A data alignment algorithm that automatically aligns data from multiple monitoring devices to the same zero-crossings at the same point in time. cycle-by-cycle frequency data is received from each monitoring device and a cross-correlation algorithm is performed to determine a correlation coefficient between a reference monitoring device and another monitoring device. The data of the other monitoring device is shifted by one cycle and another correlation coefficient is calculated by the cross-correlation algorithm. The data of the two monitoring devices is aligned at the point at which the maximum correlation coefficient is calculated or the point at which the correlation coefficient exceeds a threshold value. The clocks of the monitoring devices can also be synchronized at the same point of alignment.
|
13. A method of automatically aligning data in a power monitoring system, comprising:
receiving, at a controller, from a first of at least two monitoring devices first signal data corresponding to signal data stored by said first monitoring device, said first signal data representing frequency or amplitude variations in current or voltage from an electric grid measured by said first monitoring device, said first monitoring device storing a first count associated with each of a plurality of cycles of said current or voltage, said controller being remote from said at least two monitoring devices;
receiving, at said controller, from a second of said at least two monitoring devices second signal data corresponding to signal data stored by said second monitoring device, said second signal data representing frequency or amplitude variations in current or voltage from said electric grid measured by said second monitoring device, said second monitoring device storing a second count associated with each of a plurality of cycles of said current or voltage measured by said second monitoring device; and
aligning said first signal data with said second signal data to a common reference point in said respective current or voltage sensed by said first and second monitoring devices by shifting in increments said second signal data relative to said first signal data until a maximum cross-correlation coefficient is computed by a cross-correlation function that calculates a cross-correlation coefficient at each of said increments and associating said first count associated with said maximum cross-correlation coefficient with said second count associated with said maximum cross-correlation coefficient.
1. A method of aligning data measured by monitoring devices coupled to a power monitoring system, comprising:
receiving, at a controller remote from said monitoring devices, reference signal data from a reference monitoring device, said reference signal data representing at least frequency variations in current or voltage from an electric grid measured by said reference monitoring device for a predetermined number of cycles of said current or voltage sensed by said reference monitoring device, said reference monitoring device storing a reference count associated with each of said cycles of current or voltage sensed by said reference monitoring device;
receiving, at said controller, second signal data from at least a second monitoring device, said second signal data representing at least said frequency variations in current or voltage from said electric grid measured by said second monitoring device for a predetermined number of cycles of said current or voltage sensed by said second monitoring device, said second monitoring device storing a second count associated with each of said number of cycles of current or voltage sensed by said second monitoring device; and
automatically aligning said reference signal data with said second signal data to a common reference point in said respective current or voltage sensed by said reference monitoring device and said second monitoring device by:
computing a plurality of correlation coefficients each produced by a cross-correlation algorithm based on at least part of said reference signal data and at least part of said second signal data until one of said correlation coefficients produced by said cross-correlation algorithm satisfies a criterion; and
responsive to said one of said correlation coefficients satisfying said criterion, associating said reference count associated with said common reference point with said second count associated with said common reference point.
24. A power monitoring system for aligning data, comprising:
a system controller;
a first monitoring device having a communications interface coupled to said system controller, a memory, and a controller; and
a second monitoring device having a communications interface coupled to said system controller, a memory, and a controller, wherein said system controller is remote from said first and second monitoring devices,
wherein said system controller is programmed to
communicate an instruction to said first monitoring device and said second monitoring device via their respective communications interfaces to store in their respective memories data representing one or both of frequency variations and amplitude variations in respective current or voltage sensed by said first and second monitoring devices from an electric grid on a cycle-by-cycle basis for a predetermined number of cycles of said respective current or voltage sensed by said first and second monitoring devices, wherein a first count associated with each of said cycles is stored in said memory of said first monitoring device and a second count associated with each of said cycles is stored in said memory of said second monitoring device,
receive from said first monitoring device first data corresponding to said data stored by said first monitoring device in its memory,
receive from said second monitoring device second data corresponding to said data stored by said second monitoring device in its memory, and
align said first data with said second data to a common reference point in said respective current or voltage sensed by said first and second monitoring devices by shifting in cycle increments said second data relative to said first data until a maximum cross-correlation coefficient is computed by a cross-correlation function that computes a cross-correlation coefficient at each of said cycle increments and associating said first count associated with said maximum cross-correlation coefficient with said second count associated with said maximum cross-correlation coefficient, and
wherein said controller of said first monitoring device is programmed to
receive said instruction via said communication interface of said first monitoring device,
store said first data in said memory of said first monitoring device for said predetermined number of cycles, and
communicate said first data to said system controller via said communication interface.
2. The method of
3. The method of
4. The method of
5. The method of
providing reference time data;
receiving first time data from said reference monitoring device; and
responsive to said automatically aligning, synchronizing said first time data with said reference time data such that said common reference point occurs at the same time in said first time data and in said reference time data.
6. The method of
receiving first time data from said reference monitoring device;
receiving second time data from said second monitoring device;
responsive to said automatically aligning, synchronizing said first time data with said second time data such that said common reference point occurs at the same time in said first time data and said second time data.
7. The method of
responsive to said automatically aligning, sampling data at the zero-crossing of a reference channel associated with said reference monitoring device;
determining via said computer whether the values of said sampled data are zero, negative, or positive;
automatically assigning, via said computer, phase notations based on said determining; and
displaying information via said computer representing said phase notations to the user.
8. The method of
9. The method of
10. The method of
11. The method of
12. A computer readable medium encoded with instructions for directing a controller to perform the method of
14. The method of
15. The method
16. The method of
19. The method of
responsive to said aligning, synchronizing a first clock in said first monitoring device with a second clock in said second monitoring device such that at said common reference point said first clock and said second clock are temporally aligned.
20. The method of
providing a reference clock; and
responsive to said aligning, resetting a clock in said first monitoring device or said second monitoring device to said reference clock.
