sensor nodes to a concentrator and then transmit the concentrated data signals to a recorder. Such advanced systems of gathering seismic data may be used in the reservoir management system of the present invention as disclosed hereinafter in the Detailed Description section of the application.

Historically, down hole data and surface production data has been analyzed by pressure transient and production analysis. Presently, a number of commercially available computer programs such as Saphir and PTA are available to do such an analysis. The pressure transient analysis generates output data well known in the art, such as permeability-feet, skin, average reservoir pressure and the estimated reservoir boundaries. Such reservoir parameters may be used in the reservoir management system of the present invention.

In the past and present, geoscientists, geologists and geophysicists (sometimes in conjunction with reservoir engineers) analyzed well log data, core data and SDL data. The data was and may currently be processed in log processing/interpretation programs that are commercially available, such as Petroworks and DPP. Seismic data may be processed in programs such as Seisworks and then the log data and seismic data are processed together and geostatistics applied to create a geocellular model.

Presently, reservoir engineers may use reservoir simulators such as VIP or Eclipse to analyze the reservoir. Nodal analysis programs such as WEM, Prosper and Openflow have been-used in conjunction with material balance programs and economic analysis programs such as Aries and ResEV to generate a desired field wide production forecast. Once the field wide production has been forecasted, selected wells may be produced at selected rates to obtain the selected forecast rate. Likewise, such analysis is used to determine field wide injection rates for maintenance of reservoir pressure and for water flood pattern development. In a similar manner, target injection rates and zonal profiles are determined to obtain the field wide injection rates.

It is estimated that between fifty and seventy percent of a reservoir engineer's time is spent manipulating data for use by each of the computer programs in order for the data gathered and processed by the disparate programs (developed by different companies) to obtain a resultant output desired field wide production forecast. Due to the complexity and time required to perform these functions, frequently an abbreviated incomplete analysis is performed with the output used to adjust a surface choke or recomplete a well for better reservoir performance without knowledge of how such adjustment will affect reservoir management as a whole.

The present invention comprises a field wide management system for a petroleum reservoir on a real time basis. Such a field wide management system includes a suite of tools (computer programs) that seamlessly interface with each other to generate a field wide production and injection forecast. The resultant output of such a system is the real time control of downhole production and injection control devices such as chokes, valves and other flow control devices and real time control of surface production and injection control devices. Such a system and method of real time field wide reservoir management provides for better reservoir management, thereby maximizing the value of the asset to its owner.

The disclosed invention will be described with reference to the accompanying drawings, which show important sample embodiments of the invention and which are incorporated in the specification hereof by reference. A more complete understanding of the present invention may be had by reference to the following Detailed Description when taken in conjunction with the accompanying drawings, wherein:

FIG. 1 is a block diagram of the method of field wide reservoir management of the present invention;

FIG. 2 is a cross section view of a typical well completion system that may be used in the practice of the present invention;

FIG. 3 is a cross section of a flat back cable that may be used to communicate data from sensors located in a wellbore to the data management and analysis functions of the present invention and communicate commands from the reservoir management system of the present invention to adjust downhole well control devices;

FIG. 4 is a block diagram of the system of real time reservoir management of the present invention; FIG. 4 is a generalized diagrammatic illustration of one exemplary embodiment of the system of FIG. 4;

FIG. 5 illustrates exemplary operations which can be performed by the controller of FIG. 4A to implement the data management function of FIG. 4;

FIG. 6 illustrates exemplary operations which can be performed by the controller of FIG. 4A to implement the nodal analysis function and the material balance function of FIG. 4;

FIG. 7 illustrates exemplary operations which can be performed by the controller of FIG. 4A to implement the reservoir simulation function of FIG. 4; and

FIG. 8 illustrates exemplary operations which can be performed by the controller of FIG. 4A to implement the risked economics function of FIG. 4.

Reference is now made to the Drawings wherein like reference characters denote like or similar parts throughout the Figures.

Referring now to FIGS. 1 and 4, the present invention comprises a method and system of real time field wide reservoir management. Such a system includes a suite of tools (computer programs of the type listed in Table 1) that seamlessly interface with each other in accordance with the method to generate a field wide production and injection forecast. It will be understood by those skilled in the art that the practice of the present invention is not limited to the use of the programs disclosed in Table 1. Programs listed in Table 1 are merely some of the programs presently available for practice of the invention.

The resultant output of the system and method of field wide reservoir management is the real time control of downhole production and injection control devices such as chokes, valves, and other flow control devices (as illustrated in FIGS. 2 and 3 and otherwise known in the art) and real time control of surface production and injection control devices (as known in the art). The real time control described herein need not necessarily be instantaneous, but can be delayed depending on how the control is communicated to the downhole production and injection control devices. Field wide reservoir management does not require that every well in a field be controlled.

