Systems and methods for generating and a controller for controlling generation of geothermal power in an organic rankine cycle (orc) operation in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and an energy storage device. In an embodiment, during hydrocarbon production, a temperature of a flow of wellhead fluid from the wellhead or working fluid may be determined. If the temperature is above a vaporous phase change threshold of the working fluid, heat exchanger valves may be opened to divert flow of wellhead fluid to heat exchangers to facilitate heat transfer from the flow of wellhead fluid to working fluid through the heat exchangers, thereby to cause the working fluid to change from a liquid to vapor, the vapor to cause a generator to generate electrical power via rotation of an expander.
|
11. A controller to control geothermal power generated by an organic rankine cycle (orc) process in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and energy storage device, the controller comprising:
a first input in signal communication with a first wellhead fluid temperature sensor, the first wellhead fluid temperature sensor to provide a first temperature of a wellhead fluid flow from the wellhead;
a first input/output in signal communication with a first wellhead fluid valve, a second wellhead fluid valve, a heat exchanger valve, and a condenser valve, the controller configured to:
in response to the first temperature being above a phase change threshold:
transmit a signal to the first wellhead fluid valve to cause the first wellhead fluid valve to close, and
transmit a signal to the heat exchanger valve to cause the heat exchanger valve to open, to allow continuous diversion of the flow of the wellhead fluid to one or more heat exchangers to facilitate transfer of heat from the flow of the wellhead fluid to an organic working fluid through the one or more heat exchangers, thereby to change phases of the organic working fluid from a liquid to a vapor within the one or more heat exchangers so as to cause a gas expander of an orc unit, in fluid communication with the one or more heat exchangers, to rotate a generator to generate electrical power from the orc operation.
1. A controller to control geothermal power generated by an organic rankine cycle (orc) process in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and energy storage device, the controller comprising:
a first input in signal communication with a working fluid temperature sensor, the working fluid temperature sensor to provide a temperature measurement of an organic working fluid flow from one or more heat exchangers;
a first input/output in signal communication with a wellhead fluid valve and a heat exchanger valve, the controller configured to:
transmit a signal to the heat exchanger valve to cause the heat exchanger valve to open, to allow continuous diversion of the flow of the wellhead fluid to one or more heat exchangers to facilitate transfer of heat from the flow of the wellhead fluid to the organic working fluid through the one or more heat exchangers, thereby to, when the wellhead fluid temperature is greater than or equal to a phase change threshold, change phases of the organic working fluid from a liquid to a vapor within the one or more heat exchangers so as to cause a gas expander of an orc unit, in fluid communication with the one or more heat exchangers, to rotate a generator to generate electrical power from the orc operation,
receive a plurality of intermittent temperature measurements from the first input, and
in response to the plurality of intermittent temperature measurements of the organic working fluid being less than a phase change threshold for the organic working fluid:
transmit a signal to the wellhead fluid valve to cause the wellhead fluid valve to open, and
transmit a signal to the heat exchanger valve to cause the heat exchanger valve to close.
21. A controller to control geothermal power generated by an organic rankine cycle (orc) process in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and energy storage device, the controller comprising:
a first input in signal communication with one or more working fluid temperature sensors, the one or more working fluid temperature sensors to provide a temperature measurement of an organic working fluid flow from and corresponding to one or more heat exchangers;
a second input in signal communication with one or more electrical power meters, the one or more electrical power meters to provide a measurement indicative of an amount of electrical power generated by a corresponding orc unit; and
a first input/output in signal communication with one or more wellhead fluid valves corresponding to one or more wellheads, one or more heat exchanger valves corresponding to one or more heat exchangers, and one or more valves connecting one or more heat exchangers to the corresponding orc unit, the controller configured to:
in response to the measurement indicative of the amount of electrical power generated by a corresponding orc unit being less than the maximum electrical power rating of the corresponding orc unit:
determine temperature of working fluid from the one or more working fluid temperature sensors,
based on the temperatures of the working fluid from one or more heat exchangers and electrical power output from the corresponding orc unit, determine an amount of working fluid from each of the corresponding one or more heat exchangers to enable the corresponding orc unit to produce an amount of electrical power to meet or exceed a preselected electrical power output threshold, and
based on the determination of the amount of working fluid, transmit a signal to the one or more valves connecting one or more heat exchangers to the corresponding orc unit to cause the one or more valves to move to one or more of partially open positions and fully opened positions, to allow an amount of working fluid to flow to the corresponding orc unit, thereby to change phases of the organic working fluid from a liquid to a vapor within the one or more heat exchangers so as to cause a gas expander of the corresponding orc unit, in fluid communication with the one or more heat exchangers, to rotate a generator to generate electrical power from the orc operation.
27. A controller to control geothermal power generated by an organic rankine cycle (orc) process in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and energy storage device, the controller comprising:
a first input in signal communication with one or more working fluid temperature sensors, the one or more working fluid temperature sensors to provide a temperature measurement of an organic working fluid flow from and corresponding to one or more heat exchangers;
a second input in signal communication with one or more orc unit temperature sensors, the one or more orc unit temperature sensors to provide a temperature measurement of a combination of working fluid flowing into the corresponding orc unit; and
a first input/output in signal communication with one or more wellhead fluid valves corresponding to one or more wellheads, one or more heat exchanger valves corresponding to one or more heat exchangers, and one or more valves connecting one or more heat exchangers to the corresponding orc unit, the controller configured to:
in response to measurement of temperature of the combination of working fluid flowing into the corresponding orc unit being below an efficient temperature for electrical power generation:
determine the temperature of working fluid from each of the one or more working fluid temperature sensors,
based on the temperatures of the working fluid from each of the one or more heat exchangers and the temperature of the combination of working fluid flowing into the corresponding orc unit, determine an amount of working fluid from each of the corresponding one or more heat exchangers to enable the corresponding orc unit to produce an amount of electrical power to meet or exceed a preselected electrical power output threshold, and
based on the determination of the amount of working fluid, transmit a signal to the one or more valves connecting one or more heat exchangers to the corresponding orc unit to cause the one or more valves to move to, at least, partially open positions, to allow an amount of working fluid to flow to the corresponding orc unit, thereby to change phases of the organic working fluid from a liquid to a vapor within the one or more heat exchangers so as to cause a gas expander of the corresponding orc unit, in fluid communication with the one or more heat exchangers, to rotate a generator to generate electrical power from the orc operation.
2. The controller of
a second input in signal communication with a wellhead fluid temperature sensor, the wellhead fluid temperature sensor to provide a temperature measurement of the wellhead fluid flow from the wellhead.
3. The controller of
when the wellhead fluid valve is open and the heat exchanger valve is closed, receive a plurality of intermittent temperature measurements from the second input.
4. The controller of
in response to the plurality of intermittent temperature measurements of the wellhead fluid flow being greater than or equal to a phase change threshold for the organic working fluid:
transmit a signal to the heat exchanger valve to cause the heat exchanger to open.
5. The controller of
in further response to the plurality of intermittent temperature measurements of the wellhead fluid flow being greater than or equal to a phase change threshold for the organic working fluid:
transmit a signal to the wellhead fluid valve to cause the wellhead fluid valve to at least partially close.
6. The controller of
a third input in signal communication with a wellhead pressure transducer, the wellhead pressure transducer to provide a pressure measurement of the wellhead fluid flow from the wellhead.
7. The controller of
a fourth input in signal communication with a heat exchanger pressure transducer, the heat exchanger pressure transducer to provide a pressure measurement of the wellhead fluid flow through the heat exchanger.
8. The controller of
receive the pressure measurement from the third input and the pressure measurement from the fourth input; and
adjust the heat exchanger valve, based on the pressure measurement from the third input, the pressure measurement from the fourth input, and a pressure rating of the heat exchanger, to a selected open position to prevent damage to the heat exchanger.
9. The controller of
a fifth input in signal communication with a wellhead flow meter, the wellhead flow meter to provide a flow rate of the wellhead fluid flow from the wellhead; and
a sixth input in signal communication with a downstream flow meter, the downstream flow meter to provide a flow rate of the wellhead fluid flow at a location downstream of the wellhead fluid valve and the heat exchanger valve.
10. The controller of
receive a production threshold;
receive a flow rate measurement from the fifth input and the sixth input;
compare the production threshold with the fluid flow rate of the wellhead fluid flow at the location downstream of the wellhead fluid valve and the heat exchanger valve; and
adjust the wellhead fluid valve and heat exchanger valve to prevent hydrocarbon production impact, the adjustment based on the flow rate of the wellhead fluid flow from the wellhead and the flow rate of the wellhead fluid flow at the location downstream of the wellhead fluid valve and the heat exchanger valve.
12. The controller of
13. The controller of
transmit a signal to the second wellhead fluid valve to cause the second wellhead fluid valve to close, and
transmit a signal to the condenser valve to cause the condenser valve to open, thereby causing a cooled wellhead fluid flow to cool the organic working fluid causing the organic working fluid to change from the gas to the liquid.
14. The controller of
17. The controller of
18. The controller of
19. The controller of
20. The controller of
22. The controller of
23. The controller of
24. The controller of
25. The controller of
transmit a signal to corresponding one or more heat exchangers valves to cause the corresponding one or more heat exchanger valves to close.
26. The controller of
transmit a signal to corresponding one or more wellhead fluid valves to cause the corresponding one or more wellhead fluid valves to close.
28. The controller of
29. The controller of
30. The controller of
|
This application is related to U.S. Provisional Application No. 63/200,908, filed Apr. 2, 2021, titled “SYSTEMS AND METHODS FOR GENERATING GEOTHERMAL POWER DURING HYDROCARBON PRODUCTION,” the disclosure of which is incorporated herein by reference in its entirety.
Embodiments of this disclosure relate to generating geothermal power during hydrocarbon production, and more particularly, to systems and methods for generating and controllers for controlling generation of geothermal power in an organic Rankine cycle (ORC) operation in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and an energy storage device.
Typically, geothermal generators include a working fluid loop that flows to varying depths underground, such that underground heat causes the working fluid in the loop to change phases from a liquid to a vapor. The vaporous working fluid may then flow to a gas expander, causing the gas expander to rotate. The rotation of the gas expander may cause a generator to generate electrical power. The vaporous working fluid may then flow to a condenser or heat sink. The condenser or heat sink may cool the working fluid, causing the working fluid to change phase from the vapor to the liquid. The working fluid may circulate through the loop in such a continuous manner, thus the geothermal generator may generate electrical power.
Heat exchangers within geothermal generators are not built to withstand high pressures. Typically, the working fluid does not flow through the loop under high pressure. Further, rather than including heat exchangers, typically, geothermal generators utilize geothermal heat from varying depths underground, the heat being transferred to the working fluid. For example, a geothermal generator may simply include a conduit or pipe buried deep underground. As working fluid flows through the conduit or pipe, the heat at such depths causes the working fluid to change to a vapor and the vapor may flow up to the gas expander. As the vapor is cooled, the vapor flows back underground, the cycle repeating. While old or non-producing wells have been utilized for geothermal power generation, no such solution is known to exist for generating geothermal power at a well during hydrocarbon production.
