Process of drilling a bore into a geopressured-geothermal reservoir containing a gas-laden fluid, allowing the fluid to escape through the bore, passing the fluid into a rotatable turbine which causes a generator to produce electricity, passing the fluid to means for separating gas from the fluid, and passing the fluid into a multi-effect distillation system to extract fresh water from the fluid to produce fresh water and saturated brine.

Patent
   RE36282
Priority
Nov 23 1994
Filed
Nov 23 1994
Issued
Aug 31 1999
Expiry
Aug 31 2016
Assg.orig
Entity
Small
36
17
all paid
1. A method of using a geopressured-geothermal reservoir containing a gas-laden fluid, said method comprising the steps of:
(a) drilling a bore into the reservoir;
(b) allowing the fluid within the reservoir to escape through the bore;
(c) passing the fluid into an interior of a turbine such that movement of the fluid causes the turbine to rotate, rotation of the turbine causing a generator to rotate to produce electricity;
(d) passing the fluid from the interior of the turbine to means for separating the gas from the fluid; and
(e) passing the fluid into an interior of a multi-effect distillation system, the multi-effect distillation system extracting fresh water from the fluid to produce fresh water and saturated brine.
2. The method of claim 1, further comprising the step of A method of using a geopressured-geothermal reservoir containing a gas-laden fluid, the reservoir having a bore therein, said method comprising the steps of:
(a) allowing the fluid within the reservoir to escape through the bore;
(b) passing the fluid into means for separating the gas from the fluid;
(c) passing the fluid into an interior of a multi-effect distillation system having cascading distillation effects, each distillation effect removing water vapor from the fluid and passing the water vapor through a heat exchanger located adjacent to fluid contained within a successive distillation effect, the multi-effect distillation system extracting fresh water from the fluid to produce fresh water and concentrated brine; and
(d) withdrawing the fluid from the reservoir in such a manner as to generate a limit intensity of a controlled earthquake to relieve stress within an underlying geographical strata.
3. The method of claim 1, further comprising the step of A method of using a geopressured-geothermal reservoir containing a gas-laden fluid, the reservoir having a bore therein, said method comprising the steps of:
(a) allowing the fluid within the reservoir to escape through the bore;
(b) passing the fluid into means for separating the gas from the fluid;
(c) passing the fluid into an interior of a multi-effect distillation system having cascading distillation effects, each distillation effect removing water vapor from the fluid and passing the water vapor through a heat exchanger located adjacent to fluid contained within a successive distillation effect, the multi-effect distillation system extracting fresh water from the fluid to produce fresh water and concentrated brine; and
(d) injecting fluid into the reservoir in such a manner as to generate a an earthquake to relieve stress within an underlying geographical strata.
4. The method of claim 3, wherein said step of injecting fluid into the reservoir comprises the injection and disposal of liquid waste.
5. The method of claim 1, further comprising the step of A method of using a geopressured-geothermal reservoir containing a gas-laden fluid, the reservoir having a bore therein, said method comprising the steps of:
(a) allowing the fluid within the reservoir to escape through the bore;
(b) passing the fluid into means for separating the gas from the fluid;
(c) passing the fluid into an interior of a multi-effect distillation system having cascading distillation effects, each distillation effect removing water vapor from the fluid and passing the water vapor through a heat exchanger located adjacent to fluid contained within a successive distillation effect, the multi-effect distillation system extracting fresh water from the fluid to produce fresh water and concentrated brine; and
(d) passing the gas to means for extracting moisture from the gas. 6. The method of claim 1, further comprising the step of passing the saturated brine to one or more solar ponds.7. The method of claim 6, wherein said method of passing the saturated brine to one or more solar ponds produces potable water by reverse osmosis desalination of
seawater.8. The method of claim 4, wherein said method of injecting liquid waste into the reservoir causes the displacement of unprocessed reservoir fluid from the reservoir through the bore. 9. A method of using a geopressured-geothermal reservoir containing a gas-laden fluid, the reservoir having a bore therein, said method comprising the steps of:
(a) allowing the fluid within the reservoir to escape through the bore;
(b) passing the fluid into means for separating the gas from the fluid;
(c) passing the fluid into an interior of a multi-effect distillation system having cascading distillation effects, each distillation effect removing water vapor from the fluid and passing the water vapor through a heat exchanger located adjacent to fluid contained within a successive distillation effect, the multi-effect distillation system extracting fresh water from the fluid to produce fresh water and concentrated brine; and
(d) passing the fluid from the bore into an interior of a turbine such that movement of the fluid causes the turbine to rotate, rotation of the turbine causing a generator to rotate to produce
electricity.10. The method of claim 9, further comprising the step of passing the fluid from the interior of the turbine to said means for separating the gas from the fluid.11. A method of using a geopressured-geothermal reservoir containing a gas-laden fluid, the reservoir having a bore therein, said method comprising the steps of:
(a) allowing the fluid within the reservoir to escape through the bore;
(b) passing the fluid into means for separating the gas from the fluid;
(c) passing the fluid into an interior of a multi-effect distillation system having cascading distillation effects, each distillation effect removing water vapor from the fluid and passing the water vapor through a heat exchanger located adjacent to fluid contained within a successive distillation effect, the multi-effect distillation system extracting fresh water from the fluid to produce fresh water and concentrated brine; and
(d) passing steam from the multi-effect distillation system to an external heat exchanger.12. The method of claim 11, further comprising the step of condensing the steam within the external heat exchanger by transferring latent heat to cooling fluid or seawater.13. The method of claim 9, further comprising the step of passing the concentrated brine to one or more solar ponds.14. The method of claim 13, further comprising the step of using the solar ponds to produce power for the desalination of sea water.
flow-rates flow rates through a cased well bore.

Unlike hot-water hot water and/or steam producing geothermal energy, which is generally associated with volcanic formations, geopressured-geothermal reservoirs and/or aquifers are found in sedimentary formations beneath existing oil and gas reservoirs.