Efficient and sophisticated “field wide reservoir data” is necessary for the method and system of real time reservoir management of the present invention. Referring now to blocks 1, 2, 3, 5 and 7 of FIG. 1, these blocks represent some of the types of “field wide reservoir data” acquired generally through direct measurement methods and with devices as discussed in the background section, or by methods well known in the art, or as hereinafter set forth in the specification. It will be understood by those skilled in the art that it is not necessary for the practice of the subject invention to have all of the representative types of data, data collection devices and computer programs illustrated and described in this specification and the accompanying Figures, nor is the present invention limited to the types of data, data collection devices and computer programs illustrated herein. As discussed in the background section, substantial advancements have been made and are continuing to be made in the quality and quantity of data gathered.

In order to provide for more efficient usage of “field wide reservoir data”, the data may be divided into two broad areas: production and/or injection (hereinafter “production/injection”) data and geologic data. Production/injection data includes accurate pressure, temperature, viscosity, flow rate and compositional profiles made available continuously on a real time basis or, alternatively, available as selected well test data or daily average data.

Referring to box 18, production/injection data may include downhole production data 1, seabed production data 2 and surface production data 3. It will be understood that the present invention may be used with land based petroleum reservoirs as well as subsea petroleum reservoirs. Production/injection data is pre-processed using pressure transient analysis in computer programs such as Saphir by Kappa Engineering or PTA by Geographix to output reservoir permeability, reservoir pressure, permeability-feet and the distance to the reservoir boundaries.

Referring to box 20, geologic data includes log data, core data and SDL data represented by block 5 and seismic data represented by block 7. Block 5 data is pre-processed as illustrated in block 6 using such computer programs such as Petroworks by Landmark Graphics, Prizm by Geographix and DPP by Halliburton to obtain water and oil saturations, porosity, and clay content. Block 5 data is also processed in stratigraphy programs as noted in block 6A by programs such as Stratworks by Landmark Graphics and may be further pre-processed to map the reservoir as noted in block 6B using a Z-Map program by Landmark Graphics.

Geologic data also includes seismic data block 7 that may be conventional or real time 4D seismic data (as discussed in the background section). Seismic data may be collected conventionally by periodically placing an array of hydrophones and geophones at selected places in the reservoir or 4D seismic may be collected on a real time basis using geophones placed in wells. Block 7 seismic data is processed and interpreted as illustrated in block 8 by such programs as Seisworks and Earthcube by Landmark Graphics to obtain hydrocarbon indicators, stratigraphy and structure.

Output from blocks 6 and 8 is further pre-processed as illustrated in block 9 to obtain geostatistics using Sigmaview by Landmark Graphics. Output from blocks 8, 9 and 6B are input into the Geocellular (Earthmode) programs illustrated by block 10 and processed using the Stratamodel by Landmark Graphics. The resultant output of block 10 is then upscaled as noted in block 11 in Geolink by Landmark Graphics to obtain a reservoir simulation model.

Output from upscaling 11 is input into the data management function of block 12. Production/injection data represented by downhole production 1, seabed production 2 and surface production 3 may be input directly into the data management function 12 (as illustrated by the dotted lines) or pre-processed using pressure transient analysis as illustrated in block 4 as previously discussed. Data management programs may include Openworks, Open/Explorer, TOW/cs and DSS32, all available from Landmark Graphics and Finder available from Geoquest.

Referring to box 19 of FIG. 1, wherein there is disclosed iterative processing of data gathered by and stored in the data management program. Reservoir simulation may be accomplished by using data from the data management function 12 using VIP by Landmark Graphics or Eclipse by Geoquest. Material Balance calculations may be performed using data from the reservoir simulation 13 and data management function 12 to determine hydrocarbon volumes, reservoir drive mechanisms and production profiles, using MBAL program of Petroleum Experts.

Nodal Analysis 15 may be performed using the material balance data output of 14 and reservoir simulation data of 13 and other data such as wellbore configuration and surface facility configurations to determine rate versus pressure for various system configurations and constraints using such programs as WEM by P. E. Moseley and Associates, Prosper by Petroleum Experts, and Openflow by Geographix.

Risked Economics 16 may be performed using Aries or ResEV by Landmark Graphics to determine an optimum field wide production/injection rate. Alternatively, the target field wide production/injection rate may be fixed at a predetermined rate by factors such as product (oil and gas) transportation logistics, governmental controls, gas, oil or water processing facility limitations, etc. In either scenario, the target field wide production/injection rate may be allocated back to individual wells.

After production/injection for individual wells is calculated the reservoir management system of the present invention generates and transmits a real time signal used to adjust one or more interval control valves located in one or more wells or adjust one or more subsea control valves or one or more surface production control valves to obtain the desired flow or injection rate. As above, transmission of the real time signal is not necessarily instantaneous, and can be delayed depending on the communication method. For example, the reservoir management system may signal an operator to adjust a valve. The operator may then travel into the field to make the adjustment or may telephone another operator near the valve to make the adjustment. Also, it will be understood by those skilled in the art that an inter-relationship exists between the interval control valves. When one is opened, another may be closed. The desired production rate for an individual well may be input directly back into the data management function 12 and actual production from a well is compared to the target rate on a real time basis. The system may include programming for a band width of acceptable variances from the target rate such that an adjustment is only performed when the rate is outside the set point.