21. The method of
22. The method of
23. The method of
|
The present invention relates generally to utility monitoring systems, and, in particular, to automated precision alignment of data, automated determination of power monitoring system hierarchy, and automated integration of data in a utility monitoring system.
Since the introduction of electrical power distribution systems in the late 19th century, there has been a need to monitor their operational and electrical characteristics. The ability to collect, analyze, and respond to information about the electrical power system can improve safety, minimize equipment loss, decrease scrap, and ultimately save time and money. To that end, monitoring devices were developed to measure and report such information. With the dawn of the electronics age, the quality and quantity of data from monitoring devices was vastly improved, and communications networks and software were developed to collect, display and store information. Unfortunately, those responsible for evaluating data from monitoring devices are now overwhelmed by information from their monitoring systems. In the endeavor to maximize the usefulness of a monitoring system, monitoring equipment manufacturers are seeking methods of presenting information in the most useful format.
Effectively monitoring today's electrical power distribution systems is cumbersome, expensive, and inefficient. Electric power monitoring systems are typically arranged in a hierarchy with monitoring devices such as electrical meters installed at various levels of the hierarchy (refer to
Sophisticated processing capabilities in digital monitoring devices allow large amounts of complex electrical data to be derived and accumulated from a seemingly simple electrical signal. Because of the data's complexity, quantity, and relative disjointed relationship from one monitoring device to the next, manual analysis of all the data is an enormous effort that often requires experts to be hired to complete the task. This process is tedious, complex, prone to error and oversight, and time-consuming. A partial solution has been to use global positioning satellite (GPS) systems to timestamp an event, but this approach requires that the user purchase and install additional hardware and data lines to link the monitoring devices together. And this solution still requires the evaluation of large amounts of data because the system is only temporally in context; not spatially in context. Synchronizing data using GPS systems is also disadvantageous because of time delays associated with other hardware in the system. Furthermore, any alignment of data by a GPS-based system can only be as accurate as the propagation delay of the GPS signal, which means that the data still may not be optimally aligned when a GPS system is used.
The addition of supplemental monitoring devices in the electrical system does nothing more than generate more information about the electrical system at the point where the meter is added in the electrical system, increasing complexity without any benefit. Any usefulness of the data is generally limited to the locality of the monitoring device that was added, while even more data is amassed.
The complexity of many electrical systems usually necessitates an involved configuration process of monitoring systems because each metered point in the electrical system has different characteristics, which is why multiple monitoring devices are installed in the first place. As a result of the enormous volume of complex data accumulated from electrical monitoring systems heretofore, a thorough analysis of the data is typically not feasible due to limited resources, time, and/or experience.
Temporal alignment of the data is one important aspect to understand and characterize the power system. Another important aspect is having a thorough knowledge of the power monitoring system's layout (or hierarchy). Power monitoring devices measure the electrical system's operating parameters, but do not provide information about how the parameters at different points on the power monitoring system relate to each other. Knowing the hierarchy of the power monitoring system puts the operating parameters of multiple monitoring devices into context with each other.
To determine the layout of a power monitoring system, a user must review electrical one-line drawings or physically perform an inventory of the electrical system if one-line drawings are unavailable. The user manually enters the spatial information into the monitoring system software for analysis. When a new device or monitored load is added or moved within the power monitoring system, the user must manually update the monitoring system software to reflect the new addition or change.
Data alignment and layout information are essential to understanding and characterizing the power system. With these two pieces of information, the data from each meter can be integrated and put into context with every other meter in the power system. Heretofore, the only techniques for passably integrating data were complex, expensive, manually intensive, and time-consuming for the user. These techniques also permit only limited integration of data and require additional hardware (such as GPS hardware), data lines, and supplemental monitoring device accessories.
What is needed, therefore, is an automated data integration technique, including automatic precision alignment of data and automatic hierarchical classification of system layout. The present invention is directed to satisfying this and other needs.
Briefly, according to an embodiment of the present invention, a method of aligning data measured by monitoring devices coupled to a power monitoring system includes receiving reference signal data from a reference monitoring device. The reference signal data represents frequency variations measured by the reference monitoring device for a predetermined number of cycles. The method further includes receiving second signal data from a second monitoring device that measures frequency variations for a predetermined number of cycles. The method further includes automatically aligning the reference signal data with the second signal data.
According to another embodiment of the present invention, the automatically aligning includes computing a correlation coefficient produced by a cross-correlation algorithm using the reference signal data and the second signal data. The automatically aligning further includes determining whether a maximum correlation coefficient is produced by shifting the second signal data relative to the reference signal data and computing a correlation coefficient produced by the cross-correlation algorithm using the shifted second signal data and the reference signal data. The automatically aligning further includes repeating the determining until a maximum correlation coefficient is produced by the cross-correlation algorithm. The cross-correlation algorithm can be a circular or linear cross-correlation algorithm in embodiments of the present invention.
According to various embodiments of the present invention, the method may further include communicating an instruction to the reference monitoring device to buffer the reference signal data for the predetermined number of cycles. The method may further include providing reference time data, receiving first time data from the reference monitoring device, and synchronizing the first time data with the reference time data. The method may further include sampling data at the zero-crossing of a reference channel associated with the reference monitoring device, determining whether the values of the sampled data are zero, negative, or positive, assigning phase notations based on the determining, and displaying information representing the phase notations to the user. Optionally, the user can be alerted when the phase notations are misidentified on a phase conductor.
According to still another embodiment of the present invention, monitoring system software sends an instruction or message to monitoring devices in a power monitoring system to begin buffering data (preferably data indicative of fundamental frequency variations). The monitoring system software reads the data from each monitoring device and selects a reference monitoring device and another monitoring device to analyze. The data between the two monitoring devices are cross-correlated using a circular or linear cross-correlation algorithm, for example. The cycle count and time relationships between the two devices are stored in a matrix. When all devices have been analyzed and their respective data aligned relative to one another, the monitoring system software analyzes the voltage (or current) data for mis-wirings. If a mis-wiring is detected, the user is notified.
