A tubular beam extension includes three sizes. A first tubular beam extension includes a center tube and four corner retention projections. A single corner retention projection extends outward from each corner of the center tube. Each corner retention projection includes an extension member and a retention member. A retention cavity is formed in the retention member. A second tubular beam extension includes a rectangular tube, the four corner retention projections and four side retention projections. Each side retention projection includes a first extension member, a second extension member and a flange member. A single flange member is located between two adjacent corner retention projections. A third tubular beam extension preferably includes a rectangular tube, the four corner retention projections, two end retention projections and at least four side retention projections.
|
1. A tubular beam extension comprising:
a center tube includes four side walls and four corners; and
four corner retention projections extend outward from said four corners of said center tube, each one of said four corner retention projections includes an extension member and a retention member, one end of said extension member extends from one of said four corners at an acute angle relative to one of said four side walls, said retention member terminates an opposing end of said extension member, said retention member includes a first flange leg and a second flange leg, said first flange leg is substantially perpendicular to said second flange leg.
7. A tubular beam extension comprising:
a center tube includes four side walls and four corners;
four corner retention projections extend outward from said four corners of said center tube, each one of said four corner retention projections includes a corner extension member and a corner retention member, one end of said corner extension member extends from one of said four corners at an acute angle relative to one of said four side walls, said corner retention member terminates an opposing end of said corner extension member; and
four side retention projections extend outward from said four walls of said center tube, each one of said four side retention projections includes at least one extension member and a flange member, one end of said at least one extension member extends outward from one of said four walls of said center tube, said flange member terminates an opposing end of said at least one extension member, said flange member is located between two adjacent corner retention projections of said four corner retention projections.
14. A tubular beam extension comprising:
a center tube includes four corners;
four corner retention projections extend outward from said four corners of said center tube, each one of said four corner retention projections includes a corner extension member and a corner retention member, one end of said corner extension member extends from one of said four corners at an acute angle relative to one of said four side walls, said corner retention member terminates an opposing end of said corner extension member;
an end retention projection extends outward from opposing ends of said center tube, said end retention projections includes at least one extension member and a flange member, one end of said at least one extension member extends outward from said center tube, said flange member terminates an opposing end of said at least one extension member, said flange member is located between two adjacent corner retention projections of said four corner retention projections; and
at least two side retention projections extend outward from opposing sides of said center tube.
2. The tubular beam extension of
said first and second flange legs are substantially parallel to outer surfaces of said center tube.
3. The tubular beam extension of
said first flange extends past an end of said extension member to form a first overhung lip, said second flange extends past an end of said extension member to form a second overhung lip.
4. The tubular beam extension of
a retention cavity is formed in said corner retention member, said retention cavity extends a length of said corner retention member.
5. The tubular beam extension of
an access slot is formed from an outside corner of said corner retention member to said retention cavity.
6. The tubular beam extension of
said retention cavity includes a substantially round cross section.
8. The tubular beam extension of
said first and second flange legs are substantially parallel to outer surfaces of said center tube.
9. The tubular beam extension of
a first flange leg extends past an end of said corner extension member to form a first overhung leg lip, a second flange leg extends past an end of said corner extension member to form a second overhung leg lip.
10. The tubular beam extension of
said flange member extends past opposing sides of said at least one extension member to form a first overhung lip and a second overhung lip.
11. The tubular beam extension of
a retention cavity is formed in said corner retention member, said retention cavity extends a length of said corner retention member.
12. The tubular beam extension of
an access slot is formed from outside surface of said retention member to said retention cavity.
13. The tubular beam extension of
said retention cavity includes a substantially round cross section.
15. The tubular beam extension of
a retention cavity is formed in said corner retention member, said retention cavity extends a length of said corner retention member.
16. The tubular beam extension of
said at least two side retention projections are located between two corner retention projections.
17. The tubular beam extension of
a center side retention projection is retained between two side retention projections.
18. The tubular beam extension of
a first flange leg extends past an end of said corner extension member to form a first overhung leg lip, a second flange leg extends past an end of said corner extension member to form a second overhung leg lip.
19. The tubular beam extension of
said flange member extends past opposing sides of said at least one extension member to form a first overhung lip and a second overhung lip.
|
The present invention relates generally to temporary and permanent construction and more specifically to a tubular beam extension, which includes four sides and at least one lengthwise T-slot formed in each side.
U.S. Pat. No. 3,451,183 to Lespagnol et al. discloses metal partitions and similar constructions. U.S. Pat. No. 5,263,296 to Spera discloses a modular scaffolding assembly. U.S. Pat. No. 9,004,715 to Litke et al. discloses modular structural frame lighting. U.S. Pat. No. 9,200,443 to Marple discloses a structural attachment system. However, it appears that none of the above patents teach or suggest a tubular beam with four sides, at least one T-slot formed in each side and a lengthwise cavity formed in each corner.
Accordingly, there is a clearly felt need in the art for a tubular beam extension, which includes four sides; at least one lengthwise T-slot formed in each side wall; and a lengthwise cavity formed in each corner.
The present invention provides a tubular beam extension, which includes four sides; and a lengthwise cavity formed in each corner. The tubular beam extension includes at least three sizes. A first tubular beam extension preferably includes a center tube and four corner retention projections. A single corner retention projection extends outward from each corner of the center tube. Each corner retention projection includes an extension member and a retention member. One end of the extension member extends from a corner of the center tube and the retention member terminates an opposing end of the extension member. A retention cavity is formed in the retention member and extends a length of the retention member. The retention cavity includes a substantially circular cross section. An access slot is formed from an outside corner of the retention member to retention cavity.