Opening or closing a control valve 17 to the determined position may have an almost immediate effect on the production/injection data represented by blocks 1, 2, 3; however, on a long term basis the reservoir as a whole is impacted and geologic data represented by blocks 5 and 7 will be affected (See dotted lines from control valve 17). The present invention continually performs iterative calculations as illustrated in box 19 using reservoir simulation 13, material balance 14, nodal analysis 15 and risked economics 16 to continuously calculate a desired field wide production rate and provide real time control of production/injection control devices.

The method on field wide reservoir management incorporates the concept of “closing the loop” wherein actual production data from individual wells and on a field basis.

To obtain an improved level of reservoir performance, downhole controls are necessary to enable reservoir engineers to control the reservoir response much like a process engineer controls a process facility. State of the art sensor and control technology now make it realistic to consider systematic development of a reservoir much as one would develop and control a process plant. An example of state of the art computers and plant process control is described in PCT application WO 98/37465 assigned to Baker Hughes Incorporated.

In the system and method of real time reservoir management of the present invention, the reservoir may be broken into discreet reservoir management intervals—typically a group of sands that are expected to behave as one, possibly with shales above and below. Within the wellbore, zonal isolation packers may be used to separate the producing and/or injection zones into management intervals. An example reservoir management interval might be 30 to 100 feet. Between zonal isolation packers, variable chokes may be used to regulate the flow of fluids into or out of the reservoir management interval.

U.S. Pat. No. 5,547,029 by Rubbo, the disclosure of which is incorporated by reference, discloses a controlled reservoir analysis and management system that illustrates equipment and systems that are known in the art and may be used in the practice of the present invention. Referring now to FIG. 2, one embodiment of a production well having downhole sensors and downhole control that has been successfully used in the Norwegian sector of the North Sea, the Southern Adriatic Sea and the Gulf of Mexico is the “SCRAMSJ” concept. It will be understood by those skilled in the art that the SCRAMSJ concept is one embodiment of a production well with sensors and downhole controls that may be used in practicing the subject invention. However, practice of the subject invention is not limited to the SCRAMSJ concept.

SCRAMSJ is a completion system that includes an integrated data-acquisition and control network. The system uses permanent downhole sensors and pressure-control devices as well known in the art that are operated remotely through a control network from the surface without the need for traditional well-intervention techniques. As discussed in the background section, continuous monitoring of downhole pressure, temperatures, and other parameters has been available in the industry for several decades, the recent developments providing for real-time subsurface production and injection control create a significant opportunity for cost reductions and improvements in ultimate hydrocarbon recovery. Improving well productivity, accelerating production, and increasing total recovery are compelling justifications for use of this system.

As illustrated in FIG. 2, the components of the SCRAMSJ System 100 may include:

(a) one or more interval control valves 110 which provide an annulus to tubing flow path 102 and incorporates sensors 130 for reservoir data acquisition. The system 100 and the interval control valve 110 includes a choking device that isolate the reservoir from the production tubing 150. It will be understood by those skilled in the art that there is an inter-relationship between one control valve and another as one valve is directed to open another control valve may be directed to close;

(b) an HF Retrievable Production Packer 160 provides a tubing-to-casing seal and pressure barrier, isolates zones and/or laterals from the well bore 108 and allows passage of the umbilical 120. The packer 160 may be set using one-trip completion and installation and retrieval. The packer 160 is a hydraulically set packer that may be set using the system data communications and hydraulic power components. The system may also include other components as well known in the industry including SCSSV 131, SCSSV control line 132, gas lift device 134, and disconnect device 136. It will be understood by those skilled in the art that the well bore log may be cased partially having an open hole completion or may be cased entirely. It will also be understood that the system may be used in multilateral completions;

(c) SEGNETJ Protocol Software is used to communicate with and power the SCRAMSJ system. The SEGNETJ software, accommodates third party products and provides a redundant system capable of by-passing failed units on a bus of the system;

(d) a dual flatback umbilical 120 which incorporates electro/hydraulic lines provides SEGNET communication and control and allows reservoir data acquired by the system to be transmitted to the surface.

Referring to FIG. 3, the electro and hydraulic lines are protected by combining them into a reinforced flatback umbilical 120 that is run external to the production-tubing string (not shown). The flatback 120 comprises two galvanized mild steel bumber bars 121 and 122 and an incolony ¼ inch tube 123 and 124. Inside tube 124 is a copper conductor 125. The flatback 120 is encased in a metal armor 126; and

(e) a surface control unit 160 operates completion tools, monitors the communications system and interfaces with other communication and control systems. It will be understood that an interrelationship exists between flow control devices as one is directed to open another may be directed to close.

A typical flow control apparatus for use in a subterranean well that is compatible with the SCRAMSJ system is illustrated and described in pending U.S. patent application Ser. No. 08/898,567 filed Jul. 21, 1997 by inventor Brett W. Boundin, the disclosure of which is incorporated by reference.

Referring now to blocks 21, 22, 23 of FIG. 4, these blocks represent sensors as illustrated in FIG. 2, or discussed in the background section (and/or as known in the art) used for collection of data such as pressure, temperature and volume, and 4D seismic. These sensors gather production/injection data from one or more wells that includes accurate pressure, temperature, viscosity, flow rate and compositional profiles available continuously on a real time basis.