There are seven known primary geopressured-geothermal basins in the United States of America. These basins are cartographically illustrated in FIG. 1. A more detailed map of various geopressured-geothermal basins in the United States is shown in FIG. 2. The largest basin in the United States is located in the Texas-Louisiana coastal region. That basin is estimated to contain a gas reserve of 250 TCF (trillion-cubic-feet). That amount is equivalent to 137 percent (137%) of the presently developed conventional natural gas reserves in the United States. Due to the extensive oil and gas exploration that has already been conducted in that region, much documentation as to the geology and reservoir characteristics already exists. There are approximately sixty-six (66) known geopressured-geothermal basins within the world.

Although the particular drive-mechanisms drive mechanisms of these geopressured-geothermal reservoirs are as yet not fully understood, long-range flow characteristics can be predicted from several tests which were conducted by the United States Department of Energy (D.O.E.).

For example, one of these flow-tests flow tests was performed on the Gladys McCall well in Louisiana. The flow-test flow test revealed that an average of 20,000 barrels per day (bbl/day) of brine flowed continuously for four (4) years. When the flow-test flow test was completed in October of 1987, the well had produced 27 million bbls of brine with 676 million standard-cubic-foot (scf) of natural gas without any appreciable change to the bottom hole pressure.

Other flow tests conducted by the D∅E. in the Gulf coast geopressured-geothermal region have indicated similar brine flow longevity.

The first part of the proposed three-part process employs a system which is designed to optimally convert the thermal and/or hydraulic potentials of the reservoir into electrical power. At the same time, natural gas may be separated from the brine for later sale or for on-site on site use.

The hydraulic energy stored within the reservoir, which creates a wellhead pressure, is converted into electrical power by allowing the pressurized brine to pass through a pressure-reduction turbine connected to a generator, which in turn rotates to generate electricity.

The thermal energy stored within the reservoir is passed through a multi-effect distillation unit to distill the brine into fresh water and saturated brine or saltwater. The saturated brine is produced as a by-product.

This first part of the process or system produces four distinct products: (1) electricity; (2) natural gas; (3) potable water; and (4) saturated brine.

The second part of the process utilizes the saturated brine, which is produced during the first part of the process, as a bulk material for the construction of solar ponds. The solar ponds could be built in areas such as the already naturally flat salt areas of southwestern California. The power produced by desalinated seawater within these solar ponds could supply much of California's water needs for an indefinite period of time.

The third part of the process involves the controlled production of saturated brine and the disposal of liquid waste into wells used in the first part of the process which are preferably located near geographical fault areas. This method would afford a certain measure of earthquake deintensification and control, while at the same time providing a safe disposal for various liquid wastes.

The invention herein disclosed is the combination of two or more of the above stated above-stated three parts of the process. By way of review, the three parts include: (1) the geopressured-geothermal production of fresh water, electrical power, and separation of natural gas and saturated brine by means of a turbine/multi-effect system; (2) continued water production by reverse osmosis desalination of seawater within solar ponds, which are constructed as a by-product from the processes described in part one; and (3) the timely and controlled production of saturated brine and/or disposal of liquid waste within wells located near geographical faults to dispose of liquid waste and to control the intensity of earthquakes. A schematic flow chart of the three parts of the process is illustrated in FIG. 3.

PAC Turbine

A lined well, having a wellhead at its upper end, taps into a geopressured-geothermal reservoir. A pressure reduction turbine is positioned immediately downstream from the wellhead in such a manner that the reservoir's pressure gradient causes pressurized brine to be expelled through the wellhead into the turbine. The passage of the pressurized brine through the interior of the turbine causes the turbine and an associated electric generator to rotate. Conventional means for converting the rotation of the turbine into electrical current may be used.

The turbine, and, more particularly, the turbine nozzles which direct the fluid to drive the turbine, also serves to choke the flow of brine from the wellhead. Thus positioned, the turbine causes the flow of brine to have a lower pressure at the downstream end of the turbine. This lower pressure allows for a more efficient removal of the natural gas from the brine mixture.

A gas separator may be used to effectively remove the natural gas from the brine mixture. The gas separator diverts the wet gas (natural gas mixed with a certain amount of water vapor) to a dryer. The wet gas is then dried by burning a portion of the gas in a diethylene glycol dehydrator.

In applications where the removed natural gas would be sold, the lower pressure may be further controlled by the flowing pressure of a selected pipeline. In applications where the natural gas will be used on-site, the lower pressure may be further controlled by the limitations inherent in the gas drying processes. For example, the pressure may be controlled to optimize the costs of power to dry the gas verses the gas value.

As the pressure is lowered in either of the above situations, an ever increasing amount of water vapor is produced with the extraction of the natural gas from the brine.

For modeling the phase composition of the brine exiting the turbine, it is assumed that the brine will obey Henry's law. To further simplify the model, only carbon dioxide (CO2), methane (CH4), and ethane (C2 H6) are considered significant components within the gas. All of the dissolved solids are lumped together as "salts" (shown in Table I of FIG. 8). The vapor pressure of the "salts" is approximated as zero for the working range.

Much of the data which was used for the following computations were taken from the flow test results gathered by the D.O.E. at the Pleasant Bayou No. 2. The Pleasant Bayou No. 2 is a geopressured-geothermal well located South East southeast of Houston, Tex.

Based upon the data obtained by the D.O.E. at the Pleasant Bayou No. 2 test well, the wellhead parameters are:

Pin =3500 psia

Tin =280° F.

mt =88.4 lbm/s (20,000 barrels per day)

GWR(gas withdrawal rate)=23.64 scf/bbl

ZH2O =9.2265×10-1

Zsalts =7.4260×10-2

ZCH4 =2.6813×10-3

ZC2H6 =1.1223×10-4

ZCO2 =2.9647×10-4

wherein P and T are respectively the pressure and the temperature of the brine solution entering into the turbine (or in other words, exiting the wellhead), mt is the mass flow-rate flow rate through the turbine, and Zn is the total mole fraction of the constituent n. The effects of all other constituents, other than those listed, are considered negligible and are omitted from the model.