The foregoing and additional aspects of the present invention will be apparent to those of ordinary skill in the art in view of the detailed description of various embodiments, which is made with reference to the drawings, a brief description of which is provided next.
The foregoing and other advantages of the invention will become apparent upon reading the following detailed description and upon reference to the drawings.
While the invention is susceptible to various modifications and alternative forms, specific embodiments have been shown by way of example in the drawings and will be described in detail herein. It should be understood, however, that the invention is not intended to be limited to the particular forms disclosed. Rather, the invention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.
Turning now to
Once the data from each monitoring device M is aligned and each monitoring device's location is known, the data is said to be in context 108. The contextual data 108 can be used by software applications 110 to provide and diagnose useful information about the utility system 102 beyond what is generally available if the data is not in context. The utility being monitored in the utility system 102 can be any of the five utilities designated by the acronym, WAGES, or water, air, gas, electricity, or steam. Each monitoring device measures characteristics of the utility, and quantifies these characteristics into data that can be analyzed by a computer.
A user interacts with the software applications 110 via a conventional user interface 112. The software applications 110 can be linked to other systems 114, such as a billing system, and use the contextual data 108 to communicate messages between the other systems 114 and the user interface 112.
The data alignment system 104 aligns data, such as voltage, current, time, events, and the like, from multiple monitoring devices M in a utility system, and is a valuable tool for users. When data from all the monitoring devices M is aligned to the same point in time that the data occurred, the data can be put into a temporal context from which additional decisions regarding hardware and software configuration can be automatically made or recommended. As used herein, a monitoring device refers to any system element or apparatus with the ability to sample, collect, or measure one or more operational characteristics or parameters of a utility system 102. When the utility system 102 is a power monitoring system, the monitoring device M can be a meter that measures electrical characteristics or parameters of the power monitoring system.
The data alignment techniques (which are detailed below) according to various aspects of the present invention accomplish at least the following:
1) Automated alignment of data in monitoring devices;
2) Automated synchronization of time in monitoring devices;
3) Alignment of data and time in monitoring devices located at different points on the power utility grid (where the monitoring system software may obtain time data from the Internet or another server); and
4) Diagnosing misidentification or mislabeling of phases throughout the electrical power system.
All real-world electrical signals in power systems experience subtle variations in their frequency and amplitude over time. This variation of the signal's frequency and amplitude are both indeterminate and unique with respect to time. Each monitoring device located on the same utility grid will simultaneously experience the same frequency variations. Analysis of data from monitoring devices that are directly linked to each other in the hierarchy will reveal a correlation in their amplitude variations. Analysis of both the frequency and amplitude variations of the signal are then used to precisely align the data of one monitoring device with respect to another device (or all the monitoring devices to each other) in the data alignment system 104. The details of the data alignment system 104 are discussed below.
The data alignment techniques of the present invention allow all monitoring devices M in a power utility system hierarchy to be aligned to the zero-crossing of all three phase voltages without the use of additional hardware. The present invention also anticipates potential phase shifts between various monitoring devices, for example, those caused by certain transformer configurations. Once the data of the monitoring devices are aligned with each other, the system data is essentially aligned with respect to the time it occurred, making more complex data analyses feasible.
A simplified configuration of a power monitoring system 120 is shown in
The first monitoring device 128 can be a power meter (or electric meter), such as shown in
Instructions from the computer 132 are received by the monitoring device 128 via the communications interface 140. Those instructions include, according to an embodiment of the present invention, instructions that direct the controller 134 to mark the cycle count, to begin storing electrical parameter data, or to transmit to the monitoring system software 132 electrical parameter data stored in the memory 138. The electrical parameter data can include any data acquired by monitoring devices, including any combination of frequency variations, amplitude variations, and phase variations.
The present invention provides an algorithm that precisely, automatically, and temporally aligns the data from multiple monitoring devices to the same voltage zero-crossing. Other data alignment aspects discussed below are based on this capability. The data alignment aspect of the present invention is facilitated by functionality in both the monitoring device 128 and the monitoring system software running on the computer 132, and the requirements of each will be discussed individually. Collection and partial analysis of data is performed in the monitoring device 128.
From the time the monitoring device 128 is energized, a cycle count is performed of the measured voltage signals. The cycle count is sequentially iterated with each positive voltage zero-crossing (or, alternately, with each negative voltage zero-crossing). As the monitoring device 128 measures both the frequency and amplitude variations of the voltage and current from cycle to cycle, a comparison is performed to their respective nominal values. The frequency and amplitude variations and associated cycle count are tracked by the device firmware 136. The associated monitoring device time at any specified cycle count can be stored in the memory 138.
The monitoring system software executed by the computer 132 initiates alignment of the data associated with multiple monitoring devices by sending a global command to all monitoring devices 128, 130 on the power monitoring system 120 to mark their cycle count, time and buffer a predetermined amount of cycle-by-cycle data.
This predetermined amount of data is established based on the number of monitoring devices in the power monitoring system, the communications time delays in the power monitoring system and the magnitude of frequency and amplitude variations. When the buffering is complete, the monitoring devices 128, 130 transmit their buffered data to the computer 132.