Referring to box 38, in the system of the present invention, production/injection data is pre-processed using pressure transient analysis programs 24 in computer programs such as Saphir by Kappa Engineering or PTA by Geographix to output reservoir permeability, reservoir pressure, permeability-feet and the distance to the reservoir boundaries.

Referring to box 40, geologic data including log, cores and SDL is collected with devices represented by blocks 25 and 26 as discussed in the background section, or by data sensors and collections well known in the art. Block 25 data is pre-processed as illustrated in block 26 using such computer programs Petroworks by Landmark Graphics, Prizm by Geographix and DPP by Halliburton to obtain water and oil saturations, porosity, and clay content. Block 25 data is also processed in stratigraphy programs as noted in block 26A by programs such as Stratworks by Landmark Graphics and may be further pre-processed to map the reservoir as noted in block 26B using a Z-Map program by Landmark Graphics.

Geologic data also includes seismic data obtained from collectors known in the art and represented by block 27 that may be conventional or real time 4D seismic data (as discussed in the background section). Seismic data is processed and interpreted as illustrated in block 28 by such programs as Seisworks and Earthcube by Landmark Graphics to obtain hydrocarbon indicators, stratigraphy and structure.

Output from blocks 26 and 28 is further pre-processed as illustrated in block 29 to obtain geostatistics using Sigma-view by Landmark Graphics. Output from blocks 28, 29 and 26B are input into the Geocellular (Earthmodel) programs illustrated by block 30 and processed using the Stratamodel by Landmark Graphics. The resultant output of block 30 is then upscaled as noted in block 31 in Geolink by Landmark Graphics to obtain a reservoir simulation model.

Output from the upscaling program 31 is input into the data management function of block 32. Production/injection data collected by downhole sensors 21, seabed production sensors 22 and surface production sensors 23 may be input directly into the data management function 22 (as illustrated by the dotted lines) or pre-processed using pressure transient analysis as illustrated in block 22 as previously discussed. Data Management programs may include Openworks, Open/Explorer, TOW/cs and DSS32, all available from Landmark Graphics and Finder available from Geoquest.

Referring to box 39 of FIG. 4, wherein there is disclosed iterative processing of data gathered by and stored in the data management program 32. The Reservoir Simulation program 33 uses data from the data management function 32, and can use data received from the Nodal Analysis program 35 to develop its simulation. The Reservoir Simulation program 33 can also output data to the Nodal Analysis program 35. Examples of Reservoir Simulation programs include VIP by Landmark Graphics or Eclipse by Geoquest. The Material Balance program uses data from the reservoir simulation 33 and data management function 22 to determine hydrocarbon volumes, reservoir drive mechanisms and production profiles. One of the Material Balance programs known in the art is the MBAL program of Petroleum Experts.

The Nodal Analysis program 35 uses data from the Material Balance program 34 and Reservoir Simulation program 33 and other data such as wellbore configuration and surface facility configurations to determine rate versus pressure for various system configurations. Additionally, the Nodal Analysis program 35 shares information with the Reservoir simulation program 33, so that each program, Nodal Analysis 35 and Reservoir Simulation 33, may iteratively update and account for changes in the output of the other. Nodal Analysis programs include WEM by P. E. Moseley and Associates, GAP and Prosper by Petroleum Experts, and Openflow by Geographix.

Risked Economics programs 36 such as Aries or ResEV by Landmark Graphics determine the optimum field wide production/injection rate which may then be allocated back to individual wells. After production/injection by individual wells is calculated the reservoir management system of the present invention generates and transmits real time, though not necessarily instantaneous, signals (designated generally at 50 in FIG. 4) used to adjust interval control valves located in wells or adjust subsea control valves or surface production control valves to obtain the desired flow or injection rate. The desired production rate may be input directly back into the data management function 32 and actual production/injection from a well is compared to the target rate on a real time basis. Opening or closing a control valve 37 to the pre-determined position may have an almost immediate effect on the production/injection data collected by sensors represented by blocks 21, 22 and 33, however, on a long term basis, the reservoir as a whole is impacted and geologic data collected by sensors represented by blocks 25 and 27 will be affected (see dotted line from control valve 37). The present invention may be used to perform iterative calculations as illustrated in box 39 using the reservoir simulation program 23, material balance program 24, nodal analysis program 25 and risked economics program 26 to continuously calculate a desired field wide production rate and provide real time, though not necessarily instantaneous, control of production control devices.

FIG. 4A is a generalized diagrammatic illustration of one exemplary embodiment of the system of FIG. 4. In particular, the embodiment of FIG. 4A includes a controller 400 coupled to receive input information from information collectors 401. The controller 400 processes the information received from information collectors 401, and provides real time, though not necessarily instantaneous, output control signals to controlled equipment 402. The information collectors 401 can include, for example, the components illustrated at 38 and 40 in FIG. 4. The controlled equipment 402 can include, for example, control valves such as illustrated at 37 in FIG. 4. The controller 400 includes information (for example, data and program) storage and an information processor (CPU). The information storage can include a database for storing information received from the information collectors 401. The information processor is interconnected with the information storage such that controller 400 is capable, for example, of implementing the functions illustrated at 32-36 in FIG. 4. As shown diagrammatically by broken line in FIG. 4A, operation of the controlled equipment 402 affects conditions 404 (for example, well-bore conditions) which are monitored by the information collectors 401.

