A cooling member for a mobile ice rink includes a plurality of pipes for transporting a coolant, wherein the pipes comprise at least two sections coupled by a connector. cooling elements are provided at the locations of the connectors.
|
19. An ice rink comprising at least one cooling member, the at least one cooling member comprising:
a plurality of pipes defining a coolant flow channel for transporting a coolant, wherein at least some of the pipes comprise at least two pipe sections coupled by a foldable connector enabling folding of the cooling member between an unfolded state for operation and a folded state; and
a plurality of elements, each element being outside the coolant flow channel and extending parallel to, and along one side of, an adjacent connector, past an end of one of the pipe sections, toward the other pipe section, wherein the elements are made of a material having a higher heat conductivity than a material of the connector so as to transport heat from water or ice adjacent the connectors.
17. A pipe for use in a cooling member, the pipe comprising:
first and second pipe sections coupled by a foldable connector, the first and second pipe sections and the connector defining a coolant flow channel, the first and second pipe sections and the connector configurable to an unfolded position wherein the first and second pipe sections and connector are aligned; and
at least one element outside the coolant flow channel at one side of the connector and extending along and parallel to the connector, past an end of the first pipe section, toward the second pipe section, in the unfolded position, wherein the at least one element is made of a material having a higher heat conductivity than a material of the connector so as to transport heat from water or ice adjacent the connector.
1. A cooling member for a mobile ice rink comprising:
a plurality of pipes for transporting a coolant, wherein at least some of the pipes comprise at least two sections;
a plurality of connectors, each connector connecting two pipe sections of a pipe, the pipe sections and the connector defining a coolant flow channel for the coolant, from one of the pipe sections, via the connector, to the other pipe section; and
a plurality of elements, each element being outside the coolant flow channel and extending parallel to, and along one side of, at least one adjacent connector, past an end of one of the pipe sections, toward the other pipe section, wherein the elements comprise a material having a higher heat conductivity than a material of the connector so as to transport heat from water or ice adjacent the connectors.
2. The cooling member according to
3. The cooling member according to
4. The cooling member according to
5. The cooling member according to
6. The cooling member according to
7. The cooling member according to
8. The cooling member according to
9. The cooling member according to
10. The cooling member according to
11. The cooling member according to
12. The cooling member according to
13. The cooling member according to
14. The cooling member according to
15. The cooling member according to
16. The cooling member according to
|
The discussion below is merely provided for general background information and is not intended to be used as an aid in determining the scope of the claimed subject matter.
Aspects of the invention relate to a cooling member for a mobile ice rink comprising a plurality of pipes, typically at least substantially parallel pipes, for transporting a coolant, in particular a cooling liquid, such as glycol, wherein the pipes comprise at least two sections coupled by a connector.
Higher temperatures, direct sunlight, rain, and wind may bring about weak spots and/or irregularities in the ice of the rink near the connectors. Common measures to reduce or prevent such spots and/or irregularities from forming in the ice include increasing the flow of coolant or lowering the temperature of the coolant. These measures significantly reduce energy efficient.
This Summary and the Abstract herein are provided to introduce a selection of concepts in a simplified form that are further described below in the Detailed Description. This Summary and the Abstract are not intended to identify key features or essential features of the claimed subject matter, nor are they intended to be used as an aid in determining the scope of the claimed subject matter. The claimed subject matter is not limited to implementations that solve any or all disadvantages noted in the background.
A cooling member includes cooling elements at the locations of connectors, preferably extending along and/or under the connectors.
In an embodiment, a cooling element is provided at at least 25% of the connectors, preferably at least 50% of the connectors, preferably at all of the connectors. In another embodiment, at least a plurality, preferably all of the cooling elements extend over at least 40% of the lengths of the connectors, preferably over the entire lengths of the connectors, at least when the cooling member is operational.
It was found that cooling of the water or ice is significantly less efficient at the connectors. The cooling member facilitates maintaining a more level skating surface and/or a more homogenous temperature of the ice and/or is more energy efficient.