Once the data is collected by the monitoring devices 128,130, the monitoring system software uploads the buffered data for analysis. There will likely be a time offset in each monitoring device's buffered data because the monitoring devices on the system will likely not begin buffering the data simultaneously due to communications time delays in the power monitoring system and internal time delays within the monitoring devices. The buffered data is analyzed by the monitoring system software on the computer 132 to locate the highest correlation in frequency between all the monitoring devices 128, 130. Generally, the highest correlation is located by sliding the buffered frequency data in one monitoring device with respect to another until the frequency variations line up with each other as shown in
The frequency data 360 for the monitoring device 128 is “slid” relative to the frequency data 362 for the monitoring device 130 until the frequency data for each device line up. Thus, the zero-crossing associated with Δt1 of monitoring device 128 is aligned with the zero-crossing associated with Δt1 of monitoring device 130, the zero-crossing associated with Δt2 of monitoring device 128 is aligned with the zero-crossing associated with Δt2 of monitoring device 130, and so on. Cross-correlation algorithms for “sliding” two data sets relative to one another until they are aligned are discussed in further detail below in connection with
Once the buffered data is aligned, the cycle count of the first monitoring device 128 is associated with the cycle count of the second monitoring device 130 in the software on the computer 132. The on-board monitoring device time may optionally also be aligned or associated relative to one another. This process is repeated for each monitoring device in the power monitoring system 120 until all devices' cycle counts are associated with each other. During the data alignment process, the monitoring system software on the computer 132 builds a matrix of each device's cycle count and time with respect to each other and the time on the computer 132.
Although
Once the data of the two monitoring devices 128, 130 is aligned relative to one another, there is typically no need to realign the data again unless a monitoring device loses its voltage signal or resets itself. In those cases, only the monitoring devices that lose their voltage signal or reset need to be realigned in accordance with the present invention. The data alignment technique of the present invention can be initiated by an event, such as an undervoltage or overvoltage condition, connecting or disconnecting a load to the power monitoring system, a change in the characteristics of the voltage, current, or a load, a monitoring device reset, or a power loss. The data alignment technique of the present invention can also be initiated automatically by the monitoring software or manually by the user.
Turning now to
The computer 132 selects a reference monitoring device (206) such as monitoring device 128 and then selects a monitoring device to analyze (208) such as monitoring device 130. Data from the monitoring devices 128, 130 is then cross-correlated according to the present invention (210), and each device's cycle count and time relationships are entered into a matrix (212). The cross-correlation is carried out by a conventional cross-correlation algorithm, preferably such as the one provided below in Equation 1.
The correlation coefficient is represented by r(d), the delay (offset or shift) being represented by d, where −1<=r(d)<=1 for two series x(i) and y(i) representing the respective data from the monitoring devices 128, 130; and mx and my are the means of the corresponding series x(i) and y(i). According to an embodiment, the correlation algorithm is a circular correlation algorithm in which out-of-range indexes are “wrapped” back within range. In another embodiment, the correlation algorithm is a linear correlation algorithm in which each series is repeated. In still other embodiments, the correlation algorithm is a pattern-matching algorithm or a text-search algorithm.
After cross-correlation, the computer 132 checks whether all monitoring devices have been analyzed (214), and if so, proceeds to check the wiring of the phase conductors. In many instances, phase conductors may be misidentified throughout an electrical system by the contractor who installed them. For example, the phase that is identified as “A-phase” at the main switchgear may be identified as “B-phase” at the load. This nomenclature misidentification of the phase conductors can result in confusion, and even pose a safety hazard.
To mitigate this hazard, the computer 132 analyzes the voltage (or current) data by sampling data at the voltage (or current) zero-crossing of a reference channel on each monitoring device (216). The computer 132 determines whether the wiring is correct (218) by determining whether the values of the sampled data are zero, negative, or positive, and, based on those values, assigning phase notations (such as A, B, or C) for each reference channel. If all monitoring devices are identified accurately, the data values for Phase-A should be approximately zero. If the data values are negative, then the phase in question is the “B-Phase” for an ABC phase rotation. If the data values are positive, then the phase in question is the “C-phase” for an ABC phase rotation. The user is notified (220) whether the wiring is correct. Once the proper phase notation is determined for each monitoring device (222), the computer 132 may then allow the user to correct the misidentified phase notation in any or all monitoring devices. The phase diagnosis embodiments according to the present invention are applicable to voltage inputs as well as current inputs.
The computer 132 instructs each monitoring device in the power monitoring system 120 to store data on a cycle-by-cycle basis (250) for a predetermined number of cycles, preferably between about 1,000 and about 10,000 cycles. When a sufficient amount of data has been stored by the monitoring devices, the computer 132 receives the data from the monitoring devices (252) and selects a reference monitoring device (254). Using a convention cross-correlation algorithm such as Equation 1 above, the computer 132 calculates a correlation coefficient r(d) between at least a portion of the data (such as about 400 cycles) of the reference monitoring device and the data of a second monitoring device (256). The calculated correlation coefficient is stored, and the data of the second monitoring device is shifted relative to the reference device by one cycle (258).
As mentioned above, the out-of-range indexes can be wrapped back within range according to a circular correlation algorithm or the indexes can be repeated according to a linear correlation algorithm. A correlation coefficient is calculated using the shifted data (260) and if no further shifts are required (262), the data of the second monitoring device is aligned with the data of the reference device at the point at which the maximum correlation coefficient is calculated or at which the correlation coefficient exceeds a threshold value, such as 0.5 (264). It should be noted that when the correlation coefficient r(d) is close to 1.0, the algorithm can exit without conducting any further shifts.
The computer 132 synchronizes the clocks of the second monitoring device and the reference device at the point of alignment (266). The computer 132 reads the cycle count in each monitoring device and the associated monitoring device's on-board clock time. A monitoring device's on-board clock time and cycle count may drift with respect to each other due to the limitations of the on-board clock. Once the data is aligned, the cycle count is considered the absolute reference for a monitoring device. Due to the clock drift, it may be necessary to re-read the time associated with a device's cycle count periodically to reestablish the device's time. The software on the computer 132 will then update the matrix containing the monitoring device time information.
Another capability of this feature is to allow all on-board monitoring device clocks to be periodically reset to the same value to provide a standard time for the entire power monitoring system. Preferably, the time within the monitoring system software (running on the computer 132) is set according to some absolute time reference. Once the computer time is set, the monitoring system software resets the time on all the monitoring devices accordingly. In this embodiment, the data and time of each monitoring device and the software would be more accurately aligned with the absolute time reference.
When there are no further monitoring devices to align (268), the procedure ends. In an alternate embodiment, all of the monitoring device's data is aligned before the clocks are synchronized (266).