FIG. 5 illustrates exemplary operations which can be performed by the controller 400 of FIG. 4A to implement the data management function 32 of FIG. 4. At 51, the production/injection (P/I) data both measured (for example, from box 38 of FIG. 4) and simulated (for example, output from box 33 of FIG. 4) is monitored in real time. Any variances in the P/I data are detected at 52. If variances are detected at 52, then at 53, the new P/I data is updated in real time to the Nodal Analysis and Material Balance functions 34 and 35 of FIG. 4. At 54, geologic data, for example, from box 40 of FIG. 4, is monitored in real time. If any changes in the geologic data are detected at 55, then at 56, the new geologic data is updated in real time to the Reservoir Simulation function 33 of FIG. 4.

FIG. 6 illustrates exemplary operations which can be performed by the controller 400 of FIG. 4A to implement the Nodal Analysis function 35 and the Material Balance function 34 of FIG. 4. At 61, the controller monitors for real time updates of the P/I data from the data management function 32. If any update is detected at 62, then conventional Nodal Analysis and Material Balance functions are performed at. 63 using the real time updated P/I data. At 64, new parameters produced at 63 are updated in real time to the Reservoir Simulation function 33.

FIG. 7 illustrates exemplary operations which can be performed by the controller 400 of FIG. 4A to implement the Reservoir Simulation function 33 of FIG. 4. At 71, the controller 400 monitors for a real time update of geologic data from the data management function 32 or for a real time update of parameters output from either the Nodal Analysis function 35 or the Material Balance function 34 in FIG. 4. If any of the aforementioned updates are detected at 72, then the updated information is used in conventional fashion at 73 to produce a new simulation forecast. Thereafter at 74, the new simulation forecast is compared to a forecast history (for example, a plurality of earlier simulation forecasts) and, if the new simulation is acceptable at 75 in view of the forecast history, then at 76 the new forecast is updated in real time to the Risked Economics function 36 of FIG. 4.

Referring to the comparison and decision at 74 and 75, a new forecast could be rejected, for example, if it is considered to be too dissimilar from one or more earlier forecasts in the forecast history. If the new forecast is rejected at 75, then either another forecast is produced using the same updated information (see broken line at 78), or another real time update of the input information is awaited at 71. The broken line at 77 further indicates that the comparison and decision steps at 74 and 75 can be omitted as desired in some embodiments.

FIG. 8 illustrates exemplary operations which can be performed by the controller 400 of FIG. 4A to implement the Risked Economics function 36 of FIG. 4. At 81, the controller monitors for a real time update of the simulation forecast from the Reservoir Simulation function 33 of FIG. 4. If any update is detected at 82, then the new forecast is used in conventional fashion to produce new best case settings for the controlled equipment 402. Thereafter at 84, equipment control signals such as illustrated at 50 in FIG. 4 are produced in real rime based on the new best case settings.

The following Table 1 includes a suite of tools (computer programs) that seamlessly interface with each other to generate a field wide production/injection forecast that is used to control production and injection in wells on a real time basis.

TABLE 1
Computer
Program
(Commercial Source of
Name or Data Program (name
Flow Chart Number Input Data Output Data Source) of company)
1. Downhole Prod. Pressure, temp, Annulus (between
(across reservoir interval) flow rates tubing and
casing) annular
and tubing
pressure (psi),
temp (degrees,
Fahrenheit, Centi-
grade), flow rate)
2. Seabed prod. (at Pressure, temp, Pressure,
subsea tree & subsea flow rates temperature
manifold)
3. Surface prod. (at Pressure, temp, Pressure,
separators, compressors, flow rates temperature
manifolds, other surface
equipment)
4. Pressure Transient Pressure, temp, Reservoir Saphir Kappa
Analysis flow rates Permeability Engineering
Reservoir PTA Geographix
Pressure, Skin,
distance to
boundaries
5. Logs, Cores, SDL Pressure,
temperature
6. Log processing Saturations Petroworks Landmark
(interpretation) Porosity Graphics
Clay Content Prizm Geographix
DPP Halliburton
6A. Stratigraphy Stratworks Landmark
Graphics
6B. Mapping Z-Map Landmark
Graphics
7. Seismic Data
8. Seismic Processing Hydrocarbon Seisworks Landmark
and Interpretation indicators Earthcube Graphics
Stratigraphy
Structure
9. Geostatistics Sigmaview Landmark
Graphics
10. Geocellular Stratamodel Landmark
Graphics
11. Upscaling Geolink Landmark
Graphics
Geoquest
12. Data Management, Outputs from other boxes Finder Landmark
Data Repository Open works Graphics
Open/Explore
TOW/cs
DSS32
13. Reservoir simulation Field or well production VIP Landmark
profile with time Graphics
Eclipse Geoquest
14. Material Balance Fluid Saturations, Hydrocarbon, in- MBAL Petroleum
Pressure reservoir place reservoir Experts
geometry, temp, fluid drive mechanism,
physical prop., flow rate, production profile
reservoir physical
properties
15. Nodal Analysis, Wellbore configurations, Rate vs. Pressure WEM P. E. Mosely &
Reservoir and Fluid surface facility for various Associates
properties configurations system and GAP Petroleum
constraints Prosper Experts
Openflow Geographix
16. Risked Economics Product Price Forecast, Rate of return, net Aries Landmark
Revenue Working present value, ResEV Graphics
Interest, Discount Rate, payout, profit vs.
Production Profile, investment ratio
Capital Expense, and desired field
Operating Expense wide production
rates.
17. Control Production Geometry