Accordingly, Applicants have recognized a need for systems and methods to generate geothermal power in an organic Rankine cycle (ORC) operation in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and an energy storage device. The present disclosure is directed to embodiments of such systems and methods
The present disclosure is generally directed to systems and methods for generating and controlling generation of geothermal power in an organic Rankine cycle (ORC) operation in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and an energy storage device. The wellhead may produce a wellhead fluid. The wellhead fluid, as it exits the wellhead, may be under high-pressure and at a high temperature. The wellhead fluid's temperature may be determined, as well as the pressure, and based on such determinations, one or more heat exchanger valves may be actuated to partially open or completely open, thereby diverting a portion or all of the flow of wellhead fluid to the heat exchanger. The heat exchanger may be a high-pressure heat exchanger configured to withstand the high-pressure of the wellhead fluid from a wellhead. The heat exchanger may indirectly transfer heat from the flow of the wellhead fluid to the flow of a working fluid. As heat is transferred from the flow of the wellhead fluid to the flow of a working fluid, such a heat transfer may cause the working fluid to change phases from a liquid to a vapor. The vaporous working fluid may then flow through an ORC unit to cause a generator to generate electrical power via rotation of a gas expander of the ORC unit. Such an operation may be defined as or may be an ORC operation or process. The ORC unit may be an off-the-shelf unit, while the high-pressure heat exchanger may be a stand-alone component or device. In another embodiment, the ORC unit may be a high-pressure ORC unit and may include the high-pressure heat exchanger apparatus.
Accordingly, an embodiment of the disclosure is directed to a controller to control geothermal power generated by an organic Rankin cycle (ORC) process in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and energy storage device, the controller comprising. The controller may include a first input in signal communication with a working fluid temperature sensor. The working fluid temperature sensor may provide a temperature measurement of an organic working fluid flow from one or more heat exchangers. The controller may include a first input/output in signal communication with a wellhead fluid valve and a heat exchanger valve. The controller may be configured to transmit a signal to the heat exchanger valve to cause the heat exchanger valve to open, to allow continuous diversion of the flow of the wellhead fluid to one or more heat exchangers to facilitate transfer of heat from the flow of the wellhead fluid to the organic working fluid through the one or more heat exchangers, thereby to, when the wellhead fluid temperature is greater than or equal to a phase change threshold, change phases of the organic working fluid from a liquid to a vapor within the one or more heat exchangers so as to cause a gas expander of an ORC unit, in fluid communication with the one or more heat exchangers, to rotate a generator to generate electrical power from the ORC operation. The controller may be configured to receive a plurality of intermittent temperature measurements from the first input. The controller may be configured to, in response to the plurality of intermittent temperature measurements of the organic working fluid being less than a phase change threshold for the organic working fluid, transmit a signal to the wellhead fluid valve to cause the wellhead fluid valve to open and transmit a signal to the heat exchanger valve to cause the heat exchanger valve to close.
In an embodiment, the controller may include a second input in signal communication with a wellhead fluid temperature sensor. The wellhead fluid temperature sensor may provide a temperature measurement of the wellhead fluid flow from the wellhead. The controller may further be, in relation to the first input/output, configured to, when the wellhead fluid valve is open and the heat exchanger valve is closed, receive a plurality of intermittent temperature measurements from the second input. The controller may further be, in relation to the first input/output, configured to, in response to the plurality of intermittent temperature measurements of the wellhead fluid flow being greater than or equal to a phase change threshold for the organic working fluid, transmit a signal to the heat exchanger valve to cause the heat exchanger to open. The controller may further be, in relation to the first input/output, configured to, in further response to the plurality of intermittent temperature measurements of the wellhead fluid flow being greater than or equal to a phase change threshold for the organic working fluid, transmit a signal to the wellhead fluid valve to cause the wellhead fluid valve to at least partially close.
In another embodiment, the controller may include a third input in signal communication with a wellhead pressure transducer. The wellhead pressure transducer may provide a pressure measurement of the wellhead fluid flow from the wellhead. The controller may also include a fourth input in signal communication with a heat exchanger pressure transducer. The heat exchanger pressure transducer may provide a pressure measurement of the wellhead fluid flow through the heat exchanger. The controller may further be, in relation to the first input/output, configured to receive the pressure measurement from the third input and the pressure measurement from the fourth input and adjust the heat exchanger valve, based on the pressure measurement from the third input, the pressure measurement from the fourth input, and a pressure rating of the heat exchanger, to a selected open position to prevent damage to the heat exchanger.
The controller may further include a fifth input in signal communication with a wellhead flow meter. The wellhead flow meter may provide a flow rate of the wellhead fluid flow from the wellhead. The controller may further include a sixth input in signal communication with a downstream flow meter. The downstream flow meter may provide a flow rate of the wellhead fluid flow at a location downstream of the wellhead fluid valve and the heat exchanger valve. The controller may further be, in relation to the first input/output, configured to receive a production threshold, receive a flow rate measurement from the fifth input and the sixth input, compare the production threshold with the fluid flow rate of the wellhead fluid flow at the location downstream of the wellhead fluid valve and the heat exchanger valve, and adjust the wellhead fluid valve and heat exchanger valve to prevent hydrocarbon production impact. The adjustment may be based on the flow rate of the wellhead fluid flow from the wellhead and the flow rate of the wellhead fluid flow at the location downstream of the wellhead fluid valve and the heat exchanger valve.
Another embodiment of the disclosure is directed to a controller to control geothermal power generated by an organic Rankin cycle (ORC) process in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and energy storage device. The controller may include a first input in signal communication with a first wellhead fluid temperature sensor. The first wellhead fluid temperature sensor may provide a first temperature of a wellhead fluid flow from the wellhead. The controller may include a first input/output in signal communication with a first wellhead fluid valve, a second wellhead fluid valve, a heat exchanger valve, and a condenser valve. The controller may be configured to, in response to the first temperature being above a phase change threshold, transmit a signal to the first wellhead fluid valve to cause the first wellhead fluid valve to close and transmit a signal to the heat exchanger valve to cause the heat exchanger valve to open, to allow continuous diversion of the flow of the wellhead fluid to one or more heat exchangers to facilitate transfer of heat from the flow of the wellhead fluid to an organic working fluid through the one or more heat exchangers, thereby to change phases of the organic working fluid from a liquid to a vapor within the one or more heat exchangers so as to cause a gas expander of an ORC unit, in fluid communication with the one or more heat exchangers, to rotate a generator to generate electrical power from the ORC operation.
In another embodiment, the controller may include a second input in signal communication with a second wellhead fluid temperature sensor. The second wellhead fluid temperature sensor may provide a second temperature of the wellhead fluid flow at a point further downstream of the wellhead. The controller may be further configured to, in response to the second temperature being below a cooling threshold, transmit a signal to the second wellhead fluid valve to cause the second wellhead fluid valve to close and transmit a signal to the condenser valve to cause the condenser valve to open, thereby causing a cooled wellhead fluid flow to cool the organic working fluid causing the organic working fluid to change from the gas to the liquid.
In another embodiment, the controller may be configured to monitor generator power output. If the generator power output drops below a power output threshold, the controller may operationally transmit one or more signals to cause the heat exchange valve to close completely and the condenser valve to close completely. The generator may be included in and define the ORC unit. The ORC unit may include a subcontroller. The controller may further be configured to monitor operation of the ORC unit via the subcontroller. The controller may comprise one or more controllers. The controller may comprise one of a supervisory controller and master controller.
In another embodiment, a heat exchanger valve open position may further be based on an organic working fluid temperature.
Another embodiment of the disclosure is directed to a controller to control geothermal power generated by an organic Rankin cycle (ORC) process in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and energy storage device. The controller may include a first input in signal communication with one or more working fluid temperature sensors. The one or more working fluid temperature sensors may provide a temperature measurement of an organic working fluid flow from and corresponding to one or more heat exchangers. The controller may include a second input in signal communication with one or more electrical power meters. The one or more electrical power meters to provide a measurement indicative of an amount of electrical power generated by a corresponding ORC unit. The controller may include a first input/output in signal communication with one or more wellhead fluid valves corresponding to one or more wellheads, one or more heat exchanger valves corresponding to one or more heat exchangers, and one or more valves connecting one or more heat exchangers to the corresponding ORC unit. The controller may be configured to, in response to the measurement indicative of the amount of electrical power generated by a corresponding ORC unit being less than the maximum electrical power rating of the corresponding ORC unit, determine temperature of working fluid from the one or more working fluid temperature sensors. The controller may be further configured to, based on the temperatures of the working fluid from one or more heat exchangers and electrical power output from the corresponding ORC unit, determine an amount of working fluid from each of the corresponding one or more heat exchangers to enable the corresponding ORC unit to produce an amount of electrical power to meet or exceed a preselected electrical power output threshold. The controller may be further configured to, based on the determination of the amount of working fluid, transmit a signal to the one or more valves connecting one or more heat exchangers to the corresponding ORC unit to cause the one or more valves to move to one or more of partially open positions and fully opened positions, to allow an amount of working fluid to flow to the corresponding ORC unit, thereby to change phases of the organic working fluid from a liquid to a vapor within the one or more heat exchangers so as to cause a gas expander of the corresponding ORC unit, in fluid communication with the one or more heat exchangers, to rotate a generator to generate electrical power from the ORC operation.
In another embodiment, the signal to the one or more valves connecting one or more heat exchangers to the corresponding ORC unit causes the one or more valves to open to a fully opened position or to various partially open positions. The controller may be configured to, based on the determination of the amount of working fluid, transmit a signal to one or more of the one or more valves connecting one or more heat exchangers to the corresponding ORC unit to cause the one or more valves to close. The signal to the one or more of the one or more valves connecting one or more heat exchangers to the corresponding ORC unit may cause the one or more valves to close to a fully closed position or to various partially closed positions.
In another embodiment, the controller may be further configured to, in response to fully closing one or more of the one more valves, transmit a signal to corresponding one or more heat exchangers valves to cause the corresponding one or more heat exchanger valves to close. The controller may further be configured to, in response to transmission of the signal to corresponding one or more heat exchangers to cause the corresponding one or more heat exchanger valves to close, transmit a signal to corresponding one or more wellhead fluid valves to cause the corresponding one or more wellhead fluid valves to close.
In another embodiment, the temperature of the organic working fluid and the measurement indicative of the amount of electrical power generated by the corresponding ORC unit is determined at one of periodic intervals and continuously.
Another embodiment of the disclosure is directed to a controller to control geothermal power generated by an organic Rankin cycle (ORC) process in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field operational equipment, a grid power structure, and energy storage device. The controller may include a first input in signal communication with one or more working fluid temperature sensors. The one or more working fluid temperature sensors may provide a temperature measurement of an organic working fluid flow from and corresponding to one or more heat exchangers. The controller may include a second input in signal communication with one or more ORC unit temperature sensors. The one or more ORC unit temperature sensors may provide a temperature measurement of a combination of working fluid flowing into the corresponding ORC unit. The controller may include a first input/output in signal communication with one or more wellhead fluid valves corresponding to one or more wellheads, one or more heat exchanger valves corresponding to one or more heat exchangers, and one or more valves connecting one or more heat exchangers to the corresponding ORC unit. The controller may be configured to, in response to measurement of temperature of the combination of working fluid flowing into the corresponding ORC unit being below an efficient temperature for electrical power generation, determine the temperature of working fluid from each of the one or more working fluid temperature sensors. The controller may further be configured to, based on the temperatures of the working fluid from each of the one or more heat exchangers and the temperature of the combination of working fluid flowing into the corresponding ORC unit, determine an amount of working fluid from each of the corresponding one or more heat exchangers to enable the corresponding ORC unit to produce an amount of electrical power to meet or exceed a preselected electrical power output threshold. The controller may further be configured to, based on the determination of the amount of working fluid, transmit a signal to the one or more valves connecting one or more heat exchangers to the corresponding ORC unit to cause the one or more valves to move to, at least, partially open positions, to allow an amount of working fluid to flow to the corresponding ORC unit, thereby to change phases of the organic working fluid from a liquid to a vapor within the one or more heat exchangers so as to cause a gas expander of the corresponding ORC unit, in fluid communication with the one or more heat exchangers, to rotate a generator to generate electrical power from the ORC operation.
