A test system employing a plurality of disconnect devices is provided. Each load, such as a lamp, has a local disconnect device which temporarily disconnects the load in order to protect it from high voltage during the test.
|
1. A test system comprising:
a plurality of disconnect devices and a test module arranged to be in communication with each of the plurality of disconnect devices, wherein each disconnect device is arranged to selectively remove at least one electrical load from connection between supply wires supplying electricity to the at least one electrical load in response to a first disconnect signal provided by the test module in order that the integrity of the wires can be tested, each disconnect device being further arranged to reconnect the at least one load in response to a second signal, and wherein the test module is arranged to check that all of the loads have been removed from connection between the supply wires before commencing a test.
16. A method of testing wiring to lights connected to a power supply via a test system comprising a plurality of disconnect devices and a test module arranged to be in communication with each of the plurality of disconnect devices, each disconnect device being arranged to selectively remove at least one electrical load from connection between supply wires supplying electricity to the at least one electrical load in response to a first disconnect signal provided by the test module in order that the integrity of the wires can be tested, each disconnect device being further arranged to reconnect the at least one load in response to a second signal, wherein said test module is arranged to check that all of the loads have been removed from connection between the supply before commencing a test, the test comprising:
asserting a disconnect instruction to disconnect the lights;
confirming that all lights have disconnected;
performing at least a test of continuity; and
reconnecting the lights.
17. A method of testing wiring to lights connected to a power supply via a test system comprising a plurality of disconnect devices and a test module arranged to be in communication with each of the plurality of disconnect devices, each disconnect device being arranged to selectively remove at least one electrical load from connection between power supply wires supplying electricity to the at least one electrical load in response to a first disconnect signal provided by the test module in order that the integrity of the wires can be tested, each disconnect device being further arranged to reconnect the at least one load in response to a second signal, wherein said test module is arranged to check that all of the loads have been removed from connection between the supply wires before commencing a test, the test comprising:
asserting a disconnect instruction to disconnect the lights;
confirming that all lights have disconnected;
performing at least a test of insulation; and
reconnecting the lights.
5. The test system of
6. The test system of
7. The test system of
9. The test system of
10. The test system of
11. The test system of
12. The test system of
13. The test system of
14. The test system of
|
This application claims priority to International Application Number PCT/GB01/05478 filed Dec. 11, 2001, which claims the benefit of priority to Application Number 0030390.9 filed Dec. 13, 2000, in the United Kingdom.
The present invention relates generally to the field of electrical wirings, and more specifically to a method of, and an apparatus for testing the safety of the electrical wiring within buildings.
United Kingdom wiring regulations in accordance with British Standard BS7679 requires that the electrical wiring within buildings must be regularly checked to determine whether or not the wiring meets certain minimum standards of safety. However, the period of time between which tests of the electrical wiring in a building must be carried out, are, in the majority of cases, not prescribed, except in respect of licensed premises and buildings which are open to members of the public. The requirements are often backed by the force of legislation, such as the Electricity at Work Act, the Health and Safety at Work Act and the Health and Safety Regulations in the United Kingdom.
Generally, good practice with regard to the period of time between which safety tests of the electrical wiring in buildings is carried out, is accepted as being between 7 and 8 years for domestic dwellings and 5 years for offices and commercial premises. However, those buildings or premises which are required to have a fire certificate must be tested annually. This includes licensed premises, hotels and buildings which are frequented by members of the public.
As one would expect, any failure to carry out regular tests of the safety of the electrical wiring in a building could lead to increase risk from of dangerous or unsafe electrical installations. Furthermore, any accidents, injuries or deaths that occur as a result of dangerous or faulty electrical installation, which has not undergone regular safety tests, may lead to the prosecution of those responsible. Prosecution resulting from a failure to carry out the prescribed safety tests could result in substantial fines, imprisonment or both in extreme cases.
Therefore, the regular testing of electrical wiring in buildings is important not only to maintain and ensure the safety of those persons frequenting such buildings, but it is also important in verifying that the subsequent installation or replacement of electrical components has been carried out properly, thereby helping to avoid or mitigate against the installation of dangerous or faulty electrical components which may lead to failure of the wiring at a later date.
Part of testing of the safety of electrical wiring involves proving or determining the integrity of the insulation of all the electrical conductors (i.e.—live, neutral and earth). British Standard BS7679 requires that the testing of the integrity of wiring insulation be carried out at a raised voltage of 1000 volts, in order to expose any potential weakness in any component of the electrical wiring insulation.
However, great difficulty is often encountered when such insulation integrity tests are conducted, especially on lighting circuits, due to the fact that modern light fittings are sensitive and are therefore often incapable of withstanding the increased voltage associated with the 1000 volt test prescribed in accordance with British Standard BS7679.