Another advantage of the data alignment techniques of the present invention is the ability to align data and time on different points of the utility grid. If monitoring devices are located on two different points of the same utility grid, it is possible to align the monitoring devices together. In this embodiment, the monitoring devices at each geographic location are first aligned to each other in accordance with the present invention. The software managing all the systems is then used as the absolute time reference for all systems, giving them all a common point of reference.
Referring back to
The hierarchy classification system 106 of the present invention allows the monitoring system software to collect data from the monitoring device on the utility system 102, and automatically determine the hierarchy of the utility system 102 with little or no user input. The level of detail given by the hierarchy classification system 106 directly correlates with the number and extent of monitoring devices in the utility system 102. As supplemental monitoring devices are added, the auto-learned hierarchical algorithm according to the present invention enables them to be automatically incorporated into the determined hierarchical structure.
A hierarchy of nodes is based on a relationship that determines that one node is always greater than another node, when the nodes are related. A hierarchy's relationship can link or interrelate elements in one of three ways: directly, indirectly, or not at all. An illustration of a direct link or interrelationship is shown in
In the case of a power system hierarchy, an objective is to order elements in the power system so as to represent the true connection layout of the power system. Determining the hierarchy of a power system provides important information that can be used to solve problems, increase equipment and system performance, improve safety, and save money. The level of detail contained in a power system hierarchy will depend on both the number of elements or nodes that are being monitored and the node's ability to provide feedback to the auto-learned hierarchy algorithm in the monitoring system software running on the computer 132.
Generally, the hierarchy classification system 106 according to the present invention utilizes an auto-learned hierarchy algorithm in the monitoring system software that is based on rules and statistical methods. Periodically, the monitoring system software polls each monitoring device in the utility system 102 to determine certain characteristics or parameters of the utility system 102 at that node (represented by monitoring device M). Multiple samples of specified parameters are taken from each meter in the system at the same given point in time. Once the parameter data is collected from each node M in the utility system 102, the auto-learned hierarchy algorithm analyzes the data and traces the relationships or links among the monitoring devices with respect to the time the data sample was taken and the associated value of the data sample. This analysis may be performed periodically to increase the probability that the hierarchy is accurate, or to ascertain any changes in the hierarchy. Once this iterative process reaches some predetermined level of statistical confidence that the determined layout of the utility system 102 is correct, the auto-learned hierarchy algorithm ends. The final layout of the utility system 102 is then presented to the user for concurrence. As each monitoring device's data is evaluated over time (the learning period) with respect to all other monitoring devices using the auto-learned hierarchy algorithm, a basic layout of the hierarchical structure of the utility system 102 is determined based on the monitoring points available. In this respect, the algorithm according to the present invention uses historical trends of the data from each monitoring device, and those trends are compared to determine whether any interrelationship (link) exists between the monitoring devices. A more detailed hierarchical structure can be determined with more monitoring points available for analysis.
A benefit of the auto-learned hierarchy algorithm of the present invention is to provide automatically a basic hierarchical structure of a utility system being monitored with minimal or no input by the user. The hierarchy can then be used as a tool for evaluation by other systems 114. Another benefit is that the present invention improves the accuracy of the time synchronization between the monitoring devices and the monitoring system software.
In an embodiment in which the utility system 102 is a power monitoring system, samples of specific electrical parameters (such as power, voltage, current, or the like) are simultaneously taken from each monitoring device in the power monitoring system. This parameter data is stored and analyzed with respect to the time the sample is taken, the associated value of the data point, and the monitoring device providing the data.
Data taken from each monitoring device in the power monitoring system is compared with each other to determine whether any correlation exists between the monitoring devices. The data is analyzed for statistical trends and correlations as well as similarities and differences over a predetermined period of time in accordance with the present invention.
According to an embodiment, one or more rules or assumptions are used to determine the hierarchical order of the power system. Certain assumptions may have to be made about the utility system in order to auto-learn the utility system's hierarchy. The assumptions are based on Ohm's Law, conservation of energy, and working experience with typical power distribution and power monitoring systems.
General rules that may be made by the auto-learned hierarchy algorithm in connection with power systems and power monitoring systems include:
1. The power system being analyzed is in a single 320 (
2. The meter measuring the highest energy usage is assumed to be at the top of the hierarchical structure (e.g., Main 322 shown in
3. The rate of sampling data by the meters is at least greater than the shortest duty cycle of any load.
4. Energy is consumed (not generated) on the power system during the parameter data collection process.
5. The error due to the offset of time in all meters on the power monitoring system is minimal where data is pushed from the monitoring device to the monitoring system software running on the computer 132.
The following additional parameters may be present for the auto-learned hierarchy algorithm:
1. Data is not collected for hierarchical purposes from two monitoring devices installed at the same point of a power system.
2. Meters with no load are ignored or only use voltage information to determine their position in the hierarchy.
3. Multiple mains (Main1, Main2, Main3, etc.) may exist in the power system.
4. Data is provided to the monitoring system software by each monitoring device in the system.
5. Loads that start or stop affect the load profiles for any corresponding upstream metered data with a direct or indirect link to that load.
6. Voltage characteristics (fundamental, harmonic, symmetrical components) are relatively consistent for all monitoring devices on the same bus.
7. Transformer losses on the electrical system are minimal with respect to the loads downstream from the transformer.
8. General correlation (over time) of loads between monitoring devices indicates either a direct or indirect link.
9. Multiple unmetered loads at a point in the power system are aggregated into a single unknown load.
Any of the foregoing assumptions and parameters can be combined for a radial-fed electrical power system. For example, in a specific embodiment, the following rule-based assumptions and parameters can be utilized:
1. Voltages and currents are higher the further upstream (closer to the top of the hierarchy) a monitoring device is.
2. Harmonic values are generally lower the further upstream a monitoring device is.
3. Transformers can vary the voltages and currents.
4. Total power flow is higher upstream than downstream.
5. The power system is a radial-fed system.
6. Two monitoring devices will not be installed at the same point.
7. Monitoring devices with the same voltage distortion are adjacently connected.
8. The total load measured at a specific hierarchical level is equal (excluding losses) to the sum of all measured and unmeasured loads directly linked to that hierarchical level.
