Discussed is a method and device for increasing the operational flexibility of a current-generating system with a turboset, comprising a turbine coupled to an electrical generator, a power set point value being predefined, and a future target time at which the turboset is supposed to be at the power set point value, so that a power curve is determined via the power set point value and the target time, the turboset being operated starting from a actual power value at an actual time along the power curve such that the predefined power set point value is reached at the predefined target time. Also discussed is a gas turbine and to a steam turbine in accordance with the above description.
|
1. A method for increasing the operational flexibility of a current generating system with a turboset having a turbine coupled to an electrical generator, comprising:
predetermining a power set-point value;
predetermining a future target time at which the turboset is to exhibit the power set-point value;
automatically determining a power curve via a computer utilizing the power set-point value and the target time, wherein the power curve prolongs the service life of the generator and the turbine wherein the power curve traverses through an area between a minimum power curve and a maximum power curve characterized by a respective minimum permissible power gradient and a maximum permissible power gradient; and
executing the power curve on the turboset starting from an actual power at an actual time so that the predetermined power setpoint value is reached at the predetermined target time.
8. A turboset having a turbine and an electric generator, comprising:
a power set-point value input unit that inputs a power set-point value;
a target time input unit that inputs a target time value;
an actual power readout unit that reads out an actual power of the turboset;
an actual time readout unit that reads out an actual time;
a computation unit connected to the power set-point value input unit, the target time input unit, the actual power readout unit, and the actual time readout unit, wherein the computation unit automatically computes a power curve by:
predetermining the power set-point value,
predetermining a future target time at which the turboset is to exhibit the power set-point value,
automatically computing the power curve by taking account of the operating data,
wherein the power curve traverses through an area between a minimum power curve and a maximum power curve characterized by a respective minimum permissible power gradient and a maximum permissible power gradient, where the power curve prolongs the service life of the generator and the turbine.
5. A device for increasing the operational flexibility of a current generating system with turboset having a turbine coupled to an electrical generator, comprising:
a power set-point value input unit that inputs a power set-point value;
a target time input unit that inputs a target time value;
an actual power readout unit that reads out an actual power of the turboset;
an actual time readout unit that reads out an actual time;
a computation unit connected to the power set-point value input unit, the target time input unit, the actual power readout unit, and the actual time readout unit, wherein the computation unit automatically computes a power curve by:
predetermining the power set-point value,
predetermining a future target time at which the turboset is to exhibit the power set-point value,
automatically computing the power curve by taking account of operating data,
wherein the power curve traverses through an area between a minimum power curve and a maximum power curve characterized by a respective minimum permissible power gradient and a maximum permissible power gradient, where the power curve prolongs the service life of the generator and the turbine.
4. The method as claimed in
6. The device as claimed in
7. The device as claimed in
|
This application is the US National Stage of International Application No. PCT/EP2006/064918, filed Aug. 1, 2006 and claims the benefit thereof. The International Application claims the benefits of European application No. 05018865.5 filed Aug. 31, 2005, both of the applications are incorporated by reference herein in their entirety
The invention relates to a method for increasing the operational flexibility of a current-generating system with a turboset comprising a turbine and an electrical generator which is coupled to the turbine. The invention further relates to a device which in particular allows the execution of the method. The invention further relates to a gas turbine and a steam turbine.
The power market is affected both by regular energy demands and by peak energy loads caused by consumers. In some cases the latter are often unpredictable. Seasonal predictable variations, such as specific public holidays and large users for example are frequently an exception here, since it is often known when current-consuming machines will be started up or shut down. In order to ensure that power consumption demands are always fully catered for, current-generating systems, such as gas turbine and steam turbine power stations are informed by the large users about the amount of power required at a particular target time. So that the gas turbine or steam turbine power stations produce the desired power at the contractually-agreed time, the turboset of the power stations must be started early by the operating personnel. The desired output is thus mostly reached far too early. This means that unnecessary costs arise for the power station operators as a result of the system being started up too early, with said costs having to be borne by the large users such as industry and small users such as domestic consumers. This is precisely the disadvantage of a liberalized power market.
The object of the invention is thus to specify a method for increasing the operational flexibility of a current-generating system with a turboset. A further object is to specify a device which in particular allows execution of the method. The method and also the device are to be able to be used in both steam and gas turbines.
This object related to the method is inventively achieved by specifying a method for increasing the operational flexibility of a current-generating system with a turboset comprising a turbine and an electrical generator coupled to the turbine, with a power setpoint value being predetermined and a future target time being predetermined at which the turboset is to have the power setpoint value, so that a power curve is determined by means of the power setpoint value and the target time, with the turboset, starting from an actual power at an actual time, being moved along a power curve such that the predetermined power setpoint value is reached at the predetermined target time.