It will be understood by those skilled in the art that the practice of the present invention is not limited to the use of the programs disclosed in Table 1, or any of the aforementioned programs. These programs are merely examples of presently available programs which can be suitably enhanced for real time operations, and used to practice the invention.

It will be understood by those skilled in the art that the method and system of reservoir management may be used to optimize development of a newly discovered reservoir and is not limited to utility with previously developed reservoirs.

A preferred embodiment of the invention has been illustrated in the accompanying Drawings and described in the foregoing Detailed Description, it will be understood that the invention is not limited to the embodiment disclosed, but is capable of numerous modifications without departing from the scope of the invention as claimed.

Thomas, Jacob, Vidrine, William Launey, Wauters, Jerry Wayne, Godfrey, Craig William, Seller, Douglas Donald

Patent Priority Assignee Title
10083254, Jun 15 2010 ExxonMobil Upstream Research Company Method and system for stabilizing formulation methods
10280722, Jun 02 2015 BAKER HUGHES, A GE COMPANY, LLC System and method for real-time monitoring and estimation of intelligent well system production performance
10519768, Feb 21 2018 Saudi Arabian Oil Company Systems and methods for operating hydrocarbon wells to inhibit breakthrough based on reservoir saturation
10689958, Dec 22 2016 Wells Fargo Bank, National Association Apparatus and methods for operating gas lift wells
10920546, Dec 22 2016 WEATHERFORD TECHNOLOGY HOLDINGS, LLC Apparatus and methods for operating gas lift wells
11480053, Feb 12 2019 Halliburton Energy Services, Inc.; Halliburton Energy Services, Inc Bias correction for a gas extractor and fluid sampling system
11755795, Sep 22 2017 EXXONMOBIL TECHNOLOGY AND ENGINEERING COMPANY Detecting and mitigating flow instabilities in hydrocarbon production wells
11899410, Dec 15 2022 Halliburton Energy Services, Inc. Monitoring a wellbore operation using distributed artificial intelligence
8469090, Dec 01 2009 Schlumberger Technology Corporation Method for monitoring hydrocarbon production
Patent Priority Assignee Title
3045750,
3760362,
3971926, May 28 1975 MI DRILLING FLUIDS COMPANY, HOUSTON, TEXAS A TEXAS GENERAL PARTNERSHIP Simulator for an oil well circulation system
4461172, May 24 1982 In-Situ; Inc. Well monitoring, controlling and data reducing system
4559610, May 04 1983 Southwest Research Corporation Gas pumping system analog
4633954, Dec 05 1983 Camco International, Inc Well production controller system
4676313, Oct 30 1985 Controlled reservoir production
4685522, Dec 05 1983 Halliburton Company Well production controller system
4721158, Aug 15 1986 Amoco Corporation Fluid injection control system
4738313, Feb 20 1987 Delta-X Corporation Gas lift optimization
5208748, Nov 18 1985 ACTION TECHNOLOGIES, INC Method and apparatus for structuring and managing human communications by explicitly defining the types of communications permitted between participants
5442730, Oct 08 1993 International Business Machines Corporation Adaptive job scheduling using neural network priority functions
5455780, Oct 03 1991 Halliburton Company Method of tracking material in a well
5531270, May 04 1995 ConocoPhillips Company Downhole flow control in multiple wells
5547029, Sep 27 1994 WELLDYNAMICS, INC Surface controlled reservoir analysis and management system
5565862, Mar 28 1995 The Titan Corporation Collection and management of pipeline-flow data
5566092, Dec 30 1993 Caterpillar, Inc Machine fault diagnostics system and method
5597042, Feb 09 1995 Baker Hughes Incorporated Method for controlling production wells having permanent downhole formation evaluation sensors
5636693, Dec 20 1994 ConocoPhillips Company Gas well tubing flow rate control
5662165, Sep 11 1995 Baker Hughes Incorporated Production wells having permanent downhole formation evaluation sensors
5706892, Feb 09 1995 Baker Hughes Incorporated Downhole tools for production well control
5706896, Feb 09 1995 Baker Hughes Incorporated Method and apparatus for the remote control and monitoring of production wells
5710726, Oct 10 1995 ConocoPhillips Company Semi-compositional simulation of hydrocarbon reservoirs
5721538, Feb 09 1995 Baker Hughes Incorporated System and method of communicating between a plurality of completed zones in one or more production wells
5730219, Feb 09 1995 Baker Hughes Incorporated Production wells having permanent downhole formation evaluation sensors
5732776, Feb 09 1995 Baker Hughes Incorporated Downhole production well control system and method
5764515, May 12 1995 Institute Francais du Petrole; Institut Francais du Petrole Method for predicting, by means of an inversion technique, the evolution of the production of an underground reservoir