Turbine selection was based upon a specific speed analysis for a 2-pole, 60 Hz generator operating at 3600 rpm. Based on the aforementioned Pleasant Bayou No. 2 wellhead conditions, the specific speed for this application has a value of 0.042. This particular specific speed is best served by a single jet Pelton wheel turbine. The previously mentioned Csanady material gives equations for sizing the turbine's wheel and jet nozzle to achieve optimum performance which, for this application, yield diameters of 21.4 inches and 0.60 inches respectively. Given these dimensions and operating parameters, the turbine can be expected to run at 87.5% efficiency. The generator efficiency is assumed to be typical at 99%.

The power output of the turbine, taking into account the turbine and generator inefficiencies, is 974 hp (727 kW) for a 3300 psi pressure drop. Assuming that all inefficiencies are absorbed as an internal energy increase in the fluid, the fluid's temperature rises by only 1.0° F. Hence, the compositional phase change through the turbine is considered to be a constant temperature process at the inlet temperature of 280° F. By using Henry's law, together with mass and phase balance, the following equations can be written: ##EQU1## where PT =pressure of composite fluid

yi =mole fraction of component i in gas/vapor phase

xi =mole fraction of component i in liquid phase

Hi =Henry's constant for gas i

Pj =vapor pressure of component j (H,P=f{T})

mL =mole fraction of liquid in composite fluid.

Since Z is known and H and P can be found as functions of temperature, the above equations may be used to solve for the phase composition of the brine-gas-vapor mixture for a given pressure. It was found that above 3087 psia the fluid is in single phase for the Pleasant Bayou No. 2 test well.

Allowing for a turbine exhaust fluid pressure of 200 psia (3300 psi ΔP from the wellhead) entering a baffled separator tank, 6072 lbm H2 O vapor/day will have to be removed from the separated gas to meet pipeline standards of no more than 7 lbm water/MMscf gas. A diethylene glycol (DEG) dehydration unit is suggested for this purpose. The heat requirements for operating the dehydrator are estimated at 1.5×106 BTU/hr. This requirement could be supplied from the dried gas and, for the reference flow rate of the Pleasant Bayou No. 2 test well, would result in a net dry gas production of 435×103 scf/day. The operating pressure for the separator may have to be altered dependent upon the flowing pressure of an available pipeline or the on-site usage line pressure.

Leaving the gas separator, the brine is throttled to a lower pressure in a first effect of a multi-effect unit. The first effect of the distillation unit acts as a flash chamber removing a certain volume of steam off the brine and starts the multi-effect cascading process.

A multi-effect distillation system essentially operates like a series of flash-tanks, with one variation: the water vapor from each effect is routed through a heat exchanger located opposite the brine of the following effect, which has at a lower pressure and temperature. The multi-effect distillation system is shown in FIG. 4.

The multi-effect distillation system not only condenses the water vapor into liquid, by removing latent heat, it also transfers that latent heat back into the brine solution in the following effect to help drive the evaporation in that subsequent effect. The first and last effects are hybrid to this cascading distillation design in that the first effect has no prior effect's condensing vapor to help drive its evaporation, and the last effect's vapor has to be condensed by an out-of-system heat sink since there isn't any following effect.

As the brine moves through the multi-effect distillation system the pressure is lowered in a step-wise manner at each effect. This drives water vapor off the brine solution while increasing the salt concentration in the brine. The ever-increasing salt concentration causes a boiling point rise in the brine solution.

To achieve efficient heat transfer and fully realize the condensation and evaporation feature, the saturation temperature for the exiting steam in each effect must be sufficiently higher than the brine temperature in the following effect. An amount of desuperheating will occur in each heat exchanger as the steam, which is leaving the prior effect at that previous effect's pressure and temperature, is liberated from the brine solution.

When the brine enters the first effect, a large amount of steam is captured in the top of the effect. A slightly more concentrated brine solution is then removed from the bottom of the effect.

The conveyed brine is then throttled to yet a lower pressure and temperature in the second effect. The steam from the first effect, which has a higher pressure and temperature, is routed through a heat exchanger in the second effect. This process not only condenses the steam from the first effect, it also helps drive the vaporization process in the second effect.

Leaving the second effect, and each subsequent effect thereafter in the multi-effect cascade, the amount of steam produced increases and a greater concentration of brine solution is created. The fresh water condensate is continually removed from the heat exchangers.

The steam from the last effect will have to be condensed by an out-of-system heat sink, since there is no following effect to serve this purpose. For example, a cooling pond of seawater at 80° F. could be used as the out-of-system heat sink.

Using the laws of mass balance and the First Law of Thermodynamics, two separate equations can be written to model the steam production through the multi-effect distillation system: the first equation is for the first effect; and the second equation is for subsequent effects.

First effect:

(6) f1 ≈Cp (T1 -T2)/hfg1 (6)

Subsequent effects:

fn ≈[Cp (Tn -Tn+1)+hfgn {fn-1 /(1-fn-1)}]/hfgnb (7)

(7) fn ≈(Cp (Tn-1 -Tn)+hfgn {fn-1 /(1-fn-1)})/hfgnb

where

fn =mass fraction of brine vaporized in effect n

Cp =average specific heat of brine

Tn =temperature in effect n

hfgn =latent heat of vaporization for the condensing steam in effect n

hfgnb =latent heat of vaporization for the brine in effect n

The simplification that NaCl represents the only soluble ions in the brine (all other soluble ions are comparatively low) is made to model the brine's salt concentration and boiling point rise through the multi-effect distillation system.