In another embodiment, the controller may include a third input in signal communication with one or more electrical power meters. The one or more electrical power meters may provide a measurement indicative of an amount of electrical power generated by a corresponding ORC unit. The amount of working fluid may further be based on the measurement indicative of the amount of electrical power generated by the corresponding ORC unit. The controller may further include a fourth input in signal communication with one or more wellhead fluid temperature sensors. The one or more wellhead fluid temperature sensors may provide temperatures of wellhead fluid flow from each of the one or more wellheads. The amount of working fluid may further be based on the temperatures of wellhead fluid flow from each of the one or more wellheads.
Still other aspects and advantages of these embodiments and other embodiments, are discussed in detail herein. Moreover, it is to be understood that both the foregoing information and the following detailed description provide merely illustrative examples of various aspects and embodiments, and are intended to provide an overview or framework for understanding the nature and character of the claimed aspects and embodiments. Accordingly, these and other objects, along with advantages and features of the present invention herein disclosed, will become apparent through reference to the following description and the accompanying drawings. Furthermore, it is to be understood that the features of the various embodiments described herein are not mutually exclusive and may exist in various combinations and permutations.
These and other features, aspects, and advantages of the disclosure will become better understood with regard to the following descriptions, claims, and accompanying drawings. It is to be noted, however, that the drawings illustrate only several embodiments of the disclosure and, therefore, are not to be considered limiting of the scope of the disclosure.
So that the manner in which the features and advantages of the embodiments of the systems and methods disclosed herein, as well as others that will become apparent, may be understood in more detail, a more particular description of embodiments of systems and methods briefly summarized above may be had by reference to the following detailed description of embodiments thereof, in which one or more are further illustrated in the appended drawings, which form a part of this specification. It is to be noted, however, that the drawings illustrate only various embodiments of the systems and methods disclosed herein and are therefore not to be considered limiting of the scope of the systems and methods disclosed herein as it may include other effective embodiments as well.
The present disclosure is directed to systems and methods for generating geothermal power in an organic Rankine cycle (ORC) operation in the vicinity of a wellhead during hydrocarbon production to thereby supply electrical power to one or more of in-field equipment or operational equipment, a grid power structure, other equipment, and an energy storage device. Wellhead fluids flowing from a wellhead at a well are typically under high-pressure. In-field equipment at the well is not rated for such high pressures. Prior to further processing or transport, the pressure of the flow of the wellhead fluid may be reduced, e.g., from 15,000 PSI to 200 PSI, from 10,000 PSI to 200 PSI, from 2,000 PSI to 200 PSI, or any other range from 20,000 PSI to 100 PSI, based on the pressure rating of the in-field equipment at the well. As the wellhead fluid flows from the wellhead, the temperature of the flow of the wellhead fluid may be at a high temperature, at least partially due to the high pressure of the flow of the wellhead fluid. As the pressure is reduced, the wellhead fluid temperature may also be reduced, as result of the pressure drop. Typically, the heat of the flow of wellhead fluid from the wellhead is not utilized and may be considered heat waste.
Geothermal power generators typically use a looping pipe or pipeline buried at depths with sufficient temperature to allow a working fluid to change phase from liquid to vapor. As the working fluid changes phase from a liquid to a vaporous state, the vaporous state working fluid may flow up the pipe or pipeline to a gas expander. The vaporous state working fluid may flow through and cause the gas expander to rotate. The rotation of the gas expander may cause a generator to generate electrical power, as will be described below. The vaporous state working fluid may flow through the gas expander to a heat sink, condenser, or other cooling apparatus. The heat sink, condenser, or other cooling apparatus may cool the working fluid thereby causing the working fluid to change phases from a vapor to a liquid. Heat exchangers of typical geothermal generators are not rated for high-pressure operations and usually geothermal generators obtain heat from varying underground depths.
In the present disclosure, a high-pressure heat exchanger may be placed or disposed at the well and/or in the vicinity of one or more wellheads. The high-pressure heat exchanger may be connected to the wellhead and may accept a high temperature or heated flow of wellhead fluid. A working fluid may flow through the heat exchanger. As the wellhead fluid and working fluid flows through the high-pressure heat exchanger, the high-pressure heat exchanger may facilitate transfer of heat from the wellhead fluid to the working fluid. A heat exchanger may include two fluidic paths, one for a heated fluid and another for a cool fluid. The fluidic paths may be in close proximity, allowing heat to transfer from the heated fluid to the cool fluid. The fluidic paths may be loops, coils, densely packed piping, tubes, chambers, some other type of path to allow for fluid to flow therethrough, and/or a combination thereof, as will be understood by those skilled in the art. As fluids flow through the heat exchanger, the cool liquid's temperature may increase, while the heated liquid's temperature may decrease.
Additionally, a geothermal generator unit or ORC unit may be disposed, positioned, or placed at the wellhead. The geothermal generator unit or ORC unit may directly connect to the high-pressure heat exchanger, include the high-pressure heat exchanger, or may connect to the high-pressure heat exchanger via an intermediary heat exchanger. As the hot wellhead fluid heats the working fluid, either via direct connection or through an intermediary heat exchanger, the working fluid may change phases from a liquid to a vapor. In such examples, the working fluid utilized may be chosen based on a low boiling point and/or high condensing point. The vaporous state working fluid may flow through the geothermal generator unit or ORC unit to a generator, e.g., a gas expander and generator. The vaporous state working fluid may then flow to a condenser or heat sink, thereby changing state from the vapor to the liquid. Finally, the liquid may be pumped back to the high-pressure heat exchanger. Such a cycle, process, or operation may be considered a Rankine cycle or ORC.
Such systems may include various components, devices, or apparatuses, such as temperature sensors, pressure sensors or transducers, flow meters, control valves, smart valves, valves actuated via control signal, controllers, a master or supervisory controller, other computing devices, computing systems, user interfaces, in-field equipment, and/or other equipment. The controller may monitor and adjust various aspects of the system to ensure that hydrocarbon production continues at a specified rate, that downtime is limited or negligible, and that electrical power is generated efficiently, optimally, economically, and/or to meet or exceed a preselected electrical power output threshold.
As illustrated in
As illustrated in
Further, when the first heat exchanger valve 208 is opened, a second heat exchanger valve 222 connected to a second pipe 217 may be opened, e.g., partially opened or fully opened. The second heat exchanger valve 222 may allow the flow of wellhead fluid to exit the high-pressure heat exchanger 250. Based on the opening of the first heat exchanger valve 208 and second heat exchanger valve 222, a first wellhead fluid valve 210 may be adjusted. Such adjustment may occur to ensure that the production of the wellhead 202 or the production of wellhead fluid from the wellhead 202 may not be impeded or slowed based on a diversion of the flow of the wellhead fluid to the high-pressure heat exchanger 250. Downstream of the first wellhead fluid valve 210, but prior to where the diverted portion of the flow of wellhead fluid is reintroduced to the primary or bypass wellhead fluid flow, a pressure sensor 212 may be disposed, e.g., the pressure sensor 212 may be disposed along pipe 217. In another example, rather than a pressure sensor 212, a flow meter may be disposed along pipe 217, e.g., a wellhead fluid flow meter and/or a downstream flow meter. The wellhead fluid flow meter may measure the flow rate of a fluid exiting the wellhead 202. A downstream flow meter may measure the flow rate of the wellhead fluid at a point downstream of the first wellhead fluid valve 210. Such a pressure sensor 212 or flow meter may be utilized to determine whether the flow of wellhead fluid is at a pressure or flow that does not impede hydrocarbon production. In an example, where the flow is impeded to a degree that the production of hydrocarbons may be inhibited, the first wellhead fluid valve 210 may be opened further, if the first wellhead fluid valve 210 is not already fully opened. If the first wellhead fluid valve 210 is fully opened, the first heat exchanger valve's 208 and second heat exchanger valve's 222 percent open may be adjusted. Other factors may be taken into account for such determinations, such as the pressure or flow from the high-pressure heat exchanger 250, the pressure or flow at the point of a choke valve located further downstream along the second pipe 217, a pressure rating for downstream equipment, and/or the temperature of the wellhead fluid within the high-pressure heat exchanger 250. Once the flow of wellhead fluid passes through the first wellhead fluid valve 210 and/or the second heat exchanger valve 222, the wellhead fluid may flow to in-field equipment 270 for further processing or transport.
Each of the valves described herein, e.g., first heat exchanger valve 208, second heat exchanger valve 222, first wellhead fluid valve 210, and other valves illustrated in the
As illustrated in
In another embodiment, in addition to the first heat exchanger valve 208 and second heat exchanger valve 222, the well 200 may include a first ORC unit valve 295 and a second ORC unit valve 296. Such ORC unit valves 295, 296 may be utilized to control flow of working fluid flowing into the ORC unit 203. Further the ORC unit valves 295, 296 may be utilized when more than one high-pressure heat exchanger 250 corresponding to one or more wellheads are connected to the ORC unit 203. The ORC unit valves 295, 296 may be utilized to optimize or to enable the ORC unit 203 to meet a preselected electrical power output threshold via the flow of working fluid from one or more high-pressure heat exchangers into the ORC unit 203, as will be understood by a person skilled in the art. The flow of working fluid may be adjusted to ensure that the ORC unit 203 produces an amount of electrical power greater than or equal to a preselected electrical power output threshold, based on various factors or operating conditions (e.g., temperature of wellhead fluid flow, temperature of working fluid flow, electrical output 236 of the ORC unit 203, electrical rating of the ORC unit 203, flow and/or pressure of the wellhead fluid, and/or flow and/or pressure of the working fluid). In some examples, the ORC unit valves 295, 296 may initially be fully open or at least partially open and as various factors or operating conditions are determined, then the ORC unit valves 295, 296 for one or more heat exchangers may be adjusted to enable the ORC unit 203 to meet a preselected electrical power output threshold, as will be understood by a person skilled in the art. The preselected electrical power output threshold may be set by a user or may be a predefined value generated by a controller (e.g., controller 272) based on various factors. The various factors may include an ORC unit electrical power rating or output rating or maximum potential temperature of the wellhead fluid and/or working fluid.
As shown, several pairs of sensors may be located adjacent to one another. In other examples, those positions, for example, the pressure sensor's 204 and the temperature sensor's 206 location, may be reversed. In yet another example, each one of the sensors may provide measurements for multiple aspects of the wellhead fluid, e.g., one sensor to provide a combination of flow, pressure, temperature, composition (e.g., amount of components in the wellhead fluid, such as water, hydrocarbons, other chemicals, proppant, etc.), density, or other aspect of the wellhead fluid or working fluid. Each sensor described above may be integrated in or within the pipes or conduits of each device or component, clamped on or over pipes or conduits, and or disposed in other ways, as will be understood by those skilled in the art. Further, the determinations, adjustments, and/or other operations described above may occur or may be performed by or in a controller.