A further problem associated with carrying out the 1000 volt integrity test on lighting circuits, is that electronic circuits of modern fluorescent lights, discharge fittings and various other lighting components generate electrical leakage which may lead to false test readings, providing unsatisfactory test conditions and uncertain test results. As a result of these problems, it has been necessary for an electrician testing the lighting circuit to disconnect all of the light fittings in a circuit in order to carry out the test properly. This is a very laborious, time consuming and expensive task. Once the electrician has carried out the test he must then reconnect the lights and prove that they are all functioning correctly and safely after the test has been conducted. In many instances the testing of electrical circuits is made almost impossible due to the inaccessibility of lights as a result of mounting locations or access restrictions.
Furthermore, due to the fact that the testing of electrical wiring comprising lighting circuits is so labour intensive, time consuming and expensive, in many instances testing of electrical wiring is often not carried out properly or is not attempted at all, simply being ignored, having serious ramifications in terms of the integrity and safety of the wiring, and the associated safety of those persons frequenting such buildings.
According to a first aspect of the present invention there is provided a test system comprising a test module and a plurality of disconnect devices, each disconnect device being arranged to selectively disconnect at least one electrical load from wires supplying electricity to the at least one electrical load in response to a first disconnect signal in order that the integrity of the wires can be tested, each disconnect device being further arranged to reconnect the at least one load in response to a second signal, and said test module being arranged to check that all disconnect devices have disconnected before commencing a test.
One or more disconnect signal may be generated by the test module. The test module may be portable or may be provided as part of a building management system.
Preferably the disconnect devices are responsive to a disconnect signal supplied via a control line. The control line may run back to a control board.
As a further alternative, one or more control signals may be transmitted along the supply cables (wires under test) themselves. This makes retrofitting into existing buildings easier.
Many modern light fittings include controllers that support an addressable lighting interface. This interface may be used to control isolation devices, such as relays, in order to disconnect selected lamps. This interface may also be used to disconnect the lamp ballast such that the test can be performed.
The disconnect devices also enable the user to verify that the load are disconnected before he commences a test. Thus each disconnect device includes a signalling device that operates once the associated load has been disconnected. Each disconnect device may report independently that it has operated, the reports are ANDed or daisy chained such that each device within the plurality of devices that are grouped together must disconnect its load before an indication is given that all the loads are disconnected. However, in digital systems, the controller/test module may poll the disconnect devices to confirm that they have operated to disconnect the local load.
Advantageously each disconnect device may also give a local indication that it has disconnected its load. The indication may be visual or audible. Use of an LED is a preferred way of giving a local indication that the disconnection has occurred.
A further test for disconnection can be performed by supplying mains power along the cables that lead to the devices under test after the disconnect signal has been given. Any devices that are still operating clearly indicate that they have not disconnected. This can be monitored remotely by measurement of the load on the circuit. If the current being drawn exceeds a threshold whose value is substantially that of the smallest (least power consuming) device on the circuit, then it can be inferred that at least one device has not disconnected correctly.
Additionally or alternatively the device may respond to a signal transmitted via radio (including bluetooth-RTM), infrared or ultrasound to cause a disconnect to occur. Instructions to disconnect may also be transmitted over the wires under test. The reconnect can then occur after a predetermined period of time or after the transmission of a reconnect signal. In such circumstances a control circuit may monitor the wires for signals. However a reconnect signal may, in some circumstances merely be the absence of a disconnect signal.
The disconnect devices may be battery powered and/or may derive their power from the mains supply or from a remote DC supply, which may be derived from the mains or may be a battery. Short term storage may be provided to operate the disconnect devices during the disconnect test.
Preferably the disconnect device includes at least one relay for disconnecting the load. The load may comprise one or more lights.
In a preferred embodiment, each disconnect device may be remotely controlled by a control module, comprising a battery and/or charging means, and a switch which when closed supplies a disconnect signal causing the disconnect device to be activated. The control module also comprises a means for verifying that all the disconnect devices have activated. Said verification means may comprise an LED which when lit indicates that all the disconnect devices have been activated and that all the loads have been disconnected prior to carrying out testing of the wires. A fail safe function is therefore included such that a test cannot be performed until all the disconnect devices have operated.
According to a second aspect of the present invention there is provided a method of testing lights connected to a power supply via a test system according to the first aspect of the present invention, the test comprising the steps of asserting a disconnect signal to disconnect the lights, confirming that all the lights have disconnected, performing at least a test of the insulation or continuity, supplying power to the lights and reconnecting the lights.
Those skilled in the art will further appreciate the above-mentioned advantages and superior features of the invention, together with other important aspects thereof upon reading the detailed description that follows in conjunction with the drawings.
For more complete understanding of the features and advantages of the present invention, reference is now made to the detailed description of the invention along with the accompanying FIGURES, wherein:
Although making and using various embodiments of the present invention are discussed in detail below, it should be appreciated that the present invention provides many inventive concepts that may be embodied in a wide variety of contexts. The specific aspects and embodiments discussed herein are merely illustrative of ways to make and use the invention, and do not limit the scope of the invention.
A control test panel 10 is provided which has a test connection to the circuit breaker 4. This allows the control test panel 10 to generate the disconnect signal and to superimpose it onto the appropriate ones of the conductors under test in order that the signal can be supplied to the disconnect device 8.