5767680, Jun 11 1996 Schlumberger Technology Corporation Method for sensing and estimating the shape and location of oil-water interfaces in a well
5829520, Feb 14 1995 Baker Hughes Incorporated Method and apparatus for testing, completion and/or maintaining wellbores using a sensor device
5841678, Jan 17 1997 ConocoPhillips Company Modeling and simulation of a reaction for hydrotreating hydrocarbon oil
5842149, Oct 22 1996 Baker Hughes Incorporated Closed loop drilling system
5859437, Mar 17 1997 Taiwan Semiconductor Manufacturing Corporation Intelligent supervision system with expert system for ion implantation process
5871047, Aug 12 1997 Schlumberger Technology Corporation Method for determining well productivity using automatic downtime data
5873049, Feb 21 1997 Atlantic Richfield Company Abstraction of multiple-format geological and geophysical data for oil and gas exploration and production analysis
5881811, Dec 22 1995 Institut Francais du Petrole Modeling of interactions between wells based on produced watercut
5959547, Feb 09 1995 Baker Hughes Incorporated Well control systems employing downhole network
5975204, Feb 09 1995 Baker Hughes Incorporated Method and apparatus for the remote control and monitoring of production wells
5979558, Jul 21 1997 WELLDYNAMICS, INC Variable choke for use in a subterranean well
5992519, Sep 29 1997 Schlumberger Technology Corporation Real time monitoring and control of downhole reservoirs
6002985, May 06 1997 Halliburton Energy Services, Inc Method of controlling development of an oil or gas reservoir
6021377, Oct 23 1995 Baker Hughes Incorporated Drilling system utilizing downhole dysfunctions for determining corrective actions and simulating drilling conditions
6021662, Dec 15 1997 Institut Francais du Petrole Method for modeling fluid displacements in a porous medium
6022985, Jul 08 1994 AVENTIS PHARMA S A Process for the preparation of 4-acetoxy-2α-benzoyloxy-5β, 20-epoxy-1, 7β-10β-trihydroxy-9-oxo-tax-11-en-13α-yl(2R,3S)-3-tert-b utoxy-carbonYlamino-2-hydroxy-3-phenylpropionate trihydrate
6023656, Dec 30 1996 Institut Francais du Petrole Method for determining the equivalent fracture permeability of a fracture network in a subsurface multi-layered medium
6076046, Jul 24 1998 Schlumberger Technology Corporation Post-closure analysis in hydraulic fracturing
6095262, Aug 31 1999 Halliburton Energy Services, Inc Roller-cone bits, systems, drilling methods, and design methods with optimization of tooth orientation
6098020, Apr 09 1997 Shell Oil Company Downhole monitoring method and device
6101447, Feb 12 1998 Schlumberger Technology Corporation Oil and gas reservoir production analysis apparatus and method
6112126, Feb 21 1997 LMHALES, L L C Adaptive object-oriented optimization software system
6112817, May 06 1998 Baker Hughes Incorporated Flow control apparatus and methods
6176323, Jun 26 1998 Baker Hughes Incorporated Drilling systems with sensors for determining properties of drilling fluid downhole
6182756, Feb 10 1999 Intevep, S.A. Method and apparatus for optimizing production from a gas lift well
6192980, Feb 02 1995 Baker Hughes Incorporated Method and apparatus for the remote control and monitoring of production wells
6236894, Dec 19 1997 Atlantic Richfield Company Petroleum production optimization utilizing adaptive network and genetic algorithm techniques
6266619, Jul 20 1999 Halliburton Energy Services, Inc System and method for real time reservoir management
6281489, May 02 1997 Baker Hughes Incorporated Monitoring of downhole parameters and tools utilizing fiber optics
6282452, Nov 19 1998 Halliburton Energy Services, Inc Apparatus and method for well management
6356844, Jul 20 1999 Halliburton Energy Services, Inc. System and method for real time reservoir management
6397946, Jan 19 2000 Wells Fargo Bank, National Association Closed-loop system to compete oil and gas wells closed-loop system to complete oil and gas wells c
6412555, Jun 18 1998 Kongsberg Offshore A.S. System and method for controlling fluid flow in one or more oil and/or gas wells
6422312, Jul 08 1998 Retrievable Information Systems, LLC Multizone production monitoring system
6424919, Jun 26 2000 Smith International, Inc. Method for determining preferred drill bit design parameters and drilling parameters using a trained artificial neural network, and methods for training the artificial neural network
6434435, Feb 21 1997 Baker Hughes, Inc Application of adaptive object-oriented optimization software to an automatic optimization oilfield hydrocarbon production management system
6442445, Mar 19 1999 GLOBALFOUNDRIES Inc User configurable multivariate time series reduction tool control method
6516293, Mar 13 2000 Smith International, Inc Method for simulating drilling of roller cone bits and its application to roller cone bit design and performance