Monitoring devices are considered to be on the same hierarchical level if they are all directly linked to the same reference device. For example, referring to
A specific aspect of the auto-learned hierarchy algorithm 400 in accordance with an embodiment of the present invention is flow-charted in
TABLE 1
Data Table Example
Time
Meter 1
Meter 2
Meter 3
Meter 4
. . .
Meter k
T1
D11
D21
D31
D41
. . .
Dk1
T2
D12
D22
D32
D42
. . .
Dk2
T3
D13
D23
D33
D43
. . .
Dk3
T4
D14
D24
D34
D44
. . .
Dk4
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Tn
D1n
D2n
D3n
D4n
. . .
Dkn
Once the data for the Data Table is accumulated, a Check Matrix is developed. The Check Matrix is a matrix of logical connections based on the Data Table. A zero (0) indicates that no direct link exists between any two monitoring devices, and a one (1) indicates that there is a possible relationship between two monitoring devices. An exemplary Check Matrix is illustrated in Table 2 below. In Table 2, it is assumed that no link exists between Meter 1 and Meter 2. This is because the power measured by Meter 1 exceeds Meter 2 in one entry of the Data Table and the power measured by Meter 2 exceeds Meter 1 in another entry of the Data Table. Meter 1 always correlates with itself so an NA is placed in that cell of the Check Matrix. Only half of the Check Matrix is required due to the redundancy of information.
TABLE 2
Check Matrix Example
Meter 1
Meter 2
Meter 3
Meter 4
. . .
Meter k
Meter 1
NA
0
1
1
. . .
0
Meter 2
0
NA
1
0
. . .
1
Meter 3
1
1
NA
0
. . .
1
Meter 4
1
0
0
NA
. . .
0
.
.
.
.
.
. . .
.
.
.
.
.
.
. . .
.
.
.
.
.
.
. . .
.
Meter k
0
1
0
. . .
NA
Once the Check Matrix is determined, the data from each monitoring device in the Data Table is used to develop a Correlation Coefficient Matrix (CCM) shown in Table 3 below. In the CCM, a statistical evaluation is carried out to determine the linear relationship of each monitoring device in the electrical system with respect to the other monitoring devices in the matrix. The correlation coefficient between any two monitoring devices is determined and placed in the appropriate cell in the CCM. In the exemplary Table 3 below, C12 is the correlation coefficient of Meter 1 with respect to Meter 2. The higher the correlation coefficient value is, the higher the probability that these two monitoring devices are either directly or indirectly linked. Conversely, the lower this number is, the lower the probability that these two monitoring devices are directly or indirectly linked. Equation 2 below is used to determine the correlation coefficient between any two given monitoring devices:
where: ρx,y is the correlation coefficient and lies in the range of −1≦ρx,y≦1; Cov(x,y) is the covariance of x and y; and σx and σy are the standard deviations of x and y, respectively.
where: n is the number of data elements in x and y, and μx and μy are the mean values of x and y respectively.
The diagonal cells of the Correlation Matrix are all always 1 because each meter has 100% correlation with itself. Again, only half of the Correlation Matrix is required due to the redundancy of data (e.g., C12=C21).
TABLE 3
Correlation Coefficient Matrix (CCM) Example
Meter 1
Meter 2
Meter 3
Meter 4
. . .
Meter k
Meter 1
1
C12
C13
C14
. . .
C1k
Meter 2
C21
1
C23
C24
. . .
C2k
Meter 3
C31
C32
1
C34
. . .
C3k
Meter 4
C41
C42
C43
1
. . .
C4k
:
:
:
:
:
1
:
Meter k
Ck1
Ck2
Ck3
Ck4
. . .
1
Returning to
The Correlation Coefficient Matrix (CCM) is calculated based on the power data (416). In the first iteration, the only known element in the hierarchy is the main, and the hierarchy is auto-learned from the top-most feeder level down, in accordance with some or all of the assumptions or parameters listed above.
TABLE 4
Correlation Reference Array (CRA) Example
Iteration
Iteration 1
Iteration 2
Iteration 3
Iteration 4
Iteration 5
. . .
n
C51
C51
C51
C51
C51
. . .
C51
C52
C52
C52
C52
C52
. . .
C52
C53
C53
C53
C53
C53
. . .
C53
C54
C54
C54
C54
C54
. . .
C54
. . .
. . .
. . .
. . .
. . .
. . .
. . .
C5m
C5m
C5m
C5m
C5m
. . .
C5m
Continuing with
In Iteration 2, meter 11's power is subtracted from meter 5's power in the data table, and the meter 5-11 correlation coefficient drops to −0.048 in Iteration 2, which provides a high degree of confidence that meter 11 is interrelated with meter 5. Also noteworthy is that some meter's correlation coefficients trend higher as the iterations progress. For example, the correlation coefficients for meter 18 relative to meter 5 gradually increase from 0.296 in Iteration 1 to 0.417 in Iteration 2 to 0.436 in Iteration 3 to 0.525 in Iteration 4 and finally to 0.671 in Iteration 5, which is the highest correlation coefficient among all the meters (meter 5 correlated with itself is always 1.0, so its correlation coefficient is ignored). This increasing trend also provides a high degree of confidence that meter 18 is also directly linked with meter 5, and this link is finally confirmed in Iteration 5. The same increasing trends can be observed for meters 12 and 15, for example. In Iteration 7, none of the correlation coefficients exceed a threshold, and the algorithm 400 proceeds to analyze the next feeder level. By Iteration 7, the algorithm 400 has determined that meters 11, 12, 14, 15, 18, and 20 are directly linked with meter 5.