Multiple disconnect devices having associated lamps may be run in parallel off the main supply. When this is done, it may be desirable to add a daisy chained test line running from device to device such that a signal can be generated confirming that each and every device has operated to disconnect its associated lamp.
In use, the control test panel sends a signal to the disconnect device 8 in order to cause it to disconnect the lamp and ballast 2 and 6 respectively, from the mains supply. Optionally the control test panel may also send a signal to the circuit breaker in order to cause it to disconnect its circuit from the mains supply. The conductors, generally indicated 14, can then be subjected to the high voltage insulation test in order to confirm their reliability.
It is thus possible to provide a lighting test system.
In a modification of the invention, wireless communication may be provided between the control unit or each disconnect device. Thus each disconnect device would require at least a local receiver and optionally a local transmitter in order that it can signal to the control device that it has disconnected its load. Constructional details of transmitters and receivers are within the scope the person skilled in the art and need not be described here in detail. It is expected that such transmitters could be bluetooth (RTM) devices.
Each disconnect device 8 may remain permanently disconnected until such time as it receives a reconnect signal, or alternatively it may be arranged to reconnect after a predetermined time as lapsed. The mode of operation may be freely selected by the user.
Additional objects, advantages and novel features of the invention as set forth in the description that follows, will be apparent to one skilled in the art after reading the foregoing detailed description or may be learned by practice of the invention. The objects and advantages of the invention may be realized and attained by means of the instruments and combinations particularly pointed out herein.
Patent | Priority | Assignee | Title |
10782357, | Mar 15 2013 | MEG-ALERT, INC. | Automatic insulation resistance testers with heater |
8912800, | Sep 02 2004 | Ziota Technology Inc. | Wireless portable automated harness scanner system and method therefor |
9664716, | Mar 15 2013 | MEG-ALERT, INC | Automatic insulation resistance testers |
Patent | Priority | Assignee | Title |
4155036, | Nov 04 1977 | General Connector Corp. | Apparatus for testing cooking range electrical circuitry |
4363105, | Sep 04 1979 | Durkoppwerke GmbH | Microcomputer-controlled circuit tester |
4689551, | Sep 05 1985 | KMS ADVANCED PRODUCTS, INC | Testing wiring harnesses |
4721899, | Feb 20 1987 | KeyTek Instrument Corp. | Combined air-direct testing simulator |
4786876, | May 30 1986 | Essex Group, Inc. | Continuity test method and test card circuit |
4807277, | May 15 1987 | AFL Telecommunications LLC | Remotely activated switching apparatus |
5280251, | Nov 07 1991 | CAMI Research, Inc. | Continuity analysis system with graphic wiring display |
5285163, | May 07 1992 | Electrical cable continuity and voltage tester | |
5552699, | Oct 08 1991 | Technoserv GmbH | Method and apparatus for testing wires extending between a switch cabinet and remotely positioned field units |
5966280, | Aug 24 1993 | Xerox Corporation | Modular, distributed equipment leakage circuit interrupter |
6028420, | Jun 17 1998 | Agilent Technologies Inc | Constant voltage power supply with continuity checking |
6054865, | Mar 03 1998 | Associated Research, Inc. | Multiple function electrical safety compliance analyzer |
6072317, | Mar 27 1998 | Eaton Corporation | Plug-in multifunction tester for AC electrical distribution system |
6087834, | Apr 16 1996 | The Shane Group | Diagnostic tester for lighting systems and method of using same |
6538577, | Sep 05 1997 | SILVER SPRING NETWORKS, INC | Electronic electric meter for networked meter reading |
DE19509831, | |||
SU141410, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Dec 11 2001 | Interface Technical Components Limited | (assignment on the face of the patent) | / | |||
Oct 07 2003 | WILSON, JOHN NMI | INTERFACE TECHICAL COMPONENTS LIMITED | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 014136 | /0932 |
Date | Maintenance Fee Events |
Feb 16 2010 | M2551: Payment of Maintenance Fee, 4th Yr, Small Entity. |
Mar 05 2010 | RMPN: Payer Number De-assigned. |
Mar 08 2010 | ASPN: Payor Number Assigned. |
Apr 04 2014 | REM: Maintenance Fee Reminder Mailed. |
Aug 22 2014 | EXP: Patent Expired for Failure to Pay Maintenance Fees. |
Date | Maintenance Schedule |
Aug 22 2009 | 4 years fee payment window open |
Feb 22 2010 | 6 months grace period start (w surcharge) |
Aug 22 2010 | patent expiry (for year 4) |
Aug 22 2012 | 2 years to revive unintentionally abandoned end. (for year 4) |
Aug 22 2013 | 8 years fee payment window open |
Feb 22 2014 | 6 months grace period start (w surcharge) |
Aug 22 2014 | patent expiry (for year 8) |
Aug 22 2016 | 2 years to revive unintentionally abandoned end. (for year 8) |
Aug 22 2017 | 12 years fee payment window open |
Feb 22 2018 | 6 months grace period start (w surcharge) |
Aug 22 2018 | patent expiry (for year 12) |
Aug 22 2020 | 2 years to revive unintentionally abandoned end. (for year 12) |