It is necessary to maintain the brine solution below the solubility limit to prevent solids from precipitating within the system. At the same time, the brine solution should be brought as close to the solubility limit as possible to maximize fresh water production. The assumption is also made that the solubility limit of the brine solution is that for NaCl in hot water, or 39.12 grams/100cc. The maximum mass fraction of salt allowable before reaching this solubility limit is 0.281. The relationship between the mass and mole fractions of NaCl in water, can be written as:

(8) mNaCln =xNaCln MWNaCl /[MWH2O (1-xNaCln)+xNaCln MWNaCl ] (8)

where

xNaCln =mole fraction of NaCl in effect n

mNaCln=mass fraction of NaCl in effect n

MW=molecular weight

Also, the mass fraction change for NaCl through each effect can be written as:

(9) msen =ms /[mn (1-fn)]=msin /(1-fn) (9)

where

msen =NaCl mass fraction exiting effect n

msin =NaCl mass fraction entering effect n

ms =NaCl mass flow rate through multi-effect

mn =brine mass flow rate into effect n

Several additional simplifying assumptions are made in the modeling of the multi-effect system. The assumptions include: (1) the latent heat of vaporization and the specific heat of the brine is nearly that of pure water for the working range; (2) the throttling processes through the multi-effect are considered isenthalpic; (3) the desuperheating is considered negligible (less than 0.5% of heat transfer for condensation); and (4) the steam from the last effect is condensed by a heat exchanger with 80° F. water (obtained from the ocean or cooling pond).

The solution of equations (1) through (5) for the Pleasant Bayou No. 2 test well yields the following input conditions into the multi-effect for a turbine exhaust pressure of 200 psia:

ZH2O =0.925

ZCH4 =1.28×10-3

ZCO2 =9.56×10-4

ZC2H6 =5.61×10-5

ZNaCl =0.03725

m1 =88.1 lbm/s

With the aforementioned assumptions, the model of the multi-effect distillation system equations (6) through (9) predicted the performance listed in Table II of FIG. 9. The turbine and effects listed in Table II correspond to the same elements identified in FIG. 5.

The depicted seven-effect distillation system design reflects a 21° F. temperature drop, not including the individual boiling point rise, in each effect. This design was selected as the most efficient, in terms of heat transfer, to distill the brine at a 99% salt saturated composition and condense the steam from the last effect. Other combinations and number of effects could similarly be used.

The power requirements as given in Table II are based on a flow-line pressure of 20 psia for the condensate and brine, and an arbitrary head of 50 feet for the cooling pump. The trace amounts of non-condensable gases can be bled from the first and second effects, as their pressure is above atmospheric pressure.

One of the major obstacles associated with the coproduction of gas and brine is the formation of calcium carbonate scale (CaCO3) in the production tubing and surface equipment. As the fluid's pressure is lowered, from its shut-in formation pressure at the wellhead to a designated operating pressure, CaCO3 precipitates and forms as scale.

In the proposed system this scale formation and growth would not only have the conventional adverse effects of restricting flow and possibly causing down-hole tubing failure, it could also severely impair heat transfer for brine distillation in the multi-effect distillation system.

It is, therefore, suggested that a phosphorate based scale inhibitor pill (as designed by Dr. Mason Tomson of Rice University in his earlier identified article) be used to remedy the scaling problem. The inhibitor pill is squeezed into the geopressured-geothermal formation and held in-place in place for approximately one day. When the well is again allowed to flow, the inhibitor interacts with the brine to prohibit CaCO3 precipitation.

The inhibitor's success in virtually eliminating CaCO3 scale has been observed on both the Gladys McCall and the Pleasant Bayou No. 2 test wells, with a squeeze frequency estimated at one per 8 million bbl of brine produced. This is approximately one inhibitor squeeze per year for the Pleasant Bayou No. 2 test well.

With the use of stainless steel material in the critical flow paths and proper materials selection in other areas, it should be possible to reasonably protect the surface components of the system against accelerated corrosion due to the absence of scale.

It has also been shown on the Gladys McCall and on the Pleasant Bayou No. 2 test wells that, by proper design of the production tubing string, long-term production can be realized without down-hole failure in the tubulars. Work is also being performed to design a corrosion inhibitor for heavy brine production.

PAC Well-System Grid / Solar Pond Water Production

The Great Valley-Franciscan geopressured-geothermal basin in California, generally shown in FIGS. 1 and 2, covers an area of approximately 30,000 square miles and has similar fluid temperatures and pressure gradients as those found in the Gulf coast area. In the absence of specific site data, the proposed scenario assumes that the California basin will perform in like manner to that demonstrated in the Gulf coast basin.

A well-system grid could be established on the Great Valley. The number of wells would depend upon the basin's ability to support production. Assuming the basin could sustain a ten-year production on a 1000 well grid well-grid, or one well per 30 square miles, the estimated pure water production for the well-grid process at height of production would be approximately 530×106 gallons per day. This initial estimate of well-grid water production is roughly equivalent to 2% of California's 1985 total water consumption.

The saturated brine by-product could then be piped to south-central south central California where natural salt-flats salt flats already exist. The saturated brine by-products could then be used as bulk material for the construction of solar ponds.

Solar pond technology has made considerable advances in recent years, particularly in the Dead Sea area of Israel, and today stands as a well-demonstrated science.

A solar pond is a shallow, concentrated saltwater lake that establishes a well-defined temperature gradient by absorbing solar energy. This temperature gradient can be used to drive a Rankine cycle for power production.

During the well production phase, the 1000 wells would produce enough brine to construct a six foot deep, 850 square mile solar pond (roughly two times the size of the Salton Sea in southern California).

An advanced solar pond, recovering an 80% Second Law efficiency from its Rankine cycle, could generate a twenty-fold increase in the fresh water production realized from the wells by desalinating seawater in a 30 Whr/gal reverse osmosis process. The reverse osmosis process could be partially performed on an on-line basis. For example, it could occur before the end of the well production phase. At its fullest potential this process would supply around 40% of California's total water consumption demand, including the requirements of industry and agriculture.

In areas where the well-system grid would encompass or border geographically faulted zones, in particular the San Andreas fault, it could be laid out in accordance with C. B. Raleigh's proposed model for earthquake control. Mr. Raleigh's proposed model is explained in his above identified above-identified article.

At the risk of over simplification, the method would allow areas of high plate-stress plate stress build-up to be hydraulically "jacked" over the locked zones in a controlled slip fashion, analogous to letting the air out of a tire slowly versus a blowout (intense earthquake). This concept is depicted in FIGS. 6A, 6B, 6C, and 6D.