TABLE 5
CRA Example With Exemplary Correlation Coefficients
Iteration 1
Iteration 2
Iteration 3
Iteration 4
Iteration 5
Iteration 6
Iteration 7
5-1
0.020
−0.029
0.010
0.016
−0.037
−0.004
0.007
5-2
0.043
−0.020
−0.037
−0.009
−0.095
−0.091
−0.099
5-3
0.067
0.079
0.017
0.024
−0.052
−0.046
−0.009
5-4
0.018
−0.024
−0.038
−0.018
0.037
0.015
0.037
5-5
1.000
1.000
1.000
1.000
1.000
1.000
1.000
5-6
0.058
0.022
−0.016
−0.015
−0.035
−0.010
0.029
5-7
−0.042
−0.005
0.001
0.054
0.033
0.026
0.031
5-8
−0.034
−0.016
−0.057
−0.058
0.005
−0.034
−0.049
5-9
0.418
0.386
0.308
0.292
0.189
0.099
0.136
5-10
0.022
0.077
0.016
0.014
−0.016
−0.018
0.022
5-11
0.649
−0.048
−0.090
−0.095
−0.076
−0.077
−0.014
5-12
0.344
0.506
0.628
0.725
0.047
−0.007
0.016
5-13
−0.038
−0.036
0.038
0.017
−0.046
−0.023
−0.010
5-14
0.483
0.591
0.072
0.044
0.066
−0.006
0.004
5-15
0.043
0.161
0.210
0.263
0.417
0.587
0.031
5-16
0.024
0.045
0.055
0.044
−0.017
−0.010
0.022
5-17
−0.057
−0.063
−0.101
−0.090
−0.061
−0.048
−0.049
5-18
0.296
0.417
0.436
0.525
0.671
0.113
0.165
5-19
−0.046
−0.053
−0.057
−0.047
−0.046
−0.050
−0.034
5-20
0.398
0.549
0.633
0.128
0.069
0.054
0.061
5-21
−0.060
−0.017
0.028
0.080
−0.013
0.010
0.005
Still referring to
Otherwise, the algorithm 400 determines whether the current iteration is the first iteration for the reference monitoring device (426), and if not, determines whether the feeder correlation is trending higher (428). If the feeder correlation is not trending higher, the algorithm 400 continues to
If the current iteration is the first iteration for the reference monitoring device, the feeder is added to the list of monitoring devices on the current level of the hierarchy (430), and the algorithm 400 continues to
Turning now to the OP3 function, the algorithm 400 determines whether all monitoring devices on the previous level have been analyzed (432), and if not, the next monitoring device (feeder) is obtained on the previous level, and the algorithm 400 returns to the FEEDER LOOP of
An auto-learned hierarchy algorithm 500 according to another embodiment of the present invention is illustrated in
The algorithm 500 calculates a correlation coefficient between a reference monitoring device and every other monitoring device to be interrelated in the hierarchy (504). The algorithm 500 determines the highest correlation coefficient (506) and interrelates the monitoring device associated with the highest correlation coefficient and the reference monitoring device (508). The algorithm 500 checks whether more monitoring devices are to be interrelated (510), and if not, the algorithm 500 ends. If so, the algorithm 500 checks whether to use the same reference monitoring device (512), and if so, recalculates the correlation coefficients (504). Otherwise, the algorithm 500 selects a new reference monitoring device (514), and recalculates the correlation coefficients (504).
An auto-learned hierarchy algorithm 550 according to still another embodiment of the present invention is illustrated in
The auto-learned hierarchy algorithm according to the various embodiments of the present invention is operable in both radial-fed and multiple radial-fed systems. In multiple radial-fed systems, the algorithm first determines the main meter having the highest power, then determines the hierarchy for that system first before proceeding to the next system(s) having lower power ratings.
The auto-learned hierarchy algorithm has been discussed in various embodiments in which the hierarchy is developed from the top-most level towards the bottom-most level. In an alternate embodiment, an auto-learned hierarchy algorithm develops a hierarchy from the bottom-most level based on events local to each level. For example, monitoring devices proximate to an event will ‘see’ an event, such as a load turning on or off, before monitoring devices remote from the event will see it. The algorithm recognizes interrelationships among monitoring devices based on the occurrences of events and the timestamps associated with each monitoring device as to when it became aware of an event. By mapping out a chronology of when each monitoring device in the system perceives an event, conclusions can be automatically drawn based upon the time order in which monitoring device perceived that event as to which meters are interrelated (directly linked).
Referring back to
The temporal position of each monitoring device's data in the utility system 102 relative to every other monitoring device's data in the utility system 102; and
The spatial position of each monitoring device M in the utility system 102 with respect to every other monitoring device M in the utility system 102.
Evaluating all the monitoring data accumulated from the utility system 102 in context will provide a degree of knowledge about the utility system 102 that heretofore was unavailable. Because the information from the entire system (software and monitoring devices) is integrated together through a uniform context, this approach to monitoring a utility system is referred to as Integrated Monitoring (IM).
A useful analogy of the IM approach according to the present invention is the central nervous system of the human body. The brain (software) knows what is going on with the entire body (the monitoring devices) relative to time and position. If a toe is stubbed, the brain sends a signal for the body to react in some manner. Similarly if an electrical event occurs, the IM algorithms executed by the monitoring system software provides useful information to the user on the symptoms throughout the monitored system, potential sources of the problem, and possible solutions or recommendations.
The present invention involves integrating data based on analysis of the data from each monitoring point using special algorithms (for example, a data alignment algorithm and an auto-learned hierarchy algorithm) in the monitoring system software. In the data alignment system 104, subtle but measurable changes in the data's frequency and amplitude are analyzed from all data sources. These changes are used to establish both the common point of data alignment for all data sources and a data source's position in the electrical system with respect to other data sources. Because the process of integrating the system data is performed automatically on algorithms in the monitoring system software, much of the effort and expense required by the user is eliminated. More arbitrary and substantial variations of the parameters being analyzed offers quicker integration of the system data.