In an embodiment, the cooling elements are configured to transport heat from the water or ice surrounding the connectors to the coolant in the pipes through at least one of conduction and convection, preferably such that the heat absorbed by the cooling elements at least substantially compensates, preferably by at least 70%, preferably at least 80%, preferably at least 90%, the difference between the heat absorption (per centimeter) of the connectors and the heat absorption (per centimeter) of the pipe sections. In a refinement, the cooling elements are thermally connected to the pipes, e.g. an integral part of or connected to the pipe sections.
The cooling elements can be made of a solid material, e.g. formed of solid aluminum rods. To enhance transport of heat from the water or ice surrounding the connectors, in an embodiment, at least a plurality, preferably all of the cooling elements comprise a channel connected to the lumen of the respective pipe. Thus, coolant from the pipes is fed to the cooling elements.
In a refinement, a first (entry) end of the channel is connected to the lumen of the pipe, the channel comprises a first portion extending along the connector, a U turn, and a second portion extending along the connector, and a second (return or exit) end of the channel is connected to the pipe, downstream from the first end.
To set or regulate the flow of coolant through the cooling element, in an embodiment, it comprises a flow restriction in the lumen of the pipe, located between the first end of the channel and the second (return or exit) end of the channel. In a refinement, the flow restriction causes 1 to 25%, preferably 1 to 15%, preferably 2 to 5% of the coolant to flow through the channel and back to the main stream of coolant downstream from the flow restriction.
The cooling elements can be e.g. a(n integral) part of the pipe sections being formed of a single unitary body or extensions connected to the pipe sections. In an embodiment, the cooling elements comprises two or more components, e.g. two halves, that are glued together, e.g. by means of a two-part methacrylate adhesive, preferably a two-part methacrylate adhesive, such as Plexus® MA830. Other suitable means of joining the components include welding and bolting. Combinations, e.g. a combination of gluing and bolting, can be employed e.g. to withstand harsh conditions or increase service life. In a refinement, a gasket is placed between at least two of the components.
In an embodiment, a pair of cooling elements is provided on alternate pipes. Thus, no cooling elements need to be present on the remaining pipes, simplifying assembly of the cooling members.
In a further embodiment, the pipes are made of metal, in particular aluminum, and the connectors are made of a synthetic material, such as a thermoplast or an elastomer, e.g. a rubber, e.g. EPDM (ethylene propylene diene monomer). In another embodiment, the connector comprises a joint, in particular a flexible tube made of rubber, that enables the sections to be folded at the connectors and relative to each other, e.g. between a unfolded state of the cooling member for operation and a folded state for transport.
In another embodiment, the pipe sections have a length in a range from 0.5 to 11 meters, preferably in a range from 4 to 8 meters.
To facilitate installation on location, e.g. on a square or in a park, in an embodiment, the cooling member comprises a feed manifold and a discharge manifold. The parallel pipes are connected to the manifolds. To form an ice rink, the manifolds are coupled, in series or in parallel, to a cooling unit.
An aspect of the invention also relates to a pipe for use in a cooling member as described above, comprising at least two sections coupled by a connector, in particular a flexible tube made of rubber that enables the sections to be folded at the connectors and relative to each other. A cooling element at the location of the connector, preferably a cooling element that extends along, about, above and/or under the connector.
An aspect of the invention further relates to an ice rink comprising one or more cooling members or pipes.
Aspects of the invention will now be explained in more detail with reference to the Figures, which show an embodiment of the present cooling member.
On one end of the cooling member 1, the ends of the pipes 2 are connected to feed and discharge manifolds 27 and 28 alternately. On the other end of the cooling member, the ends of the pipes are provided, in pairs, with U-bends or with a collector such that each pair of pipes has a feed pipe (connected to the feed manifold) and a return pipe (connected to the discharge manifold). To form an ice rink, a number of cooling members are positioned side by side and the manifolds of the cooling members are coupled, in series or in parallel, to a cooling unit (not shown). The flexible joints enable the sections of the cooling members to be folded relative to each other between an unfolded state of the cooling member for operation and a folded state for transport. Suitable manifolds, connections and further technical aspects are disclosed in EP 1 462 755.
In the operational (unfolded) state of the cooling member 1, a cooling element 6 extends along the entire length of each joint 3. In this example, the cooling elements 6 are formed in pairs in end pieces 7 on alternate pipe sections 2A. As shown in
As shown in
During operation, explained with reference to
The cooling member according to present invention facilitates maintaining a more homogenous skating surface, e.g. in terms of surface continuity and temperature of the ice, and/or is more energy efficient.