The arrows in FIGS. 6A, 6B, 6C, and 6D illustrate the direction of strain build-up over or adjacent to a locked geographic zone. The lines depict the existing or intended fracture line for stress relief.

As shown in FIG. 6A, heavy de-watering of the outside two wells creates fracture "seats" (the large "X"s) which strengthen that area's resistance to slip.

As shown in FIG. 6B, the inner well may be used to inject heavy fluid into the underlying strata, thereby, "jacking" the fracture apart and generating a minor earthquake, having an intensity which is proportional to the distance between the wells. If the distance between the wells is approximately five kilometers, a minor earthquake of approximately 4.5 or less on the Richter scale could be generated to propagate stress relief through the locked zone.

As shown in FIG. 6C, the inner well is then used to extract the previously injected heavy fluid to "seat" or strengthen the fracture line.

As shown in FIG. 6D, the outer two wells are then used to inject heavy fluid into the underlying strata to "unseat" the fracture, again allowing a minor earthquake to propagate stress relief as the plates slip.

The magnitude of the induced earthquakes is kept low by the near proximity of the wells. To accommodate the necessary slippage along the San Andreas fault of 2 to 3 cm/year, this cycle would need to be repeated approximately once every six months for wells spaced at five kilometers.

The relationship between down-hole extraction and injection and the intensity of earthquakes has been documented in a number of areas. Low permeability in the deep fault zone is of prime concern to the reduction of risk and success of this method. An assessment of the performance of this method can not be fully made until a test zone is drilled and operated.

While it may be possible to induce a stress relieving tremor with heavy injection, adequate permeability must be assured for the strengthening and/or seating of the plates in the intentionally locked regions.

Even though the first two parts of the disclosed process, which specifically address California's water crisis, are able to function without the incorporation of the earthquake control method, all three of these systems may be used in conjunction with one another.

Where all three processes are used, the brine by-product of the outer two wells in FIG. 6A would be routed to the solar ponds until such time as injection of the liquid waste was needed at the central well to stabilize or destabilize the region, or to simple simply dispose of the waste. The extracted brine from the outer wells is then routed to the solar ponds until the outer wells are shut-in.

As shown in FIG. 6B, when desired or needed, the central or inner well could be used to inject a high-volume of brine and/or liquid waste at a high-pressure high pressure into the underlying strata to destabilize the central area of the fault.

Once strain release is accomplished, fluid may be removed from the central well and the outer two wells are used to inject brine and/or liquid waste into the strata as shown in FIG. 6C. The brine removed from the central or inner well could be diverted from the solar ponds and used for the above-described purposes. As the injection cycle is completed on the outer two wells, shown in FIG. 6D, the sequence would start over. Thus, this method allows all three wells to be producing while still deriving the desired earthquake slippage control.

It bears noting that well-shear well shear could present a minor problem. However, in many areas, it is anticipated that the fracture line will occur below the producing and injecting wells.

Depending upon whether the geology provides an impermeable shale above and below the producing sandstone, after well production has been completed and the previously underlying reservoir basin is spent, the in-place well system may be used for deep disposal of treated liquid waste and sewage. In some areas of California such sewage is currently being dumped directly into the Pacific Ocean not more than a few hundred yards offshore. The in-place pipeline system that initially carried the well-grid produced fresh water to the coast, would then be used to return the liquid waste to the spent geopressured field. It should be possible to "leap-frog" this waste into the spent basin through the fault line slippage control wells, thereby, further benefiting from the previously installed well system well-system grid.

In areas of the basin where reservoir communication is prevalent, the injection pressure for the liquid waste could be kept relatively low by injecting the liquid waste into the lower portions of the spent pay-zone and allowing unprocessed brine to flow from the top.

The pipeline to the solar ponds would continue its usefulness in routing this bleed-off unprocessed brine to the solar ponds. The bleed-off unprocessed brine may be used to replenish the solar pond's losses due to evaporation.

It should be noted that this portion of the process, wherein liquid waste is disposed within the spent reservoir, can be used independently from the earthquake control processes.

It is assumed that a 30 square mile reservoir has approximately a ten-year life. This assumption is very conservative. Indeed, the overall production capabilities of the Great Valley Basin could be much greater, provided the basin behaves similarly to the test wells made along the Gulf coast.

With the water situation in California worsening on a daily basis, due to drought and population growth, the merits and benefits of a long-term clean water source, along with the potential benefits of earthquake control and a sound liquid waste disposal system, speak for themselves. While financial and governmental restrictions might prevent the initiation of this technology on a commercial basis in time to significantly assist the current California drought crisis, this technology will provide relief and possibly a cure for future problems to be faced by the people of California. The present invention is both economically and environmentally sound.

While the above example deals with "The California Design", it is to be clearly understood that the described processes could be used in many other areas of the United States and world.

Although not required for an understanding of the claimed invention, the inventor wishes to set forth the following projected economic analysis which clearly illustrates the economic feasibility of putting this invention into practice.

For the sake of this cost analysis, a producing well depth of 15,000 ft, with a similar casing schedule as that used on the Pleasant Bayou No. 2 test well is assumed. The production depth for the Pleasant Bayou No. 2 test well was 14,700 ft. The drilling conditions are assumed to be nominal for soft to medium formations. With these assumptions, the well costs are estimated as follows:

______________________________________
Conductor: 126' of 26" at $60/ft =
7,560
Surface: 1400' of 20" at $59/ft =
82,600
1st Intermediate: 8500' of 133/8" at $35/ft =
297,500
2nd Intermediate: 13,000' of 95/8" at $28/ft =
364,900
Liner: 2500' of 7" at $28/ft =
70,000
Tubing: 15,000' of 51/2" P-110 at $15.50/ft =
240,250
Misc. equip. (wellhead, hanger, etc., est.) =
138,090
60 days rig time at $7500/day =
450,000
Drilling muds (est.) = 250,000
Service Co. (cementing., logging, etc., est.) =
350,000
$2,259,000
______________________________________

These estimates are only a guideline. Hole problems encountered while drilling and completing the well can greatly increase the costs (i.e., lost circulation of drill mud, down-hole tool failure, etc.) etc.). These costs are not representative of the initial test wells required to determine the reservoir horizons of a particular geopressured-geothermal region, as time and money have not been allotted for extensive flow tests, elaborate logging, etc. Rather, these estimates reflect conditions expected for in-field drilling.