As noted, a high-pressure heat exchanger 250 may be disposed, placed, or installed at a well. The high-pressure heat exchanger 250 may be disposed nearby or at a distance from the wellhead 202. The high-pressure heat exchanger 250 may be a modular and/or mobile apparatus. In such examples, the high-pressure heat exchanger 250 may be brought or moved to a well or site (e.g., via a vehicle, such as a truck), placed at the well or site during hydrocarbon production, and then moved to another well or site at the end of hydrocarbon production. The high-pressure heat exchanger 250 may be disposed on a skid, a trailer, a flatbed truck, inside a geothermal generator unit, or inside an ORC unit 203. Once brought to a well or site, the high-pressure heat exchanger 250 may be secured to the surface at the well. The high-pressure heat exchanger 250 may be configured to withstand pressures in excess of about 5,000 PSI, about 10,000 PSI, about 15,000 PSI, and/or greater. In an example, the high-pressure heat exchanger 250 may be a high-pressure shell and tube heat exchanger, a spiral plate or coil heat exchanger, a heliflow heat exchanger, or other heat exchanger configured to withstand high pressures. In another example, portions of the high-pressure heat exchanger 250 may be configured to withstand high-pressures. For example, if a shell and tube heat exchanger is utilized, the shell and/or tubes may be configured to withstand high-pressures.
In another embodiment, at least one fluidic path of the high-pressure heat exchanger 250 may be coated or otherwise configured to reduce or prevent corrosion. In such examples, a wellhead fluid may be corrosive. To prevent damage to the high-pressure heat exchanger 250 over a period of time, the fluid path for the wellhead fluid may be configured to withstand such corrosion by including a permanent, semi-permanent, or temporary anti-corrosive coating, an injection point for anti-corrosive chemical additive injections, and/or some combination thereof. Further, at least one fluid path of the high-pressure heat exchanger 250 may be comprised of an anti-corrosive material, e.g., anti-corrosive metals or polymers. As noted, the wellhead fluid may flow into the high-pressure heat exchanger 250 at a high pressure. As the high-pressure heat exchanger 250 may operate at high pressure, the high-pressure heat exchange may include pressure relief valves to prevent failures if pressure within the high-pressure heat exchanger 250 were to exceed the pressure rating of the high-pressure heat exchanger 250. Over time, wellhead fluid flowing through the high-pressure heat exchanger 250 may cause a buildup of deposits or scaling. To prevent scaling and/or other related issues, the high-pressure heat exchanger 250 may be injected with scaling inhibitors or other chemicals or may include vibration or radio frequency induction devices.
Once the high-pressure heat exchanger 250 facilitates heat transfer from the wellhead fluid to the working fluid, the working fluid may partially, substantially, or completely change phases from a liquid to a vapor, vaporous state, gas, or gaseous state. The vapor or gas may flow to the ORC unit 203 causing an expander to rotate. The rotation may cause a generator to generate electricity, as will be further described and as will be understood by those skilled in the art. The generated electricity may be provided as an electrical output 236. The electricity generated may be provided to in-field equipment, energy storage devices, equipment at other wells, or to a grid power structure. The working fluid in the high-pressure heat exchanger may be a working fluid to carry heat. Further, the working fluid of the high-pressure heat exchanger 250 may or may not exhibit a vaporous phase change. The working fluid may carry heat to another heat exchanger 205 of the ORC unit 203. As such, heat may be transferred from the wellhead fluid to the working fluid of the high-pressure heat exchanger 250 and heat may be transferred from the working fluid of the high-pressure heat exchanger 250 to the working fluid of the ORC unit 203.
In an example, the working fluid may be a fluid with a low boiling point and/or high condensation point. In other words, a working fluid may boil at lower than typical temperatures, while condensing at higher than typical temperatures. The working fluid may be an organic working fluid. The working fluid may be one or more of pentafluoropropane, carbon dioxide, ammonia and water mixtures, tetrafluoroethane, isobutene, propane, pentane, perfluorocarbons, other hydrocarbons, a zeotropic mixture of pentafluoropentane and cyclopentane, other zeotropic mixtures, and/or other fluids or fluid mixtures. The working fluid's boiling point and condensation point may be different depending on the pressure within the ORC loop 221, e.g., the higher the pressure, the lower the boiling point.
An ORC unit 203 may include a heat exchanger 205 or heater. Connections to the heat exchanger 205 or heater may pass through the exterior of the ORC unit 203. Thus, as an ORC unit 203 is brought or shipped to a well or other location, a user, technician, service person, or other person may connect pipes or hoses from a working fluid heat source (e.g., the high-pressure heat exchanger 250) to the connections on the ORC unit 203, allowing a heat source to facilitate phase change of a second working fluid in the ORC unit 203. In such examples, the working fluid flowing through ORC loop 221 may include water or other organic fluid exhibiting a higher vaporous phase change threshold than the working fluid of the ORC unit 203, to ensure proper heat transfer in heat exchanger 205. Further, the heat exchanger 205 may not be a high-pressure heat exchanger. In such examples, the high-pressure heat exchanger 250 allows for utilization of waste heat from high-pressure wellhead fluids. In another embodiment and as will be described, a high-pressure heat exchanger 250 may be included in the ORC unit 203.
In yet another embodiment, the high-pressure heat exchanger 250 may be considered an intermediary heat exchanger or another intermediary heat exchanger (e.g., intermediary heat exchanger 219) may be disposed between the high-pressure heat exchanger 250 and the ORC unit 203 (as illustrated in
The ORC unit 203 may further include pressure sensors 228, 238, 246 and temperature sensors 230, 240 to determine whether sufficient, efficient, and/or optimal heat transfer is occurring in the heat exchanger 205. A sensor or meter may further monitor electrical power produced via the expander 232 and generator 234. Further, the ORC unit 203 may include a condenser or heat sink 211 to transfer heat from the second working fluid or working fluid of the ORC unit 203. In other words, the condenser or heat sink 211 may cool the second working fluid or working fluid of the ORC unit 203 causing the second working fluid or working fluid of the ORC unit 203 to condense or change phases from vapor to liquid. The ORC unit 203 may also include a working fluid reservoir 298 to store an amount of working fluid, e.g., in a liquid state, to ensure continuous operation of the ORC unit 203. The liquid state working fluid, whether from the working fluid reservoir 298 or directly form the condenser/heat sink 211, may be pumped, via pump 244, back to the heat exchanger 205. Further, the pressure prior to and after pumping, e.g., as measured by the pressure sensors 238, 246, may be monitored to ensure that the working fluid remains at a ORC unit or working fluid loop pressure rating.
As illustrated in
As illustrated in
The system may include, as noted, a temperature sensor 259 and pressure sensor 257 to determine the temperature of the wellhead fluid after the choke valve 252. The system may include temperature sensor 240 to determine the temperature of the working fluid or ORC fluid exiting the heat sink 236 and temperature sensor 238 to determine the temperature of the working fluid or ORC fluid entering the heat sink 236. The pressure and/or temperature of the wellhead fluid may be used to determine whether the heat sink 236 may be utilized based on pressure rating of the heat sink 236 and/or a liquid phase change threshold of the working fluid. In other words, if the flow of wellhead fluid is at a temperature sufficient to cool the working fluid and/or below a pressure rating of the heat sink 236, the heat sink valve 254 may open to allow wellhead fluid to flow through the heat sink 236 to facilitate cooling of the working fluid. In another embodiment, the heat sink valve 254 may initially be fully or partially open. The temperature of the working fluid or ORC fluid may be measured as the fluid enters the heat sink 236 and exits the heat sink 236. If the temperature differential indicates that there is no change or an increase in temperature, based on the temperature of the working fluid or ORC fluid entering the heat sink 236 and then leaving the heat sink 236, then the heat sink valve 254 may be closed. Temperature sensors 238, 240, 256, 262, and pressure sensors 258, 260 may be disposed within the heat sink 236 to ensure that the temperature of the wellhead fluid is suitable for cooling the working fluid and that the pressure of wellhead fluid does not exceed the pressure rating of the heat sink 236.
As illustrated in
As illustrated in
As illustrated in
As the wellhead fluid flows from the wellhead 306, the wellhead fluid may flow to the high-pressure heat exchanger, through a bypass pipe, and/or a combination thereof based on various factors or characteristics, e.g., wellhead fluid temperature and/or pressure and/or working fluid temperature. For example, if the wellhead fluid flow 308 is above a vaporous phase change threshold for a working fluid flow 310, then valve 332 may open, at least partially, to allow the wellhead fluid flow to the high pressure heat exchanger 312. In such examples, the wellhead fluid may continue to flow through the primary or bypass wellhead fluid pipe. As such, valve 330 may remain open, whether completely or at a certain percentage. From the high-pressure heat exchanger 312, the wellhead fluid may flow back to the primary or bypass wellhead fluid pipe, to a condenser 316 or other cooling apparatus, and/or a combination thereof. If the wellhead fluid is at a temperature to provide cooling to the working fluid flow 310, then valve 336 may open to allow wellhead fluid to flow therethrough. In such examples, the valve 334 may close to prevent wellhead fluid from flowing back. If the wellhead fluid is not at a temperature to allow for cooling of the working fluid flow 310, then valve 336 may close or remained closed and valve 334 may open or remain open. From the condenser 316 or the primary or bypass wellhead fluid pipe, the wellhead fluid may flow to in-field equipment 316, storage tanks, and/or other processing equipment at the well. The valves described above may be controlled via controller 320.
In another embodiment, rather than basing the opening and closing of valve 332 and/or valve 336 on wellhead fluid flow 308 temperature, the valve 332 and/or valve 336 may be opened or closed based on the temperature of the working fluid flow 310. For example, prior to activating the wellhead 306 (e.g., allowing wellhead fluid to flow or pumping wellhead fluid from the wellhead 306), valve 332 may be open, fully or partially. As the wellhead fluid flows through the high-pressure heat exchanger 312, the temperature of the working fluid flow 310 may be measured. Based on the working fluid flow 310 temperature, taken at continuously or at periodic intervals, and after a specified period of time, if the working fluid flow 310 does not reach a vaporous phase change temperature, then valve 332 may be closed. Further, such operations may be performed in conjunction with measuring wellhead fluid flow 308 and opening or closing valve 332 based on such measurements.
The wellhead fluid flowing through the high-pressure heat exchanger 312 may be at a temperature to facilitate heat transfer to a working fluid flow 310. The working fluid may further flow, as a vaporous state working fluid flow to an ORC expander/generator 314. The vaporous state working fluid may cause the ORC expander/generator 314 to generate electrical power to be utilized at equipment at the well (e.g., in-field equipment), energy storage device, or a grid power structure (via a transformer and power lines). The working fluid may then flow to a condenser 316 or other cooling apparatus. The condenser 316 or other cooling apparatus may facilitate cooling of the working fluid flow 310 via the wellhead fluid flow, air, another liquid, and/or other types of heat sinks or heat exchangers. The liquid state working fluid may then flow back to the high-pressure heat exchanger 312.
In another embodiment, the high-pressure heat exchanger 312 may connect to an ORC unit/module 340 or one or more ORC units or modules. The number of ORC units/modules may scale based on power to be utilized by in-field equipment, the amount or potential capacity of electricity generation at the well, and/or other factors. After production of hydrocarbons begins, additional ORC units/modules may be added at the well or existing ORC units/modules may be removed from the well.