6549879, Sep 21 1999 Mobil Oil Corporation Determining optimal well locations from a 3D reservoir model
6584368, Mar 19 1999 GLOBALFOUNDRIES Inc User configurable multivariate time series reduction tool control method
6609079, May 14 1998 Va Tech Elin Transformatoren GmbH Method and arrangement for ascertaining state variables
6678569, Mar 19 1999 GLOBALFOUNDRIES Inc User configurable multivariate time series reduction tool control method
6701514, Mar 27 2000 Accenture Global Services Limited System, method, and article of manufacture for test maintenance in an automated scripting framework
6823296, Dec 22 2000 Institut Francais du Petrole Method for forming an optimized neural network module intended to simulate the flow mode of a multiphase fluid stream
6826483, Oct 13 1999 TRUSTEES OF COLUMBIA UNIVERSITY IN THE CITY OF NEW YORK, THE Petroleum reservoir simulation and characterization system and method
6853921, Jul 20 1999 Halliburton Energy Services, Inc System and method for real time reservoir management
6871118, Mar 01 2001 Institut Francais du Petrole Method for detecting and controlling hydrate formation at any point of a pipe carrying multiphase petroleum fluids
6954737, Nov 05 2001 JOHNSONDIVERSEY, INC Method and apparatus for work management for facility maintenance
6980940, Feb 22 2000 Schlumberger Technology Corp. Intergrated reservoir optimization
6985750, Apr 27 1999 BJ Energy Solutions, LLC Wireless network system
7047170, Apr 14 2000 LOCKHEED MARTIN CORPORATION, A CORP MARYLAND Method of determining boundary interface changes in a natural resource deposit
7054752, Jun 02 2003 Institut Francais du Petrole Method for optimizing production of an oil reservoir in the presence of uncertainties
7062420, Oct 04 2000 Schlumberger Technology Corporation Production optimization methodology for multilayer commingled reservoirs using commingled reservoir production performance data and production logging information
7072809, Jul 17 2000 Gaz De France; Institut Francais du Petrole Method for modelling fluid displacements in a porous environment taking into account hysteresis effects
7079952, Jul 20 1999 Halliburton Energy Services, Inc. System and method for real time reservoir management
7096092, Nov 03 2000 Schlumberger Technology Corporation Methods and apparatus for remote real time oil field management
7266456, Apr 19 2004 Intelligent Agent Corporation Method for management of multiple wells in a reservoir
7277836, Dec 29 2000 ExxonMobil Upstream Research Company Computer system and method having a facility network architecture
7373976, Nov 18 2004 Well production optimizing system
20020049625,
20030028325,
20030139916,
20030167157,
20040104027,
20040138862,
20040148147,
20040153437,
20040220790,
20040230413,
20040236553,
20050010384,
20050038603,
20050096893,
20050149307,
20050267718,
20050267771,
20050273301,
20050273303,
20060085174,
20060116856,
20060149520,
20070078637,
20070112547,
20070179766,
20070179767,
20070179768,
20070192072,
20070198223,
20070271039,
20070295501,
20080133550,
EP1679424,
GB2320731,
WO2054332,
WO2063130,
WO2063403,
WO2101555,
WO2004049216,
WO2004079144,
WO2004095259,
WO9741330,
WO9749894,
WO9807049,
WO9812417,
WO9837465,
WO9960247,
//////
Executed onAssignorAssigneeConveyanceFrameReelDoc
Nov 01 2001GODFREY, CRAIG WILLIAMHalliburton Energy Services, IncASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0249850927 pdf
Nov 06 2001THOMAS, JACOBHalliburton Energy Services, IncASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0249850927 pdf
Nov 20 2001VIDRINE, WILLIAM LAUNEYHalliburton Energy Services, IncASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0249850927 pdf
Nov 20 2001WAUTERS, JERRY WAYNEHalliburton Energy Services, IncASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0249850927 pdf
Jan 16 2002SEILER, DOUGLAS DONALDHalliburton Energy Services, IncASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS 0249850927 pdf
May 06 2009Halliburton Energy Services, Inc.(assignment on the face of the patent)
Date Maintenance Fee Events
Dec 30 2013M1552: Payment of Maintenance Fee, 8th Year, Large Entity.
Nov 16 2017M1553: Payment of Maintenance Fee, 12th Year, Large Entity.


Date Maintenance Schedule
Mar 22 20144 years fee payment window open
Sep 22 20146 months grace period start (w surcharge)
Mar 22 2015patent expiry (for year 4)
Mar 22 20172 years to revive unintentionally abandoned end. (for year 4)
Mar 22 20188 years fee payment window open
Sep 22 20186 months grace period start (w surcharge)
Mar 22 2019patent expiry (for year 8)
Mar 22 20212 years to revive unintentionally abandoned end. (for year 8)
Mar 22 202212 years fee payment window open
Sep 22 20226 months grace period start (w surcharge)
Mar 22 2023patent expiry (for year 12)
Mar 22 20252 years to revive unintentionally abandoned end. (for year 12)