The foregoing assumptions are considered reasonable since many geopressured basins are typically concurrent with existing oil and gas fields where the documentation of reservoir geology has largely already been completed. In certain areas it may even be possible to re-enter and complete a played-out oil or gas well, as with the Pleasant Bayou No. 2 test well.

The post-operating plug and abandonment costs are omitted as the wells of the disclosed process will continue to be used for waste disposal and solar pond replenishing.

The system costs are estimated by the following schedule:

______________________________________
Multi-Effect:
115,000 ft of 1" Al or Cu heat exch. tbg. at $1.00/ft
115,000
4000 man-hours for a certified welder at $25/hr
100,000
4000 man-hours for a welder's helper at $10/hr
40,000
Pumps, chokes, controls, additional materials
245,000
Seawater pipeline or cooling pond
500,000
Peripherals:
DEG dehydrator 20,000
Gas separator and controls
20,000
Pressure reduction turbine with generator
350,000
Misc. 360,000
$1,750,000
______________________________________

In the above-listed schedule, the tubing length is dictated by the heat transfer requirements of the heat exchangers in the multi-effect distillation system. The man-hours are estimated at 18,000 full-pass welds around 1' 1" tubing to fabricate the heat exchangers (estimated at 10 minutes/weld) plus an additional 1000 welding hours for the rest of the system. The rest of the system component's costs were estimated by conversations with industry personnel.

A manufactured multi-effect distillation plant is available from Israel Desalination Engineering Ltd. (IDE), Tel Aviv, Israel. The IDE plant is designed for lower brine temperatures, having a maximum temperature of 158° F. Hence, the IDE plant uses horizontal tubes in driving falling film condensation. The geopressured-geothermal brine temperatures of between 250 and 400.F 400° F. are capable of driving nucleate-boiling/dropwise-condensation. Vertical tube heat exchangers would be more efficient for heat transfer and, therefore, are proposed for the system. The inventor is unaware of any readily available manufactured multi-effect distillation system fully applicable to geopressured-geothermal brine.

The cost for the phosphorate based scale inhibitor squeeze treatment has been averaged at $0.0038/bbl of brine produced on the Gladys McCall site. For the reference brine production rate of 20,000 bpd (7.3×106 bbl/yr) the treatment cost per system is approximated as $30,000/yr. The per annum maintenance schedule is estimated as:

______________________________________
Inhibitor squeeze treatment
30,000
Operator (one person/system)
50,000
Repairs, general maintenance,
100,000
and DEG replenishing
$180,000/yr
______________________________________

For this analysis the commodities of gas, water, and electricity are given a value estimated at 50% of commercial rates for medium-sized industries. These rates, based upon a mid-range value of the usage fee, were quoted for Houston and San Francisco as they are located near the two largest U.S. geopressured-geothermal basins (shown in FIG. 1). With this in mind, the following is the baseline for returns.

Gas: $2.00/Mscf

Electricity: $0.045/kWhr

Water: $1.00/1000 gal

In addition, the wellhead pressure is assumed to decline linearly with time after the first four years of production, while maintaining a constant flow rate, until the lowest allowable operating pressure is reached. This will effect the amount of electricity that the system is able to produce, decreasing as the wellhead pressure declines. It is also assumed that the GWR remains constant through the flow life. These assumptions are considered conservative, in light of the four-year Gladys McCall test, and are in keeping with simulator runs of geopressured-geothermal reservoirs modeled by Mr. M. Azari of the University of Wyoming. It is also allowed that the salt content of the brine remains constant.

With the above assumptions, on a daily basis in the first four years of the well-grid's production, the expected baseline returns are: ##EQU2##

The low-end operating pressure is determined by the power requirements to run the pumps and controls, of the particular system, and the turbine/generator output. For the Pleasant Bayou No. 2 test well example, the minimum wellhead pressure would be 650 psia.

To maintain a turbine efficiency of 85% to 87.5%, while keeping the volume flow rate constant with the decreasing available head, it will be necessary to continuously increase the diameter of the adjustable flow nozzle and periodically reduce the diameter of the Pelton wheel. It is suggested that this resizing be done in accordance with the predicted replacement of the wheel's buckets due to washout, and as such is already included in the maintenance schedule.

A plot depicting the frequency of resizing the Pelton wheel as a function of wellhead pressure is shown in FIG. 7, along with the corresponding nozzle diameter. The specific speed of the turbine at the lowest operating pressure of 650 psia is 0.17, still within the range for a single-jet Pelton wheel. Two-phase flow at these lower wellhead pressures can be managed with a surge tank (included within the miscellaneous costs) ahead of the turbine to remove and throttle the gas phase to the separator.

In addition to the solar ponds, associated power generating facilities, and desalination stations, the second part of the process will require a triad of pipelines. One pipeline is required to route the initial fresh water produced by the well-system grid from the geopressured field to the areas where it is needed, namely the populated coastal regions. A second pipeline is required to divert the saturated brine from the well-system grid to the solar pond fields. A third pipeline is required to distribute the fresh water produced from the desalination stations, wherever they may optimally be located, to a point of use. As noted previously herein, the first two of these pipeline systems would serve double-duty, and the third system would be used indefinitely, so that the impact of their cost would be minimized.

To date, no detailed study has been conducted to offer a firm estimate of the costs involved for this portion of the California Design. For this economic analysis, however, the cost of the pipeline triad and the cost for the construction of the solar ponds, power generating facilities, and desalination stations are lumped together and are estimated at $20 billion. While this figure is very rough, it is not entirely arbitrary. It is generated by comparing the scope of the project to the costs incurred with projects of similar magnitude (i.e., Dutch Shell's estimate of $10 billion for a pipeline across the Peruvian Andeas).