As used herein, “signal communication” refers to electric communication such as hard wiring two components together or wireless communication for remote monitoring and control/operation, as understood by those skilled in the art. For example, wireless communication may be Wi-Fi®, Bluetooth®, ZigBee, cellular wireless communication, satellite communication, or forms of near field communications. In addition, signal communication may include one or more intermediate controllers or relays disposed between elements that are in signal communication with one another.
The master controller 402 may include instructions 408 to measure temperature at various points or locations of the system (e.g., as illustrated in, for example,
Utilizing the characteristics noted above, the master controller 402 may control various aspects of the system 400. For example, the master controller 402 may include flow control adjustment instructions 412. The system 400 may include one or more valves placed in various locations (For example, but not limited to,
In an example, the system 400 may include a user interface 436, e.g., such as a monitor, display, computing device, smartphones, tablets, and other similar devices as will be understood by those skilled in the art. A user may view data, enter thresholds or limits, monitor status of the equipment, and perform other various tasks in relation to the equipment at the well. For example, a specific flow rate may be set for hydrocarbon production. As a wellhead begins producing hydrocarbons (e.g., wellhead fluids begin flowing from a wellhead), the master controller 402 may monitor flow rate and compare the flow rate to the threshold either set by a user or pre-set in the master controller 402. If the master controller 402 determines that the heat exchanger valves 428 (e.g., via flow control adjustment instructions 412) should be open or are open and that the flow of wellhead fluid is higher or lower than the threshold, the master controller 402 may adjust the appropriate valves, e.g., wellhead fluid valve 426 and/or heat exchanger valves 428. The valve associated with the primary or bypass wellhead fluid pipe, e.g., wellhead fluid valve 426, may open or close by varying degrees based on such determinations.
In another example, the master controller 402 may include instructions 410 to control a pump for the ORC unit, e.g., working fluid pump 424. If heat exchanger valves 428 and condenser valves 432 are closed, the master controller 402 may transmit a signal to shut down or cease operation of the working fluid pump 424, if the working fluid pump 424 is operating. The master controller 402 may further transmit a signal, based on the heat exchanger valves 428 being open, to initiate or start operations of the working fluid pump 424. The working fluid pump 424 may be a fixed pressure pump or a variable frequency pump. The master controller 402 may further include instructions 414 to monitor the power output from an ORC unit or from expanders/generators 434 (e.g., expander/generator A 434A, expander/generator B 434B, and/or up to expander/generator N 434N). If the system 400 utilizes ORC units, the master controller 402 may determine the electrical power generated or output based on an output from, for example, ORC unit controller A 438A, ORC unit controller B 438B, and/or up to ORC unit controller N 438N. If the power output drops to an un-economical or unsustainable level or electrical power generation ceases completely while the heat exchanger valves 428 are open, the master controller 402 may transmit signals to close the heat exchanger valves 428. In another example, the master controller 402 may monitor electrical power output from other wells. The master controller 402 may monitor or meter the amount of electrical power being utilized at each of the wells and/or the amount of electrical power being generated at each of the wells. If an excess of electrical power exists, the master controller 402 may transmit signals causing the excess energy at any particular well to be stored in energy storage devices, transmitted to the grid, and/or transmitted to another well. If a deficit of electrical power exists, the master controller 402 may transmit a signal causing other wells to transmit electrical power to the well experiencing an electrical power deficit. In another example, the metered electrical power may be utilized for commercial trade, to determine a cost of the electricity generated, and/or for use in determining emissions or emission reductions through use of an alternate energy source (e.g., geothermal power).
In another example, the master controller 402 may include instructions to maximize energy output from an ORC unit. In such examples, the ORC unit may be connected to a plurality of high-pressure heat exchangers. Further, each of the high-pressure heat exchangers may connect to one or more wellheads. As a wellhead produces a wellhead fluid, the pressure and temperature of the wellhead fluid may vary, over time, as well as based on the location of the wellhead. The master controller 402 may determine the temperature of the wellhead fluid at each high-pressure heat exchanger and/or the temperature of the working fluid in each high-pressure heat exchanger. Based on these determinations, the master controller 402 may open/close valves associated with one or more particular high-pressure heat exchangers to ensure the most efficient heat transfer. Further, the master controller 402 may determine the amount of electrical power output from the ORC unit. Based on a power rating of the ORC unit (e.g., the maximum power output the ORC unit is able to produce) and/or the amount of electrical power output from the ORC unit, the master controller 402 may adjust valves associated with the one or more particular high-pressure heat exchangers to thereby increase electrical power output. Additional ORC units may be utilized and electrical power output for each may be optimized or efficiently generated. The master controller 402 may determine, for each ORC unit, the optimal amount or efficient amount of heated working fluid flowing from each high-pressure heat exchanger to ensure the highest amount of electrical power possible is generated per ORC unit or that each ORC unit meets a preselected electrical power output threshold. In such examples, each ORC unit may be connected to each high-pressure heat exchanger and the master controller 402 may determine which set of valves to open/close based on such an optimization or electrical power output threshold.
In another example, the master controller 402 may include failover instructions or instructions to be executed to effectively reduce or prevent risk. The failover instructions may execute in the event of ORC unit and/or high-pressure heat exchanger failure or if an ORC unit and/or high-pressure heat exchanger experiences an issue requiring maintenance. For example, the ORC unit and/or high-pressure heat exchanger may have various sensors or meters. Such sensors or meters, when providing measurement to the master controller 402, may indicate a failure in the ORC unit and/or high-pressure heat exchanger. In another example, the master controller 402 may include pre-determined parameters that indicate failures. If the master controller 402 receives such indications, the master controller 402 may open, if not already open, the wellhead fluid valve 1 426 and wellhead fluid valve 2 430. After the wellhead fluid valve 1 426 and wellhead fluid valve 2 430 are opened, the master controller 402 may close the heat exchanger valves 428, the condenser valves 432, or any other valve associated with the flow of fluid to the ORC unit and/or high-pressure heat exchanger. In such examples, the master controller 402 may prevent further use of the ORC unit and/or high-pressure heat exchanger until the issue or failure indicated is resolved. Such a resolution may be indicated by a user via the user interface 436 or based on measurements from sensors and/or meters.
In another example, the master controller 402 may, as noted, determine an amount of electrical power output by an ORC unit. The master controller 402 may additionally determine different characteristics of the electrical power output. For example, the master controller 402 may monitor the output voltage and frequency. Further, the master controller 402 may include pre-set or predetermined thresholds, limits, or parameters in relation to the monitored characteristics of the electrical power output. Further still, the master controller 402 may connect to a breaker or switchgear. In the event that the master controller 402 detects that an ORC unit exceeds any of the thresholds, limits, and/or parameters, the master controller 402 may transmit a signal to the breaker or switchgear to break the circuit (e.g., the flow of electricity from the ORC unit to a source) and may shut down the ORC unit (e.g., closing valves preventing further flow to the ORC unit, as described above).
At block 502, the master controller 402 may determine whether the wellhead is active. Such a determination may be made based on sensors located at or near the wellhead, e.g., a pressure sensor indicating a pressure or a flow meter indicating a flow of a wellhead fluid or hydrocarbon stream from the wellhead. In other examples, a user may indicate, via the user interface 436, that the wellhead is active. If the wellhead is not active, the master controller 402 may wait for a specified period of time and make such a determination after the period of time. In an example, the master controller 402 may continuously check for wellhead activity.
At block 504, in response to wellhead activity or during hydrocarbon production, the master controller 402 may determine a wellhead fluid temperature. The wellhead fluid temperature may be measured by a wellhead fluid temperature sensor 1 416 disposed at or near the wellhead. The wellhead fluid temperature sensor 1 416 may be disposed on or in a pipe. In an example, various other temperature sensors may be disposed at other points in the system 400, e.g., heat exchanger temperature sensor 418, wellhead fluid temperature sensor 2 420, condenser temperature sensor 422, and/or other temperature sensors. The temperature measurements provided by such sensors may be utilized by the master controller 402 to determine which valves to open or close.
At block 506, the master controller 402 may determine whether the wellhead fluid is at or above a vaporous phase change temperature threshold of a working fluid. In such examples, the vaporous phase change temperature may be based on the working fluid of the ORC unit. For example, for pentafluoropropane the vaporous phase change temperature or boiling point may be 15.14 degrees Celsius. In another example, or factors may be taken into account when determining whether to open heat exchanger valves 428. For example, whether the pressure is within operating range of a high-pressure heat exchanger, whether the flow rate at a primary or bypass pipeline is sufficient to prevent impedance of hydrocarbon production, whether power generation costs are offset by power generation needs, among other factors.
At block 508, if the wellhead fluid is at or above the vaporous phase change temperature, the master controller 402 may transmit a signal to heat exchanger valves 428 to open to a specified degree. In an example, the heat exchanger valves 428 may be may be fully opened or partially opened. The degree to which the heat exchanger valves 428 opens may depend on the temperature of the wellhead fluid, the flow rate of the wellhead fluid, and/or the pressure of the wellhead fluid.
At block 510, the master controller 402 may close wellhead fluid valves (e.g., wellhead fluid valve 1 426) to divert a portion of the flow of wellhead fluids to the high-pressure heat exchanger. The wellhead fluid valves (e.g., wellhead fluid valve 1 426) may close partially or completely, depending on various factors, such as heat exchanger flow capacity, current flow rate, current pressure, current temperature, among other factors. Once the wellhead fluid valves (e.g., wellhead fluid valve 1 426) are closed, at block 512, a working fluid pump 424 of the ORC unit may begin pumping the working fluid through the ORC loop. At block 514, the master controller 402 may determine whether electricity is being generated. If not, the master controller 402 may check if the wellhead is still active and, if the wellhead is still active, the master controller 402 may adjust the valves (e.g., wellhead fluid valve 1 426 and heat exchanger valves 428) as appropriate (e.g., increasing flow through the heat exchanger to facilitate an increase in heat transfer).
At block 516, if the wellhead fluid is lower than the vaporous phase change temperature, the master controller 402 may open or check if the wellhead fluid valves (e.g., wellhead fluid valve 1 426) are open. Further, the wellhead fluid valves may already be open to a degree and, at block 516, may open further or fully open, depending on desired wellhead fluid flow. In an example, the wellhead fluid valve (e.g., wellhead fluid valve 1 426) may be used, with or without a separate choke valve, to choke or partially choke the wellhead fluid flow. Further, once the wellhead fluid valves are open, at block 518, the master controller 402 may close the heat exchanger valves 428 fully or partially in some cases.
Blocks 602 through 610 correspond to blocks 502 through 610, as described above. Once it has been determined that the heat exchanger valves 428 should be open and after the heat exchanger valves 428 open, wellhead fluid may flow through the heat exchanger and/or the primary or bypass wellhead fluid pipe to a choke valve. The choke valve may reduce the pressure of the wellhead fluid and, thus, reduce the temperature of the wellhead fluid. At block 612, the master controller 402 may determine the reduced pressure wellhead fluid temperature at or near a condenser or heat sink valve based on a measurement from the condenser temperature sensors 422. The master controller 402 may, at block 614, determine whether the wellhead fluid is at cool enough temperatures to facilitate cooling of a working fluid flow. The working fluid may have a condensation point or a temperature at which the working fluid changes phase from a vapor to a liquid. Such a temperature may be utilized as the threshold for such determinations.