The invention is not restricted to the above-described embodiments, which can be varied in a number of ways within the scope of the claims. For instance, instead of arranging the cooling elements in pairs, end pieces with a single cooling element can be provided on each pipe section. Also, instead of flexible joints, the pipe sections can be coupled by means of rigid connectors that e.g. enable the pipes to be assembled and disassembled on location.
Hoeks, Wilhelmus Adolfus Johannes Marie, Van Nigtevecht, Hugo Jacob, Molenaar, Guido William
Patent | Priority | Assignee | Title |
Patent | Priority | Assignee | Title |
2069811, | |||
3000193, | |||
4611471, | Mar 02 1984 | KABUSHIKI KAISHA PATINE SHOKAI, 6-1, 2-CHOME, SUGAMO, TOSHIMA-KU, TOKYO, JAPAN, A CORP OF JAPAN | Ice making apparatus particularly for an ice rink |
4693079, | Nov 09 1985 | MTU-Motoren und Turbinen-Union Friedrichshafen GmbH | Multi-partite exhaust gas line |
4979373, | Feb 06 1989 | Apparatus for making and maintaining an ice surface | |
5174366, | Nov 08 1990 | Kabushiki Kaisha Toshiba | Bendable cooling fin and heat-exchanger with a bent cooling fin block |
5493872, | Jun 28 1993 | Hoshizaki Denki Kabushiki Kaisha | Water sprinkling apparatus for ice making machine |
5970734, | Sep 29 1995 | Method and system for creating and maintaining a frozen surface | |
6253558, | Sep 29 1995 | Method and system for creating and maintaining a frozen surface | |
6334439, | Jun 11 1999 | Thomas & Betts, International, Inc. | Tubular heat exchanger for infrared heater |
7089753, | Mar 24 2003 | ICE-WORLD INTERNATIONAL B V | Cooling member for a mobile ice rink and method for using such a cooling member |
9777441, | Jul 25 2012 | Guang Jing, Li | Modular assembled artificial skating rink |
20030000239, | |||
20050045318, | |||
20050067514, | |||
20070296211, | |||
20130313821, | |||
20150107694, | |||
20160208978, | |||
20180023882, | |||
20180056456, | |||
CN1259196, | |||
DE1000649, | |||
EP1031809, | |||
EP1462755, | |||
FR2502896, | |||
FR2677262, | |||
FR2802292, | |||
GB2051340, | |||
GB252516, | |||
GR1007249, | |||
JP432399, | |||
PL213454, | |||
SU1664693, | |||
WO2016193689, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Feb 24 2017 | MOLENAAR, GUIDO WILLIAM | ICE-WORLD HOLDING B V | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 042651 | /0404 | |
Feb 24 2017 | HOEKS, WILHELMUS ADOLFUS JOHANNES MARIE | ICE-WORLD HOLDING B V | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 042651 | /0404 | |
Feb 28 2017 | ICE-WORLD HOLDING B.V. | (assignment on the face of the patent) | / | |||
Mar 28 2017 | NIGTEVECHT, HUGO JACOB VAN | ICE-WORLD HOLDING B V | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 042651 | /0404 |
Date | Maintenance Fee Events |
Date | Maintenance Schedule |
Feb 21 2026 | 4 years fee payment window open |
Aug 21 2026 | 6 months grace period start (w surcharge) |
Feb 21 2027 | patent expiry (for year 4) |
Feb 21 2029 | 2 years to revive unintentionally abandoned end. (for year 4) |
Feb 21 2030 | 8 years fee payment window open |
Aug 21 2030 | 6 months grace period start (w surcharge) |
Feb 21 2031 | patent expiry (for year 8) |
Feb 21 2033 | 2 years to revive unintentionally abandoned end. (for year 8) |
Feb 21 2034 | 12 years fee payment window open |
Aug 21 2034 | 6 months grace period start (w surcharge) |
Feb 21 2035 | patent expiry (for year 12) |
Feb 21 2037 | 2 years to revive unintentionally abandoned end. (for year 12) |