At full production, the solar ponds would produce around 1.1×1010 gallons per day of fresh water, or roughly 40% of California's total water load, based upon California's 1985 consumption. At the given baseline returns for water at $1.00/1000 gal, this figure would gross about $4 billion annually.

For this study the somewhat arbitrary amount of 50% has been selected for the operating expenses on the power generation/desalination processes, so that a $2 billion annual net return is considered.

No consideration will be ventured here as to the costs/benefits of the waste disposal/earthquake control scenario. It is conjectured, however, that the addition of these elements (i.e., waste disposal fees, reduction of earthquake damage, etc.) will greatly improve the overall economic picture.

It's worth noting, when examining these projected capital costs of $24 billion (i.e., $4 million/system×1000 systems +$20 billion =$24 billion), that the canal scheme proposed for California mentioned earlier carries with it a projected capital cost of $200 billion. The solution herein explained would not only be economically superior, it is also a long term long-term solution and is environmentally sound. In comparison, the other proposed solutions, particularly the canal scheme, are not.

The overall projected economic picture is summed up in FIGS. 10 through 12. FIG. 10 shows a simplified breakdown of the costs and returns over the life of the project.

Well/System Costs: The 1000 well/system installation is valued at $4 billion, which is $4 million for each well. The cost is affixed in equal annual assessments over the first five years. Completing the well-grid in five years would require mobilizing 40 drilling rigs, each finishing five wells per year.

Equip./Pipeline Costs: The cost of the solar pond power generation facilities, reverse osmosis desalination stations, and the needed pipelines are estimated at $20 billion. This cost is distributed evenly over the first 14 years, at which time the solar pond would be in full production.

Well-Grid Returns: The well-grid returns line graph represents the net annual returns, after taxes and expenses, for the well-grid's water and power. Electricity revenues per well decline linearly after the forth fourth year as the wellhead pressure declines. Some of the electric power could be used to assist the transport of the brine to the solar pond field (in conjunction with using the gas for a gas-lift operation, such as to clear mountains).

Solar Pond Returns: The gross return at $1/1000 gallons of water is $4 billion annually. The plotted net return represents 50 percent of the gross going for operating expenses, taxes, etc., for a net annual return of $2 billion. This return will continue indefinitely, as represented by the arrow.

FIG. 11 simply illustrates the totals of FIG. 10, wherein: "Total Costs" is the sum of the two cost curves; and "Total Returns" is the sum of the two return curves, with the arrow again indicating the long term long-term nature of the solar pond production. Where the area between the total costs curve and the zero axis equals the area between the total returns curve and the zero axis, the project is at a break-even point.

A Rate of Return (ROR) analysis was performed on the project to determine the effect of project life on the proceeds. This analysis is shown in FIG. 12, wherein: "ROR", or the Rate of Return, is the interest rate earned on the unrecovered capital investment. Each annual return includes an equal installment towards repaying the capital investment, along with the interest earned at the given ROR on the unrecovered capital, such that at the end of the project life the capital investment is completely repaid. While no arrow is shown, the project could last well beyond 50 years. Where the ROR equals zero, the venture is at the break-even point. The 16.5 year break-even point can be verified by inspection of FIG. 11 (i.e., where the two curve areas are equal).

To recap, the conditions for the analysis were:

1) a 25% tax rate (reflecting State and Federal assistance);

2) 1/8 of gas revenues paid out in lease fees;

3) Double Declining Balance depreciation with a switch to Straight Line depreciation in the best year for accelerating the depreciation schedule;

4) $180,000/year operating expenses for each of the well-grid's systems;

5) a 360 day operating year;

6) zero salvage value at the end of the well life for the well-grid systems;

7) 50% of the gross revenues from the solar pond's water production is used for operating expenses;

8) the baseline returns for utilities as spelled out earlier in this application; and

9) no proceeds are realized from the earthquake control/waste disposal benefit.

Where the ROR is equal to zero, the venture is at a break-even point, which is a full pay-back on the capital investment with no earned interest. As can be seen in FIG. 12, under these assumptions the process would break-even break even in about 16.5 years and then asymptotically approach a 10% ROR.

The project's impact on California's water situation is shown in FIG. 13. Here, as well as in the economic analysis above, an aggressive developmental schedule is assumed: all 1000 wells are in-place in place within five years; each of the wells is depleted after 10 years of production, or in other words the well production life is 10 years; and the solar pond/desalination station construction is ongoing in the sense that as soon as any new brine is available, it immediately goes into a solar pond which in turn produces desalinated seawater. The total California water load is based upon the water consumption of 1985. The "Water Production" is based upon the annual gallons produced by the well-grid and the solar ponds. A portion of the water production ends when all of the wells have been depleted. However, the solar pond will continue to produce water indefinitely. The "Percentage of Total California Load" includes industry, agriculture, and personal used use, and is produced by the combination of the well-grid and the solar pond. A forty percent (40%) figure is realized in about the thirteenth year of the project. The arrows indicate that the production could continue indefinitely.

The means and construction disclosed herein are by way of example and comprise primarily the preferred form of putting the invention into effect. Although the drawings depict a preferred embodiment of the invention, other processes and embodiments have been described within the preceding and following text. One skilled in the art will appreciate that the disclosed processes and devices may have a wide variety of uses, shapes, and configurations. Additionally, persons skilled in the art to which the invention pertains might consider the foregoing teachings in making various modifications, other embodiments, and alternative forms of the invention.

It is, therefore, to be understood that the invention is not limited to the particular processes, embodiments, or specific features shown herein. To the contrary, the inventor claims the invention in all of its forms, including all modifications, equivalents, and alternative embodiments which fall within the legitimate and valid scope of the appended claims, appropriately interpreted under the Doctrine of Equivalents.