At block 616, if the temperature is cool enough, the master controller 402 may open the condenser valves 432, allowing wellhead fluid to flow through the condenser or other cooling apparatus. At block 617 the master controller 402 may transmit a signal to the working fluid pump 424 to start or begin pumping working fluid through an ORC loop. In another example, at block 619, if the temperature of the working fluid is not cool enough to facilitate cooling of the working fluid to any degree, the master controller 402 may close the condenser valves 432. In another example, the master controller 402 may determine the temperature of the reduced pressure wellhead fluid flow and whether the temperature of the reduced pressure wellhead fluid flow, in conjunction with a primary or secondary cooler, may cool the working fluid to a point. The master controller 402, in such examples, may consider the temperature of the working fluid entering the condenser and the temperature of the reduced pressure wellhead fluid flow at or near the condenser valve 432.
As noted and described above, the master controller 402 may, at block 618, determine whether electric power is generated. In another example, if the wellhead temperature is not high enough to produce geothermal power, the master controller 402 may, at block 620, open the wellhead fluid valves. At block 622, the master controller 402 may close, if the heat exchanger valves 428 are open, the heat exchanger valves 428. Finally, at block 624, the master controller 402 may close condenser valves 432.
At block 702, the master controller 702 may determine whether the wellhead is active. Such a determination may be made based on sensors located at or near the wellhead, e.g., a pressure sensor indicating a pressure or a flow meter indicating a flow of a wellhead fluid or hydrocarbon stream from the wellhead. In other examples, a user may indicate, via the user interface 436, that the wellhead is active. If the wellhead is not active, the master controller 402 may wait for a specified period of time and make such a determination after the specified period of time. In an example, the master controller 402 may continuously check for wellhead activity.
At block 704, in response to wellhead activity or during hydrocarbon production, the master controller 402 may open heat exchanger valves 428. At block 706, the master controller 402 may close wellhead fluid valve 1 426, at least partially. At block 708, when the heat exchanger valves 428 is open and wellhead fluid valve 1 426 is fully or partially closed, working fluid or ORC fluid may be pumped through the ORC unit.
At block 710, the master controller 402 may measure the temperature of the working fluid or ORC fluid. At block 712, the master controller 402 may determine whether the wellhead fluid is at or above a vaporous phase change temperature threshold. In such examples, the vaporous phase change may include when the working fluid or ORC fluid changes from a liquid to a vapor or gas. For example, for pentafluoropropane the vaporous phase change temperature or boiling point may be 15.14 degrees Celsius. In another example, other factors may be taken into account when determining whether to maintain an open percentage of the heat exchanger valves 428. For example, whether the pressure is within operating range of a high-pressure heat exchanger, whether the flow rate at a primary or bypass pipeline is sufficient to prevent impedance of hydrocarbon production, whether power generation costs are offset by power generation needs, among other factors.
At block 712, if the working fluid or ORC fluid is at or above the vaporous phase change temperature, the master controller 402 may determine whether electricity is generated at the ORC unit. If electricity is not generated, the master controller 402 may check, at block 702, whether the wellhead is active and perform the operations of method 700 again.
If the working fluid or ORC fluid, at block 712 is not at a vaporous phase change temperature, then, at block 714, the master controller 402 may first determine whether a first specified period of time has lapsed. The first period of time may be period of time of sufficient length to determine whether or not the working fluid or ORC fluid may reach a vaporous phase change state. Such a first specified period of time may be about an hour or more, two hours, three hours, four hours, or some other length of time during wellhead activity.
If the first specified period of time has not lapsed, at block 716, the master controller 402 may wait a second specified period of time before measuring the temperature of the working fluid or ORC fluid The second specified period of time may be less than the first specified period of time.
If the first specified period of time has lapsed, then the master controller 402 may have determined that, based on the temperature of the working fluid or ORC fluid, that the wellhead fluid may not reach temperatures sufficient to cause a vaporous phase change of the working fluid or ORC fluid. As such, at block 718, the master controller may close the open wellhead fluid valves and, at block 720, close the heat exchanger valves 428.
Blocks for
In addition, after the master controller 402 closes the heat exchanger valves at block 720, the master controller 402 may determine, at block 726, the wellhead fluid temperature at the heat exchanger. At block 728, the master controller may determine whether the wellhead fluid is at a vaporous phase change temperature of the working fluid or ORC fluid. If the wellhead fluid temperature is less than such a value, the master controller 402 may wait and measure the temperature again after a period of time. If the wellhead fluid temperature is greater than or equal to such a value, the master controller 402 may perform the operations of method 701 starting at block 724 again.
At block 802, each of one or more heat exchangers may be connected to one or more wellhead fluid lines. Each of the one or more wellhead fluid lines may correspond to a wellhead. At block 804, an ORC unit may be connected to the one or more heat exchangers. In another example, the system 400 may include one or more ORC units and each of the one or more ORC units may connect to one or more heat exchangers or two or more heat exchangers.
At block 806, heat exchanger valves positioned between the one or more heat exchangers and the one or more wellhead fluid lines may be opened. Once opened, the heat exchanger valves may allow for continuous diversion of the flow of wellhead fluid through the heat exchanger. The flow of wellhead fluid through the heat exchanger may facilitate transfer of heat from the flow of wellhead fluid to a flow of working fluid or intermediate working fluid.
At block 808, ORC unit valves may be opened. The ORC unit valves may initially be fully opened or partially opened. The ORC unit valves, when open, may allow for working fluid from each of the heat exchangers to flow into the ORC unit. Each working fluid flow may be combined and may pass through the ORC unit.
At block 810, the master controller 402 may determine one or more operating conditions of the ORC unit and/or the system 400. The one or more operating conditions may include the flow rate and/or pressure of working fluid flowing through each of the one or more heat exchangers, the flow rate and/or pressure of wellhead fluid flowing through each of the one or more heat exchangers or at any other point downstream of the wellhead, the temperature of the working fluid in each of the one or more heat exchangers, the temperature of wellhead fluid at each of the one or more heat exchangers, the temperature of the combined working fluid flow at the ORC unit, the electrical power output from the ORC unit, and/or the open position of each of the valves included in the system 400.
At block 812, based on the determined operating conditions, the master controller 402 may determine an optimal or efficient working fluid flow of the ORC unit. The optimal or efficient working fluid flow may depend on the temperature of the combined working fluid flowing to the ORC unit. The other operating conditions, described above, may be utilized to determine the optimal or efficient working fluid flow. The optimal or efficient working fluid flow may comprise the combined flow of working fluid flowing into the ORC unit to thereby produce a maximum amount of electrical power possible or to enable the ORC unit to meet a preselected electrical power output threshold. The optimal or efficient working fluid flow may be at a temperature sufficient to produce such an amount of electrical power (e.g., a temperature greater than or equal to the boiling point of the working fluid within the ORC unit). The optimal or efficient working fluid flow may be indicated by the master controller 402 as one or more open positions for each of the ORC unit valves and/or heat exchanger valves.
At block 814, the master controller 402 may, based on a determined optimal or efficient working fluid flow, determine whether to adjust the one or more ORC unit valves. Other valves within the system 400 may be adjusted based on the optimal or efficient working fluid flow, such as one or more heat exchanger valves and/or one or more wellhead fluid valves. If it is determined that the ORC unit valves or any other valves are to be adjusted, the master controller 402, at block 816, may transmit a signal to the valve to be adjusted indicating a new open position or closed position for the valve to adjust to. After the signal is transmitted, the valve may automatically adjust to the position indicated. If the valve is not to be adjusted or after the valves have been adjusted, the master controller 402 may determine operating conditions again. In an example, the master controller 402 may wait for a period of time, allowing the system to adjust to the new temperatures and flow rates or to reach equilibrium, prior to determining the operating conditions.
As noted and as illustrated in
As described and as illustrated in
As illustrated in
As such, a working fluid of a particular high-pressure heat exchanger 906A, 906B, 906N may be heated to a degree sufficient, insufficient, or more than sufficient to cause the working fluid of the ORC equipment 908A, 908B to exhibit a vaporous phase change. Since the temperature of the wellhead fluid varies, a controller (e.g., controller 916A, 916B, up to 916N or master controller 918, as illustrated in
For example, if high-pressure heat exchanger A 906A includes a working fluid at a temperature slightly less than a temperature to cause vaporous phase change, then valves providing working fluid or intermediate working fluid from the high-pressure heat exchanger A 906A to the ORC equipment 908A, 908B may be closed. In another example, if high-pressure heat exchanger B 906B is providing working fluid at a temperature well above a temperature to cause vaporous phase change, then valves providing working fluid or intermediate working fluid from high-pressure heat exchanger B 906B to ORC equipment A 908A and/or to ORC equipment B 908B may be adjusted to positions such that a greater portion of the working fluid or intermediate working fluid is transported to ORC equipment A 908A and/or to ORC equipment B 908B.
In yet another example, all valves for allowing flow of working fluid or intermediate working fluid to the ORC equipment A 908A and/or ORC equipment B 908B may be, at least, in a partially open position. The temperature of the wellhead fluid and/or working fluid of each heat exchanger 906A, 906B, 906N may be determined or measured. Further, the electrical power output of the ORC equipment A 908A and/or ORC equipment B 908B may be determined. The positions of each valve for allowing flow of working fluid or intermediate working fluid to the ORC equipment A 908A and/or ORC equipment B 908B may be adjusted to different partially open positions, fully opened positions, or fully closed positions. Such valve adjustments may be based on maximization of the resultant temperature and heat delivered to the ORC equipment A 908A and/or ORC equipment B 908B once the combined working fluid flows into the ORC equipment 908 A 908A and/or ORC equipment B 908B. The valve adjustments may be based on, rather than or in addition to other factors, the maximization of the electrical power output from the ORC equipment A 908A and/or ORC equipment B 908B. Valve adjustments may further be based on wellhead fluid temperature and/or some combination of the factors described herein.
As noted and described above and as illustrated in
In the drawings and specification, several embodiments of systems and methods to provide geothermal power in the vicinity of a wellhead during hydrocarbon production have been disclosed, and although specific terms are employed, the terms are used in a descriptive sense only and not for purposes of limitation. Embodiments of systems and methods have been described in considerable detail with specific reference to the illustrated embodiments. However, it will be apparent that various modifications and changes can be made within the spirit and scope of the embodiments of systems and methods as described in the foregoing specification, and such modifications and changes are to be considered equivalents and part of this disclosure.