The invention starts from the knowledge that the power setpoint value reached too early and the associated operating costs are the result of the manual handling of the system. The turboset will be started up too early as a result of this manual handling and also with the incorrect acceleration. The invention starts from the approach that both the power setpoint value and also the future target time will be predetermined at which the turboset is to exhibit the power setpoint value. This can be entered at any time via an operating console by the operating personnel for example. Furthermore both the actual power output and the actual time are known from the operating data. A power curve is now determined by means of these values. This power curve contains a start point at which the turboset begins to be started up, or for reduction of the power at a particular target time, also the time at which it begins to be powered down. Furthermore this power curve also includes the acceleration with which the turboset is powered up or down, starting from the actual time through to the target time. The turboset is thus moved, starting from the actual power at the actual time, along the power curve such that the predetermined power setpoint value is reached at the predetermined target time. The effect of this is a saving in useful energy since the power is essentially provided at precisely the right point. Reaching the power setpoint value too early by manually starting up and shutting down is avoided. This saves money. Furthermore a more accurate load profile can be created. A more accurate load profile allows power consumption to be better measured and to be calculated for large and small customers, which in turn relieves the load on the small customers. A further advantage is the user friendliness in that the load on the operating personnel is relieved.
In a preferred embodiment the power curve will be selected so that this curve acts on the generator and the turbines to extend their life. This also allows repair costs and maintenance costs to be reduced.
The power curve is preferably computed automatically. A fully-automatic system additionally reduces the load on the operating personnel. In addition operator errors are avoided.
In a further preferred embodiment the power curve will be computed taking into account the minimum and maximum power curve. This avoids damage to the turboset on power-up and power-down.
Preferably with a turboset which is provided in a gas turbine, the power curve is selected so that the NOx emissions are kept as low as possible. This depends on the efficiency of the of the turboset. Unnecessary emissions from incorrect powering up or powering down are avoided.
This object related to the device is inventively achieved by specifying a device for increasing the operational flexibility of a current-generating system with turboset comprising a turbine and an electrical generator coupled to the turbine, with an input unit for a power setpoint value, an input unit for a target time, as well as a readout unit for an actual power and a readout unit for an actual time, with the readout unit and the input units being connected to a computation unit for computing the power curve. The device is especially suitable for executing the method described above. The advantages of the method are thus also produced for the device.
Further features, characteristics and advantages of the invention emerge from the description of an exemplary embodiment and from the further dependent claims.
The invention will be explained below in greater detail using examples which refer to a drawing.
This is a simplified representation and is not drawn to scale:
The same parts are shown by the same reference symbols in all the figures.
Ebner, Günther, Herzog, Tobias
Patent | Priority | Assignee | Title |
Patent | Priority | Assignee | Title |
4283634, | Jun 23 1971 | Siemens Westinghouse Power Corporation | System and method for monitoring and controlling operation of industrial gas turbine apparatus and gas turbine electric power plants preferably with a digital computer control system |
4582669, | Jan 08 1982 | Westinghouse Electric Corp. | Xenon suppression in a nuclear fueled electric power generation system |
4583360, | Mar 31 1983 | DRESSER-RAND COMPANY, CORNING, NEW YORK A GENERAL PARTNERSHIP OF NEW YORK | Electronic fuel control system for gas turbine |
6175217, | Dec 20 1996 | Manuel Dos Santos, Da Ponte | Hybrid generator apparatus |
20040021445, | |||
20040103068, | |||
20040112037, | |||
20050257514, | |||
20070217105, | |||
20090216385, | |||
EP1920142, | |||
JP60079106, | |||
SU1040186, | |||
SU1227823, | |||
SU1295012, |
Executed on | Assignor | Assignee | Conveyance | Frame | Reel | Doc |
Aug 01 2006 | Siemens Aktiengesellschaft | (assignment on the face of the patent) | / | |||
Mar 07 2008 | EBNER, GUNTHER | Siemens Aktiengesellschaft | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 022490 | /0938 | |
Mar 11 2008 | HERZOG, TOBIAS | Siemens Aktiengesellschaft | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 022490 | /0938 | |
Aug 18 2020 | Siemens Aktiengesellschaft | SIEMENS GAS AND POWER GMBH & CO KG | ASSIGNMENT OF ASSIGNORS INTEREST SEE DOCUMENT FOR DETAILS | 053624 | /0628 | |
Oct 15 2020 | SIEMENS GAS AND POWER GMBH & CO KG | SIEMENS ENERGY GLOBAL GMBH & CO KG | CHANGE OF NAME SEE DOCUMENT FOR DETAILS | 056408 | /0395 |
Date | Maintenance Fee Events |
Nov 17 2015 | M1551: Payment of Maintenance Fee, 4th Year, Large Entity. |
Nov 08 2019 | M1552: Payment of Maintenance Fee, 8th Year, Large Entity. |
Nov 28 2023 | M1553: Payment of Maintenance Fee, 12th Year, Large Entity. |
Date | Maintenance Schedule |
Jun 19 2015 | 4 years fee payment window open |
Dec 19 2015 | 6 months grace period start (w surcharge) |
Jun 19 2016 | patent expiry (for year 4) |
Jun 19 2018 | 2 years to revive unintentionally abandoned end. (for year 4) |
Jun 19 2019 | 8 years fee payment window open |
Dec 19 2019 | 6 months grace period start (w surcharge) |
Jun 19 2020 | patent expiry (for year 8) |
Jun 19 2022 | 2 years to revive unintentionally abandoned end. (for year 8) |
Jun 19 2023 | 12 years fee payment window open |
Dec 19 2023 | 6 months grace period start (w surcharge) |
Jun 19 2024 | patent expiry (for year 12) |
Jun 19 2026 | 2 years to revive unintentionally abandoned end. (for year 12) |