The present invention is a combination of any two or more of three integral processes that if used will significantly curtail the water shortage crisis in California, as well as other areas of the United States of American America and of the world. The disclosed processes accomplish this task in an economically and environmentally sound manner. A first part of the process distills geopressured brine into pure water and saturated saltwater. A second part of the process uses the saturated saltwater to construct solar ponds which, at full production, would produce roughly 40% of California's water load by reverse osmosis. A third part of the process involves the controlled production and disposal from and into near-fault wells for earthquake control and liquid waste disposal.

Nitschke, George S.

Patent Priority Assignee Title
11187212, Apr 02 2021 ICE Thermal Harvesting, LLC Methods for generating geothermal power in an organic Rankine cycle operation during hydrocarbon production based on working fluid temperature
11236735, Apr 02 2021 ICE Thermal Harvesting, LLC Methods for generating geothermal power in an organic Rankine cycle operation during hydrocarbon production based on wellhead fluid temperature
11255315, Apr 02 2021 ICE Thermal Harvesting, LLC Controller for controlling generation of geothermal power in an organic Rankine cycle operation during hydrocarbon production
11274663, Apr 02 2021 ICE Thermal Harvesting, LLC Controller for controlling generation of geothermal power in an organic rankine cycle operation during hydrocarbon production
11280322, Apr 02 2021 ICE Thermal Harvesting, LLC Systems for generating geothermal power in an organic Rankine cycle operation during hydrocarbon production based on wellhead fluid temperature
11293414, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods for generation of electrical power in an organic rankine cycle operation
11326550, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11359576, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11359612, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods for generation of electrical power in an organic rankine cycle operation
11421625, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11421663, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods for generation of electrical power in an organic Rankine cycle operation
11480074, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11486330, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11486370, Apr 02 2021 ICE Thermal Harvesting, LLC Modular mobile heat generation unit for generation of geothermal power in organic Rankine cycle operations
11493029, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods for generation of electrical power at a drilling rig
11542888, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11549402, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11572849, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11578706, Apr 02 2021 ICE Thermal Harvesting, LLC Systems for generating geothermal power in an organic Rankine cycle operation during hydrocarbon production based on wellhead fluid temperature
11592009, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods for generation of electrical power at a drilling rig
11598320, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods for generation of electrical power at a drilling rig
11624355, Apr 02 2021 ICE Thermal Harvesting, LLC Modular mobile heat generation unit for generation of geothermal power in organic Rankine cycle operations
11644014, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods for generation of electrical power in an organic Rankine cycle operation
11644015, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods for generation of electrical power at a drilling rig
11668209, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11680541, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11732697, Apr 02 2021 ICE Thermal Harvesting, LLC Systems for generating geothermal power in an organic Rankine cycle operation during hydrocarbon production based on wellhead fluid temperature
11761353, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11761433, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods for generation of electrical power in an organic Rankine cycle operation
11773805, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11879409, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods utilizing gas temperature as a power source
11905934, Apr 02 2021 ICE Thermal Harvesting, LLC Systems and methods for generation of electrical power at a drilling rig
7845406, Aug 30 2007 Enhanced oil recovery system for use with a geopressured-geothermal conversion system
8353341, Jan 04 2010 Well system
8707697, Dec 08 2008 System integration to produce concentrated brine and electricity from geopressured-geothermal reservoirs
9335428, Jun 12 2008 Method and system for reducing the loss caused by an earthquake
Patent Priority Assignee Title
2927428,
3470943,
3845627,
3893299,
3953972, Mar 17 1975 BECHTEL GROUP, INC , 50 BEALE ST , SAN FRANCISCO, CA 94105 A CORP OF DE Geothermal energy recovery process
3988895, Jan 11 1974 Power generation from hot brines
4026111, Feb 03 1976 The Dow Chemical Company Method of removing dissolved non-condensibles from geothermal brines
4054175, Dec 13 1973 ROTOFLOW CORPORATION, A TX CORPORATION Geothermal power system
4060988, Apr 21 1975 Texaco Inc. Process for heating a fluid in a geothermal formation
4132075, Jun 30 1977 Union Oil Company of California Method of producing mechanical energy from geothermal brine
4152898, Aug 01 1977 BECHTEL GROUP, INC , 50 BEALE ST , SAN FRANCISCO, CA 94105 A CORP OF DE Energy transfer apparatus and method using geothermal brine
4211613, Nov 28 1977 Geothermal mineral extraction system
4429535, Aug 13 1980 Magma Power Company Geothermal plant silica control system
4665705, May 18 1984 Magma Power Company Geothermal plant silica control apparatus and method
4719759, Jul 05 1983 SOLMAT SYSTEMS, LTD Method of and means for disposing of waste salts and brines
4824447, Dec 30 1986 The United States of America as represented by the United States Enhanced oil recovery system
5165235, Dec 12 1990 System for using geopressured-geothermal reservoirs
Executed onAssignorAssigneeConveyanceFrameReelDoc
Date Maintenance Fee Events
Nov 21 2000M281: 7.5 yr surcharge - late pmt w/in 6 mo, Small Entity.
Nov 21 2000M284: Payment of Maintenance Fee, 8th Yr, Small Entity.
Nov 13 2004M2553: Payment of Maintenance Fee, 12th Yr, Small Entity.
Nov 13 2004M2556: 11.5 yr surcharge- late pmt w/in 6 mo, Small Entity.


Date Maintenance Schedule
Aug 31 20024 years fee payment window open
Mar 03 20036 months grace period start (w surcharge)
Aug 31 2003patent expiry (for year 4)
Aug 31 20052 years to revive unintentionally abandoned end. (for year 4)
Aug 31 20068 years fee payment window open
Mar 03 20076 months grace period start (w surcharge)
Aug 31 2007patent expiry (for year 8)
Aug 31 20092 years to revive unintentionally abandoned end. (for year 8)
Aug 31 201012 years fee payment window open
Mar 03 20116 months grace period start (w surcharge)
Aug 31 2011patent expiry (for year 12)
Aug 31 20132 years to revive unintentionally abandoned end. (for year 12)