Bodishbaugh, Adrian Benjamin, Murtland, Carrie Jeanne
Patent | Priority | Assignee | Title |
11359612, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods for generation of electrical power in an organic rankine cycle operation |
11421625, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods utilizing gas temperature as a power source |
11421663, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods for generation of electrical power in an organic Rankine cycle operation |
11480074, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods utilizing gas temperature as a power source |
11486330, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods utilizing gas temperature as a power source |
11486370, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Modular mobile heat generation unit for generation of geothermal power in organic Rankine cycle operations |
11493029, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods for generation of electrical power at a drilling rig |
11542888, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods utilizing gas temperature as a power source |
11549402, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods utilizing gas temperature as a power source |
11572849, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods utilizing gas temperature as a power source |
11578706, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems for generating geothermal power in an organic Rankine cycle operation during hydrocarbon production based on wellhead fluid temperature |
11592009, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods for generation of electrical power at a drilling rig |
11598320, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods for generation of electrical power at a drilling rig |
11624355, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Modular mobile heat generation unit for generation of geothermal power in organic Rankine cycle operations |
11644014, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods for generation of electrical power in an organic Rankine cycle operation |
11644015, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods for generation of electrical power at a drilling rig |
11668209, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods utilizing gas temperature as a power source |
11680541, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods utilizing gas temperature as a power source |
11732697, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems for generating geothermal power in an organic Rankine cycle operation during hydrocarbon production based on wellhead fluid temperature |
11761353, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods utilizing gas temperature as a power source |
11761433, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods for generation of electrical power in an organic Rankine cycle operation |
11773805, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods utilizing gas temperature as a power source |
11879409, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods utilizing gas temperature as a power source |
11905934, | Apr 02 2021 | ICE Thermal Harvesting, LLC | Systems and methods for generation of electrical power at a drilling rig |
Patent | Priority | Assignee | Title |
10005950, | Dec 13 2013 | Halliburton Energy Services, Inc. | Methods and systems for removing geothermal scale |
10024198, | Aug 13 2015 | Echogen Power Systems, LLC | Heat engine system including an integrated cooling circuit |
10059870, | Dec 02 2014 | Halliburton Energy Services, Inc. | Acid-soluble cement composition |
10060302, | Oct 21 2013 | Passive low temperature heat sources organic working fluid power generation method | |
10060652, | Feb 16 2015 | KYOEI DENKI KOGYO CORPORATION | Boiling-water geothermal heat exchanger and boiling-water geothermal power generation equipment |
10077683, | Mar 14 2013 | ECHOGEN POWER SYSTEMS LLC | Mass management system for a supercritical working fluid circuit |
10113389, | Sep 09 2014 | Halliburton Energy Services, Inc. | Crack-resistant cement composition |
10113535, | Jun 04 2014 | PINTAIL POWER LLC | Dispatchable combined cycle power plant |
10138405, | Nov 25 2013 | Halliburton Energy Services, Inc. | Fiber suspending agent for lost-circulation materials |
10138560, | Mar 11 2015 | Halliburton Energy Services, Inc. | Methods and systems utilizing a boron-containing corrosion inhibitor for protection of titanium surfaces |
10221770, | May 31 2012 | RTX CORPORATION | Fundamental gear system architecture |
10227893, | Jun 08 2011 | RTX CORPORATION | Flexible support structure for a geared architecture gas turbine engine |
10267184, | Nov 03 2014 | Echogen Power Systems, LLC | Valve network and method for controlling pressure within a supercritical working fluid circuit in a heat engine system with a turbopump |
10458206, | Oct 06 2016 | Saudi Arabian Oil Company | Choke system for wellhead assembly having a turbine generator |
10465104, | Dec 02 2014 | Halliburton Energy Services, Inc. | Lime-based cement composition |
10472994, | May 26 2017 | ECHOGEN POWER SYSTEMS LLC | Systems and methods for controlling the pressure of a working fluid at an inlet of a pressurization device of a heat engine system |
10494897, | Sep 09 2014 | Halliburton Energy Services, Inc. | Crack-resistant cement composition |
10495098, | Jun 13 2014 | ECHOGEN POWER SYSTEMS LLC | Systems and methods for balancing thrust loads in a heat engine system |
10570777, | Nov 03 2014 | Echogen Power Systems, LLC | Active thrust management of a turbopump within a supercritical working fluid circuit in a heat engine system |
10584660, | Jan 24 2012 | RTX CORPORATION | Geared turbomachine fan and compressor rotation |
10590324, | Nov 25 2013 | Halliburton Energy Services, Inc. | Fiber suspending agent for lost-circulation materials |
10590802, | Jun 08 2011 | RTX CORPORATION | Flexible support structure for a geared architecture gas turbine engine |
10598160, | Sep 28 2017 | HMFSF IP HOLDINGS, LLC | Systems and methods of generating electricity using heat from within the earth |
10619520, | Mar 02 2007 | Controlled organic Rankine cycle system for recovery and conversion of thermal energy | |
10767904, | Apr 27 2015 | VON DÃœRING MANAGEMENT AG | Method for utilizing the inner energy of an aquifer fluid in a geothermal plant |
10794292, | Jan 31 2012 | RTX CORPORATION | Geared turbofan gas turbine engine architecture |
10883388, | Jun 27 2018 | ECHOGEN POWER SYSTEMS LLC | Systems and methods for generating electricity via a pumped thermal energy storage system |
10934895, | Mar 04 2013 | Echogen Power Systems, LLC | Heat engine systems with high net power supercritical carbon dioxide circuits |
10947626, | Sep 01 2016 | Halliburton Energy Services, Inc. | Fluoride corrosion inhibition of metal surfaces |
10947839, | Jul 07 2014 | Halliburton Energy Services, Inc | Downhole thermal anomaly detection for passive ranging to a target wellbore |
3517208, | |||
3757516, | |||
3808794, | |||
3875749, | |||
3908381, | |||
3988895, | Jan 11 1974 | Power generation from hot brines | |
4063417, | Feb 04 1976 | ELLIOTT TURBOMACHINERY CO , INC | Power generating system employing geothermally heated fluid |
4112687, | Sep 16 1975 | Power source for subsea oil wells | |
4112745, | May 05 1976 | Magna Energy, Inc. | High temperature geothermal energy system |
4157730, | Nov 13 1975 | Commissariat a l'Energie Atomique; Societe Nationale Elf Aquitaine | System for the storage and recovery of heat in a captive layer |
4228657, | Aug 04 1978 | Hughes Aircraft Company | Regenerative screw expander |
4356401, | Jul 03 1979 | Thermo-electric power station supplied by geothermal heat source | |
4369373, | Sep 06 1977 | Method and apparatus for generating electricity from the flow of fluid through a well | |
4484446, | Feb 28 1983 | W K TECHNOLOGY, INC | Variable pressure power cycle and control system |
4542625, | Jul 20 1984 | Ormat Industries Ltd | Geothermal power plant and method for operating the same |
4558568, | Sep 07 1982 | Mitsui Engineering & Shipbuilding Co., Ltd. | Method and apparatus for mobilizing geothermal fluid |
4576005, | Jan 07 1985 | Wellhead gas treatment and co-generation method and system | |
4982568, | Jan 11 1989 | GLOBAL GEOTHERMAL LIMITED | Method and apparatus for converting heat from geothermal fluid to electric power |
4996846, | Feb 12 1990 | ORMAT TECHNOLOGIES INC | Method of and apparatus for retrofitting geothermal power plants |
5117908, | Mar 31 1988 | KSB Aktiengsellschaft | Method and equipment for obtaining energy from oil wells |
5440882, | Nov 03 1993 | GLOBAL GEOTHERMAL LIMITED | Method and apparatus for converting heat from geothermal liquid and geothermal steam to electric power |
5661977, | Jun 07 1995 | System for geothermal production of electricity | |
5685362, | Jan 22 1996 | The Regents of the University of California | Storage capacity in hot dry rock reservoirs |
5816048, | Mar 13 1995 | ORMAT TECHNOLOGIES, INC | Method for utilizing acidic geothermal fluid for generating power in a rankine cycle power plant |
6585047, | Feb 15 2000 | System for heat exchange with earth loops | |
6695061, | Feb 27 2002 | Halliburton Energy Services, Inc | Downhole tool actuating apparatus and method that utilizes a gas absorptive material |
6724687, | Oct 26 2000 | WEST VIRGINIA UNIVERSITY | Characterizing oil, gasor geothermal wells, including fractures thereof |
6853798, | Oct 15 2001 | National Technology & Engineering Solutions of Sandia, LLC | Downhole geothermal well sensors comprising a hydrogen-resistant optical fiber |
6989989, | Jun 17 2003 | United Technologies Corporation | Power converter cooling |
7174716, | Nov 13 2002 | NANJING TICA AIR-CONDITIONING CO , LTD | Organic rankine cycle waste heat applications |
7224080, | Jul 09 2004 | ONESUBSEA IP UK LIMITED | Subsea power supply |
7234314, | Jan 14 2003 | Earth to Air Systems, LLC | Geothermal heating and cooling system with solar heating |
7254949, | Nov 13 2002 | United Technologies Corporation | Turbine with vaned nozzles |
7281379, | Nov 13 2002 | RTX CORPORATION | Dual-use radial turbomachine |
7289325, | Jun 17 2003 | RTX CORPORATION | Power converter cooling |
7313926, | Jan 18 2005 | Rexorce Thermionics, Inc. | High efficiency absorption heat pump and methods of use |
7334410, | Apr 07 2004 | RTX CORPORATION | Swirler |
7337842, | Oct 24 2005 | Halliburton Energy Services, Inc.; Halliburton Energy Services, Inc | Methods of using cement compositions comprising high alumina cement and cement kiln dust |
7472548, | Sep 08 2004 | Solar augmented geothermal energy | |
7753122, | Jun 23 2004 | TerraWatt Holdings Corporation | Method of developing and producing deep geothermal reservoirs |
7900450, | Dec 29 2005 | ECHOGEN POWER SYSTEMS, INC | Thermodynamic power conversion cycle and methods of use |
7942001, | Mar 29 2005 | RAYTHEON TECHNOLOGIES CORPORATION | Cascaded organic rankine cycles for waste heat utilization |
8096128, | Sep 17 2009 | REXORCE THERMIONICS, INC ; Echogen Power Systems | Heat engine and heat to electricity systems and methods |
8099198, | Jul 25 2005 | ECHOGEN POWER SYSTEMS, INC | Hybrid power generation and energy storage system |
8166761, | May 15 2006 | GRANITE POWER LIMITED | Method and system for generating power from a heat source |
8193659, | Nov 19 2009 | ORMAT TECHNOLOGIES, INC | Power system |
8309498, | Sep 24 2009 | Halliburton Energy Services, Inc | High temperature fracturing fluids and methods |
8381523, | May 27 2009 | Zadok, Eli | Geothermal electricity production methods and geothermal energy collection systems |
8430166, | May 14 2009 | Board of Regents of the Nevada System of Higher Education, on behalf of the University of Nevada, Reno | Geothermal energy extraction system and method |
