FIG. 1 is a front view of a sprocket with double mud relief showing our new design;
FIG. 2 is an edge view of the sprocket shown in FIG. 1;
FIG. 3 is a front top left perspective view of the sprocket shown in FIG. 1; and,
FIG. 4 is a second front top left perspective view at a different angle than the view of FIG. 3.
The broken lines indicate unclaimed portions and form no part of the claimed design.
Patent |
Priority |
Assignee |
Title |
6142900, |
Apr 18 1997 |
Sunstar Suisse SA |
Sprocket with thin body and grooved teeth |
6415532, |
Jul 31 2000 |
The Toro Company |
Drive sprocket for a roller chain for material removal implement |
6910980, |
Mar 18 2002 |
HH-CLOYES, INC |
Cushion ring sprocket assembly and method |
7416500, |
Dec 19 1996 |
HH-CLOYES, INC |
Random engagement roller chain sprocket and timing chain system including same |
7451863, |
Feb 27 2006 |
Kun Teng Industry Co., Ltd. |
Hub driving assembly for transmitting a driving force from a sprocket to rotate a hub of a bicycle |
7914408, |
Sep 29 2005 |
HH-CLOYES, INC |
Multiple-cushion ring sprocket assembly |
8202185, |
Oct 06 2004 |
BorgWarner Inc |
Random elastomer cushion rings for a chain sprocket |
20120198950, |
|
|
|
20170074383, |
|
|
|
D527245, |
Oct 26 2004 |
Bison Designs, LLC |
Sprocket shaped carabiner |
D716191, |
Dec 06 2011 |
SRAM, LLC |
Chainring |
D751036, |
Aug 22 2012 |
Hoganas AB |
Motor |
D781345, |
Mar 17 2015 |
EATON INTELLIGENT POWER LIMITED |
Elastomeric coupling for supercharger |
Date |
Maintenance Schedule |
Aug 20 2022 | 4 years fee payment window open |
Feb 20 2023 | 6 months grace period start (w surcharge) |
Aug 20 2023 | patent expiry (for year 4) |
Aug 20 2025 | 2 years to revive unintentionally abandoned end. (for year 4) |
Aug 20 2026 | 8 years fee payment window open |
Feb 20 2027 | 6 months grace period start (w surcharge) |
Aug 20 2027 | patent expiry (for year 8) |
Aug 20 2029 | 2 years to revive unintentionally abandoned end. (for year 8) |
Aug 20 2030 | 12 years fee payment window open |
Feb 20 2031 | 6 months grace period start (w surcharge) |
Aug 20 2031 | patent expiry (for year 12) |
Aug 20 2033 | 2 years to revive unintentionally abandoned end. (for year 12) |