There are several benefits associated with IM that are beyond what is presently available including:
The automated IM approach greatly reduces the existing requirements for the user to manually provide detailed information about the power system layout in order to put the system data into context. The IM algorithms analyze data from each monitoring point in the electrical system to automatically determine the system layout with little or no user involvement, saving the user time and resources.
The automated IM approach eliminates the need for special hardware, additional data lines, and, in some cases, monitor accessories. The IM algorithms analyze data from each monitoring point in the electrical system to automatically determine the temporal alignment of the system data, saving the user equipment and labor costs.
The automated IM approach allows an easier configuration of monitoring hardware and software. This is because the IM algorithms automatically put the monitoring information into context throughout the system. Once the monitoring devices are in context, additional decisions regarding hardware and software configuration can automatically be made by the IM algorithms. One example would be setting a monitoring device's under-voltage threshold depending on the monitoring device's location within the electrical system. Again, the automated IM approach saves the user time and resources.
An automated IM algorithm 600 according to an embodiment of the present invention is illustrated in
If the power system layout is not complete, the algorithm 600 sends a command to the monitoring devices to collect power data (612). The host computer running the algorithm 600 uploads the power data from monitoring devices (614) and determines the power system layout (616) in accordance with the present invention. This procedure is repeated until the power system layout is complete (618) at which point the algorithm ends.
While particular embodiments and applications of the present invention have been illustrated and described, it is to be understood that the invention is not limited to the precise construction and compositions disclosed herein and that various modifications, changes, and variations can be apparent from the foregoing descriptions without departing from the spirit and scope of the invention as defined in the appended claims.
Curtis, Larry E., Carter, Ronald W., Bickel, Jon A.
Patent | Priority | Assignee | Title |
10145903, | Aug 09 2013 | ABB Schweiz AG | Methods and systems for monitoring devices in a power distribution system |
10401402, | Jul 26 2016 | ACLARA TECHNOLOGIES LLC | Synchronized phasor measurement in power distribution networks |
10489019, | Jun 16 2017 | FLORIDA POWER & LIGHT COMPANY | Identifying and presenting related electrical power distribution system events |
10495672, | Apr 03 2015 | ACLARA TECHNOLOGIES LLC | Framework for fault detection and localization in power distribution networks |
10809885, | Jun 16 2017 | FLORIDA POWER & LIGHT COMPANY | Identifying and presenting related electrical power distribution system events |
10837995, | Jun 16 2017 | FLORIDA POWER & LIGHT COMPANY | Composite fault mapping |
10852341, | Jun 16 2017 | FLORIDA POWER & LIGHT COMPANY | Composite fault mapping |
11543440, | Apr 03 2015 | ACLARA TECHNOLOGIES LLC | Framework for fault detection and localization in power distribution networks |
9142968, | May 07 2010 | SMA SOLAR TECHNOLOGY AG | Systems and methods for islanding detection |
9176171, | Nov 19 2010 | SCHNEIDER ELECTRIC USA, INC.; SCHNEIDER ELECTRIC USA, INC | Data alignment in large scale electrical system applications |
9817045, | Dec 13 2010 | Fraunhofer USA, Inc | Methods and system for nonintrusive load monitoring |
Patent | Priority | Assignee | Title |
3654479, | |||
4855671, | Apr 13 1983 | UNDERSGROUND SYSTEMS, INC | Electrical power line and substation monitoring apparatus |
5272439, | Feb 21 1992 | University of Connecticut | Method and apparatus for the detection and location of faults and partial discharges in shielded cables |
5473244, | Sep 17 1992 | Apparatus for measuring voltages and currents using non-contacting sensors | |
6088659, | Sep 11 1997 | Elster Electricity, LLC | Automated meter reading system |
6094650, | Dec 15 1997 | Manning And Napier Information Services LLC | Database analysis using a probabilistic ontology |
6266452, | Mar 18 1999 | NEC Corporation | Image registration method |
6292683, | May 18 1999 | SUNNYBROOK & WOMEN S COLLEGE HEALTH SCIENCES CENTRE | Method and apparatus for tracking motion in MR images |
7265334, | Nov 19 2004 | Macom Technology Solutions Holdings, Inc | Laser power control with automatic compensation |
20030014678, | |||
20030033094, | |||
20030222509, | |||
20040225649, | |||
20050050095, | |||
GB2220753, | |||
WO65480, | |||
WO2005059572, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Jul 01 2005 | BICKEL, JON A | Square D Company | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 017531 | /0278 | |
Jul 01 2005 | CARTER, RONALD W | Square D Company | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 017531 | /0278 | |
Jul 01 2005 | CURTIS, LARRY E | Square D Company | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 017531 | /0278 |
Date | Maintenance Fee Events |
Sep 23 2013 | M1551: Payment of Maintenance Fee, 4th Year, Large Entity. |
Sep 25 2017 | M1552: Payment of Maintenance Fee, 8th Year, Large Entity. |
Sep 14 2021 | M1553: Payment of Maintenance Fee, 12th Year, Large Entity. |
Date | Maintenance Schedule |
Mar 23 2013 | 4 years fee payment window open |
Sep 23 2013 | 6 months grace period start (w surcharge) |
Mar 23 2014 | patent expiry (for year 4) |
Mar 23 2016 | 2 years to revive unintentionally abandoned end. (for year 4) |
Mar 23 2017 | 8 years fee payment window open |
Sep 23 2017 | 6 months grace period start (w surcharge) |
Mar 23 2018 | patent expiry (for year 8) |
Mar 23 2020 | 2 years to revive unintentionally abandoned end. (for year 8) |
Mar 23 2021 | 12 years fee payment window open |
Sep 23 2021 | 6 months grace period start (w surcharge) |
Mar 23 2022 | patent expiry (for year 12) |
Mar 23 2024 | 2 years to revive unintentionally abandoned end. (for year 12) |