8528333, | Mar 02 2007 | Controlled organic rankine cycle system for recovery and conversion of thermal energy | |
8534069, | Aug 05 2008 | PARDEV,LLC | Control system to manage and optimize a geothermal electric generation system from one or more wells that individually produce heat |
8555643, | Jun 15 2011 | KALINA POWER LTD | Systems and methods extracting useable energy from low temperature sources |
8555912, | Dec 28 2007 | RAYTHEON TECHNOLOGIES CORPORATION | Dynamic leak control for system with working fluid |
8572970, | Jul 27 2007 | RAYTHEON TECHNOLOGIES CORPORATION | Method and apparatus for starting a refrigerant system without preheating the oil |
8616000, | Jun 13 2008 | PARDEV,LLC | System and method of capturing geothermal heat from within a drilled well to generate electricity |
8616001, | Nov 29 2010 | Echogen Power Systems, LLC | Driven starter pump and start sequence |
8616323, | Mar 11 2009 | Echogen Power Systems | Hybrid power systems |
8680704, | Sep 18 2009 | TAYLOR INNOVATIONS, L L C | Wellhead pressure reduction and electrical power generation |
8708046, | Nov 16 2007 | ConocoPhillips Company | Closed loop energy production from geothermal reservoirs |
8720563, | May 09 2012 | Halliburton Energy Services, Inc | Calcium aluminate cement composition containing a set retarder of an organic acid and a polymeric mixture |
8756908, | May 31 2012 | RTX CORPORATION | Fundamental gear system architecture |
8771603, | Dec 07 2009 | Halliburton Energy Services, Inc | Method for removal of hydrogen sulfide from geothermal steam and condensate |
8783034, | Nov 07 2011 | Echogen Power Systems, LLC | Hot day cycle |
8791054, | Sep 27 2012 | Halliburton Energy Services, Inc. | Methods of converting an inactive biocide into an active biocide using a chemical reaction |
8820075, | Oct 22 2009 | ExxonMobil Upstream Research Company | System and method for producing geothermal energy |
8839857, | Dec 14 2010 | Halliburton Energy Services, Inc | Geothermal energy production |
8857186, | Nov 29 2010 | Echogen Power Systems, LLC | Heat engine cycles for high ambient conditions |
8869531, | Sep 17 2009 | Echogen Power Systems, LLC | Heat engines with cascade cycles |
8881805, | Mar 22 2010 | Skibo Systems LLC | Systems and methods for an artificial geothermal energy reservoir created using hot dry rock geothermal resources |
8984883, | Apr 27 2012 | Hydropower and geothermal energy system and methods | |
9003798, | Mar 15 2012 | CYCLECT ELECTRICAL ENGINEERING PTE LTD | Organic rankine cycle system |
9014791, | Apr 17 2009 | Echogen Power Systems, LLC | System and method for managing thermal issues in gas turbine engines |
9062898, | Oct 03 2011 | ECHOGEN POWER SYSTEMS DELAWRE , INC | Carbon dioxide refrigeration cycle |
9077220, | Oct 30 2012 | INLINE TECHNOLOGIES, LLC | Pipeline turbine generator |
9080789, | May 05 2010 | GREENSLEEVES TECHNOLOGIES CORP | Energy chassis and energy exchange device |
9091278, | Aug 20 2012 | ECHOGEN POWER SYSTEMS DELAWRE , INC | Supercritical working fluid circuit with a turbo pump and a start pump in series configuration |
9109398, | Oct 28 2011 | MECHANICAL & ELECTRICAL CONCEPTS, INC | Method for forming a geothermal well |
9118226, | Oct 12 2012 | Echogen Power Systems, LLC | Heat engine system with a supercritical working fluid and processes thereof |
9121259, | Aug 13 2010 | Board of Regents, The University of Texas System | Storing carbon dioxide and producing methane and geothermal energy from deep saline aquifers |
9150774, | Aug 11 2011 | Halliburton Energy Sevices, Inc. | Methods for cementing in a subterranean formation using a cement composition containing a set retarder of a polyester |
9234522, | Jan 03 2012 | RTX CORPORATION | Hybrid bearing turbomachine |
9243616, | Nov 02 2012 | Korea Institute of Energy Research | Heat-electricity combined production system that utilizes solar energy and geothermal heat |
9297367, | May 02 2008 | United Technologies Corporation | Combined geothermal and solar thermal organic rankine cycle system |
9316404, | Aug 04 2009 | Echogen Power Systems, LLC | Heat pump with integral solar collector |
9331547, | Sep 13 2012 | ORMAT TECHNOLOGIES INC | Hybrid geothermal power plant |
9341084, | Oct 12 2012 | ECHOGEN POWER SYSTEMS DELAWRE , INC | Supercritical carbon dioxide power cycle for waste heat recovery |
9376937, | Feb 22 2010 | University of South Florida | Method and system for generating power from low- and mid- temperature heat sources using supercritical rankine cycles with zeotropic mixtures |
9394764, | Mar 29 2010 | SIME SRL | Method and an apparatus for obtaining energy by expanding a gas at a wellhead |
9394771, | Jan 27 2012 | Deep Well Power, LLC | Single well, self-flowing, geothermal system for energy extraction |
9403102, | Feb 13 2012 | RTX CORPORATION | Heat exchange system configured with a membrane contactor |
9441504, | Jun 22 2009 | Echogen Power Systems, LLC | System and method for managing thermal issues in one or more industrial processes |
9458738, | Sep 17 2009 | INC , ECHOGEN POWER SYSTEMS ; ECHOGEN POWER SYSTEMS DELWARE , INC | Heat engine and heat to electricity systems and methods with working fluid mass management control |
9499732, | Aug 11 2011 | Halliburton Energy Services, Inc. | Methods for cementing in a subterranean formation using a cement composition containing a set retarder of a polyester |
9512348, | Mar 28 2013 | Halliburton Energy Services, Inc. | Removal of inorganic deposition from high temperature formations with non-corrosive acidic pH fluids |
9512741, | Aug 19 2011 | FUJI ELECTRIC CO , LTD | Power plant |
9574551, | Dec 16 2011 | GTHERM GEO, INC | Power tower—system and method of using air flow generated by geothermal generated heat to drive turbines generators for the generation of electricity |
9587161, | Feb 21 2012 | Halliburton Energy Services, Inc. | Drilling fluid containing a surfactant having a high boiling point and a long chain tail group |
9587162, | Feb 21 2012 | Halliburton Energy Services, Inc. | Drilling fluid containing a surfactant having a high boiling point and a long chain tail group |
9638065, | Jan 28 2013 | ECHOGEN POWER SYSTEMS DELWARE , INC | Methods for reducing wear on components of a heat engine system at startup |
9649582, | Jul 28 2008 | Deep sea collection of solid materials from geothermal fluid | |
9683463, | Mar 02 2007 | Controlled organic rankine cycle system for recovery and conversion of thermal energy | |
9726157, | May 09 2012 | Halliburton Energy Services, Inc | Enhanced geothermal systems and methods |
9759096, | Aug 20 2012 | Echogen Power Systems, L.L.C. | Supercritical working fluid circuit with a turbo pump and a start pump in series configuration |
9762460, | Mar 24 2015 | NetApp, Inc | Providing continuous context for operational information of a storage system |
9816443, | Sep 27 2012 | RTX CORPORATION | Method for setting a gear ratio of a fan drive gear system of a gas turbine engine |
9829194, | Nov 17 2010 | ORCAN ENERGY AG | Method and apparatus for evaporating organic working media |
9840662, | Dec 11 2013 | Halliburton Energy Services, Inc | Hydrofluoric acid acidizing composition compatible with sensitive metallurgical grades |
9845423, | Apr 29 2015 | Halliburton Energy Services, Inc. | Grout fluids for use in a geothermal well loop |
9863282, | Sep 17 2009 | INC , ECHOGEN POWER SYSTEMS ; ECHOGEN POWER SYSTEMS DELWARE , INC | Automated mass management control |
9874112, | Sep 05 2013 | ECHOGEN POWER SYSTEMS DELAWRE , INC | Heat engine system having a selectively configurable working fluid circuit |
9932861, | Jun 13 2014 | ECHOGEN POWER SYSTEMS LLC | Systems and methods for controlling backpressure in a heat engine system having hydrostaic bearings |
9957432, | Nov 05 2013 | Halliburton Energy Services, Inc. | Wellbore fluid additives of fibrillated fibers and methods of use |
20030010652, | |||
20040237890, | |||
20050034467, | |||
20060130480, | |||
20090217664, | |||
20100077792, | |||
20100187319, | |||
20100218930, | |||
20110000210, | |||
20110030404, | |||
20110041505, | |||
20110100003, | |||
20110272166, | |||
20110314818, | |||
20120042650, | |||
20120131918, | |||
20120145397, | |||
20120174581, | |||
20120198844, | |||
20120261092, | |||
20120292909, | |||
20120315158, | |||
20130041068, | |||
20130217604, | |||
20130247569, | |||
20130299123, | |||
20130299170, | |||
20140011908, | |||
20140057810, | |||
20140087978, | |||
20140102098, | |||
20140123643, | |||
20140130498, | |||
20140296113, | |||
20150252653, | |||
20150300327, | |||
20150330261, | |||
20150345482, | |||
20160017758, | |||
20160017759, | |||
20160040557, | |||
20160047540, | |||
20160061055, | |||
20160076405, | |||
20160084115, | |||
20160160111, | |||
20160222275, | |||
20160257869, | |||
20160312646, | |||
20160340572, | |||
20160369408, | |||
20170058181, | |||
20170145815, | |||
20170175582, | |||
20170175583, | |||
20170226402, | |||
20170233635, | |||
20170240794, | |||
20170254223, | |||
20170321104, | |||
20170321107, | |||
20170362963, | |||
20180274524, | |||
20180313340, | |||
20180328138, | |||
20190055445, | |||
20190128567, | |||
20200011426, | |||
20200025032, | |||
20200232342, | |||
20200248063, | |||
20200308992, | |||
20200309101, | |||
20200354839, | |||
20200386212, | |||
20200399524, | |||
20210071063, | |||
20210172344, | |||
CA2676502, | |||
CN102812212, | |||
CN103174473, | |||
CN103174475, | |||
CN107246550, | |||
EP652368, | |||
EP1573173, | |||
EP1713877, | |||
EP1869293, | |||
EP2167872, | |||
EP2201666, | |||
EP2222939, | |||
EP3464836, | |||
FR2738872, | |||
GB2336943, | |||
IN247090, | |||
IN256000, | |||
JP2001183030, | |||
KR101126833, | |||
NZ581457, | |||
RE36282, | Nov 23 1994 | System for using geopressured-geothermal reservoirs | |
RU2006142350, | |||
SG191467, | |||
SG191468, | |||
SG192327, | |||
WO2005049975, | |||
WO2006060253, | |||
WO2006138459, | |||
WO20070079245, | |||
WO2007048999, | |||
WO2009017471, | |||
WO2009017473, | |||
WO2009017474, | |||
WO2010021618, | |||
WO2011073469, | |||
WO2011093854, | |||
WO2012060510, | |||
WO2013059695, | |||
WO2013103592, | |||
WO2013103631, | |||
WO2014065977, | |||
WO2014164620, | |||
WO2014165053, | |||
WO2016147419, | |||
WO2016204287, | |||
WO2017203447, | |||
WO2019155240, | |||
WO2020152485, | |||
WO2020239067, | |||
WO2020239068, | |||
WO2020239069, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Jul 02 2021 | ICE Thermal Harvesting, LLC | (assignment on the face of the patent) | / | |||
Jul 02 2021 | MURTLAND, CARRIE JEANNE | ICE Thermal Harvesting, LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 056791 | /0543 | |
Jul 02 2021 | BODISHBAUGH, ADRIAN BENJAMIN | ICE Thermal Harvesting, LLC | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 056791 | /0543 |
Date | Maintenance Fee Events |
Jul 02 2021 | BIG: Entity status set to Undiscounted (note the period is included in the code). |
Jul 15 2021 | SMAL: Entity status set to Small. |
Date | Maintenance Schedule |
Feb 22 2025 | 4 years fee payment window open |
Aug 22 2025 | 6 months grace period start (w surcharge) |
Feb 22 2026 | patent expiry (for year 4) |
Feb 22 2028 | 2 years to revive unintentionally abandoned end. (for year 4) |
Feb 22 2029 | 8 years fee payment window open |
Aug 22 2029 | 6 months grace period start (w surcharge) |
Feb 22 2030 | patent expiry (for year 8) |
Feb 22 2032 | 2 years to revive unintentionally abandoned end. (for year 8) |
Feb 22 2033 | 12 years fee payment window open |
Aug 22 2033 | 6 months grace period start (w surcharge) |
Feb 22 2034 | patent expiry (for year 12) |
Feb 22 2036 | 2 years to revive unintentionally abandoned end. (for year 12) |