A second tubular beam extension preferably includes a rectangular tube, the four corner retention projections and four side retention projections. A single corner retention projection extends outward from each corner of the rectangular tube. Each side retention projection includes a first extension member, a second extension member and a flange member. One end of the first extension member extends from an inner surface of the flange member, such that a first flange is formed on a first end of the flange member. One end of the second extension member extends from an inner surface of the flange member, such that a second flange is formed on a second end of the flange member. The flange member is located between two adjacent corner retention projections. The other ends of the first and second extension members extend from an outer surface of the rectangular tube.
A third tubular beam extension preferably includes a rectangular tube, the four corner retention projections, two end retention projections, at least four side retention projections. A single corner retention projection extends outward from each corner of the rectangular tube. It is preferable to have one end retention projection on each end of the rectangular tube and three retention projections on each side of the rectangular tube. Each end retention projection is located between two adjacent corner retention projections. Each side retention projection is located between a corner retention projection and a center side retention projection. A plurality of splice bars and a plurality of flat head screws may be used to secure at least two tubular beam extensions in series.
Accordingly, it is an object of the present invention to provide a tubular beam extension, which includes four sides; at least one lengthwise T-slot formed in each side wall; and a lengthwise cavity formed in each corner.
These and additional objects, advantages, features and benefits of the present invention will become apparent from the following specification.
With reference now to the drawings, and particularly to
The second tubular beam extension 2 preferably includes a rectangular tube 28, the four corner retention projections 12 and four side retention projections 30. A single corner retention projection 12 extends outward from each corner of the rectangular tube 28. Each side retention projection 30 includes a first extension member 32, a second extension member 34 and a flange member 36. One end of the first extension member 32 extends from an inner surface of the flange member 36, such that a first flange 38 is formed on a first end of the flange member 36. One end of the second extension member 34 extends from an inner surface of the flange member 36, such that a second flange 40 is formed on a second end of the flange member 36. The flange member 30 is located between two adjacent corner retention projections 12. The other ends of the first and second extension members 32, 34 extend from an outer surface of the rectangular tube 28.
The third tubular beam extension 3 preferably includes a rectangular tube 42, the four corner retention projections 12, two end retention projections 44 and four side retention projections 46 and two center side retention projections 48. The end retention projections 44 and the side retention projections 46 are structurally the same as the side retention projections 30. A single corner retention projection 12 extends outward from each corner of the rectangular tube 42. It is preferable to have one end retention projection 44 on each end of the rectangular tube 42 and three side retention projections 46, 48 on each side of the rectangular tube 42. Each end retention projection 44 is located between two adjacent corner retention projections 12. Each center side projection 48 includes a first angled leg 50, a second angled leg 52 and a flange member 54. One end of the first angled leg 50 extends from an inner surface of the flange member 54, such that a first flange 56 is formed on a first end of the flange member 54. One end of the second angled leg 52 extends from an inner surface of the flange member 52, such that a second flange 58 is formed on a second end of the flange member 54. The side retention projections 46 are located between one corner retention projection 12 and the center side retention projection 48. The other ends of the first and second extension members 32, 34 extend from an outer surface of the rectangular tube 42 for the end and side retention projections 44, 46. The other ends of the first and second angle legs 50, 52 extend from an outer surface of the rectangular tube 42.
With reference to
With reference to
While particular embodiments of the invention have been shown and described, it will be obvious to those skilled in the art that changes and modifications may be made without departing from the invention in its broader aspects, and therefore, the aim in the appended claims is to cover all such changes and modifications as fall within the true spirit and scope of the invention.
Patent | Priority | Assignee | Title |
11913215, | Feb 27 2019 | Inventio AG | Truss section connection region |
D882826, | Mar 18 2015 | Tubular beam | |
D930856, | Mar 18 2015 | Tubular beam | |
D932060, | Mar 18 2015 | Tubular beam |
Patent | Priority | Assignee | Title |
3451183, | |||
5263296, | Jul 17 1991 | Speral Aluminium Inc. | Modular scaffolding assembly |
9004715, | Sep 10 2010 | Emergency Technology, Inc. | Modular structural frame lighting |
9200443, | Feb 12 2014 | Ezekiel Building Systems LLC | Structural attachment system |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Date | Maintenance Fee Events |
Jun 01 2022 | M2551: Payment of Maintenance Fee, 4th Yr, Small Entity. |
Date | Maintenance Schedule |
Jan 15 2022 | 4 years fee payment window open |
Jul 15 2022 | 6 months grace period start (w surcharge) |
Jan 15 2023 | patent expiry (for year 4) |
Jan 15 2025 | 2 years to revive unintentionally abandoned end. (for year 4) |
Jan 15 2026 | 8 years fee payment window open |
Jul 15 2026 | 6 months grace period start (w surcharge) |
Jan 15 2027 | patent expiry (for year 8) |
Jan 15 2029 | 2 years to revive unintentionally abandoned end. (for year 8) |
Jan 15 2030 | 12 years fee payment window open |
Jul 15 2030 | 6 months grace period start (w surcharge) |
Jan 15 2031 | patent expiry (for year 12) |
Jan 15 2033 | 2 years to revive unintentionally abandoned end. (for year 12) |